Power Equipment Operator prevailing wages: Michigan, county by county
1675 current power equipment operator rates across 157 active Michigan wage determinations. Rates differ by county and construction type; click a determination for revision history, diffs, and change alerts.
| County / area | Classification | Rate | Fringe | Total | Determination |
|---|---|---|---|---|---|
| Alcona | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $12.98 | $6.12 | $19.10 | MI20260029 Heavy |
| Alcona | OPERATOR: GRADER/BLADE | $15.50 | $3.62 | $19.12 | MI20260029 Heavy |
| Alcona | OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 | MI20260102 Building |
| Alcona | OPERATOR: LOADER | $16.07 | $8.37 | $24.44 | MI20260029 Heavy |
| Alcona | OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER | $48.98 | $25.25 | $74.23 | MI20260029 Heavy |
| Alcona | OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK | $45.68 | $25.25 | $70.93 | MI20260029 Heavy |
| Alcona | OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 4 BOOM TRUCK (NON-SWINGING) | $41.32 | $25.25 | $66.57 | MI20260029 Heavy |
| Alcona | OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 5 OILER | $32.98 | $25.25 | $58.23 | MI20260029 Heavy |
| Alcona | OPERATOR: POWER EQUIPMENT:EXCLUDES UNDERGROUND CONSTRUCTION GROUP 3 BACKHOE/EXCAVATOR; BULLDOZER; COMPACTOR; CRANE; SCRAPER | $44.00 | $25.25 | $69.25 | MI20260029 Heavy |
| Alcona | OPERATOR: ROLLER | $13.74 | $7.93 | $21.67 | MI20260029 Heavy |
| Alcona | OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 | MI20260102 Building |
| Alcona | POWER EQUIPMENT OPERATOR: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $44.13 | $25.25 | $69.38 | MI20260102 Building |
| Alcona | POWER EQUIPMENT OPERATOR: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER; TOWER CRANE, GANTRY CRANE AND WHIRLEY DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $43.93 | $25.25 | $69.18 | MI20260102 Building |
| Alcona | POWER EQUIPMENT OPERATOR: GROUP 3 BACKHOE/EXCAVATOR; BULLDOZER; CRANE; LOADER; PAVER; ROLLER; SCRAPER; STIFF LEG DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 | $66.53 | MI20260102 Building |
| Alcona | POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID LOADER; FORK TRUCK (OVER 20' LIFT) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 | MI20260102 Building |
| Alcona | POWER EQUIPMENT OPERATOR: GROUP 5 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 | MI20260102 Building |
| Alcona | POWER EQUIPMENT OPERATOR: GROUP 6 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $31.23 | $25.25 | $56.48 | MI20260102 Building |
| Alcona | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 | $66.50 | MI20260029 Heavy |
| Alcona | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 | $65.77 | MI20260029 Heavy |
| Alcona | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR | $39.95 | $25.25 | $65.20 | MI20260029 Heavy |
| Alcona | POWER EQUIPMENT OPERATOR:UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 | $71.23 | MI20260029 Heavy |
| Alcona + 9 more | OPERATOR: POWER EQUIPMENT: BACKHOE/EXCAVATOR; LOADER; ROLLER PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $44.00 | $25.25 | $69.25 | MI20260006 Residential |
| Alger | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $12.98 | $6.12 | $19.10 | MI20260030 Heavy |
| Alger | OPERATOR: GRADER/BLADE | $16.63 | $5.85 | $22.48 | MI20260030 Heavy |
| Alger | OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 | MI20260103 Building |
| Alger | OPERATOR: POWER EQUIPMENT: CRANE, MAIN BOOM & JIB 120' OR LONGER (EXCLUDES UNDERGROUND CONSTRUCTION) | $43.81 | $25.00 | $68.81 | MI20260030 Heavy |
| Alger | OPERATOR: POWER EQUIPMENT: CRANE, MAIN BOOM & JIB 140' OR LONGER (EXCLUDES UNDERGROUND CONSTRUCTION) | $44.63 | $25.00 | $69.63 | MI20260030 Heavy |
| Alger | OPERATOR: POWER EQUIPMENT: CRANE, MAIN BOOM & JIB 220' OR LONGER (EXCLUDES UNDERGROUND CONSTRUCTION) | $44.92 | $25.00 | $69.92 | MI20260030 Heavy |
| Alger | OPERATOR: ROLLER | $13.74 | $7.93 | $21.67 | MI20260030 Heavy |
| Alger | OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 | MI20260103 Building |
| Alger | POWER EQUIPMENT OPERATOR: CRANE OPERATOR, MAIN BOOM & JIB 120' OR LONGER PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $43.81 | $25.00 | $68.81 | MI20260103 Building |
| Alger | POWER EQUIPMENT OPERATOR: CRANE OPERATOR, MAIN BOOM & JIB 140' OR LONGER PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $44.63 | $25.00 | $69.63 | MI20260103 Building |
| Alger | POWER EQUIPMENT OPERATOR: CRANE OPERATOR, MAIN BOOM & JIB 220' OR LONGER PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $44.92 | $25.00 | $69.92 | MI20260103 Building |
| Alger | POWER EQUIPMENT OPERATOR: GROUP 1 BACKHOE, BULLDOZER; CRANE, FRONT END LOADER, EXCAVATOR, PAVER, ROLLER, AND SCRAPER (SELF-PROPELLED AND TRACTOR DRAWN) PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $40.51 | $25.00 | $65.51 | MI20260103 Building |
| Alger | POWER EQUIPMENT OPERATOR: GROUP 2 FORK TRUCK PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $37.26 | $25.00 | $62.26 | MI20260103 Building |
| Alger | POWER EQUIPMENT OPERATOR: GROUP 3 OILER PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $35.86 | $12.50 | $48.36 | MI20260103 Building |
| Alger | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, SCRAPER, LOADER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 | $71.23 | MI20260030 Heavy |
| Alger | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 | $66.50 | MI20260030 Heavy |
| Alger | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 | $65.77 | MI20260030 Heavy |
| Alger | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR | $39.95 | $25.25 | $65.20 | MI20260030 Heavy |
| Alger + 12 more | OPERATOR: POWER EQUIPMENT: BACKHOE/EXCAVATOR; LOADER; ROLLER | $40.51 | $25.00 | $65.51 | MI20260007 Residential |
| Allegan | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $12.98 | $6.12 | $19.10 | MI20260031 Heavy |
| Allegan | OPERATOR: BULLDOZER | $13.50 | $1.55 | $15.05 | MI20260031 Heavy |
| Allegan | OPERATOR: BULLDOZER | $22.34 | $1.22 | $23.56 | MI20260104 Building |
| Allegan | OPERATOR: FORKLIFT | $15.31 | $4.47 | $19.78 | MI20260104 Building |
| Allegan | OPERATOR: GRADER/BLADE | $15.50 | $3.62 | $19.12 | MI20260031 Heavy |
| Allegan | OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 | MI20260104 Building |
| Allegan | OPERATOR: LOADER | $13.50 | $1.55 | $15.05 | MI20260031 Heavy |
| Allegan | OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER | $48.98 | $25.25 | $74.23 | MI20260031 Heavy |
| Allegan | OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK | $45.68 | $25.25 | $70.93 | MI20260031 Heavy |
| Allegan | OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 3 BACKHOE/EXCAVATOR; COMPACTOR; CRANE; SCRAPER | $44.00 | $25.25 | $69.25 | MI20260031 Heavy |
| Allegan | OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 4 BOOM TRUCK (NON-SWINGING) | $41.32 | $25.25 | $66.57 | MI20260031 Heavy |
| Allegan | OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 5 OILER | $32.98 | $25.25 | $58.23 | MI20260031 Heavy |
| Allegan | OPERATOR: ROLLER | $13.74 | $7.93 | $21.67 | MI20260031 Heavy |
| Allegan | OPERATOR: ROLLER | $28.02 | $7.07 | $35.09 | MI20260104 Building |
| Allegan | OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 | MI20260104 Building |
| Allegan | POWER EQUIPMENT OPERATOR: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $47.28 | $25.25 | $72.53 | MI20260104 Building |
| Allegan | POWER EQUIPMENT OPERATOR: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER; TOWER CRANE; GANTRY CRANE AND WHIRLEY DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $43.93 | $25.25 | $69.18 | MI20260104 Building |
| Allegan | POWER EQUIPMENT OPERATOR: GROUP 3 BACKHOE/EXCAVATOR; CRANE; LOADER; PAVER; SCRAPER; STIFF LEG DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 | $66.53 | MI20260104 Building |
| Allegan | POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID LOADER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 | MI20260104 Building |
| Allegan | POWER EQUIPMENT OPERATOR: GROUP 5 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $31.23 | $25.25 | $56.48 | MI20260104 Building |
| Allegan | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, CRANE, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 | $71.23 | MI20260031 Heavy |
| Allegan | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 | $66.50 | MI20260031 Heavy |
| Allegan | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 | $65.77 | MI20260031 Heavy |
| Allegan | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR | $39.95 | $25.25 | $65.20 | MI20260031 Heavy |
| Alpena | OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 | MI20260105 Building |
| Alpena | OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 | MI20260105 Building |
| Alpena | POWER EQUIPMENT OPERATOR: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $44.13 | $25.25 | $69.38 | MI20260105 Building |
| Alpena | POWER EQUIPMENT OPERATOR: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER; TOWER CRANE, GANTRY CRANE AND WHIRLEY DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $43.93 | $25.25 | $69.18 | MI20260105 Building |
| Alpena | POWER EQUIPMENT OPERATOR: GROUP 3 BACKHOE/EXCAVATOR; BULLDOZER; CRANE; LOADER; PAVER; ROLLER; SCRAPER; STIFF LEG DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 | $66.53 | MI20260105 Building |
| Alpena | POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID LOADER; FORK TRUCK (OVER 20' LIFT) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 | MI20260105 Building |
| Alpena | POWER EQUIPMENT OPERATOR: GROUP 5 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 | MI20260105 Building |
| Alpena | POWER EQUIPMENT OPERATOR: GROUP 6 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $31.23 | $25.25 | $56.48 | MI20260105 Building |
| Alpena + 8 more | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $12.98 | $6.12 | $19.10 | MI20260042 Heavy |
| Alpena + 8 more | OPERATOR: GRADER/BLADE | $15.50 | $3.62 | $19.12 | MI20260042 Heavy |
| Alpena + 8 more | OPERATOR: LOADER | $16.07 | $8.37 | $24.44 | MI20260042 Heavy |
| Alpena + 8 more | OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER | $48.98 | $25.25 | $74.23 | MI20260042 Heavy |
| Alpena + 8 more | OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK | $45.68 | $25.25 | $70.93 | MI20260042 Heavy |
| Alpena + 8 more | OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 4 BOOM TRUCK (NON-SWINGING) | $41.32 | $25.25 | $66.57 | MI20260042 Heavy |
| Alpena + 8 more | OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 5 OILER | $32.98 | $25.25 | $58.23 | MI20260042 Heavy |
| Alpena + 8 more | OPERATOR: POWER EQUIPMENT:EXCLUDES UNDERGROUND CONSTRUCTION GROUP 3 BACKHOE/EXCAVATOR; BULLDOZER; COMPACTOR; CRANE; SCRAPER | $44.00 | $25.25 | $69.25 | MI20260042 Heavy |
| Alpena + 8 more | OPERATOR: ROLLER | $13.74 | $7.93 | $21.67 | MI20260042 Heavy |
| Alpena + 8 more | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, SCRAPER, LOADER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 | $71.23 | MI20260042 Heavy |
| Alpena + 8 more | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 | $66.50 | MI20260042 Heavy |
| Alpena + 8 more | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 | $65.77 | MI20260042 Heavy |
| Alpena + 8 more | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR | $39.95 | $25.25 | $65.20 | MI20260042 Heavy |
| Antrim | OPERATOR: BACKHOE/EXCAVATOR | $24.04 | $6.03 | $30.07 | MI20260106 Building |
| Antrim | OPERATOR: BULLDOZER | $22.46 | $7.29 | $29.75 | MI20260106 Building |
| Antrim | OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 | MI20260106 Building |
| Antrim | OPERATOR: LOADER | $24.04 | $6.03 | $30.07 | MI20260106 Building |
| Antrim | OPERATOR: ROLLER | $27.47 | $8.86 | $36.33 | MI20260106 Building |
| Antrim | OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 | MI20260106 Building |
| Antrim | POWER EQUIPMENT OPERATOR: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $47.28 | $25.25 | $72.53 | MI20260106 Building |
| Antrim | POWER EQUIPMENT OPERATOR: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER; TOWER CRANE, GANTRY CRANE AND WHIRLEY DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $43.93 | $25.25 | $69.18 | MI20260106 Building |
| Antrim | POWER EQUIPMENT OPERATOR: GROUP 3 CRANE; PAVER; AND SCRAPER; STIFF LEG DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 | $66.53 | MI20260106 Building |
| Antrim | POWER EQUIPMENT OPERATOR: GROUP 4 FORK TRUCK (OVER 20' LIFT) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 | MI20260106 Building |
| Antrim | POWER EQUIPMENT OPERATOR: GROUP 5 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $33.71 | $25.25 | $58.96 | MI20260106 Building |
| Antrim | POWER EQUIPMENT OPERATOR: GROUP 6 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $31.23 | $25.25 | $56.48 | MI20260106 Building |
| Antrim + 5 more | OPERATOR: BACKHOE/EXCAVATOR | $16.05 | $9.55 | $25.60 | MI20260043 Heavy |
| Antrim + 5 more | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $12.98 | $6.12 | $19.10 | MI20260043 Heavy |
| Antrim + 5 more | OPERATOR: BULLDOZER | $16.17 | $9.51 | $25.68 | MI20260043 Heavy |
| Antrim + 5 more | OPERATOR: GRADER/BLADE | $15.50 | $3.62 | $19.12 | MI20260043 Heavy |
| Antrim + 5 more | OPERATOR: LOADER | $13.68 | $8.41 | $22.09 | MI20260043 Heavy |
| Antrim + 5 more | OPERATOR: ROLLER | $13.74 | $7.93 | $21.67 | MI20260043 Heavy |
| Antrim + 5 more | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BORING MACHINE, CRANE, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 | $71.23 | MI20260043 Heavy |
| Antrim + 5 more | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 | $66.50 | MI20260043 Heavy |
| Antrim + 5 more | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 | $65.77 | MI20260043 Heavy |
| Antrim + 5 more | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR | $39.95 | $25.25 | $65.20 | MI20260043 Heavy |
| Antrim + 8 more | OPERATOR: POWER EQUIPMENT: BACKHOE/EXCAVATOR; LOADER; ROLLER (MANISTEE COUNTY) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $44.00 | $25.25 | $69.25 | MI20260009 Residential |
| Antrim + 8 more | OPERATOR: POWER EQUIPMENT: BACKHOE/EXCAVATOR; LOADER; ROLLER (REMAINING COUNTIES) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $44.00 | $25.25 | $69.25 | MI20260009 Residential |
| Arenac | OPERATOR: BULLDOZER | $22.34 | $1.22 | $23.56 | MI20260107 Building |
| Arenac | OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 | MI20260107 Building |
| Arenac | OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $47.28 | $25.25 | $72.53 | MI20260107 Building |
| Arenac | OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $43.93 | $25.25 | $69.18 | MI20260107 Building |
| Arenac | OPERATOR: POWER EQUIPMENT: GROUP 3 BACKHOE/EXCAVATOR; CRANE; LOADER; PAVER; SCRAPER; STIFF LEG DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 | $66.53 | MI20260107 Building |
| Arenac | OPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; FORK TRUCK (OVER 20' LIFT) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 | MI20260107 Building |
| Arenac | OPERATOR: POWER EQUIPMENT: GROUP 5 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $33.71 | $25.25 | $58.96 | MI20260107 Building |
| Arenac | OPERATOR: POWER EQUIPMENT: GROUP 6 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $31.23 | $25.25 | $56.48 | MI20260107 Building |
| Arenac | OPERATOR: ROLLER | $28.02 | $7.07 | $35.09 | MI20260107 Building |
| Arenac | OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 | MI20260107 Building |
| Baraga | OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 | MI20260108 Building |
| Baraga | OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 | MI20260108 Building |
| Baraga | POWER EQUIPMENT OPERATOR: CRANE OPERATOR, MAIN BOOM & JIB 120' OR LONGER PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $43.81 | $25.00 | $68.81 | MI20260108 Building |
| Baraga | POWER EQUIPMENT OPERATOR: CRANE OPERATOR, MAIN BOOM & JIB 140' OR LONGER PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $44.63 | $25.00 | $69.63 | MI20260108 Building |
| Baraga | POWER EQUIPMENT OPERATOR: CRANE OPERATOR, MAIN BOOM & JIB 220' OR LONGER PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $44.92 | $25.00 | $69.92 | MI20260108 Building |
| Baraga | POWER EQUIPMENT OPERATOR: GROUP 1 BACKHOE, BULLDOZER; CRANE, FRONT END LOADER, EXCAVATOR, PAVER, ROLLER, AND SCRAPER (SELF-PROPELLED AND TRACTOR DRAWN) PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $40.51 | $25.00 | $65.51 | MI20260108 Building |
| Baraga | POWER EQUIPMENT OPERATOR: GROUP 2 FORK TRUCK PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $37.26 | $25.00 | $62.26 | MI20260108 Building |
| Baraga | POWER EQUIPMENT OPERATOR: GROUP 3 OILER PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $35.86 | $12.50 | $48.36 | MI20260108 Building |
| Baraga + 7 more | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $12.98 | $6.12 | $19.10 | MI20260045 Heavy |
| Baraga + 7 more | OPERATOR: GRADER/BLADE | $16.63 | $5.85 | $22.48 | MI20260045 Heavy |
| Baraga + 7 more | OPERATOR: POWER EQUIPMENT: CRANE, MAIN BOOM & JIB 120' OR LONGER (EXCLUDES UNDERGROUND CONSTRUCTION) | $43.81 | $25.00 | $68.81 | MI20260045 Heavy |
| Baraga + 7 more | OPERATOR: POWER EQUIPMENT: CRANE, MAIN BOOM & JIB 140' OR LONGER (EXCLUDES UNDERGROUND CONSTRUCTION) | $44.63 | $25.00 | $69.63 | MI20260045 Heavy |
| Baraga + 7 more | OPERATOR: POWER EQUIPMENT: CRANE, MAIN BOOM & JIB 220' OR LONGER (EXCLUDES UNDERGROUND CONSTRUCTION) | $44.92 | $25.00 | $69.92 | MI20260045 Heavy |
| Baraga + 7 more | OPERATOR: ROLLER | $13.74 | $7.93 | $21.67 | MI20260045 Heavy |
| Baraga + 7 more | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, SCRAPER, LOADER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 | $71.23 | MI20260045 Heavy |
| Baraga + 7 more | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 | $66.50 | MI20260045 Heavy |
| Baraga + 7 more | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 | $65.77 | MI20260045 Heavy |
| Baraga + 7 more | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR | $39.95 | $25.25 | $65.20 | MI20260045 Heavy |
| Barry | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $16.50 | $6.17 | $22.67 | MI20260076 Building |
| Barry | OPERATOR: BULLDOZER | $29.31 | $2.64 | $31.95 | MI20260050 Heavy |
| Barry | OPERATOR: BULLDOZER | $18.50 | $5.81 | $24.31 | MI20260076 Building |
| Barry | OPERATOR: CRANE | $18.50 | $5.10 | $23.60 | MI20260050 Heavy |
| Barry | OPERATOR: CRANE | $19.28 | $7.55 | $26.83 | MI20260076 Building |
| Barry | OPERATOR: GRADER/BLADE | $16.64 | $0.00 | $16.64 | MI20260050 Heavy |
| Barry | OPERATOR: LOADER | $17.41 | $4.97 | $22.38 | MI20260050 Heavy |
| Barry | OPERATOR: LOADER | $17.16 | $4.05 | $21.21 | MI20260076 Building |
| Barry | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 1 BACKHOE/EXCAVATOR; BORING MACHINE; ROLLER; SCRAPER; TRACTOR; TRENCHER PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. SWING BOOM TRUCK OPERATOR OVER 12 TONS-$.50 PER HOUR | $44.00 | $25.25 | $69.25 | MI20260050 Heavy |
| Barry | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 2 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. SWING BOOM TRUCK OPERATOR OVER 12 TONS-$.50 PER HOUR | $41.32 | $25.25 | $66.57 | MI20260050 Heavy |
| Barry | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 3 BOOM TRUCK (NON-SWINGING) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. SWING BOOM TRUCK OPERATOR OVER 12 TONS-$.50 PER HOUR | $41.32 | $25.25 | $66.57 | MI20260050 Heavy |
| Barry | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 4 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. SWING BOOM TRUCK OPERATOR OVER 12 TONS-$.50 PER HOUR | $35.46 | $25.25 | $60.71 | MI20260050 Heavy |
| Barry | OPERATOR: POWER EQUIPMENT: GROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; CONCRETE PUMP; GRADER/BLADE; HIGHLIFT; HOIST; ROLLER; SCRAPER; TRENCHER PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 | $66.53 | MI20260076 Building |
| Barry | OPERATOR: POWER EQUIPMENT: GROUP 2 BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 | MI20260076 Building |
| Barry | OPERATOR: POWER EQUIPMENT: GROUP 3 BOOM TRUCK (NON-SWINGING) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 | MI20260076 Building |
| Barry | OPERATOR: POWER EQUIPMENT: GROUP 4 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $33.71 | $25.25 | $58.96 | MI20260076 Building |
| Barry | OPERATOR: POWER EQUIPMENT: GROUP 5 OILER PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $31.23 | $25.25 | $56.48 | MI20260076 Building |
| Barry | OPERATOR: TRACTOR | $15.72 | $1.92 | $17.64 | MI20260076 Building |
| Barry | POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, ROLLER, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 | $71.23 | MI20260050 Heavy |
| Barry | POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 | $66.50 | MI20260050 Heavy |
| Barry | POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 | $65.77 | MI20260050 Heavy |
| Barry | POWER EQUIPMENT OPERATOR: Underground Construction (Including Sewer)- GROUP 4 : BROOM/ SWEEPER, FORK TRUCK, TRACTOR, BOBCAT/ SKID STEER /SKID LOADER | $39.95 | $25.25 | $65.20 | MI20260050 Heavy |
| Bay | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $18.57 | $6.40 | $24.97 | MI20260077 Building |
| Bay | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $17.66 | $7.65 | $25.31 | MI20260011 Residential |
| Bay | OPERATOR: LOADER | $15.93 | $8.10 | $24.03 | MI20260077 Building |
| Bay | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER | $48.98 | $25.25 | $74.23 | MI20260051 Heavy |
| Bay | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK | $45.68 | $25.25 | $70.93 | MI20260051 Heavy |
| Bay | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 3 BACKHOE/EXCAVATOR; BORING MACHINE; BULLDOZER; CRANE; GRADER/BLADE; LOADER; ROLLER; SCRAPER; TRACTOR; TRENCHER | $44.00 | $25.25 | $69.25 | MI20260051 Heavy |
| Bay | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 4 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) | $41.32 | $25.25 | $66.57 | MI20260051 Heavy |
| Bay | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 5 BOOM TRUCK (NON-SWINGING) | $41.32 | $25.25 | $66.57 | MI20260051 Heavy |
| Bay | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 6 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) | $35.46 | $25.25 | $60.71 | MI20260051 Heavy |
| Bay | OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER | $48.98 | $25.25 | $74.23 | MI20260011 Residential |
| Bay | OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER | $47.28 | $25.25 | $72.53 | MI20260077 Building |
| Bay | OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK | $45.68 | $25.25 | $70.93 | MI20260011 Residential |
| Bay | OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK | $43.93 | $25.25 | $69.18 | MI20260077 Building |
| Bay | OPERATOR: POWER EQUIPMENT: GROUP 3 BACKHOE/EXCAVATOR; BULLDOZER; CRANE; GRADER/BLADE; LOADER; SCRAPER | $44.00 | $25.25 | $69.25 | MI20260011 Residential |
| Bay | OPERATOR: POWER EQUIPMENT: GROUP 3 BULLDOZER; CONCRETE PUMP; CRANE; GRADER/BLADE; HIGHLIFT; HOIST; ROLLER; SCRAPER; STIFF LEG DERRICK; TRENCHER 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $42.25 | $25.25 | $67.50 | MI20260077 Building |
| Bay | OPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) | $39.57 | $25.25 | $64.82 | MI20260077 Building |
| Bay | OPERATOR: POWER EQUIPMENT: GROUP 5 BOOM TRUCK (NON-SWINGING) | $39.57 | $25.25 | $64.82 | MI20260077 Building |
| Bay | OPERATOR: POWER EQUIPMENT: GROUP 6 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) | $33.37 | $25.25 | $58.62 | MI20260077 Building |
| Bay | OPERATOR: POWER EQUIPMENT: GROUP 7 OILER | $31.23 | $25.25 | $56.48 | MI20260077 Building |
| Bay | OPERATOR: TRACTOR | $19.10 | $8.48 | $27.58 | MI20260077 Building |
| Bay | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, GRADER/ BLADE, LOADER, ROLLER, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 | $71.23 | MI20260051 Heavy |
| Bay | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 | $66.50 | MI20260051 Heavy |
| Bay | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 | $65.77 | MI20260051 Heavy |
| Bay | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR, BOBCAT/ SKID STEER /SKID LOADER | $39.95 | $25.25 | $65.20 | MI20260051 Heavy |
| Benzie | OPERATOR: BACKHOE/EXCAVATOR | $24.04 | $6.03 | $30.07 | MI20260109 Building |
| Benzie | OPERATOR: BULLDOZER | $22.46 | $7.29 | $29.75 | MI20260109 Building |
| Benzie | OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 | MI20260109 Building |
| Benzie | OPERATOR: LOADER | $24.04 | $6.03 | $30.07 | MI20260109 Building |
| Benzie | OPERATOR: ROLLER | $27.47 | $8.86 | $36.33 | MI20260109 Building |
| Benzie | OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 | MI20260109 Building |
| Benzie | POWER EQUIPMENT OPERATOR: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $47.28 | $25.25 | $72.53 | MI20260109 Building |
| Benzie | POWER EQUIPMENT OPERATOR: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER; TOWER CRANE, GANTRY CRANE AND WHIRLEY DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $43.93 | $25.25 | $69.18 | MI20260109 Building |
| Benzie | POWER EQUIPMENT OPERATOR: GROUP 3 CRANE; PAVER; AND SCRAPER; STIFF LEG DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 | $66.53 | MI20260109 Building |
| Benzie | POWER EQUIPMENT OPERATOR: GROUP 4 FORK TRUCK (OVER 20' LIFT) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 | MI20260109 Building |
| Benzie | POWER EQUIPMENT OPERATOR: GROUP 5 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $33.71 | $25.25 | $58.96 | MI20260109 Building |
| Benzie | POWER EQUIPMENT OPERATOR: GROUP 6 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $31.23 | $25.25 | $56.48 | MI20260109 Building |
| Benzie, Kalkaska | OPERATOR: BACKHOE/EXCAVATOR | $16.05 | $9.55 | $25.60 | MI20260046 Heavy |
| Benzie, Kalkaska | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $12.98 | $6.12 | $19.10 | MI20260046 Heavy |
| Benzie, Kalkaska | OPERATOR: BULLDOZER | $16.17 | $9.51 | $25.68 | MI20260046 Heavy |
| Benzie, Kalkaska | OPERATOR: GRADER/BLADE | $15.50 | $3.62 | $19.12 | MI20260046 Heavy |
| Benzie, Kalkaska | OPERATOR: LOADER | $13.68 | $8.41 | $22.09 | MI20260046 Heavy |
| Benzie, Kalkaska | OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER | $48.98 | $25.25 | $74.23 | MI20260046 Heavy |
| Benzie, Kalkaska | OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK | $45.68 | $25.25 | $70.93 | MI20260046 Heavy |
| Benzie, Kalkaska | OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 3 COMPACTOR; CRANE; SCRAPER | $44.00 | $25.25 | $69.25 | MI20260046 Heavy |
| Benzie, Kalkaska | OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 4 BOOM TRUCK (NON-SWINGING) | $41.32 | $25.25 | $66.57 | MI20260046 Heavy |
| Benzie, Kalkaska | OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 5 OILER | $32.98 | $25.25 | $58.23 | MI20260046 Heavy |
| Benzie, Kalkaska | OPERATOR: ROLLER | $13.74 | $7.93 | $21.67 | MI20260046 Heavy |
| Benzie, Kalkaska | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BORING MACHINE, CRANE, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 | $71.23 | MI20260046 Heavy |
| Benzie, Kalkaska | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 | $66.50 | MI20260046 Heavy |
| Benzie, Kalkaska | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 | $65.77 | MI20260046 Heavy |
| Benzie, Kalkaska | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR | $39.95 | $25.25 | $65.20 | MI20260046 Heavy |
| Berrien | OPERATOR: BULLDOZER | $19.68 | $6.64 | $26.32 | MI20260078 Building |
| Berrien | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF ULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE | $48.98 | $25.25 | $74.23 | MI20260052 Heavy |
| Berrien | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF ULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $45.68 | $25.25 | $70.93 | MI20260052 Heavy |
| Berrien | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 3 BACKHOE/EXCAVATOR; BORING MACHINE; BULLDOZER; CRANE; GRADER/BLADE; LOADER; ROLLER; SCRAPER; TRACTOR; TRENCHER PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF ULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $44.00 | $25.25 | $69.25 | MI20260052 Heavy |
| Berrien | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 4 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF ULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE | $41.32 | $25.25 | $66.57 | MI20260052 Heavy |
| Berrien | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 5 BOOM TRUCK (NON-SWINGING) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF ULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.32 | $25.25 | $66.57 | MI20260052 Heavy |
| Berrien | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 6 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF ULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $35.46 | $25.25 | $60.71 | MI20260052 Heavy |
| Berrien | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 7 OILER PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF ULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $32.98 | $25.25 | $58.23 | MI20260052 Heavy |
| Berrien | OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER | $47.28 | $25.25 | $72.53 | MI20260078 Building |
| Berrien | OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK | $43.93 | $25.25 | $69.18 | MI20260078 Building |
| Berrien | OPERATOR: POWER EQUIPMENT: GROUP 3 BACKHOE/EXCAVATOR/TRACKHOE; CRANE; CONCRETE PUMP; GRADER/BLADE; HIGHLIFT; HOIST; LOADER; ROLLER; SCRAPER; STIFF LEG DERRICK; TRENCHER | $42.25 | $25.25 | $67.50 | MI20260078 Building |
| Berrien | OPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) | $39.57 | $25.25 | $64.82 | MI20260078 Building |
| Berrien | OPERATOR: POWER EQUIPMENT: GROUP 5 BOOM TRUCK (NON-SWINGING) | $39.57 | $25.25 | $64.82 | MI20260078 Building |
| Berrien | OPERATOR: POWER EQUIPMENT: GROUP 6 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) | $33.37 | $25.25 | $58.62 | MI20260078 Building |
| Berrien | OPERATOR: POWER EQUIPMENT: GROUP 7 OILER | $31.23 | $25.25 | $56.48 | MI20260078 Building |
| Berrien | OPERATOR: TRACTOR | $19.10 | $8.48 | $27.58 | MI20260078 Building |
| Berrien | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, GRADER/ BLADE, LOADER, ROLLER, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 | $71.23 | MI20260052 Heavy |
| Berrien | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 | $66.50 | MI20260052 Heavy |
| Berrien | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 | $65.77 | MI20260052 Heavy |
| Berrien | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR, BOBCAT/ SKID STEER /SKID LOADER | $39.95 | $25.25 | $65.20 | MI20260052 Heavy |
| Berrien, Cass | OPERATOR: BACKHOE/EXCAVATOR | $19.94 | $5.46 | $25.40 | MI20260026 Residential |
| Berrien, Cass | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $17.66 | $7.65 | $25.31 | MI20260026 Residential |
| Berrien, Cass | OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER | $48.98 | $25.25 | $74.23 | MI20260026 Residential |
| Berrien, Cass | OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK | $45.68 | $25.25 | $70.93 | MI20260026 Residential |
| Berrien, Cass | OPERATOR: POWER EQUIPMENT: GROUP 3 BULLDOZER; CRANE; GRADER/BLADE; LOADER; SCRAPER; STIFF LEG DERRICK | $44.00 | $25.25 | $69.25 | MI20260026 Residential |
| Branch | OPERATOR: BULLDOZER | $22.34 | $1.22 | $23.56 | MI20260110 Building |
| Branch | OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 | MI20260110 Building |
| Branch | OPERATOR: ROLLER | $26.64 | $8.09 | $34.73 | MI20260110 Building |
| Branch | OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 | MI20260110 Building |
| Branch | POWER EQUIPMENT OPERATOR: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $47.28 | $25.25 | $72.53 | MI20260110 Building |
| Branch | POWER EQUIPMENT OPERATOR: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER; TOWER CRANE; GANTRY CRANE AND WHIRLEY DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $43.93 | $25.25 | $69.18 | MI20260110 Building |
| Branch | POWER EQUIPMENT OPERATOR: GROUP 3 BACKHOE/EXCAVATOR; CRANE; LOADER; PAVER; SCRAPER; STIFF LEG DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 | $66.53 | MI20260110 Building |
| Branch | POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID LOADER; FORK TRUCK (OVER 20' LIFT) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 | MI20260110 Building |
| Branch | POWER EQUIPMENT OPERATOR: GROUP 5 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $33.71 | $25.25 | $58.96 | MI20260110 Building |
| Branch | POWER EQUIPMENT OPERATOR: GROUP 6 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $31.23 | $25.25 | $56.48 | MI20260110 Building |
| Calhoun | OPERATOR: BACKHOE/EXCAVATOR | $19.94 | $5.46 | $25.40 | MI20260012 Residential |
| Calhoun | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $17.66 | $7.65 | $25.31 | MI20260012 Residential |
| Calhoun | OPERATOR: BULLDOZER | $19.68 | $6.64 | $26.32 | MI20260079 Building |
| Calhoun | OPERATOR: COMPACTOR | $17.68 | $6.70 | $24.38 | MI20260079 Building |
| Calhoun | OPERATOR: CRANE | $25.26 | $5.00 | $30.26 | MI20260053 Heavy |
| Calhoun | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 1 BACKHOE/EXCAVATOR; BORING MACHINE; BULLDOZER; GRADER/BLADE; LOADER; ROLLER; SCRAPER; TRACTOR; TRENCHER PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. SWING BOOM TRUCK OPERATOR OVER 12 TONS-$.50 PER HOUR | $44.00 | $25.25 | $69.25 | MI20260053 Heavy |
| Calhoun | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 2 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. SWING BOOM TRUCK OPERATOR OVER 12 TONS-$.50 PER HOUR | $41.32 | $25.25 | $66.57 | MI20260053 Heavy |
| Calhoun | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 3 BOOM TRUCK (NON-SWINGING) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. SWING BOOM TRUCK OPERATOR OVER 12 TONS-$.50 PER HOUR | $41.32 | $25.25 | $66.57 | MI20260053 Heavy |
| Calhoun | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 4 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. SWING BOOM TRUCK OPERATOR OVER 12 TONS-$.50 PER HOUR | $35.46 | $25.25 | $60.71 | MI20260053 Heavy |
| Calhoun | OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER | $48.98 | $25.25 | $74.23 | MI20260012 Residential |
| Calhoun | OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER | $47.28 | $25.25 | $72.53 | MI20260079 Building |
| Calhoun | OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK | $45.68 | $25.25 | $70.93 | MI20260012 Residential |
| Calhoun | OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK | $43.93 | $25.25 | $69.18 | MI20260079 Building |
| Calhoun | OPERATOR: POWER EQUIPMENT: GROUP 3 BACKHOE/EXCAVATOR/TRACKHOE; CRANE; CONCRETE PUMP; GRADER/BLADE; HIGHLIFT; HOIST; LOADER; ROLLER; SCRAPER; STIFF LEG DERRICK; TRENCHER | $42.25 | $25.25 | $67.50 | MI20260079 Building |
| Calhoun | OPERATOR: POWER EQUIPMENT: GROUP 3 BULLDOZER; CRANE; GRADER/BLADE; LOADER; SCRAPER; STIFF LEG DERRICK | $44.00 | $25.25 | $69.25 | MI20260012 Residential |
| Calhoun | OPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) | $39.57 | $25.25 | $64.82 | MI20260079 Building |
| Calhoun | OPERATOR: POWER EQUIPMENT: GROUP 5 BOOM TRUCK (NON-SWINGING) | $39.57 | $25.25 | $64.82 | MI20260079 Building |
| Calhoun | OPERATOR: POWER EQUIPMENT: GROUP 6 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) | $33.37 | $25.25 | $58.62 | MI20260079 Building |
| Calhoun | OPERATOR: POWER EQUIPMENT: GROUP 7 OILER | $31.23 | $25.25 | $56.48 | MI20260079 Building |
| Calhoun | OPERATOR: TRACTOR | $19.10 | $8.48 | $27.58 | MI20260079 Building |
| Calhoun | POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, GRADER/ BLADE, LOADER, ROLLER, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 | $71.23 | MI20260053 Heavy |
| Calhoun | POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 | $66.50 | MI20260053 Heavy |
| Calhoun | POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 | $65.77 | MI20260053 Heavy |
| Calhoun | POWER EQUIPMENT OPERATOR: Underground Construction (Including Sewer)- GROUP 4 : BROOM/ SWEEPER, FORK TRUCK, TRACTOR, BOBCAT/ SKID STEER /SKID LOADER | $39.95 | $25.25 | $65.20 | MI20260053 Heavy |
| Calhoun | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1 (AREA 2: LEVEL D WHEN CAPPING LANDFILL) | $42.74 | $21.53 | $64.27 | MI20260079 Building |
| Cass | OPERATOR: BULLDOZER | $19.68 | $6.64 | $26.32 | MI20260080 Building |
| Cass | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF ULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE | $48.98 | $25.25 | $74.23 | MI20260054 Heavy |
| Cass | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF ULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $45.68 | $25.25 | $70.93 | MI20260054 Heavy |
| Cass | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 3 BACKHOE/EXCAVATOR; BORING MACHINE; BULLDOZER; CRANE; GRADER/BLADE; LOADER; ROLLER; SCRAPER; TRACTOR; TRENCHER PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF ULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $44.00 | $25.25 | $69.25 | MI20260054 Heavy |
| Cass | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 4 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF ULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE | $41.32 | $25.25 | $66.57 | MI20260054 Heavy |
| Cass | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 5 BOOM TRUCK (NON-SWINGING) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF ULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.32 | $25.25 | $66.57 | MI20260054 Heavy |
| Cass | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 6 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF ULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $35.46 | $25.25 | $60.71 | MI20260054 Heavy |
| Cass | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 7 OILER PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF ULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $32.98 | $25.25 | $58.23 | MI20260054 Heavy |
| Cass | OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER | $47.28 | $25.25 | $72.53 | MI20260080 Building |
| Cass | OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK | $43.93 | $25.25 | $69.18 | MI20260080 Building |
| Cass | OPERATOR: POWER EQUIPMENT: GROUP 3 BACKHOE/EXCAVATOR/TRACKHOE; CRANE; CONCRETE PUMP; GRADER/BLADE; HIGHLIFT; HOIST; LOADER; ROLLER; SCRAPER; STIFF LEG DERRICK; TRENCHER | $42.25 | $25.25 | $67.50 | MI20260080 Building |
| Cass | OPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) | $39.57 | $25.25 | $64.82 | MI20260080 Building |
| Cass | OPERATOR: POWER EQUIPMENT: GROUP 5 BOOM TRUCK (NON-SWINGING) | $39.57 | $25.25 | $64.82 | MI20260080 Building |
| Cass | OPERATOR: POWER EQUIPMENT: GROUP 6 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) | $33.37 | $25.25 | $58.62 | MI20260080 Building |
| Cass | OPERATOR: POWER EQUIPMENT: GROUP 7 OILER | $31.23 | $25.25 | $56.48 | MI20260080 Building |
| Cass | OPERATOR: TRACTOR | $19.10 | $8.48 | $27.58 | MI20260080 Building |
| Cass | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, GRADER/ BLADE, LOADER, ROLLER, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 | $71.23 | MI20260054 Heavy |
| Cass | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 | $66.50 | MI20260054 Heavy |
| Cass | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 | $65.77 | MI20260054 Heavy |
| Cass | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR, BOBCAT/ SKID STEER /SKID LOADER | $39.95 | $25.25 | $65.20 | MI20260054 Heavy |
| Charlevoix | OPERATOR: BACKHOE/EXCAVATOR | $24.04 | $6.03 | $30.07 | MI20260111 Building |
| Charlevoix | OPERATOR: BULLDOZER | $22.46 | $7.29 | $29.75 | MI20260111 Building |
| Charlevoix | OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 | MI20260111 Building |
| Charlevoix | OPERATOR: LOADER | $24.04 | $6.03 | $30.07 | MI20260111 Building |
| Charlevoix | OPERATOR: ROLLER | $27.47 | $8.86 | $36.33 | MI20260111 Building |
| Charlevoix | OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 | MI20260111 Building |
| Charlevoix | POWER EQUIPMENT OPERATOR: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $47.28 | $25.25 | $72.53 | MI20260111 Building |
| Charlevoix | POWER EQUIPMENT OPERATOR: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER; TOWER CRANE, GANTRY CRANE AND WHIRLEY DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $43.93 | $25.25 | $69.18 | MI20260111 Building |
| Charlevoix | POWER EQUIPMENT OPERATOR: GROUP 3 CRANE; PAVER; AND SCRAPER; STIFF LEG DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 | $66.53 | MI20260111 Building |
| Charlevoix | POWER EQUIPMENT OPERATOR: GROUP 4 FORK TRUCK (OVER 20' LIFT) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 | MI20260111 Building |
| Charlevoix | POWER EQUIPMENT OPERATOR: GROUP 5 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $33.71 | $25.25 | $58.96 | MI20260111 Building |
| Charlevoix | POWER EQUIPMENT OPERATOR: GROUP 6 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $31.23 | $25.25 | $56.48 | MI20260111 Building |
| Cheboygan | OPERATOR: BACKHOE/EXCAVATOR | $12.25 | $0.37 | $12.62 | MI20260032 Heavy |
| Cheboygan | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $12.98 | $6.12 | $19.10 | MI20260032 Heavy |
| Cheboygan | OPERATOR: GRADER/BLADE | $15.50 | $3.62 | $19.12 | MI20260032 Heavy |
| Cheboygan | OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 | MI20260112 Building |
| Cheboygan | OPERATOR: LOADER | $16.07 | $8.37 | $24.44 | MI20260032 Heavy |
| Cheboygan | OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER | $48.98 | $25.25 | $74.23 | MI20260032 Heavy |
| Cheboygan | OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK | $45.68 | $25.25 | $70.93 | MI20260032 Heavy |
| Cheboygan | OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 3 BULLDOZER; COMPACTOR; CRANE; SCRAPER | $44.00 | $25.25 | $69.25 | MI20260032 Heavy |
| Cheboygan | OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 4 BOOM TRUCK (NON-SWINGING) | $41.32 | $25.25 | $66.57 | MI20260032 Heavy |
| Cheboygan | OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 5 OILER | $32.98 | $25.25 | $58.23 | MI20260032 Heavy |
| Cheboygan | OPERATOR: ROLLER | $13.74 | $7.93 | $21.67 | MI20260032 Heavy |
| Cheboygan | OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 | MI20260112 Building |
| Cheboygan | POWER EQUIPMENT OPERATOR: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $44.13 | $25.25 | $69.38 | MI20260112 Building |
| Cheboygan | POWER EQUIPMENT OPERATOR: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER; TOWER CRANE, GANTRY CRANE AND WHIRLEY DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $43.93 | $25.25 | $69.18 | MI20260112 Building |
| Cheboygan | POWER EQUIPMENT OPERATOR: GROUP 3 BACKHOE/EXCAVATOR; BULLDOZER; CRANE; LOADER; PAVER; ROLLER; SCRAPER; STIFF LEG DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 | $66.53 | MI20260112 Building |
| Cheboygan | POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID LOADER; FORK TRUCK (OVER 20' LIFT) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 | MI20260112 Building |
| Cheboygan | POWER EQUIPMENT OPERATOR: GROUP 5 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 | MI20260112 Building |
| Cheboygan | POWER EQUIPMENT OPERATOR: GROUP 6 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $31.23 | $25.25 | $56.48 | MI20260112 Building |
| Cheboygan | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BORING MACHINE, BULLDOZER, CRANE, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 | $71.23 | MI20260032 Heavy |
| Cheboygan | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 | $66.50 | MI20260032 Heavy |
| Cheboygan | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 | $65.77 | MI20260032 Heavy |
| Cheboygan | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR | $39.95 | $25.25 | $65.20 | MI20260032 Heavy |
| Chippewa | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $12.98 | $6.12 | $19.10 | MI20260033 Heavy |
| Chippewa | OPERATOR: CRANE | $21.73 | $11.35 | $33.08 | MI20260113 Building |
| Chippewa | OPERATOR: GRADER/BLADE | $16.63 | $5.85 | $22.48 | MI20260033 Heavy |
| Chippewa | OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 | MI20260113 Building |
| Chippewa | OPERATOR: POWER EQUIPMENT: CRANE, MAIN BOOM & JIB 120' OR LONGER (EXCLUDES UNDERGROUND CONSTRUCTION) | $43.81 | $25.00 | $68.81 | MI20260033 Heavy |
| Chippewa | OPERATOR: POWER EQUIPMENT: CRANE, MAIN BOOM & JIB 140' OR LONGER (EXCLUDES UNDERGROUND CONSTRUCTION) | $44.63 | $25.00 | $69.63 | MI20260033 Heavy |
| Chippewa | OPERATOR: POWER EQUIPMENT: CRANE, MAIN BOOM & JIB 220' OR LONGER (EXCLUDES UNDERGROUND CONSTRUCTION) | $44.92 | $25.00 | $69.92 | MI20260033 Heavy |
| Chippewa | OPERATOR: ROLLER | $13.74 | $7.93 | $21.67 | MI20260033 Heavy |
| Chippewa | OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 | MI20260113 Building |
| Chippewa | POWER EQUIPMENT OPERATOR: GROUP 1 BACKHOE, BULLDOZER, FRONT END LOADER, EXCAVATOR, PAVER, ROLLER, AND SCRAPER (SELF-PROPELLED AND TRACTOR DRAWN) | $40.51 | $25.00 | $65.51 | MI20260113 Building |
| Chippewa | POWER EQUIPMENT OPERATOR: GROUP 2 FORK TRUCK | $37.26 | $25.00 | $62.26 | MI20260113 Building |
| Chippewa | POWER EQUIPMENT OPERATOR: GROUP 3 OILER | $35.86 | $12.50 | $48.36 | MI20260113 Building |
| Chippewa | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, SCRAPER, LOADER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 | $71.23 | MI20260033 Heavy |
| Chippewa | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 | $66.50 | MI20260033 Heavy |
| Chippewa | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 | $65.77 | MI20260033 Heavy |
| Chippewa | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR | $39.95 | $25.25 | $65.20 | MI20260033 Heavy |
| Chippewa, Delta | OPERATOR: POWER EQUIPMENT: BACKHOE/EXCAVATOR; LOADER; ROLLER | $40.51 | $25.00 | $65.51 | MI20260010 Residential |
| Clare | OPERATOR: BULLDOZER | $22.34 | $1.22 | $23.56 | MI20260114 Building |
| Clare | OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 | MI20260114 Building |
| Clare | OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER | $48.98 | $25.25 | $74.23 | MI20260034 Heavy |
| Clare | OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK | $45.68 | $25.25 | $70.93 | MI20260034 Heavy |
| Clare | OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 3 BACKHOE/EXCAVATOR; BULLDOZER; COMPACTOR; CRANE; SCRAPER; LOADER | $44.00 | $25.25 | $69.25 | MI20260034 Heavy |
| Clare | OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 4 BOOM TRUCK (NON-SWINGING) | $41.32 | $25.25 | $66.57 | MI20260034 Heavy |
| Clare | OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 5 OILER | $32.98 | $25.25 | $58.23 | MI20260034 Heavy |
| Clare | OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $47.28 | $25.25 | $72.53 | MI20260114 Building |
| Clare | OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $43.93 | $25.25 | $69.18 | MI20260114 Building |
| Clare | OPERATOR: POWER EQUIPMENT: GROUP 3 BACKHOE/EXCAVATOR; CRANE; LOADER; PAVER; SCRAPER; STIFF LEG DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 | $66.53 | MI20260114 Building |
| Clare | OPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; FORK TRUCK (OVER 20' LIFT) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 | MI20260114 Building |
| Clare | OPERATOR: POWER EQUIPMENT: GROUP 5 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $33.71 | $25.25 | $58.96 | MI20260114 Building |
| Clare | OPERATOR: POWER EQUIPMENT: GROUP 6 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $31.23 | $25.25 | $56.48 | MI20260114 Building |
| Clare | OPERATOR: ROLLER | $28.02 | $7.07 | $35.09 | MI20260114 Building |
| Clare | OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 | MI20260114 Building |
| Clare | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, GRADER/ BLADE, LOADER, ROLLER, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 | $71.23 | MI20260034 Heavy |
| Clare | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 | $66.50 | MI20260034 Heavy |
| Clare | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 | $65.77 | MI20260034 Heavy |
| Clare | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR, BOBCAT/ SKID STEER /SKID LOADER | $39.95 | $25.25 | $65.20 | MI20260034 Heavy |
| Clare + 20 more | OPERATOR: POWER EQUIPMENT: BACKHOE/EXCAVATOR; LOADER; ROLLER (ALLEGAN, BRANCH, HILLSDALE, LAKE, MASON, MECOSTA, MONTCALM, OCEANA, OSCEOLA & ST. JOSEPH COUNTIES) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $44.00 | $25.25 | $69.25 | MI20260008 Residential |
| Clare + 20 more | OPERATOR: POWER EQUIPMENT: BACKHOE/EXCAVATOR; LOADER; ROLLER (ARENAC, CLARE, GLADWIN, GRATIOT, HURON, ISABELLA, MIDLAND, SANILAC & SHIAWASSEE COUNTIES) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $44.00 | $25.25 | $69.25 | MI20260008 Residential |
| Clare + 20 more | OPERATOR: POWER EQUIPMENT: BACKHOE/EXCAVATOR; LOADER; ROLLER (LENAWEE COUNTY) | $45.34 | $25.35 | $70.69 | MI20260008 Residential |
| Clare + 83 more | OPERATOR: POWER EQUIPMENT, SEWER RELINING: GROUP 1- OPERATION OF AUDIO-VISUAL CLOSED CIRCUIT TV SYSTEM, INCLUDING REMOTE IN-GROUND CUTTER AND OTHER EQUIPMENT USED IN CONNECTION WITH THE CCTV SYSTEM. (ALCONA, ALGER, ALLEGAN, ALPENA, ANTRIM, ARENAC, BARAGA, BARRY, BAY, BENZIE, BERRIEN, BRANCH, CALHOUN, CASS, CHARLEVOIX, CHEBOYGAN, CHIPPEWA, CLARE, CLINTON, CRAWFORD, DELTA, DICKINSON, EATON, EMMET, GENESEE, GLADWIN, GOGEBIC, GRAND TRAVERSE, GRATIOT, HILLSDALE, HOUGHTON, HURON, INGHAM, IONIA, IOSCO, IRON, ISABELLA, JACKSON, KALAMAZOO, KALKASKA, KENT, KEWEENAW, LAKE, LAPEER, LEELANAU, LENAWEE, LIVINGSTON, LUCE, MACKINAC, MACOMB, MANISTEE, MAR | $37.37 | $15.44 | $52.81 | MI20260001 Highway |
| Clare + 83 more | OPERATOR: POWER EQUIPMENT, SEWER RELINING: GROUP 2- OPERATION OF HOT WATER HEATERS AND CIRCULATION SYSTEMS, WATER JETTERS AND VACUUM AND MECHANICAL DEBRIS REMOVAL SYSTEMS. (ALCONA, ALGER, ALLEGAN, ALPENA, ANTRIM, ARENAC, BARAGA, BARRY, BAY, BENZIE, BERRIEN, BRANCH, CALHOUN, CASS, CHARLEVOIX, CHEBOYGAN, CHIPPEWA, CLARE, CLINTON, CRAWFORD, DELTA, DICKINSON, EATON, EMMET, GENESEE, GLADWIN, GOGEBIC, GRAND TRAVERSE, GRATIOT, HILLSDALE, HOUGHTON, HURON, INGHAM, IONIA, IOSCO, IRON, ISABELLA, JACKSON, KALAMAZOO, KALKASKA, KENT, KEWEENAW, LAKE, LAPEER, LEELANAU, LENAWEE, LIVINGSTON, LUCE, MACKINAC, MACOMB, MANISTEE, MAR | $35.33 | $15.44 | $50.77 | MI20260001 Highway |
| Clare + 83 more | OPERATOR: POWER EQUIPMENT, STEEL ERECTION: COMPRESSOR, WELDER AND FORKLIFT (ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT COUNTIES) | $43.30 | $25.00 | $68.30 | MI20260001 Highway |
| Clare + 83 more | OPERATOR: POWER EQUIPMENT, STEEL ERECTION: CRANE OPERATOR, MAIN BOOM & JIB 120' OR LONGER (ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT COUNTIES) | $49.77 | $25.00 | $74.77 | MI20260001 Highway |
| Clare + 83 more | OPERATOR: POWER EQUIPMENT, STEEL ERECTION: CRANE OPERATOR, MAIN BOOM & JIB 140' OR LONGER (ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT COUNTIES) | $50.07 | $24.60 | $74.67 | MI20260001 Highway |
| Clare + 83 more | OPERATOR: POWER EQUIPMENT, STEEL ERECTION: CRANE OPERATOR, MAIN BOOM & JIB 220' OR LONGER (ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT COUNTIES) | $50.66 | $25.00 | $75.66 | MI20260001 Highway |
| Clare + 83 more | OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 1- CRANE OPERATOR WITH MAIN BOOM & JIB 400', 300', OR 220' OR LONGER. (AREA 1: ALLEGAN, BARRY, BERRIEN, BRANCH, CALHOUN, CASS, EATON, HILLSDALE, IONIA, KALAMAZOO, KENT, LAKE, MANISTEE, MASON, MECOSTA, MONTCALM, MUSKEGON, NEWAYGO, OCEANA, OSCEOLA, OTTAWA, ST. JOSEPH, AND VAN BUREN COUNTIES) | $55.02 | $28.25 | $83.27 | MI20260001 Highway |
| Clare + 83 more | OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 1- CRANE OPERATOR WITH MAIN BOOM & JIB 400', 300', OR 220' OR LONGER. (AREA 2: ANTRIM, BREEZE, CHARLEVOIX, EMMET, GRAND TRAVERSE, KALKASKA, LEELANAU, MISSAUKEE, AND WEXFORD COUNTIES) | $55.02 | $28.25 | $83.27 | MI20260001 Highway |
| Clare + 83 more | OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 1- ENGINEER WHEN OPERATING COMBINATION OF BOOM AND JIB 400' OR LONGER (ALCONA, ALPENA, ARENAC, BAY, CHEBOYGAN, CLARE, CLINTON, CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO, ISABELLA, JACKSON, LAPEER, LENAWEE, LIVINGSTON, MACOMB, MIDLAND, MONROE, MONTMORENCY, OAKLAND, OGEMAW, OSCODA, OTSEGO, PRESQUE ISLE, ROSCOMMON, SAGINAW, ST. CLAIR, SANILAC, SHIAWASSEE, TUSCOLA, WASHTENAW AND WAYNE COUNTIES) | $55.42 | $28.25 | $83.67 | MI20260001 Highway |
| Clare + 83 more | OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 10- TOWER CRANE & DERRICK OPERATOR (WHERE OPERATOR'S WORK STATION IS 50 FT. OR MORE ABOVE FIRST SUB-LEVEL) ON A CRANE THAT REQUIRES AN OILER CLINTON, CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO, ISABELLA, JACKSON, LAPEER, LENAWEE, LIVINGSTON, MACOMB, MIDLAND, MONROE, MONTMORENCY, OAKLAND, OGEMAW, OSCODA, OTSEGO, PRESQUE ISLE, ROSCOMMON, SAGINAW, ST. CLAIR, SANILAC, SHIAWASSEE, TUSCOLA, WASHTENAW AND WAYNE COUNTIES) | $52.70 | $28.25 | $80.95 | MI20260001 Highway |
| Clare + 83 more | OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 11- ENGINEER WHEN OPERATING COMBINATION OF BOOM AND JIB 120' OR LONGER (ALCONA, ALPENA, ARENAC, BAY, CHEBOYGAN, CLARE, CLINTON, CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO, ISABELLA, JACKSON, LAPEER, LENAWEE, LIVINGSTON, MACOMB, MIDLAND, MONROE, MONTMORENCY, OAKLAND, OGEMAW, OSCODA, OTSEGO, PRESQUE ISLE, ROSCOMMON, SAGINAW, ST. CLAIR, SANILAC, SHIAWASSEE, TUSCOLA, WASHTENAW AND WAYNE COUNTIES) | $50.97 | $28.25 | $79.22 | MI20260001 Highway |
| Clare + 83 more | OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 12- ENGINEER WHEN OPERATING COMBINATION OF BOOM AND JIB 120' OR LONGER ON A CRANE THAT REQUIRES AN OILER (ALCONA, ALPENA, ARENAC, BAY, CHEBOYGAN, CLARE, CLINTON, CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO, ISABELLA, JACKSON, LAPEER, LENAWEE, LIVINGSTON, MACOMB, MIDLAND, MONROE, MONTMORENCY, OAKLAND, OGEMAW, OSCODA, OTSEGO, PRESQUE ISLE, ROSCOMMON, SAGINAW, ST. CLAIR, SANILAC, SHIAWASSEE, TUSCOLA, WASHTENAW AND WAYNE COUNTIES) | $51.97 | $28.25 | $80.22 | MI20260001 Highway |
| Clare + 83 more | OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 13- CRANE OPERATOR; JOB MECHANIC AND 3 DRUM HOIST AND EXCAVATOR (ALCONA, ALPENA, ARENAC, BAY, CHEBOYGAN, CLARE, CLINTON, CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO, ISABELLA, JACKSON, LAPEER, LENAWEE, LIVINGSTON, MACOMB, MIDLAND, MONROE, MONTMORENCY, OAKLAND, OGEMAW, OSCODA, OTSEGO, PRESQUE ISLE, ROSCOMMON, SAGINAW, ST. CLAIR, SANILAC, SHIAWASSEE, TUSCOLA, WASHTENAW AND WAYNE COUNTIES) | $50.61 | $28.25 | $78.86 | MI20260001 Highway |
| Clare + 83 more | OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 14- CRANE OPERATOR ON A CRANE THAT REQUIRES AN OILER (ALCONA, ALPENA, ARENAC, BAY, CHEBOYGAN, CLARE, CLINTON, CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO, ISABELLA, JACKSON, LAPEER, LENAWEE, LIVINGSTON, MACOMB, MIDLAND, MONROE, MONTMORENCY, OAKLAND, OGEMAW, OSCODA, OTSEGO, PRESQUE ISLE, ROSCOMMON, SAGINAW, ST. CLAIR, SANILAC, SHIAWASSEE, TUSCOLA, WASHTENAW AND WAYNE COUNTIES) | $51.61 | $28.25 | $79.86 | MI20260001 Highway |
| Clare + 83 more | OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 15- HOISTING OPERATOR; 2 DRUM HOIST AND RUBBER TIRED BACKHOE (ALCONA, ALPENA, ARENAC, BAY, CHEBOYGAN, CLARE, CLINTON, CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO, ISABELLA, JACKSON, LAPEER, LENAWEE, LIVINGSTON, MACOMB, MIDLAND, MONROE, MONTMORENCY, OAKLAND, OGEMAW, OSCODA, OTSEGO, PRESQUE ISLE, ROSCOMMON, SAGINAW, ST. CLAIR, SANILAC, SHIAWASSEE, TUSCOLA, WASHTENAW AND WAYNE COUNTIES) | $49.97 | $28.25 | $78.22 | MI20260001 Highway |
| Clare + 83 more | OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 16- FORKLIFT AND 1 DRUM HOIST (ALCONA, ALPENA, ARENAC, BAY, CHEBOYGAN, CLARE, CLINTON, CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO, ISABELLA, JACKSON, LAPEER, LENAWEE, LIVINGSTON, MACOMB, MIDLAND, MONROE, MONTMORENCY, OAKLAND, OGEMAW, OSCODA, OTSEGO, PRESQUE ISLE, ROSCOMMON, SAGINAW, ST. CLAIR, SANILAC, SHIAWASSEE, TUSCOLA, WASHTENAW AND WAYNE COUNTIES) | $46.77 | $28.25 | $75.02 | MI20260001 Highway |
| Clare + 83 more | OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 17- COMPRESSOR OR WELDER OPERATOR (ALCONA, ALPENA, ARENAC, BAY, CHEBOYGAN, CLARE, CLINTON, CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO, ISABELLA, JACKSON, LAPEER, LENAWEE, LIVINGSTON, MACOMB, MIDLAND, MONROE, MONTMORENCY, OAKLAND, OGEMAW, OSCODA, OTSEGO, PRESQUE ISLE, ROSCOMMON, SAGINAW, ST. CLAIR, SANILAC, SHIAWASSEE, TUSCOLA, WASHTENAW AND WAYNE COUNTIES) | $32.29 | $15.40 | $47.69 | MI20260001 Highway |
| Clare + 83 more | OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 18- OILER (ALCONA, ALPENA, ARENAC, BAY, CHEBOYGAN, CLARE, CLINTON, CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO, ISABELLA, JACKSON, LAPEER, LENAWEE, LIVINGSTON, MACOMB, MIDLAND, MONROE, MONTMORENCY, OAKLAND, OGEMAW, OSCODA, OTSEGO, PRESQUE ISLE, ROSCOMMON, SAGINAW, ST. CLAIR, SANILAC, SHIAWASSEE, TUSCOLA, WASHTENAW AND WAYNE COUNTIES) | $35.78 | $28.25 | $64.03 | MI20260001 Highway |
| Clare + 83 more | OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 2- CRANE OPERATOR WITH MAIN BOOM & JIB 140' OR LONGER, TOWER CRANE; GANTRY CRANE; WHIRLEY DERRICK. (AREA 1: ALLEGAN, BARRY, BERRIEN, BRANCH, CALHOUN, CASS, EATON, HILLSDALE, IONIA, KALAMAZOO, KENT, LAKE, MANISTEE, MASON, MECOSTA, MONTCALM, MUSKEGON, NEWAYGO, OCEANA, OSCEOLA, OTTAWA, ST. JOSEPH, AND VAN BUREN COUNTIES) | $52.15 | $28.25 | $80.40 | MI20260001 Highway |
| Clare + 83 more | OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 2- CRANE OPERATOR WITH MAIN BOOM & JIB 140' OR LONGER, TOWER CRANE; GANTRY CRANE; WHIRLEY DERRICK. (AREA 2: ANTRIM, BREEZE, CHARLEVOIX, EMMET, GRAND TRAVERSE, KALKASKA, LEELANAU, MISSAUKEE, AND WEXFORD COUNTIES) | $52.15 | $28.25 | $80.40 | MI20260001 Highway |
| Clare + 83 more | OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 2- ENGINEER WHEN OPERATING COMBINATION OF BOOM AND JIB 400' OR LONGER ON A CRANE THAT REQUIRES AN OILER (ALCONA, ALPENA, ARENAC, BAY, CHEBOYGAN, CLARE, CLINTON, CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO, ISABELLA, JACKSON, LAPEER, LENAWEE, LIVINGSTON, MACOMB, MIDLAND, MONROE, MONTMORENCY, OAKLAND, OGEMAW, OSCODA, OTSEGO, PRESQUE ISLE, ROSCOMMON, SAGINAW, ST. CLAIR, SANILAC, SHIAWASSEE, TUSCOLA, WASHTENAW AND WAYNE COUNTIES) | $56.42 | $28.25 | $84.67 | MI20260001 Highway |
| Clare + 83 more | OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 3- ENGINEER WHEN OPERATING COMBINATION OF BOOM AND JIB 300' OR LONGER (ALCONA, ALPENA, ARENAC, BAY, CHEBOYGAN, CLARE, CLINTON, CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO, ISABELLA, JACKSON, LAPEER, LENAWEE, LIVINGSTON, MACOMB, MIDLAND, MONROE, MONTMORENCY, OAKLAND, OGEMAW, OSCODA, OTSEGO, PRESQUE ISLE, ROSCOMMON, SAGINAW, ST. CLAIR, SANILAC, SHIAWASSEE, TUSCOLA, WASHTENAW AND WAYNE COUNTIES) | $53.92 | $28.25 | $82.17 | MI20260001 Highway |
| Clare + 83 more | OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 3- REGULAR EQUIPMENT OPERATOR, CRAE, DOZER, LOADER, HOIST, STRADDLE WAGON, MECHANIC, GRADER AND HYDRO EXCAVATOR. (AREA 1: ALLEGAN, BARRY, BERRIEN, BRANCH, CALHOUN, CASS, EATON, HILLSDALE, IONIA, KALAMAZOO, KENT, LAKE, MANISTEE, MASON, MECOSTA, MONTCALM, MUSKEGON, NEWAYGO, OCEANA, OSCEOLA, OTTAWA, ST. JOSEPH, AND VAN BUREN COUNTIES) | $50.61 | $28.25 | $78.86 | MI20260001 Highway |
| Clare + 83 more | OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 3- REGULAR EQUIPMENT OPERATOR, CRAE, DOZER, LOADER, HOIST, STRADDLE WAGON, MECHANIC, GRADER AND HYDRO EXCAVATOR. (AREA 2: ANTRIM, BREEZE, CHARLEVOIX, EMMET, GRAND TRAVERSE, KALKASKA, LEELANAU, MISSAUKEE, AND WEXFORD COUNTIES) | $50.61 | $28.25 | $78.86 | MI20260001 Highway |
| Clare + 83 more | OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 4- AIR TUGGER (SINGLE DRUM), MATERIAL HOIST PUMP 6" OR OVER, ELEVATORS, BROKK CONCRETE BREAKER. (AREA 1: ALLEGAN, BARRY, BERRIEN, BRANCH, CALHOUN, CASS, EATON, HILLSDALE, IONIA, KALAMAZOO, KENT, LAKE, MANISTEE, MASON, MECOSTA, MONTCALM, MUSKEGON, NEWAYGO, OCEANA, OSCEOLA, OTTAWA, ST. JOSEPH, AND VAN BUREN COUNTIES) | $46.77 | $28.25 | $75.02 | MI20260001 Highway |
| Clare + 83 more | OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 4- AIR TUGGER (SINGLE DRUM), MATERIAL HOIST PUMP 6" OR OVER, ELEVATORS, BROKK CONCRETE BREAKER. (AREA 2: ANTRIM, BREEZE, CHARLEVOIX, EMMET, GRAND TRAVERSE, KALKASKA, LEELANAU, MISSAUKEE, AND WEXFORD COUNTIES) | $46.77 | $28.25 | $75.02 | MI20260001 Highway |
| Clare + 83 more | OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 4- ENGINEER WHEN OPERATING COMBINATION OF BOOM AND JIB 300' OR LONGER ON A CRANE THAT REQUIRES AN OILER (ALCONA, ALPENA, ARENAC, BAY, CHEBOYGAN, CLARE, CLINTON, CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO, ISABELLA, JACKSON, LAPEER, LENAWEE, LIVINGSTON, MACOMB, MIDLAND, MONROE, MONTMORENCY, OAKLAND, OGEMAW, OSCODA, OTSEGO, PRESQUE ISLE, ROSCOMMON, SAGINAW, ST. CLAIR, SANILAC, SHIAWASSEE, TUSCOLA, WASHTENAW AND WAYNE COUNTIES) | $54.92 | $28.25 | $83.17 | MI20260001 Highway |
| Clare + 83 more | OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 5- ENGINEER WHEN OPERATING COMBINATION OF BOOM AND JIB 220' OR LONGER (ALCONA, ALPENA, ARENAC, BAY, CHEBOYGAN, CLARE, CLINTON, CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO, ISABELLA, JACKSON, LAPEER, LENAWEE, LIVINGSTON, MACOMB, MIDLAND, MONROE, MONTMORENCY, OAKLAND, OGEMAW, OSCODA, OTSEGO, PRESQUE ISLE, ROSCOMMON, SAGINAW, ST. CLAIR, SANILAC, SHIAWASSEE, TUSCOLA, WASHTENAW AND WAYNE COUNTIES) | $52.42 | $28.25 | $80.67 | MI20260001 Highway |
| Clare + 83 more | OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 5-AIR COMPRESSOR, WELDER, GENERATORS, CONVEYORS. (AREA 1: ALLEGAN, BARRY, BERRIEN, BRANCH, CALHOUN, CASS, EATON, HILLSDALE, IONIA, KALAMAZOO, KENT, LAKE, MANISTEE, MASON, MECOSTA, MONTCALM, MUSKEGON, NEWAYGO, OCEANA, OSCEOLA, OTTAWA, ST. JOSEPH, AND VAN BUREN COUNTIES) | $32.29 | $15.40 | $47.69 | MI20260001 Highway |
| Clare + 83 more | OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 5-AIR COMPRESSOR, WELDER, GENERATORS, CONVEYORS. (AREA 2: ANTRIM, BREEZE, CHARLEVOIX, EMMET, GRAND TRAVERSE, KALKASKA, LEELANAU, MISSAUKEE, AND WEXFORD COUNTIES) | $32.29 | $15.40 | $47.69 | MI20260001 Highway |
| Clare + 83 more | OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 6- ENGINEER WHEN OPERATING COMBINATION OF BOOM AND JIB 220' OR LONGER ON A CRANE THAT REQUIRES AN OILER (ALCONA, ALPENA, ARENAC, BAY, CHEBOYGAN, CLARE, CLINTON, CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO, ISABELLA, JACKSON, LAPEER, LENAWEE, LIVINGSTON, MACOMB, MIDLAND, MONROE, MONTMORENCY, OAKLAND, OGEMAW, OSCODA, OTSEGO, PRESQUE ISLE, ROSCOMMON, SAGINAW, ST. CLAIR, SANILAC, SHIAWASSEE, TUSCOLA, WASHTENAW AND WAYNE COUNTIES) | $53.42 | $28.25 | $81.67 | MI20260001 Highway |
| Clare + 83 more | OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 6- OILER AND FIRE TENDER (AREA 2: ANTRIM, BREEZE, CHARLEVOIX, EMMET, GRAND TRAVERSE, KALKASKA, LEELANAU, MISSAUKEE, AND WEXFORD COUNTIES) | $35.78 | $28.25 | $64.03 | MI20260001 Highway |
| Clare + 83 more | OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 6-OILER AND FIRE TENDER. (AREA 1: ALLEGAN, BARRY, BERRIEN, BRANCH, CALHOUN, CASS, EATON, HILLSDALE, IONIA, KALAMAZOO, KENT, LAKE, MANISTEE, MASON, MECOSTA, MONTCALM, MUSKEGON, NEWAYGO, OCEANA, OSCEOLA, OTTAWA, ST. JOSEPH, AND VAN BUREN COUNTIES) | $35.78 | $28.25 | $64.03 | MI20260001 Highway |
| Clare + 83 more | OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 7- ENGINEER WHEN OPERATING COMBINATION OF BOOM AND JIB 140' OR LONGER (ALCONA, ALPENA, ARENAC, BAY, CHEBOYGAN, CLARE, CLINTON, CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO, ISABELLA, JACKSON, LAPEER, LENAWEE, LIVINGSTON, MACOMB, MIDLAND, MONROE, MONTMORENCY, OAKLAND, OGEMAW, OSCODA, OTSEGO, PRESQUE ISLE, ROSCOMMON, SAGINAW, ST. CLAIR, SANILAC, SHIAWASSEE, TUSCOLA, WASHTENAW AND WAYNE COUNTIES) | $52.15 | $28.25 | $80.40 | MI20260001 Highway |
| Clare + 83 more | OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 8- ENGINEER WHEN OPERATING COMBINATION OF BOOM AND JIB 140' OR LONGER ON A CRANE THAT REQUIRES AN OILER (ALCONA, ALPENA, ARENAC, BAY, CHEBOYGAN, CLARE, CLINTON, CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO, ISABELLA, JACKSON, LAPEER, LENAWEE, LIVINGSTON, MACOMB, MIDLAND, MONROE, MONTMORENCY, OAKLAND, OGEMAW, OSCODA, OTSEGO, PRESQUE ISLE, ROSCOMMON, SAGINAW, ST. CLAIR, SANILAC, SHIAWASSEE, TUSCOLA, WASHTENAW AND WAYNE COUNTIES) | $53.15 | $28.25 | $81.40 | MI20260001 Highway |
| Clare + 83 more | OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 9- TOWER CRANE & DERRICK OPERATOR (WHERE OPERATOR'S WORK STATION IS 50 FT. OR MORE ABOVE FIRST SUB-LEVEL) (ALCONA, ALPENA, ARENAC, BAY, CHEBOYGAN, CLARE, CLINTON, CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO, ISABELLA, JACKSON, LAPEER, LENAWEE, LIVINGSTON, MACOMB, MIDLAND, MONROE, MONTMORENCY, OAKLAND, OGEMAW, OSCODA, OTSEGO, PRESQUE ISLE, ROSCOMMON, SAGINAW, ST. CLAIR, SANILAC, SHIAWASSEE, TUSCOLA, WASHTENAW AND WAYNE COUNTIES) | $51.70 | $28.25 | $79.95 | MI20260001 Highway |
| Clare + 83 more | OPERATOR: POWER EQUIPMENT, STEEL ERECTION: MECHANIC WITH TRUCK AND TOOLS (ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT COUNTIES) | $48.90 | $25.00 | $73.90 | MI20260001 Highway |
| Clare + 83 more | OPERATOR: POWER EQUIPMENT, STEEL ERECTION: OILER AND FIREMAN (ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT COUNTIES) | $41.76 | $25.00 | $66.76 | MI20260001 Highway |
| Clare + 83 more | OPERATOR: POWER EQUIPMENT, STEEL ERECTION: REGULAR OPERATOR (ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT COUNTIES) | $47.12 | $25.00 | $72.12 | MI20260001 Highway |
| Clare + 83 more | OPERATOR: POWER EQUIPMENT, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 1 (AREA 1: GENESEE, LAPEER, LIVINGSTON, MACOMB, MONROE, OAKLAND, ST. CLAIR, WASTENAW, AND WAYNE COUNTIES) | $45.98 | $25.25 | $71.23 | MI20260001 Highway |
| Clare + 83 more | OPERATOR: POWER EQUIPMENT, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 1- BACKFILLER TAMPER; BACKHOE; BATCH PLANT OPERATOR (CONCRETE); CLAMSHELL; CONCRETE PAVER (2 DRUMS OR LARGER); CONVERYOR LOADER (EUCLID TYPE); CRANE (CRAWLER, TRUCK TYPE OR PILE DRIVING); DOZER; DRAGLINE; ELEVATING GRADER; ENDLOADER; GRADALL (AND SIMILAR TYPE MACHINE); GRADER; MECHANIC; POWER SHOVEL; ROLLER (ASPHALT); SCRAPER (SELF-PROPELLED OR TRACTOR DRAWN); SIDE BOOM TRACTOR (TYPE D-4 OR EQUIVALENT AND LARGER); SLIP FORM PAVER; SLOPE PAVER; TRENCHER (OVER 8 FT. DIGGING CAPACITY); WELL DRILLING RIG; CONCRETE PUMP WITH BOOM OPERATOR; HYDRO EXCAVATOR. (AREA 2: ALCONA, ALLEGAN, ALGER, ALPENA, ANTRIM, ARENAC, BARAGA, BARRY, BAY, BENZIE, BERRIEN, BRANCH, CALHOUN, CASS, CHARLEVOIX, CHEBOYGAN, CHIPPEWA, CLARE, CLINTON, CRAWFORD, DELTA, DICKINSON, EATON, EMMET, GLADWIN, GOGEBIC, GRAND TRAVERSE, GRATIOT, HILLSDALE, HOUGHTON, HURON, INGHAM, IONIA, IOSCO, IRON, ISABELLA, JACKSON, KALAMAZOO, KALKASKA, KENT, KWEENAW, LAKW, LEELANAU, LENAWEE, LUCE, MACKINAC, MANISTEE, MARQUETTE, MASON, MECOSTA, MENOMINEE, MIDLAND, MISSAUKEE, MONTCALM, MONTMORENCY, MUSKEGON, NEWAYGO, OCEANA, OGEMAW, ONTONAGON, OSCEOLA, OSCODA, OTSEGO, OTTAWA, PRESQUE ISLE, ROSCOMMON, SAGINAW, SANILAC, SCHOOLCRAFT, SHIAWASSEE, ST. JOSEPH, RUSCOLA, VAN BUREN, AND WEXFORD COUNTIES) | $45.98 | $25.25 | $71.23 | MI20260001 Highway |
| Clare + 83 more | OPERATOR: POWER EQUIPMENT, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 2- BOOM TRUCK (POWER SWING TYPE BOOM); CRUSHER; HOIST; PUMP (1 OR MORE - 6-IN. DISCHARGE OR LARGER- GAS OR DIESEL- POWERED OR POWERED BY GENERATOR OF 300 AMPERES OR MORE- INCLUSIVE OF GENERATOR); SIDE BOOM TRACTOR (SMALLER THAN TYPE D-4 OR EQUIVALENT); TRACTOR (PNEU-TIRED, OTHER THAN BACKHOE OR FRONT END LOADER); TRENCHER (8-FT. DIGGING CAPACITY AND SMALLER); VAC TRUCK AND END DUMP OPERATOR. (AREA 1: GENESEE, LAPEER, LIVINGSTON, MACOMB, MONROE, OAKLAND, ST. CLAIR, WASTENAW, AND WAYNE COUNTIES) | $41.25 | $25.25 | $66.50 | MI20260001 Highway |
| Clare + 83 more | OPERATOR: POWER EQUIPMENT, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 2- BOOM TRUCK (POWER SWING TYPE BOOM); CRUSHER; HOIST; PUMP (1 OR MORE - 6-IN. DISCHARGE OR LARGER- GAS OR DIESEL- POWERED OR POWERED BY GENERATOR OF 300 AMPERES OR MORE- INCLUSIVE OF GENERATOR); SIDE BOOM TRACTOR (SMALLER THAN TYPE D-4 OR EQUIVALENT); TRACTOR (PNEU-TIRED, OTHER THAN BACKHOE OR FRONT END LOADER); TRENCHER (8-FT. DIGGING CAPACITY AND SMALLER); VAC TRUCK AND END DUMP OPERATOR. (AREA 2: ALCONA, ALLEGAN, ALGER, ALPENA, ANTRIM, ARENAC, BARAGA, BARRY, BAY, BENZIE, BERRIEN, BRANCH, CALHOUN, CASS, CHARLEVOIX, CHEBOYGAN, CHIPPEWA, CLARE, CLINTON, CRAWFORD, DELTA, DICKINSON, EATON, EMMET, GLADWIN, GOGEBIC, GRAND TRAVERSE, GRATIOT, HILLSDALE, HOUGHTON, HURON, INGHAM, IONIA, IOSCO, IRON, ISABELLA, JACKSON, KALAMAZOO, KALKASKA, KENT, KWEENAW, LAKW, LEELANAU, LENAWEE, LUCE, MACKINAC, MANISTEE, MARQUETTE, MASON, MECOSTA, MENOMINEE, MIDLAND, MISSAUKEE, MONTCALM, MONTMORENCY, MUSKEGON, NEWAYGO, OCEANA, OGEMAW, ONTONAGON, OSCEOLA, OSCODA, OTSEGO, OTTAWA, PRESQUE ISLE, ROSCOMMON, SAGINAW, SANILAC, SCHOOLCRAFT, SHIAWASSEE, ST. JOSEPH, RUSCOLA, VAN BUREN, AND WEXFORD COUNTIES) | $41.25 | $25.25 | $66.50 | MI20260001 Highway |
| Clare + 83 more | OPERATOR: POWER EQUIPMENT, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 3- AIR COMPRESSORS (600 CFM OR LARGER); AIR COMPRESSORS (2 OR MORE-LESS THAN 600 CFM); BOOM TRUCK (NON-SWINGING, NON-POWERED TYPE BOOM); CONCRETE BREAKER (SELF-PROPELLED OR TRUCK MOUNTED-INCLUDES COMPRESSOR); CONCRETE PAVER (1 DRUM-1/2 YD. OR LARGER); ELEVATOR (OTHER THAN PASSENGER); MAINTENACNE PERSON; PUMP (2 OR MORE-4-IN. UP TO 6-IN. DISCHARGE- GAS OR DIESEL POWERED- EXCLUDING SUBMERSIBLE PUMPS); PUMPCRETE MACHINE (AND SIMILAR EQUIPMENT); WAGON DRILL (MULTIPLE); WELDING MACHINE OR GENERATOR( 2 OR MORE- 300 AMP. OR LARGER - GAS OR DIESEL POWERED). (AREA 1: GENESEE, LAPEER, LIVINGSTON, MACOMB, MONROE, OAKLAND, ST. CLAIR, WASTENAW, AND WAYNE COUNTIES) | $40.52 | $25.25 | $65.77 | MI20260001 Highway |
| Clare + 83 more | OPERATOR: POWER EQUIPMENT, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 3- AIR COMPRESSORS (600 CFM OR LARGER); AIR COMPRESSORS (2 OR MORE-LESS THAN 600 CFM); BOOM TRUCK (NON-SWINGING, NON-POWERED TYPE BOOM); CONCRETE BREAKER (SELF-PROPELLED OR TRUCK MOUNTED-INCLUDES COMPRESSOR); CONCRETE PAVER (1 DRUM-1/2 YD. OR LARGER); ELEVATOR (OTHER THAN PASSENGER); MAINTENACNE PERSON; PUMP (2 OR MORE-4-IN. UP TO 6-IN. DISCHARGE- GAS OR DIESEL POWERED- EXCLUDING SUBMERSIBLE PUMPS); PUMPCRETE MACHINE (AND SIMILAR EQUIPMENT); WAGON DRILL (MULTIPLE); WELDING MACHINE OR GENERATOR( 2 OR MORE- 300 AMP. OR LARGER - GAS OR DIESEL POWERED). (AREA 2: ALCONA, ALLEGAN, ALGER, ALPENA, ANTRIM, ARENAC, BARAGA, BARRY, BAY, BENZIE, BERRIEN, BRANCH, CALHOUN, CASS, CHARLEVOIX, CHEBOYGAN, CHIPPEWA, CLARE, CLINTON, CRAWFORD, DELTA, DICKINSON, EATON, EMMET, GLADWIN, GOGEBIC, GRAND TRAVERSE, GRATIOT, HILLSDALE, HOUGHTON, HURON, INGHAM, IONIA, IOSCO, IRON, ISABELLA, JACKSON, KALAMAZOO, KALKASKA, KENT, KWEENAW, LAKW, LEELANAU, LENAWEE, LUCE, MACKINAC, MANISTEE, MARQUETTE, MASON, MECOSTA, MENOMINEE, MIDLAND, MISSAUKEE, MONTCALM, MONTMORENCY, MUSKEGON, NEWAYGO, OCEANA, OGEMAW, ONTONAGON, OSCEOLA, OSCODA, OTSEGO, OTTAWA, PRESQUE ISLE, ROSCOMMON, SAGINAW, SANILAC, SCHOOLCRAFT, SHIAWASSEE, ST. JOSEPH, RUSCOLA, VAN BUREN, AND WEXFORD COUNTIES) | $40.52 | $25.25 | $65.77 | MI20260001 Highway |
| Clare + 83 more | OPERATOR: POWER EQUIPMENT, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 4- BOILER; CONCRETE SAW (40 HP OR OVER); CURING MACHINE (SELF-PROPELLED); FARM TRACTOR (WITH ATTACHMENT); FINISHING MACHINE (CONCRETE); HYDRAULIC PIPE PUSHING MACHINE; MULCHING EQUIPMENT; PUMPS (2 OR MORE UP TO 4-IN. DISCHARGE, IF USED 3 OR MORE HOURS A DAY, GAS OR DIESEL POWERED0-EXCLUDING SUBMERSIBLE PUMPS); ROLLER (OTHER THAN ASPHALT); STUMP REMOVER; TRENCHER (SERVICE); VIBRATING COMPACTION EQUIPMENT, SELF-PROPELLED (6 FT. WIDE OR OVER); SWEEPER (WAYNE TYPE); WATER WAGON AND EXTEND-A BOOM FORKLIFT. (AREA 1: GENESEE, LAPEER, LIVINGSTON, MACOMB, MONROE, OAKLAND, ST. CLAIR, WASTENAW, AND WAYNE COUNTIES) | $39.95 | $25.25 | $65.20 | MI20260001 Highway |
| Clare + 83 more | OPERATOR: POWER EQUIPMENT, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 4- BOILER; CONCRETE SAW (40 HP OR OVER); CURING MACHINE (SELF-PROPELLED); FARM TRACTOR (WITH ATTACHMENT); FINISHING MACHINE (CONCRETE); HYDRAULIC PIPE PUSHING MACHINE; MULCHING EQUIPMENT; PUMPS (2 OR MORE UP TO 4-IN. DISCHARGE, IF USED 3 OR MORE HOURS A DAY, GAS OR DIESEL POWERED0-EXCLUDING SUBMERSIBLE PUMPS); ROLLER (OTHER THAN ASPHALT); STUMP REMOVER; TRENCHER (SERVICE); VIBRATING COMPACTION EQUIPMENT, SELF-PROPELLED (6 FT. WIDE OR OVER); SWEEPER (WAYNE TYPE); WATER WAGON AND EXTEND-A BOOM FORKLIFT. (AREA 2: ALCONA, ALLEGAN, ALGER, ALPENA, ANTRIM, ARENAC, BARAGA, BARRY, BAY, BENZIE, BERRIEN, BRANCH, CALHOUN, CASS, CHARLEVOIX, CHEBOYGAN, CHIPPEWA, CLARE, CLINTON, CRAWFORD, DELTA, DICKINSON, EATON, EMMET, GLADWIN, GOGEBIC, GRAND TRAVERSE, GRATIOT, HILLSDALE, HOUGHTON, HURON, INGHAM, IONIA, IOSCO, IRON, ISABELLA, JACKSON, KALAMAZOO, KALKASKA, KENT, KWEENAW, LAKW, LEELANAU, LENAWEE, LUCE, MACKINAC, MANISTEE, MARQUETTE, MASON, MECOSTA, MENOMINEE, MIDLAND, MISSAUKEE, MONTCALM, MONTMORENCY, MUSKEGON, NEWAYGO, OCEANA, OGEMAW, ONTONAGON, OSCEOLA, OSCODA, OTSEGO, OTTAWA, PRESQUE ISLE, ROSCOMMON, SAGINAW, SANILAC, SCHOOLCRAFT, SHIAWASSEE, ST. JOSEPH, RUSCOLA, VAN BUREN, AND WEXFORD COUNTIES) | $39.95 | $25.25 | $65.20 | MI20260001 Highway |
| Clare + 83 more | OPERATOR: POWER EQUIPMENT, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 5- FIRE PERSON, OILER (AREA 1: GENESEE, LAPEER, LIVINGSTON, MACOMB, MONROE, OAKLAND, ST. CLAIR, WASTENAW, AND WAYNE COUNTIES) | $30.35 | $12.10 | $42.45 | MI20260001 Highway |
| Clare + 83 more | OPERATOR: POWER EQUIPMENT, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 5- FIRE PERSON, OILER (AREA 2: ALCONA, ALLEGAN, ALGER, ALPENA, ANTRIM, ARENAC, BARAGA, BARRY, BAY, BENZIE, BERRIEN, BRANCH, CALHOUN, CASS, CHARLEVOIX, CHEBOYGAN, CHIPPEWA, CLARE, CLINTON, CRAWFORD, DELTA, DICKINSON, EATON, EMMET, GLADWIN, GOGEBIC, GRAND TRAVERSE, GRATIOT, HILLSDALE, HOUGHTON, HURON, INGHAM, IONIA, IOSCO, IRON, ISABELLA, JACKSON, KALAMAZOO, KALKASKA, KENT, KWEENAW, LAKW, LEELANAU, LENAWEE, LUCE, MACKINAC, MANISTEE, MARQUETTE, MASON, MECOSTA, MENOMINEE, MIDLAND, MISSAUKEE, MONTCALM, MONTMORENCY, MUSKEGON, NEWAYGO, OCEANA, OGEMAW, ONTONAGON, OSCEOLA, OSCODA, OTSEGO, OTTAWA, PRESQUE ISLE, ROSCOMMON, SAGINAW, SANILAC, SCHOOLCRAFT, SHIAWASSEE, ST. JOSEPH, RUSCOLA, VAN BUREN, AND WEXFORD COUNTIES) | $30.35 | $12.10 | $42.45 | MI20260001 Highway |
| Clare + 83 more | POWER EQUIPMENT OPERATORS - GAS DISTRIBUTION AND DUCT INSTALLATION WORK: GROUP 1 BACKHOE, CRANE, GRADER, MECHANIC, DOZER (D-6 EQUIVALENT OR LARGER), SIDE BOOM (D-4 EQUIVALENT OR LARGER), TRENCHER(EXCEPT SERVICE), ENDLOADER (2 YD. CAPACITY OR GREATER). SCOPE OF WORK: THE CONSTRUCTION, INSTALLATION, TREATING AND RECONDITIONING OF PIPELINES TRANSPORTING GAS VAPORS WITHIN CITIES, TOWNS, SUBDIVISIONS, SUBURBAN AREAS, OR WITHIN PRIVATE PROPERTY BOUNDARIES, UP TO AND INCLUDING PRIVATE METER SETTINGS OF PRIVATE INDUSTRIAL, GOVERNMENTAL OR OTHER PREMISES, MORE COMMONLY REFERRED TO AS "DISTRIBUTION WORK," STARTING FROM THE FIRST METERING STATION, CONNECTION, SIMILAR OR RELATED FACILITY, OF THE MAIN OR CROSS COUNTRY PIPELINE AND INCLUDING DUCT INSTALLATION | $39.78 | $25.25 | $65.03 | MI20260157 Heavy |
| Clare + 83 more | POWER EQUIPMENT OPERATORS - GAS DISTRIBUTION AND DUCT INSTALLATION WORK: GROUP 1- BACKHOE, CRANE, GRADER, MECHANIC, DOZER (D-6 EQUIVALENT OR LARGER), SIDE BOOM (D-4 EQUIVALENT OR LARGER), TRENCHER(EXCEPT SERVICE), ENDLOADER (2 YD. CAPACITY OR GREATER). SCOPE OF WORK: THE CONSTRUCTION, INSTALLATION, TREATING AND RECONDITIONING OF PIPELINES TRANSPORTING GAS VAPORS WITHIN CITIES, TOWNS, SUBDIVISIONS, SUBURBAN AREAS, OR WITHIN PRIVATE PROPERTY BOUNDARIES, UP TO AND INCLUDING PRIVATE METER SETTINGS OF PRIVATE INDUSTRIAL, GOVERNMENTAL OR OTHER PREMISES, MORE COMMONLY REFERRED TO AS "DISTRIBUTION WORK," STARTING FROM THE FIRST METERING STATION, CONNECTION, SIMILAR OR RELATED FACILITY, OF THE MAIN OR CROSS COUNTRY PIPELINE AND INCLUDING DUCT INSTALLATION | $39.78 | $25.25 | $65.03 | MI20260001 Highway |
| Clare + 83 more | POWER EQUIPMENT OPERATORS - GAS DISTRIBUTION AND DUCT INSTALLATION WORK: GROUP 2 DOZER (LESS THAN D-6 EQUIVALENT), ENDLOADER (UNDER 2 YD. CAPACITY), SIDE BOOM (UNDER D-4 CAPACITY), BACKFILLER, PUMPS (1 OR 2 OF 6-INCH DISCHARGE OR GREATER), BOOM TRUCK (WITH POWERED BOOM), TRACTOR (WHEEL TYPE OTHER THAN BACKHOE OR FRONT ENDLOADER). TAMPER (SELF-PROPELLED), BOOM TRUCK (WITH NON-POWERED BOOM), CONCRETE SAW (20 HP OR LARGER), PUMPS (2 TO 4 UNDER 6-INCH DISCHARGE), COMPRESSOR (2 OR MORE OR WHEN ONE IS USED CONTINUOUSLY INTO THE SECOND DAY) AND TRENCHER(SERVICE). OILER, HYDRAULIC PIPE PUSHING MACHINE, GREASE PERSON AND HYDROSTATIC TESTING OPERATOR. SCOPE OF WORK: THE CONSTRUCTION, INSTALLATION, TREATING AND RECONDITIONING OF PIPELINES TRANSPORTING GAS VAPORS WITHIN CITIES, TOWNS, SUBDIVISIONS, SUBURBAN AREAS, OR WITHIN PRIVATE PROPERTY BOUNDARIES, UP TO AND INCLUDING PRIVATE METER SETTINGS OF PRIVATE INDUSTRIAL, GOVERNMENTAL OR OTHER PREMISES, MORE COMMONLY REFERRED TO AS "DISTRIBUTION WORK," STARTING FROM THE FIRST METERING STATION, CONNECTION, SIMILAR OR RELATED FACILITY, OF THE MAIN OR CROSS COUNTRY PIPELINE AND INCLUDING DUCT INSTALLATION | $36.05 | $25.25 | $61.30 | MI20260157 Heavy |
| Clare + 83 more | POWER EQUIPMENT OPERATORS - GAS DISTRIBUTION AND DUCT INSTALLATION WORK: GROUP 2- DOZER (LESS THAN D-6 EQUIVALENT), ENDLOADER (UNDER 2 YD. CAPACITY), SIDE BOOM (UNDER D-4 CAPACITY), BACKFILLER, PUMPS (1 OR 2 OF 6-INCH DISCHARGE OR GREATER), BOOM TRUCK (WITH POWERED BOOM), TRACTOR (WHEEL TYPE OTHER THAN BACKHOE OR FRONT ENDLOADER). TAMPER (SELF-PROPELLED), BOOM TRUCK (WITH NON-POWERED BOOM), CONCRETE SAW (20 HP OR LARGER), PUMPS (2 TO 4 UNDER 6-INCH DISCHARGE), COMPRESSOR (2 OR MORE OR WHEN ONE IS USED CONTINUOUSLY INTO THE SECOND DAY) AND TRENCHER(SERVICE). OILER, HYDRAULIC PIPE PUSHING MACHINE, GREASE PERSON AND HYDROSTATIC TESTING OPERATOR. SCOPE OF WORK: THE CONSTRUCTION, INSTALLATION, TREATING AND RECONDITIONING OF PIPELINES TRANSPORTING GAS VAPORS WITHIN CITIES, TOWNS, SUBDIVISIONS, SUBURBAN AREAS, OR WITHIN PRIVATE PROPERTY BOUNDARIES, UP TO AND INCLUDING PRIVATE METER SETTINGS OF PRIVATE INDUSTRIAL, GOVERNMENTAL OR OTHER PREMISES, MORE COMMONLY REFERRED TO AS "DISTRIBUTION WORK," STARTING FROM THE FIRST METERING STATION, CONNECTION, SIMILAR OR RELATED FACILITY, OF THE MAIN OR CROSS COUNTRY PIPELINE AND INCLUDING DUCT INSTALLATION | $36.05 | $25.25 | $61.30 | MI20260001 Highway |
| Clare + 83 more | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 1: LEVEL A) | $34.68 | $19.70 | $54.38 | MI20260158 Heavy |
| Clare + 83 more | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 1: LEVEL B AND C) | $33.73 | $19.70 | $53.43 | MI20260158 Heavy |
| Clare + 83 more | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 1: LEVEL D WHEN CAPPING LANDFILL) | $32.18 | $19.70 | $51.88 | MI20260158 Heavy |
| Clare + 83 more | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 1: LEVEL D) | $32.43 | $19.70 | $52.13 | MI20260158 Heavy |
| Clare + 83 more | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 1: LEVEL A) | $34.98 | $19.70 | $54.68 | MI20260158 Heavy |
| Clare + 83 more | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 1: LEVEL B AND C) | $34.03 | $19.70 | $53.73 | MI20260158 Heavy |
| Clare + 83 more | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 1: LEVEL D WHEN CAPPING LANDFILL) | $32.48 | $19.70 | $52.18 | MI20260158 Heavy |
| Clare + 83 more | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 1: LEVEL D) | $32.73 | $19.70 | $52.43 | MI20260158 Heavy |
| Clare + 83 more | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 1 (AREA 1: LEVEL A) | $32.03 | $19.70 | $51.73 | MI20260158 Heavy |
| Clare + 83 more | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 1 (AREA 1: LEVEL B AND C) | $31.08 | $19.70 | $50.78 | MI20260158 Heavy |
| Clare + 83 more | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 1 (AREA 1: LEVEL D WHEN CAPPING LANDFILL) | $29.53 | $19.70 | $49.23 | MI20260158 Heavy |
| Clare + 83 more | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 1 (AREA 1: LEVEL D) | $29.78 | $19.70 | $49.48 | MI20260158 Heavy |
| Clare + 83 more | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 2 (AREA 1: LEVEL A) | $27.80 | $19.70 | $47.50 | MI20260158 Heavy |
| Clare + 83 more | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 2 (AREA 1: LEVEL B AND C) | $26.85 | $19.70 | $46.55 | MI20260158 Heavy |
| Clare + 83 more | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 2 (AREA 1: LEVEL D WHEN CAPPING LANDFILL) | $25.30 | $19.70 | $45.00 | MI20260158 Heavy |
| Clare + 83 more | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 2 (AREA 1: LEVEL D) | $25.55 | $19.70 | $45.25 | MI20260158 Heavy |
| Clare + 83 more | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 1: LEVEL A) | $33.00 | $19.70 | $52.70 | MI20260158 Heavy |
| Clare + 83 more | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 1: LEVEL D WHEN CAPPING LANDFILL) | $29.88 | $19.70 | $49.58 | MI20260158 Heavy |
| Clare + 83 more | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 1: LEVEL D) | $30.75 | $19.70 | $50.45 | MI20260158 Heavy |
| Clare + 83 more | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, PWER SHOVEL OPERATOR | $32.05 | $19.70 | $51.75 | MI20260158 Heavy |
| Clare + 83 more | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 2: LEVEL A) | $32.97 | $19.70 | $52.67 | MI20260158 Heavy |
| Clare + 83 more | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 2: LEVEL B AND C) | $31.91 | $19.70 | $51.61 | MI20260158 Heavy |
| Clare + 83 more | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 2: LEVEL D WHEN CAPPING LANDFILL) | $30.47 | $19.70 | $50.17 | MI20260158 Heavy |
| Clare + 83 more | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 2: LEVEL D) | $30.72 | $19.70 | $50.42 | MI20260158 Heavy |
| Clare + 83 more | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 2: LEVEL A) | $33.27 | $19.70 | $52.97 | MI20260158 Heavy |
| Clare + 83 more | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 2: LEVEL B AND C) | $32.23 | $19.70 | $51.93 | MI20260158 Heavy |
| Clare + 83 more | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 2: LEVEL D WHEN CAPPING LANDFILL) | $30.77 | $19.70 | $50.47 | MI20260158 Heavy |
| Clare + 83 more | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 2: LEVEL D) | $31.02 | $19.70 | $50.72 | MI20260158 Heavy |
| Clare + 83 more | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1 (AREA 2: LEVEL A) | $30.32 | $19.70 | $50.02 | MI20260158 Heavy |
| Clare + 83 more | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1 (AREA 2: LEVEL B AND C) | $29.37 | $19.70 | $49.07 | MI20260158 Heavy |
| Clare + 83 more | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1 (AREA 2: LEVEL D WHEN CAPPING LANDFILL) | $27.82 | $19.70 | $47.52 | MI20260158 Heavy |
| Clare + 83 more | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1 (AREA 2: LEVEL D) | $28.07 | $19.70 | $47.77 | MI20260158 Heavy |
| Clare + 83 more | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 2 (AREA 2: LEVEL A) | $25.92 | $19.70 | $45.62 | MI20260158 Heavy |
| Clare + 83 more | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 2 (AREA 2: LEVEL B AND C) | $24.98 | $19.70 | $44.68 | MI20260158 Heavy |
| Clare + 83 more | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 2 (AREA 2: LEVEL D WHEN CAPPING LANDFILL) | $23.43 | $19.70 | $43.13 | MI20260158 Heavy |
| Clare + 83 more | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 2 (AREA 2: LEVEL D) | $23.68 | $19.70 | $43.38 | MI20260158 Heavy |
| Clare + 83 more | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 2: LEVEL A) | $31.29 | $19.70 | $50.99 | MI20260158 Heavy |
| Clare + 83 more | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 2: LEVEL B AND C) | $30.34 | $19.70 | $50.04 | MI20260158 Heavy |
| Clare + 83 more | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 2: LEVEL D WHEN CAPPING LANDFILL) | $28.79 | $19.70 | $48.49 | MI20260158 Heavy |
| Clare + 83 more | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 2: LEVEL D) | $29.04 | $19.70 | $48.74 | MI20260158 Heavy |
| Clare + 83 more | POWER EQUIPMENT OPERATORS:, AIRPORT, BRIDGE & HIGHWAY CONSTRUCTION: GROUP 1- PAVER OPERATOR (5 BAGS OR MORE); SLIP FORM PAVER; ASPHALT PAVER (SELF-PROPELLED); SHOVEL (EXCVAVATOR) INSTALLING UTILITIES OVER 20 FEET IN DEPTH | $46.21 | $25.25 | $71.46 | MI20260001 Highway |
| Clare + 83 more | POWER EQUIPMENT OPERATORS:, AIRPORT, BRIDGE & HIGHWAY CONSTRUCTION: GROUP 2- ASPHALT PLANT OPERATOR; CRANE OPERATOR (DOES NOT INCLUDE WORK ON BRIDGE CONSTRUCTION PROJECTS WHEN THE CRANE OPERATOR IS ERECTING STRUCTURAL COMPONENTS); DRAGLINE OPERATOR; SHOVEL (EXCAVATOR) OPERATOR; LOCOMOTIVE OPERATOR; ELEVATING GRADER OPERATOR; PILE DRIVING OPERATOR; ROLLER OPERATOR (ASPHALT); BLADE GRADER OPERATOR; TRNECHING MACHINE OPERATOR (LADDER OR WHEEL TYPE); AUTO-GRADER; SELF-PROPELLED OR TRACTOR-DRAWN SCRAPER; CONVEYOR LOADER OPERATOR (EUCLID TYPE); BULLDOZER; HOISTING ENGINEER; TRACTOR OPERATOR; FINISHING MACHINE OPERATOR (ASPHALT); MECHANIC; PUMP OPERATOR (6-IN. DISCHARGE OR OVER, GAS, DIESEL POWERED OR GENERATOR OF 300 AMP. OR LARGER); SHOULDERING OR GRAVEL DISTRIBUTING MACHINE OPERATOR (SELF-PROPELLED); BACKHOE (WITH OVER 3/8 YD. BUCKET); SIDE BOOM TRACTOR (TYPE D-4 OR EQUIVALENT OR LARGER); TUBE FINISHER (SLIP FORM PAVING); GRADALL (AND SIMILAR TYPE MACHINE); ASPHALT PLANNER (SELF-PROPELLED); BATCH PLANT (CONCRETE-CENTRAL MIX); SLURRY MACHINE (ASPHALT); CONCRETE PUMP (3 IN.C AND OVER); ROTO-MILL; SWINGING BOOM TRUCK (OVER 12 TON CAPACITY); HYDRO DEMOLISHER (WATER BLASTER); FARM-TYPE TRACTOR WITH ATTACHED PAN; VACUUM TRUCK OPERATOR; BATCH PLANT (CONCRETE DRY BATCH); CONCRETE SAW OPERATOR (40 H.P. OR OVER); TRACTOR OPERATOR (FARM TYPE); FINISHING MACHINE OPERATOR (CONCRETE); GRADER OPEARTOR (SELF-PROPELLED FINE GRADE OR FORM (CONCRETE)); TRACTOR OPERATOR (FARM TYPE WITH ATTACHMENT); WAGON DRILL OPERATOR; BOOM OR WINCH HOIST TRUCK OPERATOR | $45.06 | $25.25 | $70.31 | MI20260001 Highway |
| Clare + 83 more | POWER EQUIPMENT OPERATORS:, AIRPORT, BRIDGE & HIGHWAY CONSTRUCTION: GROUP 3- SCREENING PLANT OPERATOR; WASHING PLANT OPERATOR; CRUSTHER OPERATOR; BACKHOE (WITH 3/8 YD. BUCKET OR LESS); SIDE BOOM TRACTOR (SMALLER THAN D-4 TYPE OR EQUIVALENT); SWEEPER (WAYNE TYPE AND SIMILAR EQUIPMENT); GREASE TRUCK; AIR COMPRESSOR OPERATOR (600 CU. FT. PER MIN OR MORE); AIR COMPRESSOR OPERATOR (TWO OR MORE, LESS THAN 600 CFM); END LOADER OPERATOR (1 YARD CAPACITY AND OVER); SIDE BOOM TRACTOR (TYPE D OR EQUIVALENT OR LARGER); ENDLOADER OPERATOR (UNDER 1 YARD CAPACITY); TRENCHER (SERVICE) | $38.33 | $25.25 | $63.58 | MI20260001 Highway |
| Clare + 83 more | POWER EQUIPMENT OPERATORS:, AIRPORT, BRIDGE & HIGHWAY CONSTRUCTION: GROUP 4- BOILER FIRE TENDER; CONCRETE BREAKER; OILER; FIRE TENDER; TRENCHER (SERVICE); FLEXPLANE OPERATOR; CLEFTPLANE OPERATOR; ROLLER OPERATOR (OTHER THAN ASPHALT); CURING EQUIPMENT OPERATOR (SELF-PROPELLED); POWER BIN OPERATOR; PLANT DRIER OPERATOR (ASPHALT); VIBRATORY COMPCTION EQUIPMENT OPEARTOR (6 FT. WIDE OR OVER); GUARD POST DRIVER OPERATOR (POWER DRIVEN); ALL MULCHING EQUIPMENT; STUMP REMOVER; CONCRETE PUM (UNDER 3-IN.); MESH INSTALLER (SELF-PROPELLED); END DUMP; SKID STEER | $37.77 | $25.25 | $63.02 | MI20260001 Highway |
| Clinton | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $21.94 | $8.72 | $30.66 | MI20260081 Building |
| Clinton | OPERATOR: BULLDOZER | $19.73 | $7.02 | $26.75 | MI20260081 Building |
| Clinton | OPERATOR: GRADER/BLADE | $22.00 | $6.29 | $28.29 | MI20260081 Building |
| Clinton | OPERATOR: LOADER | $19.75 | $9.98 | $29.73 | MI20260081 Building |
| Clinton | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER | $48.98 | $25.25 | $74.23 | MI20260055 Heavy |
| Clinton | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK | $45.68 | $25.25 | $70.93 | MI20260055 Heavy |
| Clinton | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 3 BACKHOE/EXCAVATOR; BORING MACHINE; BULLDOZER; CRANE; GRADER/BLADE; LOADER; ROLLER; SCRAPER; TRACTOR; TRENCHER | $44.00 | $25.25 | $69.25 | MI20260055 Heavy |
| Clinton | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 4 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) | $41.32 | $25.25 | $66.57 | MI20260055 Heavy |
| Clinton | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 5 BOOM TRUCK (NON-SWINGING) | $41.32 | $25.25 | $66.57 | MI20260055 Heavy |
| Clinton | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 6 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) | $35.46 | $25.25 | $60.71 | MI20260055 Heavy |
| Clinton | OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER | $47.28 | $25.25 | $72.53 | MI20260081 Building |
| Clinton | OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK | $43.93 | $25.25 | $69.18 | MI20260081 Building |
| Clinton | OPERATOR: POWER EQUIPMENT: GROUP 3 CONCRETE PUMP; CRANE; HIGHLIFT; HOIST; ROLLER; SCRAPER; STIFF LEG DERRICK; TRENCHER | $41.28 | $25.25 | $66.53 | MI20260081 Building |
| Clinton | OPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) | $39.57 | $25.25 | $64.82 | MI20260081 Building |
| Clinton | OPERATOR: POWER EQUIPMENT: GROUP 5 BOOM TRUCK (NON-SWINGING) | $39.57 | $25.25 | $64.82 | MI20260081 Building |
| Clinton | OPERATOR: POWER EQUIPMENT: GROUP 6 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) | $33.71 | $25.25 | $58.96 | MI20260081 Building |
| Clinton | OPERATOR: POWER EQUIPMENT: GROUP 7 OILER | $31.23 | $25.25 | $56.48 | MI20260081 Building |
| Clinton | OPERATOR: TRACTOR | $19.10 | $8.48 | $27.58 | MI20260081 Building |
| Clinton | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, GRADER/ BLADE, LOADER, ROLLER, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 | $71.23 | MI20260055 Heavy |
| Clinton | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 | $66.50 | MI20260055 Heavy |
| Clinton | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 | $65.77 | MI20260055 Heavy |
| Clinton | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR, BOBCAT/ SKID STEER /SKID LOADER | $39.95 | $25.25 | $65.20 | MI20260055 Heavy |
| Clinton, Eaton | OPERATOR: BACKHOE/EXCAVATOR | $19.94 | $5.46 | $25.40 | MI20260027 Residential |
| Clinton, Eaton | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $17.66 | $7.65 | $25.31 | MI20260027 Residential |
| Clinton, Eaton | OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER | $48.98 | $25.25 | $74.23 | MI20260027 Residential |
| Clinton, Eaton | OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK | $45.68 | $25.25 | $70.93 | MI20260027 Residential |
| Clinton, Eaton | OPERATOR: POWER EQUIPMENT: GROUP 3 BULLDOZER; CRANE; GRADER/BLADE; LOADER; SCRAPER | $44.00 | $25.25 | $69.25 | MI20260027 Residential |
| Crawford | OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 | MI20260115 Building |
| Crawford | OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 | MI20260115 Building |
| Crawford | POWER EQUIPMENT OPERATOR: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $44.13 | $25.25 | $69.38 | MI20260115 Building |
| Crawford | POWER EQUIPMENT OPERATOR: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER; TOWER CRANE, GANTRY CRANE AND WHIRLEY DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $43.93 | $25.25 | $69.18 | MI20260115 Building |
| Crawford | POWER EQUIPMENT OPERATOR: GROUP 3 BACKHOE/EXCAVATOR; BULLDOZER; CRANE; LOADER; PAVER; ROLLER; SCRAPER; STIFF LEG DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 | $66.53 | MI20260115 Building |
| Crawford | POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID LOADER; FORK TRUCK (OVER 20' LIFT) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 | MI20260115 Building |
| Crawford | POWER EQUIPMENT OPERATOR: GROUP 5 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 | MI20260115 Building |
| Crawford | POWER EQUIPMENT OPERATOR: GROUP 6 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $31.23 | $25.25 | $56.48 | MI20260115 Building |
| Delta | OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 | MI20260116 Building |
| Delta | OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 | MI20260116 Building |
| Delta | POWER EQUIPMENT OPERATOR: CRANE OPERATOR, MAIN BOOM & JIB 120' OR LONGER PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $43.81 | $25.00 | $68.81 | MI20260116 Building |
| Delta | POWER EQUIPMENT OPERATOR: CRANE OPERATOR, MAIN BOOM & JIB 140' OR LONGER PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $44.63 | $25.00 | $69.63 | MI20260116 Building |
| Delta | POWER EQUIPMENT OPERATOR: CRANE OPERATOR, MAIN BOOM & JIB 220' OR LONGER PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $44.92 | $25.00 | $69.92 | MI20260116 Building |
| Delta | POWER EQUIPMENT OPERATOR: GROUP 1 BACKHOE, BULLDOZER; CRANE, FRONT END LOADER, EXCAVATOR, PAVER, ROLLER, AND SCRAPER (SELF-PROPELLED AND TRACTOR DRAWN) PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $40.51 | $25.00 | $65.51 | MI20260116 Building |
| Delta | POWER EQUIPMENT OPERATOR: GROUP 2 FORK TRUCK PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $37.26 | $25.00 | $62.26 | MI20260116 Building |
| Delta | POWER EQUIPMENT OPERATOR: GROUP 3 OILER PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $35.86 | $12.50 | $48.36 | MI20260116 Building |
| Delta, Dickinson | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $12.98 | $6.12 | $19.10 | MI20260047 Heavy |
| Delta, Dickinson | OPERATOR: GRADER/BLADE | $16.63 | $5.85 | $22.48 | MI20260047 Heavy |
| Delta, Dickinson | OPERATOR: POWER EQUIPMENT: CRANE, MAIN BOOM & JIB 120' OR LONGER (EXCLUDES UNDERGROUND CONSTRUCTION) | $43.81 | $25.00 | $68.81 | MI20260047 Heavy |
| Delta, Dickinson | OPERATOR: POWER EQUIPMENT: CRANE, MAIN BOOM & JIB 140' OR LONGER (EXCLUDES UNDERGROUND CONSTRUCTION) | $44.63 | $25.00 | $69.63 | MI20260047 Heavy |
| Delta, Dickinson | OPERATOR: POWER EQUIPMENT: CRANE, MAIN BOOM & JIB 220' OR LONGER (EXCLUDES UNDERGROUND CONSTRUCTION) | $44.92 | $25.00 | $69.92 | MI20260047 Heavy |
| Delta, Dickinson | OPERATOR: ROLLER | $13.74 | $7.93 | $21.67 | MI20260047 Heavy |
| Delta, Dickinson | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, SCRAPER, LOADER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 | $71.23 | MI20260047 Heavy |
| Delta, Dickinson | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 | $66.50 | MI20260047 Heavy |
| Delta, Dickinson | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 | $65.77 | MI20260047 Heavy |
| Delta, Dickinson | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR | $39.95 | $25.25 | $65.20 | MI20260047 Heavy |
| Dickinson | OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 | MI20260117 Building |
| Dickinson | OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 | MI20260117 Building |
| Dickinson | POWER EQUIPMENT OPERATOR: CRANE OPERATOR, MAIN BOOM & JIB 120' OR LONGER PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $43.81 | $25.00 | $68.81 | MI20260117 Building |
| Dickinson | POWER EQUIPMENT OPERATOR: CRANE OPERATOR, MAIN BOOM & JIB 140' OR LONGER PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $44.63 | $25.00 | $69.63 | MI20260117 Building |
| Dickinson | POWER EQUIPMENT OPERATOR: CRANE OPERATOR, MAIN BOOM & JIB 220' OR LONGER PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $44.92 | $25.00 | $69.92 | MI20260117 Building |
| Dickinson | POWER EQUIPMENT OPERATOR: GROUP 1 BACKHOE, BULLDOZER; CRANE, FRONT END LOADER, EXCAVATOR, PAVER, ROLLER, AND SCRAPER (SELF-PROPELLED AND TRACTOR DRAWN) PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $40.51 | $25.00 | $65.51 | MI20260117 Building |
| Dickinson | POWER EQUIPMENT OPERATOR: GROUP 2 FORK TRUCK PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $37.26 | $25.00 | $62.26 | MI20260117 Building |
| Dickinson | POWER EQUIPMENT OPERATOR: GROUP 3 OILER PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $35.86 | $12.50 | $48.36 | MI20260117 Building |
| Eaton | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $21.94 | $8.72 | $30.66 | MI20260082 Building |
| Eaton | OPERATOR: BULLDOZER | $19.73 | $7.02 | $26.75 | MI20260082 Building |
| Eaton | OPERATOR: GRADER/BLADE | $22.00 | $6.29 | $28.29 | MI20260082 Building |
| Eaton | OPERATOR: LOADER | $19.75 | $9.98 | $29.73 | MI20260082 Building |
| Eaton | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER | $48.98 | $25.25 | $74.23 | MI20260056 Heavy |
| Eaton | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK | $45.68 | $25.25 | $70.93 | MI20260056 Heavy |
| Eaton | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 3 BACKHOE/EXCAVATOR; BORING MACHINE; BULLDOZER; CRANE; GRADER/BLADE; LOADER; ROLLER; SCRAPER; TRACTOR; TRENCHER | $44.00 | $25.25 | $69.25 | MI20260056 Heavy |
| Eaton | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 4 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) | $41.32 | $25.25 | $66.57 | MI20260056 Heavy |
| Eaton | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 5 BOOM TRUCK (NON-SWINGING) | $41.32 | $25.25 | $66.57 | MI20260056 Heavy |
| Eaton | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 6 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) | $35.46 | $25.25 | $60.71 | MI20260056 Heavy |
| Eaton | OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER | $47.28 | $25.25 | $72.53 | MI20260082 Building |
| Eaton | OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK | $43.93 | $25.25 | $69.18 | MI20260082 Building |
| Eaton | OPERATOR: POWER EQUIPMENT: GROUP 3 CONCRETE PUMP; CRANE; HIGHLIFT; HOIST; ROLLER; SCRAPER; STIFF LEG DERRICK; TRENCHER | $41.28 | $25.25 | $66.53 | MI20260082 Building |
| Eaton | OPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) | $39.57 | $25.25 | $64.82 | MI20260082 Building |
| Eaton | OPERATOR: POWER EQUIPMENT: GROUP 5 BOOM TRUCK (NON-SWINGING) | $39.57 | $25.25 | $64.82 | MI20260082 Building |
| Eaton | OPERATOR: POWER EQUIPMENT: GROUP 6 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) | $33.71 | $25.25 | $58.96 | MI20260082 Building |
| Eaton | OPERATOR: POWER EQUIPMENT: GROUP 7 OILER | $31.23 | $25.25 | $56.48 | MI20260082 Building |
| Eaton | OPERATOR: TRACTOR | $19.10 | $8.48 | $27.58 | MI20260082 Building |
| Eaton | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, GRADER/ BLADE, LOADER, ROLLER, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 | $71.23 | MI20260056 Heavy |
| Eaton | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 | $66.50 | MI20260056 Heavy |
| Eaton | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 | $65.77 | MI20260056 Heavy |
| Eaton | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR, BOBCAT/ SKID STEER /SKID LOADER | $39.95 | $25.25 | $65.20 | MI20260056 Heavy |
| Eaton | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1 (AREA 2: LEVEL D WHEN CAPPING LANDFILL) | $42.74 | $21.53 | $64.27 | MI20260082 Building |
| Emmet | OPERATOR: BACKHOE/EXCAVATOR | $14.24 | $8.11 | $22.35 | MI20260035 Heavy |
| Emmet | OPERATOR: BACKHOE/EXCAVATOR | $24.04 | $6.03 | $30.07 | MI20260118 Building |
| Emmet | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $12.98 | $6.12 | $19.10 | MI20260035 Heavy |
| Emmet | OPERATOR: BULLDOZER | $16.17 | $9.51 | $25.68 | MI20260035 Heavy |
| Emmet | OPERATOR: BULLDOZER | $22.46 | $7.29 | $29.75 | MI20260118 Building |
| Emmet | OPERATOR: GRADER/BLADE | $15.50 | $3.62 | $19.12 | MI20260035 Heavy |
| Emmet | OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 | MI20260118 Building |
| Emmet | OPERATOR: LOADER | $13.26 | $8.36 | $21.62 | MI20260035 Heavy |
| Emmet | OPERATOR: LOADER | $24.04 | $6.03 | $30.07 | MI20260118 Building |
| Emmet | OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER | $48.98 | $25.25 | $74.23 | MI20260035 Heavy |
| Emmet | OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK | $45.68 | $25.25 | $70.93 | MI20260035 Heavy |
| Emmet | OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 3 COMPACTOR; CRANE; SCRAPER | $44.00 | $25.25 | $69.25 | MI20260035 Heavy |
| Emmet | OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 4 BOOM TRUCK (NON-SWINGING) | $41.32 | $25.25 | $66.57 | MI20260035 Heavy |
| Emmet | OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 5 OILER | $32.98 | $25.25 | $58.23 | MI20260035 Heavy |
| Emmet | OPERATOR: ROLLER | $13.74 | $7.93 | $21.67 | MI20260035 Heavy |
| Emmet | OPERATOR: ROLLER | $27.47 | $8.86 | $36.33 | MI20260118 Building |
| Emmet | OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 | MI20260118 Building |
| Emmet | POWER EQUIPMENT OPERATOR: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $47.28 | $25.25 | $72.53 | MI20260118 Building |
| Emmet | POWER EQUIPMENT OPERATOR: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER; TOWER CRANE, GANTRY CRANE AND WHIRLEY DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $43.93 | $25.25 | $69.18 | MI20260118 Building |
| Emmet | POWER EQUIPMENT OPERATOR: GROUP 3 CRANE; PAVER; AND SCRAPER; STIFF LEG DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 | $66.53 | MI20260118 Building |
| Emmet | POWER EQUIPMENT OPERATOR: GROUP 4 FORK TRUCK (OVER 20' LIFT) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 | MI20260118 Building |
| Emmet | POWER EQUIPMENT OPERATOR: GROUP 5 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $33.71 | $25.25 | $58.96 | MI20260118 Building |
| Emmet | POWER EQUIPMENT OPERATOR: GROUP 6 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $31.23 | $25.25 | $56.48 | MI20260118 Building |
| Emmet | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BORING MACHINE, CRANE, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 | $71.23 | MI20260035 Heavy |
| Emmet | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 | $66.50 | MI20260035 Heavy |
| Emmet | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 | $65.77 | MI20260035 Heavy |
| Emmet | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR | $39.95 | $25.25 | $65.20 | MI20260035 Heavy |
| Genesee | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER | $48.98 | $25.25 | $74.23 | MI20260057 Heavy |
| Genesee | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK | $45.68 | $25.25 | $70.93 | MI20260057 Heavy |
| Genesee | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 3 BACKHOE/EXCAVATOR; BORING MACHINE; BULLDOZER; CRANE; GRADER/BLADE; LOADER; ROLLER; SCRAPER; TRACTOR; TRENCHER | $44.00 | $25.25 | $69.25 | MI20260057 Heavy |
| Genesee | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 4 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) | $41.32 | $25.25 | $66.57 | MI20260057 Heavy |
| Genesee | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 5 BOOM TRUCK (NON-SWINGING) | $41.32 | $25.25 | $66.57 | MI20260057 Heavy |
| Genesee | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 6 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) | $35.46 | $25.25 | $60.71 | MI20260057 Heavy |
| Genesee | OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER | $48.98 | $25.25 | $74.23 | MI20260013 Residential |
| Genesee | OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER | $47.28 | $25.25 | $72.53 | MI20260083 Building |
| Genesee | OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK | $45.68 | $25.25 | $70.93 | MI20260013 Residential |
| Genesee | OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK | $43.93 | $25.25 | $69.18 | MI20260083 Building |
| Genesee | OPERATOR: POWER EQUIPMENT: GROUP 3 BACKHOE/EXCAVATOR; BULLDOZER; CRANE; GRADER/BLADE; LOADER; AND SCRAPER | $44.00 | $25.25 | $69.25 | MI20260013 Residential |
| Genesee | OPERATOR: POWER EQUIPMENT: GROUP 3 BACKHOE/EXCAVATOR/TRACKHOE; BULLDOZER; CONCRETE PUMP; CRANE; GRADER/BLADE; HIGHLIFT; HOIST; LOADER; ROLLER; SCRAPER; STIFF LEG DERRICK; TRACTOR; TRENCHER | $41.28 | $25.25 | $66.53 | MI20260083 Building |
| Genesee | OPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/ SKID LOADER | $41.32 | $25.25 | $66.57 | MI20260013 Residential |
| Genesee | OPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) | $39.57 | $25.25 | $64.82 | MI20260083 Building |
| Genesee | OPERATOR: POWER EQUIPMENT: GROUP 5 BOOM TRUCK (NON-SWINGING) | $39.57 | $25.25 | $64.82 | MI20260083 Building |
| Genesee | OPERATOR: POWER EQUIPMENT: GROUP 6 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) | $33.71 | $25.25 | $58.96 | MI20260083 Building |
| Genesee | OPERATOR: POWER EQUIPMENT: GROUP 7 OILER | $31.23 | $25.25 | $56.48 | MI20260083 Building |
| Genesee | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, GRADER/ BLADE, LOADER, ROLLER, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 | $71.23 | MI20260057 Heavy |
| Genesee | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 | $66.50 | MI20260057 Heavy |
| Genesee | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 | $65.77 | MI20260057 Heavy |
| Genesee | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR, BOBCAT/ SKID STEER /SKID LOADER | $39.95 | $25.25 | $65.20 | MI20260057 Heavy |
| Genesee | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 2: LEVEL D WHEN CAPPING LANDFILL) | $31.01 | $17.19 | $48.20 | MI20260083 Building |
| Genesee | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 2: LEVEL D) | $31.01 | $17.29 | $48.30 | MI20260083 Building |
| Gladwin | OPERATOR: BACKHOE/EXCAVATOR | $19.00 | $1.22 | $20.22 | MI20260119 Building |
| Gladwin | OPERATOR: BULLDOZER | $22.34 | $1.22 | $23.56 | MI20260119 Building |
| Gladwin | OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 | MI20260119 Building |
| Gladwin | OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $44.13 | $24.85 | $68.98 | MI20260119 Building |
| Gladwin | OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER; TOWER CRANE; GANTRY CRANE AND WHIRLEY DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $38.18 | $24.85 | $63.03 | MI20260119 Building |
| Gladwin | OPERATOR: POWER EQUIPMENT: GROUP 3 CRANE; LOADER; PAVER; SCRAPER; STIFF LEG DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $40.83 | $24.85 | $65.68 | MI20260119 Building |
| Gladwin | OPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; FORK TRUCK (OVER 20' LIFT) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $36.47 | $24.85 | $61.32 | MI20260119 Building |
| Gladwin | OPERATOR: POWER EQUIPMENT: GROUP 5 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $30.61 | $24.85 | $55.46 | MI20260119 Building |
| Gladwin | OPERATOR: POWER EQUIPMENT: GROUP 6 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $26.13 | $24.85 | $50.98 | MI20260119 Building |
| Gladwin | OPERATOR: ROLLER | $28.02 | $7.07 | $35.09 | MI20260119 Building |
| Gladwin | OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 | MI20260119 Building |
| Gladwin | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 1: LEVEL A) | $28.86 | $24.85 | $53.71 | MI20260119 Building |
| Gladwin | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 1: LEVEL B AND C) | $40.83 | $24.85 | $65.68 | MI20260119 Building |
| Gladwin | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 1: LEVEL D WHEN CAPPING LANDFILL) | $36.47 | $24.85 | $61.32 | MI20260119 Building |
| Gladwin | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 1: LEVEL D) | $42.38 | $24.85 | $67.23 | MI20260119 Building |
| Gladwin | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 1: LEVEL A) | $42.38 | $24.85 | $67.23 | MI20260119 Building |
| Gladwin | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 1: LEVEL B AND C) | $26.13 | $24.85 | $50.98 | MI20260119 Building |
| Gladwin | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 1: LEVEL D WHEN CAPPING LANDFILL) | $44.13 | $24.85 | $68.98 | MI20260119 Building |
| Gladwin | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 1: LEVEL D) | $34.72 | $24.85 | $59.57 | MI20260119 Building |
| Gladwin | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 1 (AREA 1: LEVEL A) | $40.83 | $24.85 | $65.68 | MI20260119 Building |
| Gladwin | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 1 (AREA 1: LEVEL B AND C) | $44.13 | $24.85 | $68.98 | MI20260119 Building |
| Gladwin | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 1 (AREA 1: LEVEL D WHEN CAPPING LANDFILL) | $28.86 | $24.85 | $53.71 | MI20260119 Building |
| Gladwin | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 1 (AREA 1: LEVEL D) | $38.18 | $24.85 | $63.03 | MI20260119 Building |
| Gladwin | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 2 (AREA 1: LEVEL A) | $36.43 | $24.85 | $61.28 | MI20260119 Building |
| Gladwin | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 2 (AREA 1: LEVEL B AND C) | $36.47 | $24.85 | $61.32 | MI20260119 Building |
| Gladwin | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 2 (AREA 1: LEVEL D WHEN CAPPING LANDFILL) | $30.61 | $24.85 | $55.46 | MI20260119 Building |
| Gladwin | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 2 (AREA 1: LEVEL D) | $39.08 | $24.85 | $63.93 | MI20260119 Building |
| Gladwin | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 1: LEVEL A) | $30.61 | $24.85 | $55.46 | MI20260119 Building |
| Gladwin | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 1: LEVEL D WHEN CAPPING LANDFILL) | $26.13 | $24.85 | $50.98 | MI20260119 Building |
| Gladwin | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 1: LEVEL D) | $26.38 | $24.85 | $51.23 | MI20260119 Building |
| Gladwin | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 2: LEVEL A) | $42.38 | $24.85 | $67.23 | MI20260119 Building |
| Gladwin | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 2: LEVEL B AND C) | $26.13 | $24.85 | $50.98 | MI20260119 Building |
| Gladwin | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 2: LEVEL A) | $34.72 | $24.85 | $59.57 | MI20260119 Building |
| Gladwin | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 2: LEVEL B AND C) | $36.47 | $24.85 | $61.32 | MI20260119 Building |
| Gladwin | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 2: LEVEL D) | $34.72 | $24.85 | $59.57 | MI20260119 Building |
| Gladwin | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1 (AREA 2: LEVEL A) | $39.08 | $24.85 | $63.93 | MI20260119 Building |
| Gladwin | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1 (AREA 2: LEVEL B AND C) | $30.61 | $24.85 | $55.46 | MI20260119 Building |
| Gladwin | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1 (AREA 2: LEVEL D) | $26.38 | $24.85 | $51.23 | MI20260119 Building |
| Gladwin | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 2 (AREA 2: LEVEL A) | $26.38 | $24.85 | $51.23 | MI20260119 Building |
| Gladwin | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 2 (AREA 2: LEVEL B AND C) | $44.13 | $24.85 | $68.98 | MI20260119 Building |
| Gladwin | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 2 (AREA 2: LEVEL D WHEN CAPPING LANDFILL) | $36.43 | $24.85 | $61.28 | MI20260119 Building |
| Gladwin | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 2 (AREA 2: LEVEL D) | $39.08 | $24.85 | $63.93 | MI20260119 Building |
| Gladwin | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 2: LEVEL A) | $28.86 | $24.85 | $53.71 | MI20260119 Building |
| Gladwin | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 2: LEVEL B AND C) | $36.43 | $24.85 | $61.28 | MI20260119 Building |
| Gladwin | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 2: LEVEL D WHEN CAPPING LANDFILL) | $40.83 | $24.85 | $65.68 | MI20260119 Building |
| Gladwin | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 2: LEVEL D) | $38.18 | $24.85 | $63.03 | MI20260119 Building |
| Gogebic | OPERATOR: BACKHOE/EXCAVATOR | $15.61 | $3.58 | $19.19 | MI20260036 Heavy |
| Gogebic | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $12.98 | $6.12 | $19.10 | MI20260036 Heavy |
| Gogebic | OPERATOR: GRADER/BLADE | $16.63 | $5.85 | $22.48 | MI20260036 Heavy |
| Gogebic | OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 | MI20260120 Building |
| Gogebic | OPERATOR: POWER EQUIPMENT: CRANE, MAIN BOOM & JIB 140' OR LONGER (EXCLUDES UNDERGROUND CONSTRUCTION) | $44.63 | $25.00 | $69.63 | MI20260036 Heavy |
| Gogebic | OPERATOR: POWER EQUIPMENT: CRANE, MAIN BOOM & JIB 220' OR LONGER (EXCLUDES UNDERGROUND CONSTRUCTION) | $44.92 | $25.00 | $69.92 | MI20260036 Heavy |
| Gogebic | OPERATOR: POWER EQUIPMENT: GROUP 1 BULLDOZER; CRANE; COMPACTOR; SCRAPER; LOADER EXCLUDES UNDERGROUND CONSTRUCTION | $40.51 | $25.00 | $65.51 | MI20260036 Heavy |
| Gogebic | OPERATOR: ROLLER | $13.74 | $7.93 | $21.67 | MI20260036 Heavy |
| Gogebic | OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 | MI20260120 Building |
| Gogebic | POWER EQUIPMENT OPERATOR: CRANE OPERATOR, MAIN BOOM & JIB 120' OR LONGER PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $43.81 | $25.00 | $68.81 | MI20260120 Building |
| Gogebic | POWER EQUIPMENT OPERATOR: CRANE OPERATOR, MAIN BOOM & JIB 140' OR LONGER PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $44.63 | $25.00 | $69.63 | MI20260120 Building |
| Gogebic | POWER EQUIPMENT OPERATOR: CRANE OPERATOR, MAIN BOOM & JIB 220' OR LONGER PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $44.92 | $25.00 | $69.92 | MI20260120 Building |
| Gogebic | POWER EQUIPMENT OPERATOR: GROUP 1 BACKHOE, BULLDOZER; CRANE, FRONT END LOADER, EXCAVATOR, PAVER, ROLLER, AND SCRAPER (SELF-PROPELLED AND TRACTOR DRAWN) PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $40.51 | $25.00 | $65.51 | MI20260120 Building |
| Gogebic | POWER EQUIPMENT OPERATOR: GROUP 2 FORK TRUCK PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $37.26 | $25.00 | $62.26 | MI20260120 Building |
| Gogebic | POWER EQUIPMENT OPERATOR: GROUP 3 OILER PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $35.86 | $12.50 | $48.36 | MI20260120 Building |
| Gogebic | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BORING MACHINE, BULLDOZER, CRANE, LOADER, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 | $71.23 | MI20260036 Heavy |
| Gogebic | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 | $66.50 | MI20260036 Heavy |
| Gogebic | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 | $65.77 | MI20260036 Heavy |
| Gogebic | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR | $39.95 | $25.25 | $65.20 | MI20260036 Heavy |
| Grand Traverse | OPERATOR: BACKHOE/EXCAVATOR | $24.04 | $6.03 | $30.07 | MI20260121 Building |
| Grand Traverse | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $12.98 | $6.12 | $19.10 | MI20260037 Heavy |
| Grand Traverse | OPERATOR: BULLDOZER | $16.17 | $9.51 | $25.68 | MI20260037 Heavy |
| Grand Traverse | OPERATOR: BULLDOZER | $22.46 | $7.29 | $29.75 | MI20260121 Building |
| Grand Traverse | OPERATOR: GRADER/BLADE | $15.50 | $3.62 | $19.12 | MI20260037 Heavy |
| Grand Traverse | OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 | MI20260121 Building |
| Grand Traverse | OPERATOR: LOADER | $13.68 | $8.41 | $22.09 | MI20260037 Heavy |
| Grand Traverse | OPERATOR: LOADER | $24.04 | $6.03 | $30.07 | MI20260121 Building |
| Grand Traverse | OPERATOR: POWER EQUIPMENT: BACKHOE/EXCAVATOR; LOADER; ROLLER PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $44.00 | $25.25 | $69.25 | MI20260003 Residential |
| Grand Traverse | OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER | $48.98 | $25.25 | $74.23 | MI20260037 Heavy |
| Grand Traverse | OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK | $45.68 | $25.25 | $70.93 | MI20260037 Heavy |
| Grand Traverse | OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 3 BACKHOE/EXCAVATOR; COMPACTOR; CRANE; SCRAPER | $44.00 | $25.25 | $69.25 | MI20260037 Heavy |
| Grand Traverse | OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 4 BOOM TRUCK (NON-SWINGING) | $41.32 | $25.25 | $66.57 | MI20260037 Heavy |
| Grand Traverse | OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 5 OILER | $32.98 | $25.25 | $58.23 | MI20260037 Heavy |
| Grand Traverse | OPERATOR: ROLLER | $13.74 | $7.93 | $21.67 | MI20260037 Heavy |
| Grand Traverse | OPERATOR: ROLLER | $27.47 | $8.86 | $36.33 | MI20260121 Building |
| Grand Traverse | OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 | MI20260121 Building |
| Grand Traverse | POWER EQUIPMENT OPERATOR: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $47.28 | $25.25 | $72.53 | MI20260121 Building |
| Grand Traverse | POWER EQUIPMENT OPERATOR: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER; TOWER CRANE, GANTRY CRANE AND WHIRLEY DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $43.93 | $25.25 | $69.18 | MI20260121 Building |
| Grand Traverse | POWER EQUIPMENT OPERATOR: GROUP 3 CRANE; PAVER; AND SCRAPER; STIFF LEG DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 | $66.53 | MI20260121 Building |
| Grand Traverse | POWER EQUIPMENT OPERATOR: GROUP 4 FORK TRUCK (OVER 20' LIFT) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 | MI20260121 Building |
| Grand Traverse | POWER EQUIPMENT OPERATOR: GROUP 5 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $33.71 | $25.25 | $58.96 | MI20260121 Building |
| Grand Traverse | POWER EQUIPMENT OPERATOR: GROUP 6 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $31.23 | $25.25 | $56.48 | MI20260121 Building |
| Grand Traverse | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, CRANE, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 | $71.23 | MI20260037 Heavy |
| Grand Traverse | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 | $66.50 | MI20260037 Heavy |
| Grand Traverse | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 | $65.77 | MI20260037 Heavy |
| Grand Traverse | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR | $39.95 | $25.25 | $65.20 | MI20260037 Heavy |
| Gratiot | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $12.98 | $6.12 | $19.10 | MI20260038 Heavy |
| Gratiot | OPERATOR: BULLDOZER | $22.34 | $1.22 | $23.56 | MI20260122 Building |
| Gratiot | OPERATOR: GRADER/BLADE | $15.50 | $3.62 | $19.12 | MI20260038 Heavy |
| Gratiot | OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 | MI20260122 Building |
| Gratiot | OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER | $48.98 | $25.25 | $74.23 | MI20260038 Heavy |
| Gratiot | OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK | $45.68 | $25.25 | $70.93 | MI20260038 Heavy |
| Gratiot | OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 3 BACKHOE/EXCAVATOR; BULLDOZER; COMPACTOR; CRANE; SCRAPER; LOADER | $44.00 | $25.25 | $69.25 | MI20260038 Heavy |
| Gratiot | OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 4 BOOM TRUCK (NON-SWINGING) | $41.32 | $25.25 | $66.57 | MI20260038 Heavy |
| Gratiot | OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 5 OILER | $32.98 | $25.25 | $58.23 | MI20260038 Heavy |
| Gratiot | OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $47.28 | $25.25 | $72.53 | MI20260122 Building |
| Gratiot | OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER; TOWER CRANE; GANTRY CRANE AND WHIRLEY DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $43.93 | $25.25 | $69.18 | MI20260122 Building |
| Gratiot | OPERATOR: POWER EQUIPMENT: GROUP 3 BACKHOE/EXCAVATOR; CRANE; LOADER; PAVER; SCRAPER; STIFF LEG DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 | $66.53 | MI20260122 Building |
| Gratiot | OPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; FORK TRUCK (OVER 20' LIFT) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 | MI20260122 Building |
| Gratiot | OPERATOR: POWER EQUIPMENT: GROUP 5 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $33.71 | $25.25 | $58.96 | MI20260122 Building |
| Gratiot | OPERATOR: POWER EQUIPMENT: GROUP 6 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $31.23 | $25.25 | $56.48 | MI20260122 Building |
| Gratiot | OPERATOR: ROLLER | $13.74 | $7.93 | $21.67 | MI20260038 Heavy |
| Gratiot | OPERATOR: ROLLER | $28.02 | $7.07 | $35.09 | MI20260122 Building |
| Gratiot | OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 | MI20260122 Building |
| Gratiot | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, SCRAPER, LOADER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 | $71.23 | MI20260038 Heavy |
| Gratiot | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 | $66.50 | MI20260038 Heavy |
| Gratiot | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 | $65.77 | MI20260038 Heavy |
| Gratiot | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR | $39.95 | $25.25 | $65.20 | MI20260038 Heavy |
| Hillsdale | OPERATOR: BULLDOZER | $22.34 | $1.22 | $23.56 | MI20260123 Building |
| Hillsdale | OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 | MI20260123 Building |
| Hillsdale | OPERATOR: ROLLER | $28.02 | $7.07 | $35.09 | MI20260123 Building |
| Hillsdale | OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 | MI20260123 Building |
| Hillsdale | POWER EQUIPMENT OPERATOR: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $47.28 | $25.25 | $72.53 | MI20260123 Building |
| Hillsdale | POWER EQUIPMENT OPERATOR: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER; TOWER CRANE; GANTRY CRANE AND WHIRLEY DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $43.93 | $25.25 | $69.18 | MI20260123 Building |
| Hillsdale | POWER EQUIPMENT OPERATOR: GROUP 3 BACKHOE/EXCAVATOR; CRANE; LOADER; PAVER; SCRAPER; STIFF LEG DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 | $66.53 | MI20260123 Building |
| Hillsdale | POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID LOADER; FORK TRUCK (OVER 20' LIFT) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 | MI20260123 Building |
| Hillsdale | POWER EQUIPMENT OPERATOR: GROUP 5 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $33.71 | $25.25 | $58.96 | MI20260123 Building |
| Hillsdale | POWER EQUIPMENT OPERATOR: GROUP 6 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $31.23 | $25.25 | $56.48 | MI20260123 Building |
| Houghton | OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 | MI20260124 Building |
| Houghton | OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 | MI20260124 Building |
| Houghton | POWER EQUIPMENT OPERATOR: CRANE OPERATOR, MAIN BOOM & JIB 120' OR LONGER PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $43.81 | $25.00 | $68.81 | MI20260124 Building |
| Houghton | POWER EQUIPMENT OPERATOR: CRANE OPERATOR, MAIN BOOM & JIB 140' OR LONGER PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $44.63 | $25.00 | $69.63 | MI20260124 Building |
| Houghton | POWER EQUIPMENT OPERATOR: CRANE OPERATOR, MAIN BOOM & JIB 220' OR LONGER PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $44.92 | $25.00 | $69.92 | MI20260124 Building |
| Houghton | POWER EQUIPMENT OPERATOR:: GROUP 1 BACKHOE, BULLDOZER, CRANE, FRONT END LOADER, EXCAVATOR, PAVER, ROLLER, AND SCRAPER (SELF-PROPELLED AND TRACTOR DRAWN) | $40.51 | $25.00 | $65.51 | MI20260124 Building |
| Houghton | POWER EQUIPMENT OPERATOR:: GROUP 2 FORK TRUCK | $37.26 | $25.00 | $62.26 | MI20260124 Building |
| Houghton | POWER EQUIPMENT OPERATOR:: GROUP 3 OILER | $35.86 | $12.50 | $48.36 | MI20260124 Building |
| Huron | OPERATOR: BULLDOZER | $22.34 | $1.22 | $23.56 | MI20260125 Building |
| Huron | OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 | MI20260125 Building |
| Huron | OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $47.28 | $25.25 | $72.53 | MI20260125 Building |
| Huron | OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $43.93 | $25.25 | $69.18 | MI20260125 Building |
| Huron | OPERATOR: POWER EQUIPMENT: GROUP 3 BACKHOE/EXCAVATOR; CRANE; LOADER; PAVER; SCRAPER; STIFF LEG DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 | $66.53 | MI20260125 Building |
| Huron | OPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; FORK TRUCK (OVER 20' LIFT) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 | MI20260125 Building |
| Huron | OPERATOR: POWER EQUIPMENT: GROUP 5 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $33.71 | $25.25 | $58.96 | MI20260125 Building |
| Huron | OPERATOR: POWER EQUIPMENT: GROUP 6 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $31.23 | $25.25 | $56.48 | MI20260125 Building |
| Huron | OPERATOR: ROLLER | $28.02 | $7.07 | $35.09 | MI20260125 Building |
| Huron | OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 | MI20260125 Building |
| Ingham | OPERATOR: BACKHOE/EXCAVATOR | $19.94 | $5.46 | $25.40 | MI20260014 Residential |
| Ingham | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $21.34 | $7.57 | $28.91 | MI20260084 Building |
| Ingham | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $17.66 | $7.65 | $25.31 | MI20260014 Residential |
| Ingham | OPERATOR: BULLDOZER | $20.63 | $8.21 | $28.84 | MI20260084 Building |
| Ingham | OPERATOR: GRADER/BLADE | $22.00 | $6.29 | $28.29 | MI20260084 Building |
| Ingham | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER | $48.98 | $25.25 | $74.23 | MI20260058 Heavy |
| Ingham | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK | $45.68 | $25.25 | $70.93 | MI20260058 Heavy |
| Ingham | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 3 BACKHOE/EXCAVATOR; BORING MACHINE; BULLDOZER; CRANE; GRADER/BLADE; LOADER; ROLLER; SCRAPER; TRACTOR; TRENCHER | $44.00 | $25.25 | $69.25 | MI20260058 Heavy |
| Ingham | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 4 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) | $41.32 | $25.25 | $66.57 | MI20260058 Heavy |
| Ingham | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 5 BOOM TRUCK (NON-SWINGING) | $41.32 | $25.25 | $66.57 | MI20260058 Heavy |
| Ingham | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 6 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) | $35.46 | $25.25 | $60.71 | MI20260058 Heavy |
| Ingham | OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER | $48.98 | $25.25 | $74.23 | MI20260014 Residential |
| Ingham | OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER | $47.28 | $25.25 | $72.53 | MI20260084 Building |
| Ingham | OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK | $45.68 | $25.25 | $70.93 | MI20260014 Residential |
| Ingham | OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK | $43.93 | $25.25 | $69.18 | MI20260084 Building |
| Ingham | OPERATOR: POWER EQUIPMENT: GROUP 3 BULLDOZER; CRANE; GRADER/BLADE; LOADER; SCRAPER | $44.00 | $25.25 | $69.25 | MI20260014 Residential |
| Ingham | OPERATOR: POWER EQUIPMENT: GROUP 3 CONCRETE PUMP; CRANE; HIGHLIFT; HOIST; LOADER; ROLLER; SCRAPER; STIFF LEG DERRICK; TRENCHER | $41.28 | $25.25 | $66.53 | MI20260084 Building |
| Ingham | OPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) | $39.57 | $25.25 | $64.82 | MI20260084 Building |
| Ingham | OPERATOR: POWER EQUIPMENT: GROUP 5 BOOM TRUCK (NON-SWINGING) | $39.57 | $25.25 | $64.82 | MI20260084 Building |
| Ingham | OPERATOR: POWER EQUIPMENT: GROUP 6 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) | $33.71 | $25.25 | $58.96 | MI20260084 Building |
| Ingham | OPERATOR: POWER EQUIPMENT: GROUP 7 OILER | $31.23 | $25.25 | $56.48 | MI20260084 Building |
| Ingham | OPERATOR: TRACTOR | $19.10 | $8.48 | $27.58 | MI20260084 Building |
| Ingham | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, GRADER/ BLADE, LOADER, ROLLER, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 | $71.23 | MI20260058 Heavy |
| Ingham | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 | $66.50 | MI20260058 Heavy |
| Ingham | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 | $65.77 | MI20260058 Heavy |
| Ingham | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR, BOBCAT/ SKID STEER /SKID LOADER | $39.95 | $25.25 | $65.20 | MI20260058 Heavy |
| Ingham | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1 (AREA 2: LEVEL D WHEN CAPPING LANDFILL) | $42.74 | $21.53 | $64.27 | MI20260084 Building |
| Ionia | OPERATOR: BACKHOE/EXCAVATOR | $22.61 | $8.40 | $31.01 | MI20260059 Heavy |
| Ionia | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $16.50 | $6.17 | $22.67 | MI20260085 Building |
| Ionia | OPERATOR: BULLDOZER | $21.17 | $5.84 | $27.01 | MI20260059 Heavy |
| Ionia | OPERATOR: BULLDOZER | $18.50 | $5.81 | $24.31 | MI20260085 Building |
| Ionia | OPERATOR: CRANE | $18.50 | $5.10 | $23.60 | MI20260059 Heavy |
| Ionia | OPERATOR: CRANE | $19.28 | $7.55 | $26.83 | MI20260085 Building |
| Ionia | OPERATOR: GRADER/BLADE | $16.64 | $0.00 | $16.64 | MI20260059 Heavy |
| Ionia | OPERATOR: LOADER | $17.41 | $4.97 | $22.38 | MI20260059 Heavy |
| Ionia | OPERATOR: LOADER | $17.16 | $4.05 | $21.21 | MI20260085 Building |
| Ionia | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 1 BORING MACHINE; ROLLER; SCRAPER; TRACTOR; TRENCHER PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. SWING BOOM TRUCK OPERATOR OVER 12 TONS-$.50 PER HOUR | $44.00 | $25.25 | $69.25 | MI20260059 Heavy |
| Ionia | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 2 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. SWING BOOM TRUCK OPERATOR OVER 12 TONS-$.50 PER HOUR | $41.32 | $25.25 | $66.57 | MI20260059 Heavy |
| Ionia | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 3 BOOM TRUCK (NON-SWINGING) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. SWING BOOM TRUCK OPERATOR OVER 12 TONS-$.50 PER HOUR | $41.32 | $25.25 | $66.57 | MI20260059 Heavy |
| Ionia | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 4 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. SWING BOOM TRUCK OPERATOR OVER 12 TONS-$.50 PER HOUR | $35.46 | $25.25 | $60.71 | MI20260059 Heavy |
| Ionia | OPERATOR: POWER EQUIPMENT: GROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; CONCRETE PUMP; GRADER/BLADE; HIGHLIFT; HOIST; ROLLER; SCRAPER; TRENCHER PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 | $66.53 | MI20260085 Building |
| Ionia | OPERATOR: POWER EQUIPMENT: GROUP 2 BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 | MI20260085 Building |
| Ionia | OPERATOR: POWER EQUIPMENT: GROUP 3 BOOM TRUCK (NON-SWINGING) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 | MI20260085 Building |
| Ionia | OPERATOR: POWER EQUIPMENT: GROUP 4 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $33.71 | $25.25 | $58.96 | MI20260085 Building |
| Ionia | OPERATOR: POWER EQUIPMENT: GROUP 5 OILER PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $31.23 | $25.25 | $56.48 | MI20260085 Building |
| Ionia | OPERATOR: TRACTOR | $15.72 | $1.92 | $17.64 | MI20260085 Building |
| Ionia | POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 1 BORING MACHINE, ROLLER, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 | $71.23 | MI20260059 Heavy |
| Ionia | POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 | $66.50 | MI20260059 Heavy |
| Ionia | POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 | $65.77 | MI20260059 Heavy |
| Ionia | POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR, BOBCAT/ SKID STEER /SKID LOADER | $39.95 | $25.25 | $65.20 | MI20260059 Heavy |
| Ionia | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1 (AREA 2: LEVEL D WHEN CAPPING LANDFILL) | $42.74 | $21.53 | $64.27 | MI20260085 Building |
| Iosco | OPERATOR: BACKHOE/EXCAVATOR | $15.00 | $0.00 | $15.00 | MI20260126 Building |
| Iosco | OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 | MI20260126 Building |
| Iosco | OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $47.28 | $25.25 | $72.53 | MI20260126 Building |
| Iosco | OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER; TOWER CRANE; GANTRY CRANE AND WHIRLEY DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $43.93 | $25.25 | $69.18 | MI20260126 Building |
| Iosco | OPERATOR: POWER EQUIPMENT: GROUP 3 BULLDOZER; CRANE; LOADER; PAVER; ROLLER; SCRAPER; STIFF LEG DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 | $66.53 | MI20260126 Building |
| Iosco | OPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; FORK TRUCK (OVER 20' LIFT) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 | MI20260126 Building |
| Iosco | OPERATOR: POWER EQUIPMENT: GROUP 5 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $33.71 | $25.25 | $58.96 | MI20260126 Building |
| Iosco | OPERATOR: POWER EQUIPMENT: GROUP 6 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $31.23 | $25.25 | $56.48 | MI20260126 Building |
| Iosco | OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 | MI20260126 Building |
| Iron, Keweenaw | OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 | MI20260155 Building |
| Iron, Keweenaw | OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 | MI20260155 Building |
| Iron, Keweenaw | POWER EQUIPMENT OPERATOR: CRANE OPERATOR, MAIN BOOM & JIB 120' OR LONGER PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $43.81 | $25.00 | $68.81 | MI20260155 Building |
| Iron, Keweenaw | POWER EQUIPMENT OPERATOR: CRANE OPERATOR, MAIN BOOM & JIB 140' OR LONGER PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $44.63 | $25.00 | $69.63 | MI20260155 Building |
| Iron, Keweenaw | POWER EQUIPMENT OPERATOR: CRANE OPERATOR, MAIN BOOM & JIB 220' OR LONGER PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $44.92 | $25.00 | $69.92 | MI20260155 Building |
| Iron, Keweenaw | POWER EQUIPMENT OPERATOR: GROUP 1 BACKHOE, BULLDOZER; CRANE, FRONT END LOADER, EXCAVATOR, PAVER, ROLLER, AND SCRAPER (SELF-PROPELLED AND TRACTOR DRAWN) PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $40.51 | $25.00 | $65.51 | MI20260155 Building |
| Iron, Keweenaw | POWER EQUIPMENT OPERATOR: GROUP 2 FORK TRUCK PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $37.26 | $25.00 | $62.26 | MI20260155 Building |
| Iron, Keweenaw | POWER EQUIPMENT OPERATOR: GROUP 3 OILER PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $35.86 | $12.50 | $48.36 | MI20260155 Building |
| Iron, Marquette | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $12.98 | $6.12 | $19.10 | MI20260048 Heavy |
| Iron, Marquette | OPERATOR: GRADER/BLADE | $16.63 | $5.85 | $22.48 | MI20260048 Heavy |
| Iron, Marquette | OPERATOR: POWER EQUIPMENT: CRANE, MAIN BOOM & JIB 120' OR LONGER (EXCLUDES UNDERGROUND CONSTRUCTION) | $43.81 | $25.00 | $68.81 | MI20260048 Heavy |
| Iron, Marquette | OPERATOR: POWER EQUIPMENT: CRANE, MAIN BOOM & JIB 140' OR LONGER (EXCLUDES UNDERGROUND CONSTRUCTION) | $44.63 | $25.00 | $69.63 | MI20260048 Heavy |
| Iron, Marquette | OPERATOR: POWER EQUIPMENT: CRANE, MAIN BOOM & JIB 220' OR LONGER (EXCLUDES UNDERGROUND CONSTRUCTION) | $44.92 | $25.00 | $69.92 | MI20260048 Heavy |
| Iron, Marquette | OPERATOR: ROLLER | $13.74 | $7.93 | $21.67 | MI20260048 Heavy |
| Iron, Marquette | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, SCRAPER, LOADER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 | $71.23 | MI20260048 Heavy |
| Iron, Marquette | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 | $66.50 | MI20260048 Heavy |
| Iron, Marquette | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 | $65.77 | MI20260048 Heavy |
| Iron, Marquette | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR | $39.95 | $25.25 | $65.20 | MI20260048 Heavy |
| Isabella | OPERATOR: BACKHOE/EXCAVATOR | $24.24 | $3.06 | $27.30 | MI20260127 Building |
| Isabella | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $12.98 | $6.12 | $19.10 | MI20260039 Heavy |
| Isabella | OPERATOR: BULLDOZER | $22.34 | $1.22 | $23.56 | MI20260127 Building |
| Isabella | OPERATOR: GRADER/BLADE | $15.50 | $3.62 | $19.12 | MI20260039 Heavy |
| Isabella | OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 | MI20260127 Building |
| Isabella | OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER | $48.98 | $25.25 | $74.23 | MI20260039 Heavy |
| Isabella | OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK | $45.68 | $25.25 | $70.93 | MI20260039 Heavy |
| Isabella | OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 3 BACKHOE/EXCAVATOR; BULLDOZER; COMPACTOR; CRANE; SCRAPER; LOADER | $44.00 | $25.25 | $69.25 | MI20260039 Heavy |
| Isabella | OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 4 BOOM TRUCK (NON-SWINGING) | $41.32 | $25.25 | $66.57 | MI20260039 Heavy |
| Isabella | OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 5 OILER | $32.98 | $25.25 | $58.23 | MI20260039 Heavy |
| Isabella | OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $44.13 | $24.85 | $68.98 | MI20260127 Building |
| Isabella | OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER; TOWER CRANE; GANTRY CRANE AND WHIRLEY DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $38.18 | $24.85 | $63.03 | MI20260127 Building |
| Isabella | OPERATOR: POWER EQUIPMENT: GROUP 3 CRANE; LOADER; PAVER; SCRAPER; STIFF LEG DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $40.83 | $24.85 | $65.68 | MI20260127 Building |
| Isabella | OPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; FORK TRUCK (OVER 20' LIFT) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $36.47 | $24.85 | $61.32 | MI20260127 Building |
| Isabella | OPERATOR: POWER EQUIPMENT: GROUP 5 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $30.61 | $24.85 | $55.46 | MI20260127 Building |
| Isabella | OPERATOR: POWER EQUIPMENT: GROUP 6 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $26.13 | $24.85 | $50.98 | MI20260127 Building |
| Isabella | OPERATOR: ROLLER | $13.74 | $7.93 | $21.67 | MI20260039 Heavy |
| Isabella | OPERATOR: ROLLER | $28.02 | $7.07 | $35.09 | MI20260127 Building |
| Isabella | OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 | MI20260127 Building |
| Isabella | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, SCRAPER, LOADER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 | $71.23 | MI20260039 Heavy |
| Isabella | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 | $66.50 | MI20260039 Heavy |
| Isabella | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 | $65.77 | MI20260039 Heavy |
| Isabella | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR | $39.95 | $25.25 | $65.20 | MI20260039 Heavy |
| Isabella | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 1: LEVEL A) | $28.86 | $24.85 | $53.71 | MI20260127 Building |
| Isabella | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 1: LEVEL B AND C) | $40.83 | $24.85 | $65.68 | MI20260127 Building |
| Isabella | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 1: LEVEL D WHEN CAPPING LANDFILL) | $36.47 | $24.85 | $61.32 | MI20260127 Building |
| Isabella | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 1: LEVEL D) | $42.38 | $24.85 | $67.23 | MI20260127 Building |
| Isabella | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 1: LEVEL A) | $42.38 | $24.85 | $67.23 | MI20260127 Building |
| Isabella | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 1: LEVEL B AND C) | $26.13 | $24.85 | $50.98 | MI20260127 Building |
| Isabella | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 1: LEVEL D WHEN CAPPING LANDFILL) | $44.13 | $24.85 | $68.98 | MI20260127 Building |
| Isabella | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 1: LEVEL D) | $34.72 | $24.85 | $59.57 | MI20260127 Building |
| Isabella | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 1 (AREA 1: LEVEL A) | $40.83 | $24.85 | $65.68 | MI20260127 Building |
| Isabella | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 1 (AREA 1: LEVEL B AND C) | $44.13 | $24.85 | $68.98 | MI20260127 Building |
| Isabella | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 1 (AREA 1: LEVEL D WHEN CAPPING LANDFILL) | $28.86 | $24.85 | $53.71 | MI20260127 Building |
| Isabella | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 1 (AREA 1: LEVEL D) | $38.18 | $24.85 | $63.03 | MI20260127 Building |
| Isabella | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 2 (AREA 1: LEVEL A) | $36.43 | $24.85 | $61.28 | MI20260127 Building |
| Isabella | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 2 (AREA 1: LEVEL B AND C) | $36.47 | $24.85 | $61.32 | MI20260127 Building |
| Isabella | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 2 (AREA 1: LEVEL D WHEN CAPPING LANDFILL) | $30.61 | $24.85 | $55.46 | MI20260127 Building |
| Isabella | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 2 (AREA 1: LEVEL D) | $39.08 | $24.85 | $63.93 | MI20260127 Building |
| Isabella | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 1: LEVEL A) | $30.61 | $24.85 | $55.46 | MI20260127 Building |
| Isabella | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 1: LEVEL D WHEN CAPPING LANDFILL) | $26.13 | $24.85 | $50.98 | MI20260127 Building |
| Isabella | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 1: LEVEL D) | $26.38 | $24.85 | $51.23 | MI20260127 Building |
| Isabella | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 2: LEVEL A) | $42.38 | $24.85 | $67.23 | MI20260127 Building |
| Isabella | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 2: LEVEL B AND C) | $26.13 | $24.85 | $50.98 | MI20260127 Building |
| Isabella | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 2: LEVEL A) | $34.72 | $24.85 | $59.57 | MI20260127 Building |
| Isabella | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 2: LEVEL B AND C) | $36.47 | $24.85 | $61.32 | MI20260127 Building |
| Isabella | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 2: LEVEL D) | $34.72 | $24.85 | $59.57 | MI20260127 Building |
| Isabella | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1 (AREA 2: LEVEL A) | $39.08 | $24.85 | $63.93 | MI20260127 Building |
| Isabella | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1 (AREA 2: LEVEL B AND C) | $30.61 | $24.85 | $55.46 | MI20260127 Building |
| Isabella | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1 (AREA 2: LEVEL D) | $26.38 | $24.85 | $51.23 | MI20260127 Building |
| Isabella | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 2 (AREA 2: LEVEL A) | $26.38 | $24.85 | $51.23 | MI20260127 Building |
| Isabella | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 2 (AREA 2: LEVEL B AND C) | $44.13 | $24.85 | $68.98 | MI20260127 Building |
| Isabella | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 2 (AREA 2: LEVEL D WHEN CAPPING LANDFILL) | $36.43 | $24.85 | $61.28 | MI20260127 Building |
| Isabella | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 2 (AREA 2: LEVEL D) | $39.08 | $24.85 | $63.93 | MI20260127 Building |
| Isabella | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 2: LEVEL A) | $28.86 | $24.85 | $53.71 | MI20260127 Building |
| Isabella | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 2: LEVEL B AND C) | $36.43 | $24.85 | $61.28 | MI20260127 Building |
| Isabella | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 2: LEVEL D WHEN CAPPING LANDFILL) | $40.83 | $24.85 | $65.68 | MI20260127 Building |
| Isabella | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 2: LEVEL D) | $38.18 | $24.85 | $63.03 | MI20260127 Building |
| Jackson | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $17.66 | $7.65 | $25.31 | MI20260015 Residential |
| Jackson | OPERATOR: CRANE | $20.00 | $5.00 | $25.00 | MI20260060 Heavy |
| Jackson | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 1 BACKHOE/EXCAVATOR; BORING MACHINE; BULLDOZER; GRADER/BLADE; LOADER; ROLLER; SCRAPER; TRACTOR; TRENCHER PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $44.00 | $25.25 | $69.25 | MI20260060 Heavy |
| Jackson | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 2 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.32 | $25.25 | $66.57 | MI20260060 Heavy |
| Jackson | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 3 BOOM TRUCK (NON-SWINGING) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.32 | $25.25 | $66.57 | MI20260060 Heavy |
| Jackson | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 4 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $35.46 | $25.25 | $60.71 | MI20260060 Heavy |
| Jackson | OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER | $48.98 | $25.25 | $74.23 | MI20260015 Residential |
| Jackson | OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER | $47.28 | $25.25 | $72.53 | MI20260086 Building |
| Jackson | OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK | $45.68 | $25.25 | $70.93 | MI20260015 Residential |
| Jackson | OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK | $43.93 | $25.25 | $69.18 | MI20260086 Building |
| Jackson | OPERATOR: POWER EQUIPMENT: GROUP 3 BACKHOE/EXCAVATOR; BULLDOZER; CRANE; GRADER/BLADE; LOADER; SCRAPER | $44.00 | $25.25 | $69.25 | MI20260015 Residential |
| Jackson | OPERATOR: POWER EQUIPMENT: GROUP 3 BACKHOE/EXCAVATOR/TRACKHOE; BULLDOZER; CONCRETE PUMP; CRANE; GRADER/BLADE; HIGHLIFT; HOIST; LOADER; ROLLER; SCRAPER; STIFF LEG DERRICK; TRENCHER | $41.28 | $25.25 | $66.53 | MI20260086 Building |
| Jackson | OPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) | $39.57 | $25.25 | $64.82 | MI20260086 Building |
| Jackson | OPERATOR: POWER EQUIPMENT: GROUP 5 BOOM TRUCK (NON-SWINGING) | $39.57 | $25.25 | $64.82 | MI20260086 Building |
| Jackson | OPERATOR: POWER EQUIPMENT: GROUP 6 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) | $33.71 | $25.25 | $58.96 | MI20260086 Building |
| Jackson | OPERATOR: POWER EQUIPMENT: GROUP 7 OILER | $31.23 | $25.25 | $56.48 | MI20260086 Building |
| Jackson | OPERATOR: TRACTOR | $19.10 | $8.48 | $27.58 | MI20260086 Building |
| Jackson | POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, GRADER/ BLADE, LOADER, ROLLER, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 | $71.23 | MI20260060 Heavy |
| Jackson | POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 | $66.50 | MI20260060 Heavy |
| Jackson | POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 | $65.77 | MI20260060 Heavy |
| Jackson | POWER EQUIPMENT OPERATOR: Underground Construction (Including Sewer)- GROUP 4 : BROOM/ SWEEPER, FORK TRUCK, TRACTOR, BOBCAT/ SKID STEER /SKID LOADER | $39.95 | $25.25 | $65.20 | MI20260060 Heavy |
| Kalamazoo | OPERATOR: BACKHOE/EXCAVATOR | $19.94 | $5.46 | $25.40 | MI20260016 Residential |
| Kalamazoo | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $17.66 | $7.65 | $25.31 | MI20260016 Residential |
| Kalamazoo | OPERATOR: BULLDOZER | $19.68 | $6.64 | $26.32 | MI20260087 Building |
| Kalamazoo | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF ULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE | $48.98 | $25.25 | $74.23 | MI20260061 Heavy |
| Kalamazoo | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF ULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $45.68 | $25.25 | $70.93 | MI20260061 Heavy |
| Kalamazoo | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 3 BACKHOE/EXCAVATOR; BORING MACHINE; BULLDOZER; CRANE; GRADER/BLADE; LOADER; ROLLER; SCRAPER; TRACTOR; TRENCHER PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF ULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $44.00 | $25.25 | $69.25 | MI20260061 Heavy |
| Kalamazoo | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 4 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF ULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE | $41.32 | $25.25 | $66.57 | MI20260061 Heavy |
| Kalamazoo | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 5 BOOM TRUCK (NON-SWINGING) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF ULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.32 | $25.25 | $66.57 | MI20260061 Heavy |
| Kalamazoo | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 6 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF ULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $35.46 | $25.25 | $60.71 | MI20260061 Heavy |
| Kalamazoo | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 7 OILER PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF ULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $32.98 | $25.25 | $58.23 | MI20260061 Heavy |
| Kalamazoo | OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER | $48.98 | $25.25 | $74.23 | MI20260016 Residential |
| Kalamazoo | OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER | $47.28 | $25.25 | $72.53 | MI20260087 Building |
| Kalamazoo | OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK | $45.68 | $25.25 | $70.93 | MI20260016 Residential |
| Kalamazoo | OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK | $43.93 | $25.25 | $69.18 | MI20260087 Building |
| Kalamazoo | OPERATOR: POWER EQUIPMENT: GROUP 3 BACKHOE/EXCAVATOR/TRACKHOE; CRANE; CONCRETE PUMP; GRADER/BLADE; HIGHLIFT; HOIST; LOADER; ROLLER; SCRAPER; STIFF LEG DERRICK; TRENCHER | $42.25 | $25.25 | $67.50 | MI20260087 Building |
| Kalamazoo | OPERATOR: POWER EQUIPMENT: GROUP 3 BULLDOZER; CRANE; GRADER/BLADE; LOADER; SCRAPER; STIFF LEG DERRICK | $44.00 | $25.25 | $69.25 | MI20260016 Residential |
| Kalamazoo | OPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) | $39.57 | $25.25 | $64.82 | MI20260087 Building |
| Kalamazoo | OPERATOR: POWER EQUIPMENT: GROUP 5 BOOM TRUCK (NON-SWINGING) | $39.57 | $25.25 | $64.82 | MI20260087 Building |
| Kalamazoo | OPERATOR: POWER EQUIPMENT: GROUP 6 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) | $33.37 | $25.25 | $58.62 | MI20260087 Building |
| Kalamazoo | OPERATOR: POWER EQUIPMENT: GROUP 7 OILER | $31.23 | $25.25 | $56.48 | MI20260087 Building |
| Kalamazoo | OPERATOR: TRACTOR | $19.10 | $8.48 | $27.58 | MI20260087 Building |
| Kalamazoo | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, GRADER/ BLADE, LOADER, ROLLER, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 | $71.23 | MI20260061 Heavy |
| Kalamazoo | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 | $66.50 | MI20260061 Heavy |
| Kalamazoo | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 | $65.77 | MI20260061 Heavy |
| Kalamazoo | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR, BOBCAT/ SKID STEER /SKID LOADER | $39.95 | $25.25 | $65.20 | MI20260061 Heavy |
| Kalkaska | OPERATOR: BACKHOE/EXCAVATOR | $24.04 | $6.03 | $30.07 | MI20260128 Building |
| Kalkaska | OPERATOR: BULLDOZER | $22.46 | $7.29 | $29.75 | MI20260128 Building |
| Kalkaska | OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 | MI20260128 Building |
| Kalkaska | OPERATOR: LOADER | $24.04 | $6.03 | $30.07 | MI20260128 Building |
| Kalkaska | OPERATOR: ROLLER | $27.47 | $8.86 | $36.33 | MI20260128 Building |
| Kalkaska | OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 | MI20260128 Building |
| Kalkaska | POWER EQUIPMENT OPERATOR: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $47.28 | $25.25 | $72.53 | MI20260128 Building |
| Kalkaska | POWER EQUIPMENT OPERATOR: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER; TOWER CRANE, GANTRY CRANE AND WHIRLEY DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $43.93 | $25.25 | $69.18 | MI20260128 Building |
| Kalkaska | POWER EQUIPMENT OPERATOR: GROUP 3 CRANE; PAVER; AND SCRAPER; STIFF LEG DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 | $66.53 | MI20260128 Building |
| Kalkaska | POWER EQUIPMENT OPERATOR: GROUP 4 FORK TRUCK (OVER 20' LIFT) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 | MI20260128 Building |
| Kalkaska | POWER EQUIPMENT OPERATOR: GROUP 5 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $33.71 | $25.25 | $58.96 | MI20260128 Building |
| Kalkaska | POWER EQUIPMENT OPERATOR: GROUP 6 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $31.23 | $25.25 | $56.48 | MI20260128 Building |
| Kent | OPERATOR: BACKHOE/EXCAVATOR | $18.53 | $6.46 | $24.99 | MI20260062 Heavy |
| Kent | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $20.23 | $9.10 | $29.33 | MI20260088 Building |
| Kent | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $16.50 | $6.17 | $22.67 | MI20260088 Building |
| Kent | OPERATOR: BULLDOZER | $17.38 | $4.98 | $22.36 | MI20260062 Heavy |
| Kent | OPERATOR: BULLDOZER | $18.50 | $5.81 | $24.31 | MI20260088 Building |
| Kent | OPERATOR: CRANE | $18.50 | $5.10 | $23.60 | MI20260062 Heavy |
| Kent | OPERATOR: CRANE | $19.21 | $6.76 | $25.97 | MI20260088 Building |
| Kent | OPERATOR: FORKLIFT | $21.48 | $9.13 | $30.61 | MI20260088 Building |
| Kent | OPERATOR: GRADER/BLADE | $16.64 | $0.00 | $16.64 | MI20260062 Heavy |
| Kent | OPERATOR: LOADER | $17.41 | $4.97 | $22.38 | MI20260062 Heavy |
| Kent | OPERATOR: LOADER | $17.16 | $4.05 | $21.21 | MI20260088 Building |
| Kent | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 1 BORING MACHINE; ROLLER; SCRAPER; TRACTOR; TRENCHER PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. SWING BOOM TRUCK OPERATOR OVER 12 TONS-$.50 PER HOUR | $44.00 | $25.25 | $69.25 | MI20260062 Heavy |
| Kent | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 2 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. SWING BOOM TRUCK OPERATOR OVER 12 TONS-$.50 PER HOUR | $41.32 | $25.25 | $66.57 | MI20260062 Heavy |
| Kent | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 3 BOOM TRUCK (NON-SWINGING) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. SWING BOOM TRUCK OPERATOR OVER 12 TONS-$.50 PER HOUR | $41.32 | $25.25 | $66.57 | MI20260062 Heavy |
| Kent | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 4 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. SWING BOOM TRUCK OPERATOR OVER 12 TONS-$.50 PER HOUR | $35.46 | $25.25 | $60.71 | MI20260062 Heavy |
| Kent | OPERATOR: POWER EQUIPMENT: GROUP 1 CONCRETE PUMP; GRADER/BLADE; HIGHLIFT; HOIST; ROLLER; SCRAPER; TRENCHER PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 | $66.53 | MI20260088 Building |
| Kent | OPERATOR: POWER EQUIPMENT: GROUP 2 BROOM/SWEEPER PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 | MI20260088 Building |
| Kent | OPERATOR: POWER EQUIPMENT: GROUP 3 BOOM TRUCK (NON-SWINGING) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 | MI20260088 Building |
| Kent | OPERATOR: POWER EQUIPMENT: GROUP 4 OILER PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $31.23 | $25.25 | $56.48 | MI20260088 Building |
| Kent | OPERATOR: TRACTOR | $15.72 | $1.92 | $17.64 | MI20260088 Building |
| Kent | POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 1 BORING MACHINE, ROLLER, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 | $71.23 | MI20260062 Heavy |
| Kent | POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 | $66.50 | MI20260062 Heavy |
| Kent | POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 | $65.77 | MI20260062 Heavy |
| Kent | POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR, BOBCAT/ SKID STEER /SKID LOADER | $39.95 | $25.25 | $65.20 | MI20260062 Heavy |
| Lake | OPERATOR: BULLDOZER | $22.34 | $1.22 | $23.56 | MI20260129 Building |
| Lake | OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 | MI20260129 Building |
| Lake | OPERATOR: ROLLER | $28.02 | $7.07 | $35.09 | MI20260129 Building |
| Lake | OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 | MI20260129 Building |
| Lake | POWER EQUIPMENT OPERATOR: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $47.28 | $25.25 | $72.53 | MI20260129 Building |
| Lake | POWER EQUIPMENT OPERATOR: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER; TOWER CRANE; GANTRY CRANE AND WHIRLEY DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $43.93 | $25.25 | $69.18 | MI20260129 Building |
| Lake | POWER EQUIPMENT OPERATOR: GROUP 3 BACKHOE/EXCAVATOR; CRANE; LOADER; PAVER; SCRAPER; STIFF LEG DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 | $66.53 | MI20260129 Building |
| Lake | POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID LOADER; FORK TRUCK (OVER 20' LIFT) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 | MI20260129 Building |
| Lake | POWER EQUIPMENT OPERATOR: GROUP 5 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $33.71 | $25.25 | $58.96 | MI20260129 Building |
| Lake | POWER EQUIPMENT OPERATOR: GROUP 6 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $31.23 | $25.25 | $56.48 | MI20260129 Building |
| Lake + 4 more | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $12.98 | $6.12 | $19.10 | MI20260049 Heavy |
| Lake + 4 more | OPERATOR: GRADER/BLADE | $15.50 | $3.62 | $19.12 | MI20260049 Heavy |
| Lake + 4 more | OPERATOR: ROLLER | $13.74 | $7.93 | $21.67 | MI20260049 Heavy |
| Lake + 4 more | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, SCRAPER, LOADER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 | $71.23 | MI20260049 Heavy |
| Lake + 4 more | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 | $66.50 | MI20260049 Heavy |
| Lake + 4 more | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 | $65.77 | MI20260049 Heavy |
| Lake + 4 more | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR | $39.95 | $25.25 | $65.20 | MI20260049 Heavy |
| Lapeer | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER | $48.98 | $25.25 | $74.23 | MI20260063 Heavy |
| Lapeer | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK | $45.68 | $25.25 | $70.93 | MI20260063 Heavy |
| Lapeer | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 3 BACKHOE/EXCAVATOR; BORING MACHINE; BULLDOZER; CRANE; GRADER/BLADE; LOADER; ROLLER; SCRAPER; TRACTOR; TRENCHER | $44.00 | $25.25 | $69.25 | MI20260063 Heavy |
| Lapeer | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 4 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) | $41.32 | $25.25 | $66.57 | MI20260063 Heavy |
| Lapeer | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 5 BOOM TRUCK (NON-SWINGING) | $41.32 | $25.25 | $66.57 | MI20260063 Heavy |
| Lapeer | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 6 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) | $35.46 | $25.25 | $60.71 | MI20260063 Heavy |
| Lapeer | OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER | $47.28 | $25.25 | $72.53 | MI20260089 Building |
| Lapeer | OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK | $43.93 | $25.25 | $69.18 | MI20260089 Building |
| Lapeer | OPERATOR: POWER EQUIPMENT: GROUP 3 BACKHOE/EXCAVATOR/TRACKHOE; BULLDOZER; CONCRETE PUMP; CRANE; GRADER/BLADE; HIGHLIFT; HOIST; LOADER; ROLLER; SCRAPER; STIFF LEG DERRICK; TRACTOR; TRENCHER | $41.28 | $25.25 | $66.53 | MI20260089 Building |
| Lapeer | OPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) | $39.57 | $25.25 | $64.82 | MI20260089 Building |
| Lapeer | OPERATOR: POWER EQUIPMENT: GROUP 5 BOOM TRUCK (NON-SWINGING) | $39.57 | $25.25 | $64.82 | MI20260089 Building |
| Lapeer | OPERATOR: POWER EQUIPMENT: GROUP 6 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) | $33.71 | $25.25 | $58.96 | MI20260089 Building |
| Lapeer | OPERATOR: POWER EQUIPMENT: GROUP 7 OILER | $31.23 | $25.25 | $56.48 | MI20260089 Building |
| Lapeer | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, GRADER/ BLADE, LOADER, ROLLER, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 | $71.23 | MI20260063 Heavy |
| Lapeer | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 | $66.50 | MI20260063 Heavy |
| Lapeer | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 | $65.77 | MI20260063 Heavy |
| Lapeer | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR, BOBCAT/ SKID STEER /SKID LOADER | $39.95 | $25.25 | $65.20 | MI20260063 Heavy |
| Lapeer | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 2: LEVEL D WHEN CAPPING LANDFILL) | $42.74 | $21.53 | $64.27 | MI20260089 Building |
| Lapeer + 3 more | OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. (LAPEER & LIVINGSTON COUNTIES) | $48.98 | $25.25 | $74.23 | MI20260028 Residential |
| Lapeer + 3 more | OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE WITH BOOM AND JIB OR LEADS 400' OR LONGER (MACOMB & WAYNE COUNTIES) | $51.29 | $25.35 | $76.64 | MI20260028 Residential |
| Lapeer + 3 more | OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK (LAPEER & LIVINGSTON COUNTIES) | $45.68 | $25.25 | $70.93 | MI20260028 Residential |
| Lapeer + 3 more | OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE WITH BOOM AND JIB OR LEADS 300' OR LONGER (MACOMB & WAYNE COUNTIES) | $49.79 | $25.35 | $75.14 | MI20260028 Residential |
| Lapeer + 3 more | OPERATOR: POWER EQUIPMENT: GROUP 3 BACKHOE/EXCAVATOR; BULLDOZER; CRANE; GRADER/BLADE; LOADER; AND SCRAPER (LAPEER & LIVINGSTON COUNTIES) 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $44.00 | $25.25 | $69.25 | MI20260028 Residential |
| Lapeer + 3 more | OPERATOR: POWER EQUIPMENT: GROUP 3 CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (MACOMB & WAYNE COUNTIES) | $48.29 | $25.35 | $73.64 | MI20260028 Residential |
| Lapeer + 3 more | OPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/ SKID LOADER (LAPEER & LIVINGSTON COUNTIES) | $41.32 | $25.25 | $66.57 | MI20260028 Residential |
| Lapeer + 3 more | OPERATOR: POWER EQUIPMENT: GROUP 4 CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (MACOMB & WAYNE COUNTIES) | $47.99 | $25.35 | $73.34 | MI20260028 Residential |
| Lapeer + 3 more | OPERATOR: POWER EQUIPMENT: GROUP 5 CRANE WITH BOOM AND JIB OR LEADS 120' OR LONGER (MACOMB & WAYNE COUNTIES) | $47.17 | $25.35 | $72.52 | MI20260028 Residential |
| Lapeer + 3 more | OPERATOR: POWER EQUIPMENT: GROUP 6 REGULAR CRANE OPERATOR (MACOMB & WAYNE COUNTIES) | $46.31 | $25.35 | $71.66 | MI20260028 Residential |
| Lapeer + 3 more | OPERATOR: POWER EQUIPMENT: GROUP 7 BACKHOE/EXCAVATOR; BOBCAT/SKID LOADER; BULLDOZER; GRADER/BLADE; SCRAPER; LOADER (MACOMB & WAYNE COUNTIES) | $45.34 | $25.35 | $70.69 | MI20260028 Residential |
| Leelanau | OPERATOR: BACKHOE/EXCAVATOR | $24.04 | $6.03 | $30.07 | MI20260130 Building |
| Leelanau | OPERATOR: BULLDOZER | $22.46 | $7.29 | $29.75 | MI20260130 Building |
| Leelanau | OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 | MI20260130 Building |
| Leelanau | OPERATOR: LOADER | $24.04 | $6.03 | $30.07 | MI20260130 Building |
| Leelanau | OPERATOR: ROLLER | $27.47 | $8.86 | $36.33 | MI20260130 Building |
| Leelanau | OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 | MI20260130 Building |
| Leelanau | POWER EQUIPMENT OPERATOR: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $47.28 | $25.25 | $72.53 | MI20260130 Building |
| Leelanau | POWER EQUIPMENT OPERATOR: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER; TOWER CRANE, GANTRY CRANE AND WHIRLEY DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $43.93 | $25.25 | $69.18 | MI20260130 Building |
| Leelanau | POWER EQUIPMENT OPERATOR: GROUP 3 CRANE; PAVER; AND SCRAPER; STIFF LEG DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 | $66.53 | MI20260130 Building |
| Leelanau | POWER EQUIPMENT OPERATOR: GROUP 4 FORK TRUCK (OVER 20' LIFT) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 | MI20260130 Building |
| Leelanau | POWER EQUIPMENT OPERATOR: GROUP 5 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $33.71 | $25.25 | $58.96 | MI20260130 Building |
| Leelanau | POWER EQUIPMENT OPERATOR: GROUP 6 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $31.23 | $25.25 | $56.48 | MI20260130 Building |
| Lenawee | OPERATOR: BACKHOE/EXCAVATOR | $29.04 | $9.76 | $38.80 | MI20260131 Building |
| Lenawee | OPERATOR: BULLDOZER | $22.34 | $1.22 | $23.56 | MI20260131 Building |
| Lenawee | OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 | MI20260131 Building |
| Lenawee | OPERATOR: ROLLER | $28.02 | $7.07 | $35.09 | MI20260131 Building |
| Lenawee | OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 | MI20260131 Building |
| Lenawee | POWER EQUIPMENT OPERATOR: GROUP 1 CRANE WITH BOOM AND JIB OR LEADS 400' OR LONGER | $51.29 | $25.35 | $76.64 | MI20260131 Building |
| Lenawee | POWER EQUIPMENT OPERATOR: GROUP 2 CRANE WITH BOOM AND JIB OR LEADS 300' OR LONGER | $49.79 | $25.35 | $75.14 | MI20260131 Building |
| Lenawee | POWER EQUIPMENT OPERATOR: GROUP 3 CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER | $48.29 | $25.35 | $73.64 | MI20260131 Building |
| Lenawee | POWER EQUIPMENT OPERATOR: GROUP 4 CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER | $47.99 | $25.35 | $73.34 | MI20260131 Building |
| Lenawee | POWER EQUIPMENT OPERATOR: GROUP 5 CRANE WITH BOOM AND JIB OR LEADS 120' OR LONGER | $47.17 | $25.35 | $72.52 | MI20260131 Building |
| Lenawee | POWER EQUIPMENT OPERATOR: GROUP 6 REGULAR CRANE OPERATOR | $46.31 | $25.35 | $71.66 | MI20260131 Building |
| Lenawee | POWER EQUIPMENT OPERATOR: GROUP 7 BOBCAT/SKID LOADER; LOADER;PAVER; SCRAPER | $45.34 | $25.35 | $70.69 | MI20260131 Building |
| Lenawee | POWER EQUIPMENT OPERATOR: GROUP 8 FORKLIFT & EXTEND-A-BOOM FORKLIFT | $43.63 | $25.35 | $68.98 | MI20260131 Building |
| Lenawee | POWER EQUIPMENT OPERATOR: GROUP 9 OILER | $35.29 | $25.35 | $60.64 | MI20260131 Building |
| Lenawee + 10 more | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $12.98 | $6.12 | $19.10 | MI20260044 Heavy |
| Lenawee + 10 more | OPERATOR: GRADER/BLADE | $15.50 | $3.62 | $19.12 | MI20260044 Heavy |
| Lenawee + 10 more | OPERATOR: POWER EQUIPMENT: GROUP 1 (LENAWEE COUNTY) CRANE WITH BOOM & JIB OR LEADS 400' OR LONGER (LENAWEE COUNTY) | $51.29 | $25.35 | $76.64 | MI20260044 Heavy |
| Lenawee + 10 more | OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE WITH BOOM & JIB OR LEADS 300' OR LONGER (LENAWEE COUNTY) | $48.79 | $25.35 | $74.14 | MI20260044 Heavy |
| Lenawee + 10 more | OPERATOR: POWER EQUIPMENT: GROUP 3 CRANE WITH BOOM & JIB OR LEADS 220' OR LONGER (LENAWEE COUNTY) | $48.29 | $25.35 | $73.64 | MI20260044 Heavy |
| Lenawee + 10 more | OPERATOR: POWER EQUIPMENT: GROUP 4CRANE WITH BOOM & JIB OR LEADS 140' OR LONGER (LENAWEE COUNTY) | $47.99 | $25.35 | $73.34 | MI20260044 Heavy |
| Lenawee + 10 more | OPERATOR: POWER EQUIPMENT: GROUP 5 CRANE WITH BOOM & JIB OR LEADS 120' OR LONGER (LENAWEE COUNTY) | $47.17 | $25.35 | $72.52 | MI20260044 Heavy |
| Lenawee + 10 more | OPERATOR: POWER EQUIPMENT: GROUP 6 REGULAR CRANE OPERATOR (LENAWEE COUNTY) | $46.31 | $25.35 | $71.66 | MI20260044 Heavy |
| Lenawee + 10 more | OPERATOR: POWER EQUIPMENT: GROUP 7 BACKHOE/EXCAVATOR, BULLDOZER, COMPACTOR, SCRAPER, LOADER (LENAWEE COUNTY) | $45.34 | $25.35 | $70.69 | MI20260044 Heavy |
| Lenawee + 10 more | OPERATOR: POWER EQUIPMENT: GROUP 8 OILER (LENAWEE COUNTY) | $35.29 | $25.35 | $60.64 | MI20260044 Heavy |
| Lenawee + 10 more | OPERATOR: ROLLER | $13.74 | $7.93 | $21.67 | MI20260044 Heavy |
| Lenawee + 10 more | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, SCRAPER, LOADER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 | $71.23 | MI20260044 Heavy |
| Lenawee + 10 more | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 | $66.50 | MI20260044 Heavy |
| Lenawee + 10 more | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 | $65.77 | MI20260044 Heavy |
| Lenawee + 10 more | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR | $39.95 | $25.25 | $65.20 | MI20260044 Heavy |
| Livingston | OPERATOR: BULLDOZER | $18.00 | $5.00 | $23.00 | MI20260064 Heavy |
| Livingston | OPERATOR: CRANE | $22.00 | $5.00 | $27.00 | MI20260064 Heavy |
| Livingston | OPERATOR: POWER EQUIPMENT: GROUP 1 BACKHOE/EXCAVATOR; BORING MACHINE; GRADER/BLADE; LOADER; ROLLER; SCRAPER; TRACTOR; TRENCHER PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $44.00 | $25.25 | $69.25 | MI20260064 Heavy |
| Livingston | OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER | $47.28 | $25.25 | $72.53 | MI20260090 Building |
| Livingston | OPERATOR: POWER EQUIPMENT: GROUP 2 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.32 | $25.25 | $66.57 | MI20260064 Heavy |
| Livingston | OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK | $43.93 | $25.25 | $69.18 | MI20260090 Building |
| Livingston | OPERATOR: POWER EQUIPMENT: GROUP 3 BACKHOE/EXCAVATOR/TRACKHOE; BULLDOZER; CONCRETE PUMP; CRANE; GRADER/BLADE; HIGHLIFT; HOIST; LOADER; ROLLER; SCRAPER; STIFF LEG DERRICK; TRACTOR; TRENCHER | $41.28 | $25.25 | $66.53 | MI20260090 Building |
| Livingston | OPERATOR: POWER EQUIPMENT: GROUP 3 BOOM TRUCK (NON-SWINGING) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.32 | $25.25 | $66.57 | MI20260064 Heavy |
| Livingston | OPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) | $39.57 | $25.25 | $64.82 | MI20260090 Building |
| Livingston | OPERATOR: POWER EQUIPMENT: GROUP 4 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $35.46 | $25.25 | $60.71 | MI20260064 Heavy |
| Livingston | OPERATOR: POWER EQUIPMENT: GROUP 5 BOOM TRUCK (NON-SWINGING) | $39.57 | $25.25 | $64.82 | MI20260090 Building |
| Livingston | OPERATOR: POWER EQUIPMENT: GROUP 6 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) | $33.71 | $25.25 | $58.96 | MI20260090 Building |
| Livingston | OPERATOR: POWER EQUIPMENT: GROUP 7 OILER | $31.23 | $25.25 | $56.48 | MI20260090 Building |
| Livingston | POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, GRADER/ BLADE, LOADER, ROLLER, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 | $71.23 | MI20260064 Heavy |
| Livingston | POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 | $66.50 | MI20260064 Heavy |
| Livingston | POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 | $65.77 | MI20260064 Heavy |
| Livingston | POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR, BOBCAT/ SKID STEER /SKID LOADER | $39.95 | $25.25 | $65.20 | MI20260064 Heavy |
| Livingston | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 2: LEVEL D WHEN CAPPING LANDFILL) | $42.74 | $21.53 | $64.27 | MI20260090 Building |
| Livingston | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1 (AREA 2: LEVEL D WHEN CAPPING LANDFILL) | $42.74 | $21.53 | $64.27 | MI20260090 Building |
| Luce | OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 | MI20260132 Building |
| Luce | OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 | MI20260132 Building |
| Luce | POWER EQUIPMENT OPERATOR: CRANE OPERATOR, MAIN BOOM & JIB 120' OR LONGER PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $43.81 | $25.00 | $68.81 | MI20260132 Building |
| Luce | POWER EQUIPMENT OPERATOR: CRANE OPERATOR, MAIN BOOM & JIB 140' OR LONGER PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $44.63 | $25.00 | $69.63 | MI20260132 Building |
| Luce | POWER EQUIPMENT OPERATOR: CRANE OPERATOR, MAIN BOOM & JIB 220' OR LONGER PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $44.92 | $25.00 | $69.92 | MI20260132 Building |
| Luce | POWER EQUIPMENT OPERATOR: GROUP 1 BACKHOE, BULLDOZER; CRANE, FRONT END LOADER, EXCAVATOR, PAVER, ROLLER, AND SCRAPER (SELF-PROPELLED AND TRACTOR DRAWN) PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $40.51 | $25.00 | $65.51 | MI20260132 Building |
| Luce | POWER EQUIPMENT OPERATOR: GROUP 2 FORK TRUCK PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $37.26 | $25.00 | $62.26 | MI20260132 Building |
| Luce | POWER EQUIPMENT OPERATOR: GROUP 3 OILER PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $35.86 | $12.50 | $48.36 | MI20260132 Building |
| Mackinac | OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 | MI20260133 Building |
| Mackinac | OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 | MI20260133 Building |
| Mackinac | POWER EQUIPMENT OPERATOR: CRANE OPERATOR, MAIN BOOM & JIB 120' OR LONGER PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $43.81 | $25.00 | $68.81 | MI20260133 Building |
| Mackinac | POWER EQUIPMENT OPERATOR: CRANE OPERATOR, MAIN BOOM & JIB 140' OR LONGER PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $44.63 | $25.00 | $69.63 | MI20260133 Building |
| Mackinac | POWER EQUIPMENT OPERATOR: CRANE OPERATOR, MAIN BOOM & JIB 220' OR LONGER PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $44.92 | $25.00 | $69.92 | MI20260133 Building |
| Mackinac | POWER EQUIPMENT OPERATOR: GROUP 1 BACKHOE, BULLDOZER; CRANE, FRONT END LOADER, EXCAVATOR, PAVER, ROLLER, AND SCRAPER (SELF-PROPELLED AND TRACTOR DRAWN) PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $40.51 | $25.00 | $65.51 | MI20260133 Building |
| Mackinac | POWER EQUIPMENT OPERATOR: GROUP 2 FORK TRUCK PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $37.26 | $25.00 | $62.26 | MI20260133 Building |
| Mackinac | POWER EQUIPMENT OPERATOR: GROUP 3 OILER PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $35.86 | $12.50 | $48.36 | MI20260133 Building |
| Macomb | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 1 CRANE WITH BOOM & JIB OR LEADS 400' OR LONGER | $51.29 | $25.35 | $76.64 | MI20260065 Heavy |
| Macomb | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 2 CRANE WITH BOOM & JIB OR LEADS 300' OR LONGER | $49.79 | $25.35 | $75.14 | MI20260065 Heavy |
| Macomb | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 3 CRANE WITH BOOM & JIB OR LEADS 220' OR LONGER | $48.29 | $25.35 | $73.64 | MI20260065 Heavy |
| Macomb | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 4 CRANE WITH BOOM & JIB OR LEADS 140' OR LONGER | $47.99 | $25.35 | $73.34 | MI20260065 Heavy |
| Macomb | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 5 CRANE WITH BOOM & JIB OR LEADS 120' OR LONGER | $47.17 | $25.35 | $72.52 | MI20260065 Heavy |
| Macomb | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 6 REGULAR CRANE OPERATOR | $46.31 | $25.35 | $71.66 | MI20260065 Heavy |
| Macomb | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 7 BACKHOE/EXCAVATOR, BOBCAT/SKID LOADER, BORING MACHINE, BROOM/SWEEPER, BULLDOZER, GRADER/BLADE, LOADER, ROLLER, SCRAPER, TRACTOR, TRENCHER | $45.34 | $25.35 | $70.69 | MI20260065 Heavy |
| Macomb | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 8 FORKLIFT | $43.63 | $25.35 | $68.98 | MI20260065 Heavy |
| Macomb | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 9 OILER | $35.29 | $25.35 | $60.64 | MI20260065 Heavy |
| Macomb | OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE WITH BOOM AND JIB OR LEADS 400' OR LONGER | $51.29 | $25.35 | $76.64 | MI20260091 Building |
| Macomb | OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE WITH BOOM AND JIB OR LEADS 300' OR LONGER | $48.79 | $25.35 | $74.14 | MI20260091 Building |
| Macomb | OPERATOR: POWER EQUIPMENT: GROUP 3 CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER | $48.29 | $25.35 | $73.64 | MI20260091 Building |
| Macomb | OPERATOR: POWER EQUIPMENT: GROUP 4 CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER | $47.99 | $25.35 | $73.34 | MI20260091 Building |
| Macomb | OPERATOR: POWER EQUIPMENT: GROUP 5 CRANE WITH BOOM AND JIB OR LEADS 120' OR LONGER | $47.17 | $25.35 | $72.52 | MI20260091 Building |
| Macomb | OPERATOR: POWER EQUIPMENT: GROUP 6 REGULAR CRANE OPERATOR, AND CONCRETE PUMP WITH BOOM OPERATOR | $46.31 | $25.35 | $71.66 | MI20260091 Building |
| Macomb | OPERATOR: POWER EQUIPMENT: GROUP 7 BACKHOE/EXCAVATOR/TRACKHOE, BOBCAT/SKID LOADER, BROOM/SWEEPER, BULLDOZER, GRADER/BLADE, HIGHLIFT, HOIST, LOADER, ROLLER, SCRAPER, TRACTOR & TRENCHER | $45.34 | $25.35 | $70.69 | MI20260091 Building |
| Macomb | OPERATOR: POWER EQUIPMENT: GROUP 8 FORKLIFT & EXTEND-A-BOOM FORKLIFT | $43.63 | $25.35 | $68.98 | MI20260091 Building |
| Macomb | OPERATOR: POWER EQUIPMENT: GROUP 9 OILER | $35.29 | $25.35 | $60.64 | MI20260091 Building |
| Macomb | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, GRADER/ BLADE, LOADER, ROLLER, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 | $71.23 | MI20260065 Heavy |
| Macomb | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 | $66.50 | MI20260065 Heavy |
| Macomb | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 | $65.77 | MI20260065 Heavy |
| Macomb | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR, BOBCAT/ SKID STEER /SKID LOADER | $39.95 | $25.25 | $65.20 | MI20260065 Heavy |
| Manistee | OPERATOR: BACKHOE/EXCAVATOR | $24.04 | $6.03 | $30.07 | MI20260134 Building |
| Manistee | OPERATOR: BULLDOZER | $22.46 | $7.29 | $29.75 | MI20260134 Building |
| Manistee | OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 | MI20260134 Building |
| Manistee | OPERATOR: LOADER | $24.04 | $6.03 | $30.07 | MI20260134 Building |
| Manistee | OPERATOR: ROLLER | $27.47 | $8.86 | $36.33 | MI20260134 Building |
| Manistee | OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 | MI20260134 Building |
| Manistee | POWER EQUIPMENT OPERATOR: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $47.28 | $25.25 | $72.53 | MI20260134 Building |
| Manistee | POWER EQUIPMENT OPERATOR: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER; TOWER CRANE; GANTRY CRANE AND WHIRLEY DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $43.93 | $25.25 | $69.18 | MI20260134 Building |
| Manistee | POWER EQUIPMENT OPERATOR: GROUP 3 CRANE; PAVER; SCRAPER; STIFF LEG DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 | $66.53 | MI20260134 Building |
| Manistee | POWER EQUIPMENT OPERATOR: GROUP 4 FORK TRUCK (OVER 20' LIFT) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 | MI20260134 Building |
| Manistee | POWER EQUIPMENT OPERATOR: GROUP 5 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $33.71 | $25.25 | $58.96 | MI20260134 Building |
| Manistee | POWER EQUIPMENT OPERATOR: GROUP 6 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $31.23 | $25.25 | $56.48 | MI20260134 Building |
| Marquette | OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 | MI20260135 Building |
| Marquette | OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 | MI20260135 Building |
| Marquette | POWER EQUIPMENT OPERATOR: CRANE OPERATOR, MAIN BOOM & JIB 120' OR LONGER PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $43.81 | $25.00 | $68.81 | MI20260135 Building |
| Marquette | POWER EQUIPMENT OPERATOR: CRANE OPERATOR, MAIN BOOM & JIB 140' OR LONGER PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $44.63 | $25.00 | $69.63 | MI20260135 Building |
| Marquette | POWER EQUIPMENT OPERATOR: CRANE OPERATOR, MAIN BOOM & JIB 220' OR LONGER PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $44.92 | $25.00 | $69.92 | MI20260135 Building |
| Marquette | POWER EQUIPMENT OPERATOR: GROUP 1 BACKHOE, BULLDOZER; CRANE, FRONT END LOADER, EXCAVATOR, PAVER, ROLLER, AND SCRAPER (SELF-PROPELLED AND TRACTOR DRAWN) PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $40.51 | $25.00 | $65.51 | MI20260135 Building |
| Marquette | POWER EQUIPMENT OPERATOR: GROUP 2 FORK TRUCK PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $37.26 | $25.00 | $62.26 | MI20260135 Building |
| Marquette | POWER EQUIPMENT OPERATOR: GROUP 3 OILER PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $35.86 | $12.50 | $48.36 | MI20260135 Building |
| Mason | OPERATOR: BULLDOZER | $22.34 | $1.22 | $23.56 | MI20260136 Building |
| Mason | OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 | MI20260136 Building |
| Mason | OPERATOR: ROLLER | $28.02 | $7.07 | $35.09 | MI20260136 Building |
| Mason | OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 | MI20260136 Building |
| Mason | POWER EQUIPMENT OPERATOR: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $47.28 | $25.25 | $72.53 | MI20260136 Building |
| Mason | POWER EQUIPMENT OPERATOR: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER; TOWER CRANE; GANTRY CRANE AND WHIRLEY DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $43.93 | $25.25 | $69.18 | MI20260136 Building |
| Mason | POWER EQUIPMENT OPERATOR: GROUP 3 BACKHOE/EXCAVATOR; CRANE; LOADER; PAVER; SCRAPER; STIFF LEG DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 | $66.53 | MI20260136 Building |
| Mason | POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID LOADER; FORK TRUCK (OVER 20' LIFT) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 | MI20260136 Building |
| Mason | POWER EQUIPMENT OPERATOR: GROUP 5 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $33.71 | $25.25 | $58.96 | MI20260136 Building |
| Mason | POWER EQUIPMENT OPERATOR: GROUP 6 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $31.23 | $25.25 | $56.48 | MI20260136 Building |
| Mecosta | OPERATOR: BULLDOZER | $22.34 | $1.22 | $23.56 | MI20260137 Building |
| Mecosta | OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 | MI20260137 Building |
| Mecosta | OPERATOR: ROLLER | $28.02 | $7.07 | $35.09 | MI20260137 Building |
| Mecosta | OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 | MI20260137 Building |
| Mecosta | POWER EQUIPMENT OPERATOR: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $47.28 | $25.25 | $72.53 | MI20260137 Building |
| Mecosta | POWER EQUIPMENT OPERATOR: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER; TOWER CRANE; GANTRY CRANE AND WHIRLEY DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $43.93 | $25.25 | $69.18 | MI20260137 Building |
| Mecosta | POWER EQUIPMENT OPERATOR: GROUP 3 BACKHOE/EXCAVATOR; CRANE; LOADER; PAVER; SCRAPER; STIFF LEG DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 | $66.53 | MI20260137 Building |
| Mecosta | POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID LOADER; FORK TRUCK (OVER 20' LIFT) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 | MI20260137 Building |
| Mecosta | POWER EQUIPMENT OPERATOR: GROUP 5 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $33.71 | $25.25 | $58.96 | MI20260137 Building |
| Mecosta | POWER EQUIPMENT OPERATOR: GROUP 6 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $31.23 | $25.25 | $56.48 | MI20260137 Building |
| Menominee, Ontonagon | OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 | MI20260156 Building |
| Menominee, Ontonagon | OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 | MI20260156 Building |
| Menominee, Ontonagon | POWER EQUIPMENT OPERATOR: CRANE OPERATOR, MAIN BOOM & JIB 120' OR LONGER PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $43.81 | $25.00 | $68.81 | MI20260156 Building |
| Menominee, Ontonagon | POWER EQUIPMENT OPERATOR: CRANE OPERATOR, MAIN BOOM & JIB 140' OR LONGER PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $44.63 | $25.00 | $69.63 | MI20260156 Building |
| Menominee, Ontonagon | POWER EQUIPMENT OPERATOR: CRANE OPERATOR, MAIN BOOM & JIB 220' OR LONGER PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $44.92 | $25.00 | $69.92 | MI20260156 Building |
| Menominee, Ontonagon | POWER EQUIPMENT OPERATOR: GROUP 1 BACKHOE, BULLDOZER; CRANE, FRONT END LOADER, EXCAVATOR, PAVER, ROLLER, AND SCRAPER (SELF-PROPELLED AND TRACTOR DRAWN) PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $40.51 | $25.00 | $65.51 | MI20260156 Building |
| Menominee, Ontonagon | POWER EQUIPMENT OPERATOR: GROUP 2 FORK TRUCK PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $37.26 | $25.00 | $62.26 | MI20260156 Building |
| Menominee, Ontonagon | POWER EQUIPMENT OPERATOR: GROUP 3 OILER PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $35.86 | $12.50 | $48.36 | MI20260156 Building |
| Midland | OPERATOR: BULLDOZER | $22.34 | $1.22 | $23.56 | MI20260138 Building |
| Midland | OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 | MI20260138 Building |
| Midland | OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $47.28 | $25.25 | $72.53 | MI20260138 Building |
| Midland | OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $43.93 | $25.25 | $69.18 | MI20260138 Building |
| Midland | OPERATOR: POWER EQUIPMENT: GROUP 3 BACKHOE/EXCAVATOR; CRANE; LOADER; PAVER; SCRAPER; STIFF LEG DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 | $66.53 | MI20260138 Building |
| Midland | OPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; FORK TRUCK (OVER 20' LIFT) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 | MI20260138 Building |
| Midland | OPERATOR: POWER EQUIPMENT: GROUP 5 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $33.71 | $25.25 | $58.96 | MI20260138 Building |
| Midland | OPERATOR: POWER EQUIPMENT: GROUP 6 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $31.23 | $25.25 | $56.48 | MI20260138 Building |
| Midland | OPERATOR: ROLLER | $28.02 | $7.07 | $35.09 | MI20260138 Building |
| Midland | OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 | MI20260138 Building |
| Missaukee | OPERATOR: BULLDOZER | $22.46 | $7.29 | $29.75 | MI20260139 Building |
| Missaukee | OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 | MI20260139 Building |
| Missaukee | OPERATOR: LOADER | $24.04 | $6.03 | $30.07 | MI20260139 Building |
| Missaukee | OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $47.28 | $25.25 | $72.53 | MI20260139 Building |
| Missaukee | OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER; TOWER CRANE; GANTRY CRANE AND WHIRLEY DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $43.93 | $25.25 | $69.18 | MI20260139 Building |
| Missaukee | OPERATOR: POWER EQUIPMENT: GROUP 3 BACKHOE/EXCAVATOR; CRANE; PAVER; SCRAPER; STIFF LEG DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 | $66.53 | MI20260139 Building |
| Missaukee | OPERATOR: POWER EQUIPMENT: GROUP 4 FORK TRUCK (OVER 20' LIFT) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 | MI20260139 Building |
| Missaukee | OPERATOR: POWER EQUIPMENT: GROUP 5 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $33.71 | $25.25 | $58.96 | MI20260139 Building |
| Missaukee | OPERATOR: POWER EQUIPMENT: GROUP 6 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $31.23 | $25.25 | $56.48 | MI20260139 Building |
| Missaukee | OPERATOR: ROLLER | $27.47 | $8.86 | $36.33 | MI20260139 Building |
| Missaukee | OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 | MI20260139 Building |
| Monroe | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 1 CRANE WITH BOOM & JIB OR LEADS 400' OR LONGER | $51.29 | $25.35 | $76.64 | MI20260066 Heavy |
| Monroe | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 2 CRANE WITH BOOM & JIB OR LEADS 300' OR LONGER | $49.79 | $25.35 | $75.14 | MI20260066 Heavy |
| Monroe | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 3 CRANE WITH BOOM & JIB OR LEADS 220' OR LONGER | $48.29 | $25.35 | $73.64 | MI20260066 Heavy |
| Monroe | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 4 CRANE WITH BOOM & JIB OR LEADS 140' OR LONGER | $47.99 | $25.35 | $73.34 | MI20260066 Heavy |
| Monroe | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 5 CRANE WITH BOOM & JIB OR LEADS 120' OR LONGER | $47.17 | $25.35 | $72.52 | MI20260066 Heavy |
| Monroe | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 6 REGULAR CRANE OPERATOR | $46.31 | $25.35 | $71.66 | MI20260066 Heavy |
| Monroe | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 7 BACKHOE/EXCAVATOR, BOBCAT/SKID LOADER, BORING MACHINE, BROOM/SWEEPER, BULLDOZER, GRADER/BLADE, LOADER, ROLLER, SCRAPER, TRACTOR, TRENCHER | $45.34 | $25.35 | $70.69 | MI20260066 Heavy |
| Monroe | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 8 FORKLIFT | $43.63 | $25.35 | $68.98 | MI20260066 Heavy |
| Monroe | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 9 OILER | $35.29 | $25.35 | $60.64 | MI20260066 Heavy |
| Monroe | OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE WITH BOOM AND JIB OR LEADS 400' OR LONGER | $51.29 | $25.35 | $76.64 | MI20260017 Residential |
| Monroe | OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE WITH BOOM AND JIB OR LEADS 400' OR LONGER | $51.29 | $25.35 | $76.64 | MI20260092 Building |
| Monroe | OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE WITH BOOM AND JIB OR LEADS 300' OR LONGER | $49.79 | $25.35 | $75.14 | MI20260017 Residential |
| Monroe | OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE WITH BOOM AND JIB OR LEADS 300' OR LONGER | $48.79 | $25.35 | $74.14 | MI20260092 Building |
| Monroe | OPERATOR: POWER EQUIPMENT: GROUP 3 CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER | $48.29 | $25.35 | $73.64 | MI20260017 Residential |
| Monroe | OPERATOR: POWER EQUIPMENT: GROUP 3 CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER | $48.29 | $25.35 | $73.64 | MI20260092 Building |
| Monroe | OPERATOR: POWER EQUIPMENT: GROUP 4 CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER | $47.99 | $25.35 | $73.34 | MI20260017 Residential |
| Monroe | OPERATOR: POWER EQUIPMENT: GROUP 4 CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER | $47.99 | $25.35 | $73.34 | MI20260092 Building |
| Monroe | OPERATOR: POWER EQUIPMENT: GROUP 5 CRANE WITH BOOM AND JIB OR LEADS 120' OR LONGER | $47.17 | $25.35 | $72.52 | MI20260017 Residential |
| Monroe | OPERATOR: POWER EQUIPMENT: GROUP 5 CRANE WITH BOOM AND JIB OR LEADS 120' OR LONGER | $47.17 | $25.35 | $72.52 | MI20260092 Building |
| Monroe | OPERATOR: POWER EQUIPMENT: GROUP 6 REGULAR CRANE OPERATOR | $46.31 | $25.35 | $71.66 | MI20260017 Residential |
| Monroe | OPERATOR: POWER EQUIPMENT: GROUP 6 REGULAR CRANE OPERATOR, AND CONCRETE PUMP WITH BOOM OPERATOR | $46.31 | $25.35 | $71.66 | MI20260092 Building |
| Monroe | OPERATOR: POWER EQUIPMENT: GROUP 7 BACKHOE/EXCAVATOR; BOBCAT/SKID LOADER; BULLDOZER; GRADER/BLADE; SCRAPER; LOADER | $45.34 | $25.35 | $70.69 | MI20260017 Residential |
| Monroe | OPERATOR: POWER EQUIPMENT: GROUP 7 BACKHOE/EXCAVATOR/TRACKHOE, BOBCAT/SKID LOADER, BROOM/SWEEPER, BULLDOZER, GRADER/BLADE, HIGHLIFT, HOIST, LOADER, ROLLER, SCRAPER, TRACTOR & TRENCHER | $45.34 | $25.35 | $70.69 | MI20260092 Building |
| Monroe | OPERATOR: POWER EQUIPMENT: GROUP 8 FORKLIFT & EXTEND-A-BOOM FORKLIFT | $43.63 | $25.35 | $68.98 | MI20260092 Building |
| Monroe | OPERATOR: POWER EQUIPMENT: GROUP 9 OILER | $35.29 | $25.35 | $60.64 | MI20260092 Building |
| Monroe | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, GRADER/ BLADE, LOADER, ROLLER, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 | $71.23 | MI20260066 Heavy |
| Monroe | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 | $66.50 | MI20260066 Heavy |
| Monroe | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 | $65.77 | MI20260066 Heavy |
| Monroe | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR, BOBCAT/ SKID STEER /SKID LOADER | $39.95 | $25.25 | $65.20 | MI20260066 Heavy |
| Montcalm | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $12.98 | $6.12 | $19.10 | MI20260040 Heavy |
| Montcalm | OPERATOR: BULLDOZER | $22.34 | $1.22 | $23.56 | MI20260140 Building |
| Montcalm | OPERATOR: GRADER/BLADE | $15.50 | $3.62 | $19.12 | MI20260040 Heavy |
| Montcalm | OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 | MI20260140 Building |
| Montcalm | OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER | $48.98 | $25.25 | $74.23 | MI20260040 Heavy |
| Montcalm | OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK | $45.68 | $25.25 | $70.93 | MI20260040 Heavy |
| Montcalm | OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 3 BACKHOE/EXCAVATOR; BULLDOZER; COMPACTOR; CRANE; SCRAPER; LOADER | $44.00 | $25.25 | $69.25 | MI20260040 Heavy |
| Montcalm | OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 4 BOOM TRUCK (NON-SWINGING) | $41.32 | $25.25 | $66.57 | MI20260040 Heavy |
| Montcalm | OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 5 OILER | $32.98 | $25.25 | $58.23 | MI20260040 Heavy |
| Montcalm | OPERATOR: ROLLER | $13.74 | $7.93 | $21.67 | MI20260040 Heavy |
| Montcalm | OPERATOR: ROLLER | $28.02 | $7.07 | $35.09 | MI20260140 Building |
| Montcalm | OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 | MI20260140 Building |
| Montcalm | POWER EQUIPMENT OPERATOR: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $47.28 | $25.25 | $72.53 | MI20260140 Building |
| Montcalm | POWER EQUIPMENT OPERATOR: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER; TOWER CRANE; GANTRY CRANE AND WHIRLEY DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $43.93 | $25.25 | $69.18 | MI20260140 Building |
| Montcalm | POWER EQUIPMENT OPERATOR: GROUP 3 BACKHOE/EXCAVATOR; CRANE; LOADER; PAVER; SCRAPER; STIFF LEG DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 | $66.53 | MI20260140 Building |
| Montcalm | POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID LOADER; FORK TRUCK (OVER 20' LIFT) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 | MI20260140 Building |
| Montcalm | POWER EQUIPMENT OPERATOR: GROUP 5 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $33.71 | $25.25 | $58.96 | MI20260140 Building |
| Montcalm | POWER EQUIPMENT OPERATOR: GROUP 6 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $31.23 | $25.25 | $56.48 | MI20260140 Building |
| Montcalm | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, SCRAPER, LOADER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 | $71.23 | MI20260040 Heavy |
| Montcalm | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 | $66.50 | MI20260040 Heavy |
| Montcalm | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 | $65.77 | MI20260040 Heavy |
| Montcalm | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR | $39.95 | $25.25 | $65.20 | MI20260040 Heavy |
| Montmorency | OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 | MI20260141 Building |
| Montmorency | OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 | MI20260141 Building |
| Montmorency | POWER EQUIPMENT OPERATOR: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $44.13 | $25.25 | $69.38 | MI20260141 Building |
| Montmorency | POWER EQUIPMENT OPERATOR: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER; TOWER CRANE, GANTRY CRANE AND WHIRLEY DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $43.93 | $25.25 | $69.18 | MI20260141 Building |
| Montmorency | POWER EQUIPMENT OPERATOR: GROUP 3 BACKHOE/EXCAVATOR; BULLDOZER; CRANE; LOADER; PAVER; ROLLER; SCRAPER; STIFF LEG DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 | $66.53 | MI20260141 Building |
| Montmorency | POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID LOADER; FORK TRUCK (OVER 20' LIFT) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 | MI20260141 Building |
| Montmorency | POWER EQUIPMENT OPERATOR: GROUP 5 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 | MI20260141 Building |
| Montmorency | POWER EQUIPMENT OPERATOR: GROUP 6 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $31.23 | $25.25 | $56.48 | MI20260141 Building |
| Muskegon | OPERATOR: BACKHOE/EXCAVATOR | $20.94 | $8.15 | $29.09 | MI20260067 Heavy |
| Muskegon | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $17.66 | $7.65 | $25.31 | MI20260018 Residential |
| Muskegon | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $14.96 | $4.01 | $18.97 | MI20260093 Building |
| Muskegon | OPERATOR: BULLDOZER | $20.48 | $6.14 | $26.62 | MI20260067 Heavy |
| Muskegon | OPERATOR: BULLDOZER | $17.56 | $4.95 | $22.51 | MI20260093 Building |
| Muskegon | OPERATOR: CRANE | $18.50 | $5.10 | $23.60 | MI20260018 Residential |
| Muskegon | OPERATOR: CRANE | $18.50 | $5.10 | $23.60 | MI20260067 Heavy |
| Muskegon | OPERATOR: CRANE | $19.13 | $7.02 | $26.15 | MI20260093 Building |
| Muskegon | OPERATOR: GRADER/BLADE | $16.64 | $0.00 | $16.64 | MI20260067 Heavy |
| Muskegon | OPERATOR: LOADER | $17.52 | $5.51 | $23.03 | MI20260067 Heavy |
| Muskegon | OPERATOR: LOADER | $16.38 | $3.44 | $19.82 | MI20260093 Building |
| Muskegon | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 1 BORING MACHINE; ROLLER; SCRAPER; TRACTOR; TRENCHER PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. SWING BOOM TRUCK OPERATOR OVER 12 TONS-$.50 PER HOUR | $44.00 | $25.25 | $69.25 | MI20260067 Heavy |
| Muskegon | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 2 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. SWING BOOM TRUCK OPERATOR OVER 12 TONS-$.50 PER HOUR | $41.32 | $25.25 | $66.57 | MI20260067 Heavy |
| Muskegon | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 3 BOOM TRUCK (NON-SWINGING) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. SWING BOOM TRUCK OPERATOR OVER 12 TONS-$.50 PER HOUR | $41.32 | $25.25 | $66.57 | MI20260067 Heavy |
| Muskegon | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 4 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. SWING BOOM TRUCK OPERATOR OVER 12 TONS-$.50 PER HOUR | $35.46 | $25.25 | $60.71 | MI20260067 Heavy |
| Muskegon | OPERATOR: POWER EQUIPMENT: BACKHOE/EXCAVATOR; BULLDOZER; GRADER/BLADE; LOADER; SCRAPER PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 | $66.53 | MI20260018 Residential |
| Muskegon | OPERATOR: POWER EQUIPMENT: GROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; CONCRETE PUMP; GRADER/BLADE; HIGHLIFT; HOIST; ROLLER; SCRAPER; TRENCHER PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 | $66.53 | MI20260093 Building |
| Muskegon | OPERATOR: POWER EQUIPMENT: GROUP 2 BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 | MI20260093 Building |
| Muskegon | OPERATOR: POWER EQUIPMENT: GROUP 3 BOOM TRUCK (NON-SWINGING) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 | MI20260093 Building |
| Muskegon | OPERATOR: POWER EQUIPMENT: GROUP 4 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $33.71 | $25.25 | $58.96 | MI20260093 Building |
| Muskegon | OPERATOR: POWER EQUIPMENT: GROUP 5 OILER PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $31.23 | $25.25 | $56.48 | MI20260093 Building |
| Muskegon | OPERATOR: TRACTOR | $15.72 | $1.92 | $17.64 | MI20260093 Building |
| Muskegon | POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 1 BORING MACHINE, ROLLER, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 | $71.23 | MI20260067 Heavy |
| Muskegon | POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 | $66.50 | MI20260067 Heavy |
| Muskegon | POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 | $65.77 | MI20260067 Heavy |
| Muskegon | POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR, BOBCAT/ SKID STEER /SKID LOADER | $39.95 | $25.25 | $65.20 | MI20260067 Heavy |
| Newaygo | OPERATOR: BACKHOE/EXCAVATOR | $22.61 | $8.40 | $31.01 | MI20260068 Heavy |
| Newaygo | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $16.50 | $6.17 | $22.67 | MI20260094 Building |
| Newaygo | OPERATOR: BULLDOZER | $21.17 | $5.84 | $27.01 | MI20260068 Heavy |
| Newaygo | OPERATOR: BULLDOZER | $18.50 | $5.81 | $24.31 | MI20260094 Building |
| Newaygo | OPERATOR: CRANE | $18.50 | $5.10 | $23.60 | MI20260068 Heavy |
| Newaygo | OPERATOR: GRADER/BLADE | $16.64 | $0.00 | $16.64 | MI20260068 Heavy |
| Newaygo | OPERATOR: LOADER | $17.41 | $4.97 | $22.38 | MI20260068 Heavy |
| Newaygo | OPERATOR: LOADER | $17.16 | $4.05 | $21.21 | MI20260094 Building |
| Newaygo | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 1 BORING MACHINE; ROLLER; SCRAPER; TRACTOR; TRENCHER PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. SWING BOOM TRUCK OPERATOR OVER 12 TONS-$.50 PER HOUR | $44.00 | $25.25 | $69.25 | MI20260068 Heavy |
| Newaygo | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 2 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. SWING BOOM TRUCK OPERATOR OVER 12 TONS-$.50 PER HOUR | $41.32 | $25.25 | $66.57 | MI20260068 Heavy |
| Newaygo | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 3 BOOM TRUCK (NON-SWINGING) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. SWING BOOM TRUCK OPERATOR OVER 12 TONS-$.50 PER HOUR | $41.32 | $25.25 | $66.57 | MI20260068 Heavy |
| Newaygo | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 4 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. SWING BOOM TRUCK OPERATOR OVER 12 TONS-$.50 PER HOUR | $35.46 | $25.25 | $60.71 | MI20260068 Heavy |
| Newaygo | OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER | $47.28 | $25.25 | $72.53 | MI20260094 Building |
| Newaygo | OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK | $43.93 | $25.25 | $69.18 | MI20260094 Building |
| Newaygo | OPERATOR: POWER EQUIPMENT: GROUP 3 BACKHOE/EXCAVATOR/TRACKHOE; CONCRETE PUMP; CRANE; GRADER/BLADE; HIGHLIFT; HOIST; ROLLER; SCRAPER; STIFF LEG DERRICK; TRENCHER; STIFF LEG DERRICK | $41.28 | $25.25 | $66.53 | MI20260094 Building |
| Newaygo | OPERATOR: POWER EQUIPMENT: GROUP 4 BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) | $39.57 | $25.25 | $64.82 | MI20260094 Building |
| Newaygo | OPERATOR: POWER EQUIPMENT: GROUP 5 BOOM TRUCK (NON-SWINGING) | $39.57 | $25.25 | $64.82 | MI20260094 Building |
| Newaygo | OPERATOR: POWER EQUIPMENT: GROUP 6 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) | $33.71 | $25.25 | $58.96 | MI20260094 Building |
| Newaygo | OPERATOR: POWER EQUIPMENT: GROUP 7 OILER | $31.23 | $25.25 | $56.48 | MI20260094 Building |
| Newaygo | OPERATOR: TRACTOR | $15.72 | $1.92 | $17.64 | MI20260094 Building |
| Newaygo | POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 1 BORING MACHINE, ROLLER, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 | $71.23 | MI20260068 Heavy |
| Newaygo | POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 | $66.50 | MI20260068 Heavy |
| Newaygo | POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 | $65.77 | MI20260068 Heavy |
| Newaygo | POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR, BOBCAT/ SKID STEER /SKID LOADER | $39.95 | $25.25 | $65.20 | MI20260068 Heavy |
| Newaygo + 3 more | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $17.66 | $7.65 | $25.31 | MI20260025 Residential |
| Newaygo + 3 more | OPERATOR: CRANE | $18.50 | $5.10 | $23.60 | MI20260025 Residential |
| Newaygo + 3 more | OPERATOR: POWER EQUIPMENT: BACKHOE/EXCAVATOR; BULLDOZER; GRADER/BLADE; LOADER; SCRAPER PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 | $66.53 | MI20260025 Residential |
| Oakland | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 1 CRANE WITH BOOM & JIB OR LEADS 400' OR LONGER | $51.29 | $25.35 | $76.64 | MI20260069 Heavy |
| Oakland | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 2 CRANE WITH BOOM & JIB OR LEADS 300' OR LONGER | $49.79 | $25.35 | $75.14 | MI20260069 Heavy |
| Oakland | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 3 CRANE WITH BOOM & JIB OR LEADS 220' OR LONGER | $48.29 | $25.35 | $73.64 | MI20260069 Heavy |
| Oakland | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 4 CRANE WITH BOOM & JIB OR LEADS 140' OR LONGER | $47.99 | $25.35 | $73.34 | MI20260069 Heavy |
| Oakland | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 5 CRANE WITH BOOM & JIB OR LEADS 120' OR LONGER | $47.17 | $25.35 | $72.52 | MI20260069 Heavy |
| Oakland | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 6 REGULAR CRANE OPERATOR | $46.31 | $25.35 | $71.66 | MI20260069 Heavy |
| Oakland | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 7 BACKHOE/EXCAVATOR, BOBCAT/SKID LOADER, BORING MACHINE, BROOM/SWEEPER, BULLDOZER, GRADER/BLADE, LOADER, ROLLER, SCRAPER, TRACTOR, TRENCHER | $45.34 | $25.35 | $70.69 | MI20260069 Heavy |
| Oakland | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 8 FORKLIFT | $43.63 | $25.35 | $68.98 | MI20260069 Heavy |
| Oakland | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 9 OILER | $35.29 | $25.35 | $60.64 | MI20260069 Heavy |
| Oakland | OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE WITH BOOM AND JIB OR LEADS 400' OR LONGER | $51.29 | $25.35 | $76.64 | MI20260019 Residential |
| Oakland | OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE WITH BOOM AND JIB OR LEADS 400' OR LONGER | $51.29 | $25.35 | $76.64 | MI20260095 Building |
| Oakland | OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE WITH BOOM AND JIB OR LEADS 300' OR LONGER | $49.79 | $25.35 | $75.14 | MI20260019 Residential |
| Oakland | OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE WITH BOOM AND JIB OR LEADS 300' OR LONGER | $48.79 | $25.35 | $74.14 | MI20260095 Building |
| Oakland | OPERATOR: POWER EQUIPMENT: GROUP 3 CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER | $48.29 | $25.35 | $73.64 | MI20260019 Residential |
| Oakland | OPERATOR: POWER EQUIPMENT: GROUP 3 CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER | $48.29 | $25.35 | $73.64 | MI20260095 Building |
| Oakland | OPERATOR: POWER EQUIPMENT: GROUP 4 CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER | $47.99 | $25.35 | $73.34 | MI20260019 Residential |
| Oakland | OPERATOR: POWER EQUIPMENT: GROUP 4 CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER | $47.99 | $25.35 | $73.34 | MI20260095 Building |
| Oakland | OPERATOR: POWER EQUIPMENT: GROUP 5 CRANE WITH BOOM AND JIB OR LEADS 120' OR LONGER | $47.17 | $25.35 | $72.52 | MI20260019 Residential |
| Oakland | OPERATOR: POWER EQUIPMENT: GROUP 5 CRANE WITH BOOM AND JIB OR LEADS 120' OR LONGER | $47.17 | $25.35 | $72.52 | MI20260095 Building |
| Oakland | OPERATOR: POWER EQUIPMENT: GROUP 6 REGULAR CRANE OPERATOR | $46.31 | $25.35 | $71.66 | MI20260019 Residential |
| Oakland | OPERATOR: POWER EQUIPMENT: GROUP 6 REGULAR CRANE OPERATOR, AND CONCRETE PUMP WITH BOOM OPERATOR | $46.31 | $25.35 | $71.66 | MI20260095 Building |
| Oakland | OPERATOR: POWER EQUIPMENT: GROUP 7 BACKHOE/EXCAVATOR; BOBCAT/SKID LOADER; BULLDOZER; GRADER/BLADE; SCRAPER; LOADER | $45.34 | $25.35 | $70.69 | MI20260019 Residential |
| Oakland | OPERATOR: POWER EQUIPMENT: GROUP 7 BACKHOE/EXCAVATOR/TRACKHOE, BOBCAT/SKID LOADER, BROOM/SWEEPER, BULLDOZER, GRADER/BLADE, HIGHLIFT, HOIST, LOADER, ROLLER, SCRAPER, TRACTOR & TRENCHER | $45.34 | $25.35 | $70.69 | MI20260095 Building |
| Oakland | OPERATOR: POWER EQUIPMENT: GROUP 8 FORKLIFT & EXTEND-A-BOOM FORKLIFT | $43.63 | $25.35 | $68.98 | MI20260095 Building |
| Oakland | OPERATOR: POWER EQUIPMENT: GROUP 9 OILER | $35.29 | $25.35 | $60.64 | MI20260095 Building |
| Oakland | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, GRADER/ BLADE, LOADER, ROLLER, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 | $71.23 | MI20260069 Heavy |
| Oakland | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 | $66.50 | MI20260069 Heavy |
| Oakland | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 | $65.77 | MI20260069 Heavy |
| Oakland | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR, BOBCAT/ SKID STEER /SKID LOADER | $39.95 | $25.25 | $65.20 | MI20260069 Heavy |
| Oceana | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $12.98 | $6.12 | $19.10 | MI20260041 Heavy |
| Oceana | OPERATOR: BULLDOZER | $22.34 | $1.22 | $23.56 | MI20260142 Building |
| Oceana | OPERATOR: GRADER/BLADE | $15.50 | $3.62 | $19.12 | MI20260041 Heavy |
| Oceana | OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 | MI20260142 Building |
| Oceana | OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER | $48.98 | $25.25 | $74.23 | MI20260041 Heavy |
| Oceana | OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK | $45.68 | $25.25 | $70.93 | MI20260041 Heavy |
| Oceana | OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 3 BACKHOE/EXCAVATOR; BULLDOZER; COMPACTOR; CRANE; SCRAPER; LOADER | $44.00 | $25.25 | $69.25 | MI20260041 Heavy |
| Oceana | OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 4 BOOM TRUCK (NON-SWINGING) | $41.32 | $25.25 | $66.57 | MI20260041 Heavy |
| Oceana | OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 5 OILER | $32.98 | $25.25 | $58.23 | MI20260041 Heavy |
| Oceana | OPERATOR: ROLLER | $13.74 | $7.93 | $21.67 | MI20260041 Heavy |
| Oceana | OPERATOR: ROLLER | $28.02 | $7.07 | $35.09 | MI20260142 Building |
| Oceana | OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 | MI20260142 Building |
| Oceana | POWER EQUIPMENT OPERATOR: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $47.28 | $25.25 | $72.53 | MI20260142 Building |
| Oceana | POWER EQUIPMENT OPERATOR: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER; TOWER CRANE; GANTRY CRANE AND WHIRLEY DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $43.93 | $25.25 | $69.18 | MI20260142 Building |
| Oceana | POWER EQUIPMENT OPERATOR: GROUP 3 BACKHOE/EXCAVATOR; CRANE; LOADER; PAVER; SCRAPER; STIFF LEG DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 | $66.53 | MI20260142 Building |
| Oceana | POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID LOADER; FORK TRUCK (OVER 20' LIFT) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 | MI20260142 Building |
| Oceana | POWER EQUIPMENT OPERATOR: GROUP 5 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $33.71 | $25.25 | $58.96 | MI20260142 Building |
| Oceana | POWER EQUIPMENT OPERATOR: GROUP 6 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $31.23 | $25.25 | $56.48 | MI20260142 Building |
| Oceana | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, SCRAPER, LOADER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 | $71.23 | MI20260041 Heavy |
| Oceana | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 | $66.50 | MI20260041 Heavy |
| Oceana | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 | $65.77 | MI20260041 Heavy |
| Oceana | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR | $39.95 | $25.25 | $65.20 | MI20260041 Heavy |
| Ogemaw | OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 | MI20260143 Building |
| Ogemaw | OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 | MI20260143 Building |
| Ogemaw | POWER EQUIPMENT OPERATOR: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $44.13 | $25.25 | $69.38 | MI20260143 Building |
| Ogemaw | POWER EQUIPMENT OPERATOR: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER; TOWER CRANE, GANTRY CRANE AND WHIRLEY DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $43.93 | $25.25 | $69.18 | MI20260143 Building |
| Ogemaw | POWER EQUIPMENT OPERATOR: GROUP 3 BACKHOE/EXCAVATOR; BULLDOZER; CRANE; LOADER; PAVER; ROLLER; SCRAPER; STIFF LEG DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 | $66.53 | MI20260143 Building |
| Ogemaw | POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID LOADER; FORK TRUCK (OVER 20' LIFT) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 | MI20260143 Building |
| Ogemaw | POWER EQUIPMENT OPERATOR: GROUP 5 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 | MI20260143 Building |
| Ogemaw | POWER EQUIPMENT OPERATOR: GROUP 6 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $31.23 | $25.25 | $56.48 | MI20260143 Building |
| Osceola | OPERATOR: BULLDOZER | $22.34 | $1.22 | $23.56 | MI20260144 Building |
| Osceola | OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 | MI20260144 Building |
| Osceola | OPERATOR: ROLLER | $28.02 | $7.07 | $35.09 | MI20260144 Building |
| Osceola | OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 | MI20260144 Building |
| Osceola | POWER EQUIPMENT OPERATOR: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $47.28 | $25.25 | $72.53 | MI20260144 Building |
| Osceola | POWER EQUIPMENT OPERATOR: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER; TOWER CRANE; GANTRY CRANE AND WHIRLEY DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $43.93 | $25.25 | $69.18 | MI20260144 Building |
| Osceola | POWER EQUIPMENT OPERATOR: GROUP 3 BACKHOE/EXCAVATOR; CRANE; LOADER; PAVER; SCRAPER; STIFF LEG DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 | $66.53 | MI20260144 Building |
| Osceola | POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID LOADER; FORK TRUCK (OVER 20' LIFT) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 | MI20260144 Building |
| Osceola | POWER EQUIPMENT OPERATOR: GROUP 5 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $33.71 | $25.25 | $58.96 | MI20260144 Building |
| Osceola | POWER EQUIPMENT OPERATOR: GROUP 6 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $31.23 | $25.25 | $56.48 | MI20260144 Building |
| Oscoda | OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 | MI20260145 Building |
| Oscoda | OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 | MI20260145 Building |
| Oscoda | POWER EQUIPMENT OPERATOR: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $44.13 | $25.25 | $69.38 | MI20260145 Building |
| Oscoda | POWER EQUIPMENT OPERATOR: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER; TOWER CRANE, GANTRY CRANE AND WHIRLEY DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $43.93 | $25.25 | $69.18 | MI20260145 Building |
| Oscoda | POWER EQUIPMENT OPERATOR: GROUP 3 BACKHOE/EXCAVATOR; BULLDOZER; CRANE; LOADER; PAVER; ROLLER; SCRAPER; STIFF LEG DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 | $66.53 | MI20260145 Building |
| Oscoda | POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID LOADER; FORK TRUCK (OVER 20' LIFT) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 | MI20260145 Building |
| Oscoda | POWER EQUIPMENT OPERATOR: GROUP 5 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 | MI20260145 Building |
| Oscoda | POWER EQUIPMENT OPERATOR: GROUP 6 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $31.23 | $25.25 | $56.48 | MI20260145 Building |
| Otsego | OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 | MI20260146 Building |
| Otsego | OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 | MI20260146 Building |
| Otsego | POWER EQUIPMENT OPERATOR: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $44.13 | $25.25 | $69.38 | MI20260146 Building |
| Otsego | POWER EQUIPMENT OPERATOR: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER; TOWER CRANE, GANTRY CRANE AND WHIRLEY DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $43.93 | $25.25 | $69.18 | MI20260146 Building |
| Otsego | POWER EQUIPMENT OPERATOR: GROUP 3 BACKHOE/EXCAVATOR; BULLDOZER; CRANE; LOADER; PAVER; ROLLER; SCRAPER; STIFF LEG DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 | $66.53 | MI20260146 Building |
| Otsego | POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID LOADER; FORK TRUCK (OVER 20' LIFT) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 | MI20260146 Building |
| Otsego | POWER EQUIPMENT OPERATOR: GROUP 5 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 | MI20260146 Building |
| Otsego | POWER EQUIPMENT OPERATOR: GROUP 6 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $31.23 | $25.25 | $56.48 | MI20260146 Building |
| Ottawa | OPERATOR: BACKHOE/EXCAVATOR | $18.95 | $7.85 | $26.80 | MI20260070 Heavy |
| Ottawa | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $17.66 | $7.65 | $25.31 | MI20260020 Residential |
| Ottawa | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $14.96 | $4.01 | $18.97 | MI20260096 Building |
| Ottawa | OPERATOR: BULLDOZER | $19.50 | $9.23 | $28.73 | MI20260070 Heavy |
| Ottawa | OPERATOR: BULLDOZER | $17.56 | $4.95 | $22.51 | MI20260096 Building |
| Ottawa | OPERATOR: CRANE | $18.50 | $5.10 | $23.60 | MI20260020 Residential |
| Ottawa | OPERATOR: CRANE | $18.50 | $5.10 | $23.60 | MI20260070 Heavy |
| Ottawa | OPERATOR: GRADER/BLADE | $16.64 | $0.00 | $16.64 | MI20260070 Heavy |
| Ottawa | OPERATOR: LOADER | $19.50 | $9.23 | $28.73 | MI20260070 Heavy |
| Ottawa | OPERATOR: LOADER | $16.38 | $3.44 | $19.82 | MI20260096 Building |
| Ottawa | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 1 BORING MACHINE; ROLLER; SCRAPER; TRACTOR; TRENCHER PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. SWING BOOM TRUCK OPERATOR OVER 12 TONS-$.50 PER HOUR | $44.00 | $25.25 | $69.25 | MI20260070 Heavy |
| Ottawa | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 2 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. SWING BOOM TRUCK OPERATOR OVER 12 TONS-$.50 PER HOUR | $41.32 | $25.25 | $66.57 | MI20260070 Heavy |
| Ottawa | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 3 BOOM TRUCK (NON-SWINGING) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. SWING BOOM TRUCK OPERATOR OVER 12 TONS-$.50 PER HOUR | $41.32 | $25.25 | $66.57 | MI20260070 Heavy |
| Ottawa | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 4 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. SWING BOOM TRUCK OPERATOR OVER 12 TONS-$.50 PER HOUR | $35.46 | $25.25 | $60.71 | MI20260070 Heavy |
| Ottawa | OPERATOR: POWER EQUIPMENT: BACKHOE/EXCAVATOR; BULLDOZER; GRADER/BLADE; LOADER; SCRAPER PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 | $66.53 | MI20260020 Residential |
| Ottawa | OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER | $47.28 | $25.25 | $72.53 | MI20260096 Building |
| Ottawa | OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK | $43.93 | $25.25 | $69.18 | MI20260096 Building |
| Ottawa | OPERATOR: POWER EQUIPMENT: GROUP 3 BACKHOE/EXCAVATOR/TRACKHOE; CONCRETE PUMP; CRANE; GRADER/BLADE; HIGHLIFT; HOIST; ROLLER; SCRAPER; STIFF LEG DERRICK; TRENCHER; STIFF LEG DERRICK | $41.28 | $25.25 | $66.53 | MI20260096 Building |
| Ottawa | OPERATOR: POWER EQUIPMENT: GROUP 4 BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) | $39.57 | $25.25 | $64.82 | MI20260096 Building |
| Ottawa | OPERATOR: POWER EQUIPMENT: GROUP 5 BOOM TRUCK (NON-SWINGING) | $39.57 | $25.25 | $64.82 | MI20260096 Building |
| Ottawa | OPERATOR: POWER EQUIPMENT: GROUP 6 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) | $33.71 | $25.25 | $58.96 | MI20260096 Building |
| Ottawa | OPERATOR: POWER EQUIPMENT: GROUP 7 OILER | $31.23 | $25.25 | $56.48 | MI20260096 Building |
| Ottawa | OPERATOR: TRACTOR | $15.72 | $1.92 | $17.64 | MI20260096 Building |
| Ottawa | POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 1 BORING MACHINE, ROLLER, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 | $71.23 | MI20260070 Heavy |
| Ottawa | POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 | $66.50 | MI20260070 Heavy |
| Ottawa | POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 | $65.77 | MI20260070 Heavy |
| Ottawa | POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR, BOBCAT/ SKID STEER /SKID LOADER | $39.95 | $25.25 | $65.20 | MI20260070 Heavy |
| Presque Isle | OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 | MI20260147 Building |
| Presque Isle | OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 | MI20260147 Building |
| Presque Isle | POWER EQUIPMENT OPERATOR: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $44.13 | $25.25 | $69.38 | MI20260147 Building |
| Presque Isle | POWER EQUIPMENT OPERATOR: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER; TOWER CRANE, GANTRY CRANE AND WHIRLEY DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $43.93 | $25.25 | $69.18 | MI20260147 Building |
| Presque Isle | POWER EQUIPMENT OPERATOR: GROUP 3 BACKHOE/EXCAVATOR; BULLDOZER; CRANE; LOADER; PAVER; ROLLER; SCRAPER; STIFF LEG DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 | $66.53 | MI20260147 Building |
| Presque Isle | POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID LOADER; FORK TRUCK (OVER 20' LIFT) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 | MI20260147 Building |
| Presque Isle | POWER EQUIPMENT OPERATOR: GROUP 5 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 | MI20260147 Building |
| Presque Isle | POWER EQUIPMENT OPERATOR: GROUP 6 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $31.23 | $25.25 | $56.48 | MI20260147 Building |
| Roscommon | OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 | MI20260148 Building |
| Roscommon | OPERATOR: POWER EQUIPMENT: BACKHOE/EXCAVATOR; LOADER; ROLLER PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $44.00 | $25.25 | $69.25 | MI20260004 Residential |
| Roscommon | OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 | MI20260148 Building |
| Roscommon | POWER EQUIPMENT OPERATOR: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $44.13 | $25.25 | $69.38 | MI20260148 Building |
| Roscommon | POWER EQUIPMENT OPERATOR: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER; TOWER CRANE, GANTRY CRANE AND WHIRLEY DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $43.93 | $25.25 | $69.18 | MI20260148 Building |
| Roscommon | POWER EQUIPMENT OPERATOR: GROUP 3 BACKHOE/EXCAVATOR; BULLDOZER; CRANE; LOADER; PAVER; ROLLER; SCRAPER; STIFF LEG DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 | $66.53 | MI20260148 Building |
| Roscommon | POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID LOADER; FORK TRUCK (OVER 20' LIFT) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 | MI20260148 Building |
| Roscommon | POWER EQUIPMENT OPERATOR: GROUP 5 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 | MI20260148 Building |
| Roscommon | POWER EQUIPMENT OPERATOR: GROUP 6 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $31.23 | $25.25 | $56.48 | MI20260148 Building |
| Saginaw | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $18.31 | $13.84 | $32.15 | MI20260097 Building |
| Saginaw | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $17.66 | $7.65 | $25.31 | MI20260021 Residential |
| Saginaw | OPERATOR: BULLDOZER | $17.50 | $8.67 | $26.17 | MI20260097 Building |
| Saginaw | OPERATOR: LOADER | $17.62 | $0.00 | $17.62 | MI20260097 Building |
| Saginaw | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER | $48.98 | $25.25 | $74.23 | MI20260071 Heavy |
| Saginaw | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK | $45.68 | $25.25 | $70.93 | MI20260071 Heavy |
| Saginaw | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 3 BACKHOE/EXCAVATOR; BORING MACHINE; BULLDOZER; CRANE; GRADER/BLADE; LOADER; ROLLER; SCRAPER; TRACTOR; TRENCHER | $44.00 | $25.25 | $69.25 | MI20260071 Heavy |
| Saginaw | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 4 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) | $41.32 | $25.25 | $66.57 | MI20260071 Heavy |
| Saginaw | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 5 BOOM TRUCK (NON-SWINGING) | $41.32 | $25.25 | $66.57 | MI20260071 Heavy |
| Saginaw | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 6 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) | $35.46 | $25.25 | $60.71 | MI20260071 Heavy |
| Saginaw | OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER | $48.98 | $25.25 | $74.23 | MI20260021 Residential |
| Saginaw | OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER | $47.28 | $25.25 | $72.53 | MI20260097 Building |
| Saginaw | OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK | $45.68 | $25.25 | $70.93 | MI20260021 Residential |
| Saginaw | OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK | $43.93 | $25.25 | $69.18 | MI20260097 Building |
| Saginaw | OPERATOR: POWER EQUIPMENT: GROUP 3 BACKHOE/EXCAVATOR; BULLDOZER; CRANE; GRADER/BLADE; LOADER; SCRAPER | $44.00 | $25.25 | $69.25 | MI20260021 Residential |
| Saginaw | OPERATOR: POWER EQUIPMENT: GROUP 3 CONCRETE PUMP; CRANE; GRADER/BLADE; HIGHLIFT; HOIST; ROLLER; SCRAPER; STIFF LEG DERRICK; TRENCHER | $41.28 | $25.25 | $66.53 | MI20260097 Building |
| Saginaw | OPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) | $39.57 | $25.25 | $64.82 | MI20260097 Building |
| Saginaw | OPERATOR: POWER EQUIPMENT: GROUP 5 BOOM TRUCK (NON-SWINGING) | $39.57 | $25.25 | $64.82 | MI20260097 Building |
| Saginaw | OPERATOR: POWER EQUIPMENT: GROUP 6 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) | $33.71 | $25.25 | $58.96 | MI20260097 Building |
| Saginaw | OPERATOR: POWER EQUIPMENT: GROUP 7 OILER | $31.23 | $25.25 | $56.48 | MI20260097 Building |
| Saginaw | OPERATOR: TRACTOR | $19.10 | $8.48 | $27.58 | MI20260097 Building |
| Saginaw | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, GRADER/ BLADE, LOADER, ROLLER, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 | $71.23 | MI20260071 Heavy |
| Saginaw | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 | $66.50 | MI20260071 Heavy |
| Saginaw | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 | $65.77 | MI20260071 Heavy |
| Saginaw | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR, BOBCAT/ SKID STEER /SKID LOADER | $39.95 | $25.25 | $65.20 | MI20260071 Heavy |
| Sanilac | OPERATOR: BACKHOE/EXCAVATOR | $20.34 | $14.59 | $34.93 | MI20260149 Building |
| Sanilac | OPERATOR: BULLDOZER | $22.34 | $1.22 | $23.56 | MI20260149 Building |
| Sanilac | OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 | MI20260149 Building |
| Sanilac | OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $44.13 | $24.85 | $68.98 | MI20260149 Building |
| Sanilac | OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER; TOWER CRANE; GANTRY CRANE AND WHIRLEY DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $38.18 | $24.85 | $63.03 | MI20260149 Building |
| Sanilac | OPERATOR: POWER EQUIPMENT: GROUP 3 CRANE; LOADER; PAVER; SCRAPER; STIFF LEG DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $40.83 | $24.85 | $65.68 | MI20260149 Building |
| Sanilac | OPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; FORK TRUCK (OVER 20' LIFT) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $36.47 | $24.85 | $61.32 | MI20260149 Building |
| Sanilac | OPERATOR: POWER EQUIPMENT: GROUP 5 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $30.61 | $24.85 | $55.46 | MI20260149 Building |
| Sanilac | OPERATOR: POWER EQUIPMENT: GROUP 6 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $26.13 | $24.85 | $50.98 | MI20260149 Building |
| Sanilac | OPERATOR: ROLLER | $28.02 | $7.07 | $35.09 | MI20260149 Building |
| Sanilac | OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 | MI20260149 Building |
| Sanilac | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 1: LEVEL A) | $28.86 | $24.85 | $53.71 | MI20260149 Building |
| Sanilac | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 1: LEVEL B AND C) | $40.83 | $24.85 | $65.68 | MI20260149 Building |
| Sanilac | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 1: LEVEL D WHEN CAPPING LANDFILL) | $36.47 | $24.85 | $61.32 | MI20260149 Building |
| Sanilac | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 1: LEVEL D) | $42.38 | $24.85 | $67.23 | MI20260149 Building |
| Sanilac | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 1: LEVEL A) | $42.38 | $24.85 | $67.23 | MI20260149 Building |
| Sanilac | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 1: LEVEL B AND C) | $26.13 | $24.85 | $50.98 | MI20260149 Building |
| Sanilac | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 1: LEVEL D WHEN CAPPING LANDFILL) | $44.13 | $24.85 | $68.98 | MI20260149 Building |
| Sanilac | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 1: LEVEL D) | $34.72 | $24.85 | $59.57 | MI20260149 Building |
| Sanilac | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 1 (AREA 1: LEVEL A) | $40.83 | $24.85 | $65.68 | MI20260149 Building |
| Sanilac | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 1 (AREA 1: LEVEL B AND C) | $44.13 | $24.85 | $68.98 | MI20260149 Building |
| Sanilac | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 1 (AREA 1: LEVEL D WHEN CAPPING LANDFILL) | $28.86 | $24.85 | $53.71 | MI20260149 Building |
| Sanilac | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 1 (AREA 1: LEVEL D) | $38.18 | $24.85 | $63.03 | MI20260149 Building |
| Sanilac | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 2 (AREA 1: LEVEL A) | $36.43 | $24.85 | $61.28 | MI20260149 Building |
| Sanilac | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 2 (AREA 1: LEVEL B AND C) | $36.47 | $24.85 | $61.32 | MI20260149 Building |
| Sanilac | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 2 (AREA 1: LEVEL D WHEN CAPPING LANDFILL) | $30.61 | $24.85 | $55.46 | MI20260149 Building |
| Sanilac | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 2 (AREA 1: LEVEL D) | $39.08 | $24.85 | $63.93 | MI20260149 Building |
| Sanilac | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 1: LEVEL A) | $30.61 | $24.85 | $55.46 | MI20260149 Building |
| Sanilac | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 1: LEVEL D WHEN CAPPING LANDFILL) | $26.13 | $24.85 | $50.98 | MI20260149 Building |
| Sanilac | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 1: LEVEL D) | $26.38 | $24.85 | $51.23 | MI20260149 Building |
| Sanilac | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 2: LEVEL A) | $42.38 | $24.85 | $67.23 | MI20260149 Building |
| Sanilac | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 2: LEVEL B AND C) | $26.13 | $24.85 | $50.98 | MI20260149 Building |
| Sanilac | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 2: LEVEL A) | $34.72 | $24.85 | $59.57 | MI20260149 Building |
| Sanilac | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 2: LEVEL B AND C) | $36.47 | $24.85 | $61.32 | MI20260149 Building |
| Sanilac | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 2: LEVEL D) | $34.72 | $24.85 | $59.57 | MI20260149 Building |
| Sanilac | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1 (AREA 2: LEVEL A) | $39.08 | $24.85 | $63.93 | MI20260149 Building |
| Sanilac | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1 (AREA 2: LEVEL B AND C) | $30.61 | $24.85 | $55.46 | MI20260149 Building |
| Sanilac | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1 (AREA 2: LEVEL D) | $26.38 | $24.85 | $51.23 | MI20260149 Building |
| Sanilac | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 2 (AREA 2: LEVEL A) | $26.38 | $24.85 | $51.23 | MI20260149 Building |
| Sanilac | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 2 (AREA 2: LEVEL B AND C) | $44.13 | $24.85 | $68.98 | MI20260149 Building |
| Sanilac | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 2 (AREA 2: LEVEL D WHEN CAPPING LANDFILL) | $36.43 | $24.85 | $61.28 | MI20260149 Building |
| Sanilac | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 2 (AREA 2: LEVEL D) | $39.08 | $24.85 | $63.93 | MI20260149 Building |
| Sanilac | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 2: LEVEL A) | $28.86 | $24.85 | $53.71 | MI20260149 Building |
| Sanilac | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 2: LEVEL B AND C) | $36.43 | $24.85 | $61.28 | MI20260149 Building |
| Sanilac | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 2: LEVEL D WHEN CAPPING LANDFILL) | $40.83 | $24.85 | $65.68 | MI20260149 Building |
| Sanilac | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 2: LEVEL D) | $38.18 | $24.85 | $63.03 | MI20260149 Building |
| Schoolcraft | OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 | MI20260150 Building |
| Schoolcraft | OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 | MI20260150 Building |
| Schoolcraft | POWER EQUIPMENT OPERATOR: CRANE OPERATOR, MAIN BOOM & JIB 120' OR LONGER PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $43.81 | $25.00 | $68.81 | MI20260150 Building |
| Schoolcraft | POWER EQUIPMENT OPERATOR: CRANE OPERATOR, MAIN BOOM & JIB 140' OR LONGER PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $44.63 | $25.00 | $69.63 | MI20260150 Building |
| Schoolcraft | POWER EQUIPMENT OPERATOR: CRANE OPERATOR, MAIN BOOM & JIB 220' OR LONGER PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $44.92 | $25.00 | $69.92 | MI20260150 Building |
| Schoolcraft | POWER EQUIPMENT OPERATOR: GROUP 1 BACKHOE, BULLDOZER; CRANE, FRONT END LOADER, EXCAVATOR, PAVER, ROLLER, AND SCRAPER (SELF-PROPELLED AND TRACTOR DRAWN) PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $40.51 | $25.00 | $65.51 | MI20260150 Building |
| Schoolcraft | POWER EQUIPMENT OPERATOR: GROUP 2 FORK TRUCK PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $37.26 | $25.00 | $62.26 | MI20260150 Building |
| Schoolcraft | POWER EQUIPMENT OPERATOR: GROUP 3 OILER PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $35.86 | $12.50 | $48.36 | MI20260150 Building |
| Shiawassee | OPERATOR: BULLDOZER | $22.34 | $1.22 | $23.56 | MI20260151 Building |
| Shiawassee | OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 | MI20260151 Building |
| Shiawassee | OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $47.28 | $25.25 | $72.53 | MI20260151 Building |
| Shiawassee | OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $43.93 | $25.25 | $69.18 | MI20260151 Building |
| Shiawassee | OPERATOR: POWER EQUIPMENT: GROUP 3 BACKHOE/EXCAVATOR; CRANE; LOADER; PAVER; SCRAPER; STIFF LEG DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 | $66.53 | MI20260151 Building |
| Shiawassee | OPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; FORK TRUCK (OVER 20' LIFT) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 | MI20260151 Building |
| Shiawassee | OPERATOR: POWER EQUIPMENT: GROUP 5 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $33.71 | $25.25 | $58.96 | MI20260151 Building |
| Shiawassee | OPERATOR: POWER EQUIPMENT: GROUP 6 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $31.23 | $25.25 | $56.48 | MI20260151 Building |
| Shiawassee | OPERATOR: ROLLER | $28.02 | $7.07 | $35.09 | MI20260151 Building |
| Shiawassee | OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 | MI20260151 Building |
| Shiawassee | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 2: LEVEL D WHEN CAPPING LANDFILL) | $31.01 | $17.19 | $48.20 | MI20260151 Building |
| Shiawassee | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 2: LEVEL D) | $31.01 | $17.29 | $48.30 | MI20260151 Building |
| St Clair | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 1 CRANE WITH BOOM & JIB OR LEADS 400' OR LONGER | $51.29 | $25.35 | $76.64 | MI20260072 Heavy |
| St Clair | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 2 CRANE WITH BOOM & JIB OR LEADS 300' OR LONGER | $49.79 | $25.35 | $75.14 | MI20260072 Heavy |
| St Clair | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 3 CRANE WITH BOOM & JIB OR LEADS 220' OR LONGER | $48.29 | $25.35 | $73.64 | MI20260072 Heavy |
| St Clair | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 4 CRANE WITH BOOM & JIB OR LEADS 140' OR LONGER | $47.99 | $25.35 | $73.34 | MI20260072 Heavy |
| St Clair | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 5 CRANE WITH BOOM & JIB OR LEADS 120' OR LONGER | $47.17 | $25.35 | $72.52 | MI20260072 Heavy |
| St Clair | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 6 REGULAR CRANE OPERATOR | $46.31 | $25.35 | $71.66 | MI20260072 Heavy |
| St Clair | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 7 BACKHOE/EXCAVATOR, BOBCAT/SKID LOADER, BORING MACHINE, BROOM/SWEEPER, BULLDOZER, GRADER/BLADE, LOADER, ROLLER, SCRAPER, TRACTOR, TRENCHER | $45.34 | $25.35 | $70.69 | MI20260072 Heavy |
| St Clair | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 8 FORKLIFT | $43.63 | $25.35 | $68.98 | MI20260072 Heavy |
| St Clair | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 9 OILER | $35.29 | $25.35 | $60.64 | MI20260072 Heavy |
| St Clair | OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE WITH BOOM AND JIB OR LEADS 400' OR LONGER | $51.29 | $25.35 | $76.64 | MI20260022 Residential |
| St Clair | OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE WITH BOOM AND JIB OR LEADS 400' OR LONGER | $51.29 | $25.35 | $76.64 | MI20260098 Building |
| St Clair | OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE WITH BOOM AND JIB OR LEADS 300' OR LONGER | $49.79 | $25.35 | $75.14 | MI20260022 Residential |
| St Clair | OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE WITH BOOM AND JIB OR LEADS 300' OR LONGER | $48.79 | $25.35 | $74.14 | MI20260098 Building |
| St Clair | OPERATOR: POWER EQUIPMENT: GROUP 3 CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER | $48.29 | $25.35 | $73.64 | MI20260022 Residential |
| St Clair | OPERATOR: POWER EQUIPMENT: GROUP 3 CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER | $48.29 | $25.35 | $73.64 | MI20260098 Building |
| St Clair | OPERATOR: POWER EQUIPMENT: GROUP 4 CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER | $47.99 | $25.35 | $73.34 | MI20260022 Residential |
| St Clair | OPERATOR: POWER EQUIPMENT: GROUP 4 CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER | $47.99 | $25.35 | $73.34 | MI20260098 Building |
| St Clair | OPERATOR: POWER EQUIPMENT: GROUP 5 CRANE WITH BOOM AND JIB OR LEADS 120' OR LONGER | $47.17 | $25.35 | $72.52 | MI20260022 Residential |
| St Clair | OPERATOR: POWER EQUIPMENT: GROUP 5 CRANE WITH BOOM AND JIB OR LEADS 120' OR LONGER | $47.17 | $25.35 | $72.52 | MI20260098 Building |
| St Clair | OPERATOR: POWER EQUIPMENT: GROUP 6 REGULAR CRANE OPERATOR | $46.31 | $25.35 | $71.66 | MI20260022 Residential |
| St Clair | OPERATOR: POWER EQUIPMENT: GROUP 6 REGULAR CRANE OPERATOR, AND CONCRETE PUMP WITH BOOM OPERATOR | $46.31 | $25.35 | $71.66 | MI20260098 Building |
| St Clair | OPERATOR: POWER EQUIPMENT: GROUP 7 BACKHOE/EXCAVATOR; BOBCAT/SKID LOADER; BULLDOZER; GRADER/BLADE; SCRAPER; LOADER | $45.34 | $25.35 | $70.69 | MI20260022 Residential |
| St Clair | OPERATOR: POWER EQUIPMENT: GROUP 7 BACKHOE/EXCAVATOR/TRACKHOE, BOBCAT/SKID LOADER, BROOM/SWEEPER, BULLDOZER, GRADER/BLADE, HIGHLIFT, HOIST, LOADER, ROLLER, SCRAPER, TRACTOR & TRENCHER | $45.34 | $25.35 | $70.69 | MI20260098 Building |
| St Clair | OPERATOR: POWER EQUIPMENT: GROUP 8 FORKLIFT & EXTEND-A-BOOM FORKLIFT | $43.63 | $25.35 | $68.98 | MI20260098 Building |
| St Clair | OPERATOR: POWER EQUIPMENT: GROUP 9 OILER | $35.29 | $25.35 | $60.64 | MI20260098 Building |
| St Clair | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, GRADER/ BLADE, LOADER, ROLLER, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 | $71.23 | MI20260072 Heavy |
| St Clair | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 | $66.50 | MI20260072 Heavy |
| St Clair | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 | $65.77 | MI20260072 Heavy |
| St Clair | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR, BOBCAT/ SKID STEER /SKID LOADER | $39.95 | $25.25 | $65.20 | MI20260072 Heavy |
| St Joseph, St Joseph | OPERATOR: BULLDOZER | $22.34 | $1.22 | $23.56 | MI20260152 Building |
| St Joseph, St Joseph | OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 | MI20260152 Building |
| St Joseph, St Joseph | OPERATOR: LOADER | $24.26 | $11.19 | $35.45 | MI20260152 Building |
| St Joseph, St Joseph | OPERATOR: ROLLER | $28.02 | $7.07 | $35.09 | MI20260152 Building |
| St Joseph, St Joseph | OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 | MI20260152 Building |
| St Joseph, St Joseph | POWER EQUIPMENT OPERATOR: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $47.28 | $25.25 | $72.53 | MI20260152 Building |
| St Joseph, St Joseph | POWER EQUIPMENT OPERATOR: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER; TOWER CRANE; GANTRY CRANE AND WHIRLEY CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $43.93 | $25.25 | $69.18 | MI20260152 Building |
| St Joseph, St Joseph | POWER EQUIPMENT OPERATOR: GROUP 3 BACKHOE/EXCAVATOR; CRANE; PAVER; SCRAPER; STIFF LEG DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 | $66.53 | MI20260152 Building |
| St Joseph, St Joseph | POWER EQUIPMENT OPERATOR: GROUP 4 FORK TRUCK (OVER 20' LIFT) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 | MI20260152 Building |
| St Joseph, St Joseph | POWER EQUIPMENT OPERATOR: GROUP 5 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $33.71 | $25.25 | $58.96 | MI20260152 Building |
| St Joseph, St Joseph | POWER EQUIPMENT OPERATOR: GROUP 6 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $31.23 | $25.25 | $56.48 | MI20260152 Building |
| Tuscola | OPERATOR: BACKHOE/EXCAVATOR | $14.38 | $1.72 | $16.10 | MI20260153 Building |
| Tuscola | OPERATOR: BULLDOZER | $22.34 | $1.22 | $23.56 | MI20260153 Building |
| Tuscola | OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 | MI20260153 Building |
| Tuscola | OPERATOR: POWER EQUIPMENT: BACKHOE/EXCAVATOR; LOADER; ROLLER PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $44.00 | $25.25 | $69.25 | MI20260005 Residential |
| Tuscola | OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $44.13 | $24.85 | $68.98 | MI20260153 Building |
| Tuscola | OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER; TOWER CRANE; GANTRY CRANE AND WHIRLEY DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $38.18 | $24.85 | $63.03 | MI20260153 Building |
| Tuscola | OPERATOR: POWER EQUIPMENT: GROUP 3 CRANE; LOADER; PAVER; SCRAPER; STIFF LEG DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $40.83 | $24.85 | $65.68 | MI20260153 Building |
| Tuscola | OPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; FORK TRUCK (OVER 20' LIFT) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $36.47 | $24.85 | $61.32 | MI20260153 Building |
| Tuscola | OPERATOR: POWER EQUIPMENT: GROUP 5 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $30.61 | $24.85 | $55.46 | MI20260153 Building |
| Tuscola | OPERATOR: POWER EQUIPMENT: GROUP 6 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $26.13 | $24.85 | $50.98 | MI20260153 Building |
| Tuscola | OPERATOR: ROLLER | $28.02 | $7.07 | $35.09 | MI20260153 Building |
| Tuscola | OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 | MI20260153 Building |
| Tuscola | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 1: LEVEL A) | $28.86 | $24.85 | $53.71 | MI20260153 Building |
| Tuscola | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 1: LEVEL B AND C) | $40.83 | $24.85 | $65.68 | MI20260153 Building |
| Tuscola | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 1: LEVEL D WHEN CAPPING LANDFILL) | $36.47 | $24.85 | $61.32 | MI20260153 Building |
| Tuscola | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 1: LEVEL D) | $42.38 | $24.85 | $67.23 | MI20260153 Building |
| Tuscola | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 1: LEVEL A) | $42.38 | $24.85 | $67.23 | MI20260153 Building |
| Tuscola | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 1: LEVEL B AND C) | $26.13 | $24.85 | $50.98 | MI20260153 Building |
| Tuscola | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 1: LEVEL D WHEN CAPPING LANDFILL) | $44.13 | $24.85 | $68.98 | MI20260153 Building |
| Tuscola | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 1: LEVEL D) | $34.72 | $24.85 | $59.57 | MI20260153 Building |
| Tuscola | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 1 (AREA 1: LEVEL A) | $40.83 | $24.85 | $65.68 | MI20260153 Building |
| Tuscola | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 1 (AREA 1: LEVEL B AND C) | $44.13 | $24.85 | $68.98 | MI20260153 Building |
| Tuscola | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 1 (AREA 1: LEVEL D WHEN CAPPING LANDFILL) | $28.86 | $24.85 | $53.71 | MI20260153 Building |
| Tuscola | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 1 (AREA 1: LEVEL D) | $38.18 | $24.85 | $63.03 | MI20260153 Building |
| Tuscola | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 2 (AREA 1: LEVEL A) | $36.43 | $24.85 | $61.28 | MI20260153 Building |
| Tuscola | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 2 (AREA 1: LEVEL B AND C) | $36.47 | $24.85 | $61.32 | MI20260153 Building |
| Tuscola | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 2 (AREA 1: LEVEL D WHEN CAPPING LANDFILL) | $30.61 | $24.85 | $55.46 | MI20260153 Building |
| Tuscola | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 2 (AREA 1: LEVEL D) | $39.08 | $24.85 | $63.93 | MI20260153 Building |
| Tuscola | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 1: LEVEL A) | $30.61 | $24.85 | $55.46 | MI20260153 Building |
| Tuscola | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 1: LEVEL D WHEN CAPPING LANDFILL) | $26.13 | $24.85 | $50.98 | MI20260153 Building |
| Tuscola | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 1: LEVEL D) | $26.38 | $24.85 | $51.23 | MI20260153 Building |
| Tuscola | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 2: LEVEL A) | $42.38 | $24.85 | $67.23 | MI20260153 Building |
| Tuscola | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 2: LEVEL B AND C) | $26.13 | $24.85 | $50.98 | MI20260153 Building |
| Tuscola | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 2: LEVEL A) | $34.72 | $24.85 | $59.57 | MI20260153 Building |
| Tuscola | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 2: LEVEL B AND C) | $36.47 | $24.85 | $61.32 | MI20260153 Building |
| Tuscola | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 2: LEVEL D) | $34.72 | $24.85 | $59.57 | MI20260153 Building |
| Tuscola | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1 (AREA 2: LEVEL A) | $39.08 | $24.85 | $63.93 | MI20260153 Building |
| Tuscola | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1 (AREA 2: LEVEL B AND C) | $30.61 | $24.85 | $55.46 | MI20260153 Building |
| Tuscola | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1 (AREA 2: LEVEL D) | $26.38 | $24.85 | $51.23 | MI20260153 Building |
| Tuscola | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 2 (AREA 2: LEVEL A) | $26.38 | $24.85 | $51.23 | MI20260153 Building |
| Tuscola | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 2 (AREA 2: LEVEL B AND C) | $44.13 | $24.85 | $68.98 | MI20260153 Building |
| Tuscola | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 2 (AREA 2: LEVEL D WHEN CAPPING LANDFILL) | $36.43 | $24.85 | $61.28 | MI20260153 Building |
| Tuscola | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 2 (AREA 2: LEVEL D) | $39.08 | $24.85 | $63.93 | MI20260153 Building |
| Tuscola | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 2: LEVEL A) | $28.86 | $24.85 | $53.71 | MI20260153 Building |
| Tuscola | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 2: LEVEL B AND C) | $36.43 | $24.85 | $61.28 | MI20260153 Building |
| Tuscola | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 2: LEVEL D WHEN CAPPING LANDFILL) | $40.83 | $24.85 | $65.68 | MI20260153 Building |
| Tuscola | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 2: LEVEL D) | $38.18 | $24.85 | $63.03 | MI20260153 Building |
| Van Buren | OPERATOR: BACKHOE/EXCAVATOR | $19.94 | $5.46 | $25.40 | MI20260023 Residential |
| Van Buren | OPERATOR: BACKHOE/EXCAVATOR | $19.09 | $2.48 | $21.57 | MI20260073 Heavy |
| Van Buren | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $17.66 | $7.65 | $25.31 | MI20260023 Residential |
| Van Buren | OPERATOR: BULLDOZER | $19.68 | $6.64 | $26.32 | MI20260099 Building |
| Van Buren | OPERATOR: LOADER | $19.19 | $6.00 | $25.19 | MI20260073 Heavy |
| Van Buren | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $48.98 | $25.25 | $74.23 | MI20260073 Heavy |
| Van Buren | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $45.68 | $25.25 | $70.93 | MI20260073 Heavy |
| Van Buren | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 3 BORING MACHINE; BULLDOZER; GRADER/BLADE; ROLLER; SCRAPER; TRACTOR; TRENCHER; REGULAR CRANE AND STIFF LEG DERRICK PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $44.00 | $25.25 | $69.25 | MI20260073 Heavy |
| Van Buren | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 4 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.32 | $25.25 | $66.57 | MI20260073 Heavy |
| Van Buren | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 5 BOOM TRUCK (NON-SWINGING) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.32 | $25.25 | $66.57 | MI20260073 Heavy |
| Van Buren | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 6 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $35.46 | $25.25 | $60.71 | MI20260073 Heavy |
| Van Buren | OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER | $48.98 | $25.25 | $74.23 | MI20260023 Residential |
| Van Buren | OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER | $47.28 | $25.25 | $72.53 | MI20260099 Building |
| Van Buren | OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK | $45.68 | $25.25 | $70.93 | MI20260023 Residential |
| Van Buren | OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK | $43.93 | $25.25 | $69.18 | MI20260099 Building |
| Van Buren | OPERATOR: POWER EQUIPMENT: GROUP 3 BACKHOE/EXCAVATOR/TRACKHOE; CONCRETE PUMP; CRANE; GRADER/BLADE; HIGHLIFT; HOIST; LOADER; ROLLER; SCRAPER; STIFF LEG DERRICK; TRENCHER; STIFF LEG DERRICK | $41.28 | $25.25 | $66.53 | MI20260099 Building |
| Van Buren | OPERATOR: POWER EQUIPMENT: GROUP 3 BULLDOZER; CRANE; GRADER/BLADE; LOADER; SCRAPER; STIFF LEG DERRICK | $44.00 | $25.25 | $69.25 | MI20260023 Residential |
| Van Buren | OPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) | $39.57 | $25.25 | $64.82 | MI20260099 Building |
| Van Buren | OPERATOR: POWER EQUIPMENT: GROUP 5 BOOM TRUCK (NON-SWINGING) | $39.57 | $25.25 | $64.82 | MI20260099 Building |
| Van Buren | OPERATOR: POWER EQUIPMENT: GROUP 6 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) | $33.71 | $25.25 | $58.96 | MI20260099 Building |
| Van Buren | OPERATOR: POWER EQUIPMENT: GROUP 7 OILER | $31.23 | $25.25 | $56.48 | MI20260099 Building |
| Van Buren | OPERATOR: TRACTOR | $19.10 | $8.48 | $27.58 | MI20260099 Building |
| Van Buren | POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 1 BORING MACHINE, BULLDOZER, CRANE, GRADER/ BLADE, ROLLER, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 | $71.23 | MI20260073 Heavy |
| Van Buren | POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 | $66.50 | MI20260073 Heavy |
| Van Buren | POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR, BOBCAT/ SKID STEER /SKID LOADER | $39.95 | $25.25 | $65.20 | MI20260073 Heavy |
| Washtenaw | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 1 CRANE WITH BOOM & JIB OR LEADS 400' OR LONGER | $51.29 | $25.35 | $76.64 | MI20260074 Heavy |
| Washtenaw | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 2 CRANE WITH BOOM & JIB OR LEADS 300' OR LONGER | $49.79 | $25.35 | $75.14 | MI20260074 Heavy |
| Washtenaw | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 3 CRANE WITH BOOM & JIB OR LEADS 220' OR LONGER | $48.29 | $25.35 | $73.64 | MI20260074 Heavy |
| Washtenaw | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 4 CRANE WITH BOOM & JIB OR LEADS 140' OR LONGER | $47.99 | $25.35 | $73.34 | MI20260074 Heavy |
| Washtenaw | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 5 CRANE WITH BOOM & JIB OR LEADS 120' OR LONGER | $47.17 | $25.35 | $72.52 | MI20260074 Heavy |
| Washtenaw | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 6 REGULAR CRANE OPERATOR | $46.31 | $25.35 | $71.66 | MI20260074 Heavy |
| Washtenaw | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 7 BACKHOE/EXCAVATOR, BOBCAT/SKID LOADER, BORING MACHINE, BROOM/SWEEPER, BULLDOZER, GRADER/BLADE, LOADER, ROLLER, SCRAPER, TRACTOR, TRENCHER | $45.34 | $25.35 | $70.69 | MI20260074 Heavy |
| Washtenaw | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 8 FORKLIFT | $43.63 | $25.35 | $68.98 | MI20260074 Heavy |
| Washtenaw | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 9 OILER | $35.29 | $25.35 | $60.64 | MI20260074 Heavy |
| Washtenaw | OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE WITH BOOM AND JIB OR LEADS 400' OR LONGER | $51.29 | $25.35 | $76.64 | MI20260024 Residential |
| Washtenaw | OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE WITH BOOM AND JIB OR LEADS 400' OR LONGER | $51.29 | $25.35 | $76.64 | MI20260100 Building |
| Washtenaw | OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE WITH BOOM AND JIB OR LEADS 300' OR LONGER | $49.79 | $25.35 | $75.14 | MI20260024 Residential |
| Washtenaw | OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE WITH BOOM AND JIB OR LEADS 300' OR LONGER | $48.79 | $25.35 | $74.14 | MI20260100 Building |
| Washtenaw | OPERATOR: POWER EQUIPMENT: GROUP 3 CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER | $48.29 | $25.35 | $73.64 | MI20260024 Residential |
| Washtenaw | OPERATOR: POWER EQUIPMENT: GROUP 3 CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER | $48.29 | $25.35 | $73.64 | MI20260100 Building |
| Washtenaw | OPERATOR: POWER EQUIPMENT: GROUP 4 CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER | $47.99 | $25.35 | $73.34 | MI20260024 Residential |
| Washtenaw | OPERATOR: POWER EQUIPMENT: GROUP 4 CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER | $47.99 | $25.35 | $73.34 | MI20260100 Building |
| Washtenaw | OPERATOR: POWER EQUIPMENT: GROUP 5 CRANE WITH BOOM AND JIB OR LEADS 120' OR LONGER | $47.17 | $25.35 | $72.52 | MI20260024 Residential |
| Washtenaw | OPERATOR: POWER EQUIPMENT: GROUP 5 CRANE WITH BOOM AND JIB OR LEADS 120' OR LONGER | $47.17 | $25.35 | $72.52 | MI20260100 Building |
| Washtenaw | OPERATOR: POWER EQUIPMENT: GROUP 6 REGULAR CRANE OPERATOR | $46.31 | $25.35 | $71.66 | MI20260024 Residential |
| Washtenaw | OPERATOR: POWER EQUIPMENT: GROUP 6 REGULAR CRANE OPERATOR, AND CONCRETE PUMP WITH BOOM OPERATOR | $46.31 | $25.35 | $71.66 | MI20260100 Building |
| Washtenaw | OPERATOR: POWER EQUIPMENT: GROUP 7 BACKHOE/EXCAVATOR; BOBCAT/SKID LOADER; BULLDOZER; GRADER/BLADE; SCRAPER; LOADER | $45.34 | $25.35 | $70.69 | MI20260024 Residential |
| Washtenaw | OPERATOR: POWER EQUIPMENT: GROUP 7 BACKHOE/EXCAVATOR/TRACKHOE, BOBCAT/SKID LOADER, BROOM/SWEEPER, BULLDOZER, GRADER/BLADE, HIGHLIFT, HOIST, LOADER, ROLLER, SCRAPER, TRACTOR & TRENCHER | $45.34 | $25.35 | $70.69 | MI20260100 Building |
| Washtenaw | OPERATOR: POWER EQUIPMENT: GROUP 8 FORKLIFT & EXTEND-A-BOOM FORKLIFT | $43.63 | $25.35 | $68.98 | MI20260100 Building |
| Washtenaw | OPERATOR: POWER EQUIPMENT: GROUP 9 OILER | $35.29 | $25.35 | $60.64 | MI20260100 Building |
| Washtenaw | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, GRADER/ BLADE, LOADER, ROLLER, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 | $71.23 | MI20260074 Heavy |
| Washtenaw | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 | $66.50 | MI20260074 Heavy |
| Washtenaw | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 | $65.77 | MI20260074 Heavy |
| Washtenaw | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR, BOBCAT/ SKID STEER /SKID LOADER | $39.95 | $25.25 | $65.20 | MI20260074 Heavy |
| Wayne | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 1 CRANE WITH BOOM & JIB OR LEADS 400' OR LONGER | $51.29 | $25.35 | $76.64 | MI20260075 Heavy |
| Wayne | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 2 CRANE WITH BOOM & JIB OR LEADS 300' OR LONGER | $49.79 | $25.35 | $75.14 | MI20260075 Heavy |
| Wayne | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 3 CRANE WITH BOOM & JIB OR LEADS 220' OR LONGER | $48.29 | $25.35 | $73.64 | MI20260075 Heavy |
| Wayne | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 4 CRANE WITH BOOM & JIB OR LEADS 140' OR LONGER | $47.99 | $25.35 | $73.34 | MI20260075 Heavy |
| Wayne | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 5 CRANE WITH BOOM & JIB OR LEADS 120' OR LONGER | $47.17 | $25.35 | $72.52 | MI20260075 Heavy |
| Wayne | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 6 REGULAR CRANE OPERATOR | $46.31 | $25.35 | $71.66 | MI20260075 Heavy |
| Wayne | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 7 BACKHOE/EXCAVATOR, BOBCAT/SKID LOADER, BORING MACHINE, BROOM/SWEEPER, BULLDOZER, GRADER/BLADE, LOADER, ROLLER, SCRAPER, TRACTOR, TRENCHER | $45.34 | $25.35 | $70.69 | MI20260075 Heavy |
| Wayne | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 8 FORKLIFT | $43.63 | $25.35 | $68.98 | MI20260075 Heavy |
| Wayne | OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 9 OILER | $35.29 | $25.35 | $60.64 | MI20260075 Heavy |
| Wayne | OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE WITH BOOM AND JIB OR LEADS 400' OR LONGER | $51.29 | $25.35 | $76.64 | MI20260101 Building |
| Wayne | OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE WITH BOOM AND JIB OR LEADS 300' OR LONGER | $48.79 | $25.35 | $74.14 | MI20260101 Building |
| Wayne | OPERATOR: POWER EQUIPMENT: GROUP 3 CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER | $48.29 | $25.35 | $73.64 | MI20260101 Building |
| Wayne | OPERATOR: POWER EQUIPMENT: GROUP 4 CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER | $47.99 | $25.35 | $73.34 | MI20260101 Building |
| Wayne | OPERATOR: POWER EQUIPMENT: GROUP 5 CRANE WITH BOOM AND JIB OR LEADS 120' OR LONGER | $47.17 | $25.35 | $72.52 | MI20260101 Building |
| Wayne | OPERATOR: POWER EQUIPMENT: GROUP 6 REGULAR CRANE OPERATOR, AND CONCRETE PUMP WITH BOOM OPERATOR | $46.31 | $25.35 | $71.66 | MI20260101 Building |
| Wayne | OPERATOR: POWER EQUIPMENT: GROUP 7 BACKHOE/EXCAVATOR/TRACKHOE, BOBCAT/SKID LOADER, BROOM/SWEEPER, BULLDOZER, GRADER/BLADE, HIGHLIFT, HOIST, LOADER, ROLLER, SCRAPER, TRACTOR & TRENCHER | $45.34 | $25.35 | $70.69 | MI20260101 Building |
| Wayne | OPERATOR: POWER EQUIPMENT: GROUP 8 FORKLIFT & EXTEND-A-BOOM FORKLIFT | $43.63 | $25.35 | $68.98 | MI20260101 Building |
| Wayne | OPERATOR: POWER EQUIPMENT: GROUP 9 OILER | $35.29 | $25.35 | $60.64 | MI20260101 Building |
| Wayne | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, GRADER/ BLADE, LOADER, ROLLER, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 | $71.23 | MI20260075 Heavy |
| Wayne | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 | $66.50 | MI20260075 Heavy |
| Wayne | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 | $65.77 | MI20260075 Heavy |
| Wayne | POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR, BOBCAT/ SKID STEER /SKID LOADER | $39.95 | $25.25 | $65.20 | MI20260075 Heavy |
| Wexford | OPERATOR: BACKHOE/EXCAVATOR | $24.04 | $6.03 | $30.07 | MI20260154 Building |
| Wexford | OPERATOR: BULLDOZER | $22.46 | $7.29 | $29.75 | MI20260154 Building |
| Wexford | OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 | MI20260154 Building |
| Wexford | OPERATOR: LOADER | $24.04 | $6.03 | $30.07 | MI20260154 Building |
| Wexford | OPERATOR: ROLLER | $27.47 | $8.86 | $36.33 | MI20260154 Building |
| Wexford | OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 | MI20260154 Building |
| Wexford | POWER EQUIPMENT OPERATOR: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $47.28 | $25.25 | $72.53 | MI20260154 Building |
| Wexford | POWER EQUIPMENT OPERATOR: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER; TOWER CRANE, GANTRY CRANE AND WHIRLEY DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $43.93 | $25.25 | $69.18 | MI20260154 Building |
| Wexford | POWER EQUIPMENT OPERATOR: GROUP 3 CRANE; PAVER; AND SCRAPER; STIFF LEG DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 | $66.53 | MI20260154 Building |
| Wexford | POWER EQUIPMENT OPERATOR: GROUP 4 FORK TRUCK (OVER 20' LIFT) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 | MI20260154 Building |
| Wexford | POWER EQUIPMENT OPERATOR: GROUP 5 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $33.71 | $25.25 | $58.96 | MI20260154 Building |
| Wexford | POWER EQUIPMENT OPERATOR: GROUP 6 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $31.23 | $25.25 | $56.48 | MI20260154 Building |
Rates come from the current revision of each active determination; DOL revises these mid-year. Open a determination to watch it, or pin a bid date to lock the revision that legally applies. All Michigan trades.