Current rates (rev 1)
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | $43.50 | $37.64 | $81.14 |
| TILE SETTER | $32.20 | $23.46 | $55.66 |
| PLASTERER | $33.09 | $26.58 | $59.67 |
| BRICKLAYER | $35.28 | $26.30 | $61.58 |
| CARPENTER (EXCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION) | $28.29 | $21.42 | $49.71 |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION) | $28.29 | $21.42 | $49.71 |
| MILLWRIGHT | $40.04 | $26.47 | $66.51 |
| ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING) | $48.40 | $17.79 | $66.19 |
| POWER EQUIPMENT OPERATOR: GROUP 6 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $31.23 | $25.25 | $56.48 |
| POWER EQUIPMENT OPERATOR: GROUP 5 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $33.71 | $25.25 | $58.96 |
| POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID LOADER; FORK TRUCK (OVER 20' LIFT) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 |
| POWER EQUIPMENT OPERATOR: GROUP 3 BACKHOE/EXCAVATOR; CRANE; LOADER; PAVER; SCRAPER; STIFF LEG DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 | $66.53 |
| POWER EQUIPMENT OPERATOR: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER; TOWER CRANE; GANTRY CRANE AND WHIRLEY DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $43.93 | $25.25 | $69.18 |
| POWER EQUIPMENT OPERATOR: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $47.28 | $25.25 | $72.53 |
| IRONWORKER: STRUCTURAL | $36.55 | $29.51 | $66.06 |
| IRONWORKER: REINFORCING | $36.55 | $29.51 | $66.06 |
| IRONWORKER: STRUCTURAL (METAL BUILDING ERECTION ONLY) | $30.02 | $27.43 | $57.45 |
| LABORER (COMMON OR GENERAL; MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; PIPELAYER; AND SANDBLASTER) | $32.35 | $13.45 | $45.80 |
| PAINTER: SPRAY (WEST OF M-99) | $26.86 | $17.66 | $44.52 |
| PAINTER: DRYWALL FINISHING/TAPING (WEST OF M-99) | $32.85 | $20.41 | $53.26 |
| PAINTER: BRUSH AND ROLLER (WEST OF M-99) | $32.86 | $20.41 | $53.27 |
| PAINTER: SPRAY (WEST OF M-99) | $26.86 | $17.66 | $44.52 |
| PAINTER: DRYWALL FINISHING/TAPING (WEST OF M-99) | $32.85 | $20.41 | $53.26 |
| PAINTER: BRUSH AND ROLLER (WEST OF M-99) | $32.86 | $20.41 | $53.27 |
| PAINTER: SPRAY (EAST OF M-99) | $22.75 | $11.94 | $34.69 |
| PAINTER: DRYWALL FINISHING/TAPING (EAST OF M-99) | $21.75 | $11.94 | $33.69 |
| PAINTER: BRUSH AND ROLLER (EAST OF M-99) | $21.75 | $11.94 | $33.69 |
| CEMENT MASON/CONCRETE FINISHER | $27.18 | $18.11 | $45.29 |
| PLUMBER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) | $46.29 | $25.43 | $71.72 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $46.29 | $25.43 | $71.72 |
| PIPEFITTER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) | $46.29 | $25.43 | $71.72 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $41.34 | $27.39 | $68.73 |
| SHEET METAL WORKER (HVAC DUCT & SYSTEM INSTALLATION) | $42.74 | $21.53 | $64.27 |
| SHEET METAL WORKER (EXCLUDING HVAC DUCT & SYSTEM INSTALLATION) | $42.74 | $21.53 | $64.27 |
| TRUCK DRIVER: FLATBED TRUCK | $16.80 | $3.97 | $20.77 |
| TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK | $15.65 | $3.12 | $18.77 |
| ROOFER | $15.73 | $7.41 | $23.14 |
| OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 |
| OPERATOR: ROLLER | $28.02 | $7.07 | $35.09 |
| OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 |
| OPERATOR: BULLDOZER | $22.34 | $1.22 | $23.56 |
| LABORER: LANDSCAPE & IRRIGATION | $12.84 | $0.00 | $12.84 |
| GLAZIER | $16.95 | $4.74 | $21.69 |
| CARPENTER (FLOOR LAYING-CARPET ONLY) | $19.59 | $7.57 | $27.16 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $19.82 | $7.31 | $27.13 |