Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $40.00 | $23.65 | $63.65 |
| BOILERMAKER | $43.50 | $37.64 | $81.14 |
| TILE SETTER | $35.83 | $22.18 | $58.01 |
| BRICKLAYER | $35.83 | $22.18 | $58.01 |
| CARPENTER (DRYWALL HANGER AND FORM WORK) | $30.83 | $21.09 | $51.92 |
| MILLWRIGHT | $40.04 | $26.47 | $66.51 |
| ELECTRICIAN (ALL TOWNSHIPS EXCEPT WAWATAM) | $36.62 | $23.05 | $59.67 |
| ELECTRICIAN (TOWNSHIP OF WAWATAM) | $37.75 | $25.60 | $63.35 |
| POWER EQUIPMENT OPERATOR: GROUP 6 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $31.23 | $25.25 | $56.48 |
| POWER EQUIPMENT OPERATOR: GROUP 5 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $33.71 | $25.25 | $58.96 |
| POWER EQUIPMENT OPERATOR: GROUP 4 FORK TRUCK (OVER 20' LIFT) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 |
| POWER EQUIPMENT OPERATOR: GROUP 3 CRANE; PAVER; AND SCRAPER; STIFF LEG DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 | $66.53 |
| POWER EQUIPMENT OPERATOR: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER; TOWER CRANE, GANTRY CRANE AND WHIRLEY DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $43.93 | $25.25 | $69.18 |
| POWER EQUIPMENT OPERATOR: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $47.28 | $25.25 | $72.53 |
| IRONWORKER: STRUCTURAL | $36.55 | $29.51 | $66.06 |
| IRONWORKER: REINFORCING | $36.55 | $29.51 | $66.06 |
| LABORER: SANDBLASTER | $26.23 | $13.45 | $39.68 |
| LABORER (COMON OR GENERAL; MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; AND PIPELAYER) | $25.02 | $13.45 | $38.47 |
| CEMENT MASON/CONCRETE FINISHER | $23.10 | $12.38 | $35.48 |
| PLUMBER (HVAC SYSTEM INSTALLATION ONLY) | $38.01 | $21.73 | $59.74 |
| PLUMBER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) | $38.01 | $21.73 | $59.74 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $38.01 | $21.73 | $59.74 |
| PIPEFITTER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) | $38.01 | $21.73 | $59.74 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $41.34 | $27.39 | $68.73 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $31.05 | $25.07 | $56.12 |
| SHEET METAL WORKER (EXCLUDING HVAC DUCT & SYSTEM INSTALLATION) | $31.05 | $25.07 | $56.12 |
| TRUCK DRIVER: FLATBED TRUCK | $17.44 | $4.51 | $21.95 |
| TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK | $16.56 | $3.50 | $20.06 |
| ROOFER | $13.64 | $4.58 | $18.22 |
| PAINTER: SPRAY | $16.37 | $2.08 | $18.45 |
| PAINTER: ROLLER | $16.61 | $2.09 | $18.70 |
| PAINTER: BRUSH ONLY | $16.20 | $2.07 | $18.27 |
| OPERATOR: LOADER | $24.04 | $6.03 | $30.07 |
| OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 |
| OPERATOR: ROLLER | $27.47 | $8.86 | $36.33 |
| OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 |
| OPERATOR: BULLDOZER | $22.46 | $7.29 | $29.75 |
| OPERATOR: BACKHOE/EXCAVATOR | $24.04 | $6.03 | $30.07 |
| LABORER: LANDSCAPE & IRRIGATION | $11.04 | $4.39 | $15.43 |
| GLAZIER | $17.19 | $3.83 | $21.02 |
| CARPENTER, EXCLUDES DRYWALL HANGING, AND FORM WORK | $19.48 | $5.02 | $24.50 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.