Building construction wages: Lenawee, Michigan
Wage determination MI20260131 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/MI20260131 on · latest revision 1 · verify at sam.gov/wage-determination/MI20260131/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR (TOWNSHIPS OF BLISSFIELD, CLINTON, DEERFIELD, FAIRFIELD, MACON, OGDEN, PALMYRA, RAISIN, RIDGEWAY, RIGA, & TECUMSEH) | $36.00 | $20.15 | $56.15 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR (TOWNSHIPS OF ADRIAN, CAMBRIDGE, DOVER, FRANKLIN, HUDSON, MADISON, MADINA, ROLLIN, ROME, SENECA, & WOODSTOCK) | $36.62 | $19.78 | $56.40 |
| BOILERMAKER | $43.50 | $37.64 | $81.14 |
| TILE SETTER | $35.83 | $22.18 | $58.01 |
| BRICKLAYER | $35.83 | $22.18 | $58.01 |
| CARPENTER (INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION) | $35.41 | $21.06 | $56.47 |
| MILLWRIGHT | $42.92 | $39.13 | $82.05 |
| ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING) | $48.40 | $17.79 | $66.19 |
| POWER EQUIPMENT OPERATOR: GROUP 9 OILER | $35.29 | $25.35 | $60.64 |
| POWER EQUIPMENT OPERATOR: GROUP 8 FORKLIFT & EXTEND-A-BOOM FORKLIFT | $43.63 | $25.35 | $68.98 |
| POWER EQUIPMENT OPERATOR: GROUP 7 BOBCAT/SKID LOADER; LOADER;PAVER; SCRAPER | $45.34 | $25.35 | $70.69 |
| POWER EQUIPMENT OPERATOR: GROUP 6 REGULAR CRANE OPERATOR | $46.31 | $25.35 | $71.66 |
| POWER EQUIPMENT OPERATOR: GROUP 5 CRANE WITH BOOM AND JIB OR LEADS 120' OR LONGER | $47.17 | $25.35 | $72.52 |
| POWER EQUIPMENT OPERATOR: GROUP 4 CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER | $47.99 | $25.35 | $73.34 |
| POWER EQUIPMENT OPERATOR: GROUP 3 CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER | $48.29 | $25.35 | $73.64 |
| POWER EQUIPMENT OPERATOR: GROUP 2 CRANE WITH BOOM AND JIB OR LEADS 300' OR LONGER | $49.79 | $25.35 | $75.14 |
| POWER EQUIPMENT OPERATOR: GROUP 1 CRANE WITH BOOM AND JIB OR LEADS 400' OR LONGER | $51.29 | $25.35 | $76.64 |
| IRONWORKER: REINFORCING & STRUCTURAL | $35.50 | $29.20 | $64.70 |
| LABORER (COMMON OR GENERAL; MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; PIPELAYER; AND SANDBLASTER) | $32.35 | $13.45 | $45.80 |
| PAINTER: SPRAY | $26.86 | $17.66 | $44.52 |
| PAINTER: DRYWALL FINISHING/TAPING | $32.85 | $20.41 | $53.26 |
| PAINTER: BRUSH AND ROLLER | $32.85 | $20.41 | $53.26 |
| PLASTERER | $27.41 | $16.10 | $43.51 |
| CEMENT MASON/CONCRETE FINISHER | $27.18 | $18.11 | $45.29 |
| PIPEFITTER: HVAC PIPE INSTALLATION ONLY (TOWNSHIPS OF CLINTON, MACON, & TECUMSEH) | $42.26 | $23.70 | $65.96 |
| PLUMBER: EXCLUDING HVAC PIPE & SYSTEM INSTALLATION (TOWNSHIPS OF CLINTON, MACON, & TECUMSEH) | $49.43 | $24.36 | $73.79 |
| PIPEFITTER: EXCLUDES HVAC PIPE & SYSTEM INSTALLATION (TOWNSHIPS OF CLINTON, MACON, & TECUMSEH) | $51.30 | $25.87 | $77.17 |
| PLUMBER: EXCLUDING HVAC PIPE & SYSTEM INSTALLATION (EXCLUDING TOWNSHIPS OF CLINTON, MACON, & TECUMSEH) | $46.29 | $25.43 | $71.72 |
| PIPEFITTER: HVAC PIPE INSTALLATION ONLY (EXCLUDING TOWNSHIPS OF CLINTON, MACON, & TECUMSEH) | $46.29 | $25.43 | $71.72 |
| PIPEFITTER: EXCLUDING HVAC PIPE & SYSTEM INSTALLATION (EXCLUDING TOWNSHIPS OF CLINTON, MACON, & TECUMSEH) | $46.29 | $25.43 | $71.72 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $41.34 | $27.39 | $68.73 |
| SHEET METAL WORKER (HVAC DUCT & SYSTEM INSTALLATION) | $30.80 | $21.51 | $52.31 |
| SHEET METAL WORKER (EXCLUDING HVAC DUCT & SYSTEM INSTALLATION) | $30.80 | $21.51 | $52.31 |
| TRUCK DRIVER: FLATBED TRUCK | $16.80 | $3.97 | $20.77 |
| TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK | $15.50 | $0.00 | $15.50 |
| ROOFER | $15.73 | $7.41 | $23.14 |
| OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 |
| OPERATOR: ROLLER | $28.02 | $7.07 | $35.09 |
| OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 |
| OPERATOR: BULLDOZER | $22.34 | $1.22 | $23.56 |
| OPERATOR: BACKHOE/EXCAVATOR | $29.04 | $9.76 | $38.80 |
| LABORER: LANDSCAPE & IRRIGATION | $12.84 | $0.00 | $12.84 |
| GLAZIER | $16.95 | $4.74 | $21.69 |
| FLOOR LAYER: CARPET | $19.59 | $7.57 | $27.16 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.