Building construction wages: Berrien, Michigan
Wage determination MI20260078 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/MI20260078 on · latest revision 2 · verify at sam.gov/wage-determination/MI20260078/2
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 2 | 2026-05-18 | diff vs rev 1 |
| rev 1 | 2026-05-17 | diff vs rev 0 |
| rev 0 | 2026-01-30 | original |
Current rates (rev 2)
The CSV and the printed sheet are snapshots of rev 2. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $37.20 | $0.00 | $37.20 |
| BOILERMAKER | $43.50 | $36.74 | $80.24 |
| TILE SETTER | $27.35 | $22.20 | $49.55 |
| TILE FINISHER | $26.24 | $21.13 | $47.37 |
| BRICKLAYER | $35.21 | $24.26 | $59.47 |
| CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $28.29 | $21.42 | $49.71 |
| ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING) | $46.00 | $29.23 | $75.23 |
| OPERATOR: POWER EQUIPMENT: GROUP 7 OILER | $31.23 | $25.25 | $56.48 |
| OPERATOR: POWER EQUIPMENT: GROUP 6 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) | $33.37 | $25.25 | $58.62 |
| OPERATOR: POWER EQUIPMENT: GROUP 5 BOOM TRUCK (NON-SWINGING) | $39.57 | $25.25 | $64.82 |
| OPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) | $39.57 | $25.25 | $64.82 |
| OPERATOR: POWER EQUIPMENT: GROUP 3 BACKHOE/EXCAVATOR/TRACKHOE; CRANE; CONCRETE PUMP; GRADER/BLADE; HIGHLIFT; HOIST; LOADER; ROLLER; SCRAPER; STIFF LEG DERRICK; TRENCHER | $42.25 | $25.25 | $67.50 |
| OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK | $43.93 | $25.25 | $69.18 |
| OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER | $47.28 | $25.25 | $72.53 |
| IRONWORKER: REINFORCING AND STRUCTURAL | $31.75 | $22.84 | $54.59 |
| LABORER (COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; SANDBLASTER) | $27.21 | $13.45 | $40.66 |
| PAINTER: SPRAY | $27.32 | $16.46 | $43.78 |
| PAINTER: BRUSH AND ROLLER | $27.32 | $16.66 | $43.98 |
| GLAZIER | $31.22 | $21.57 | $52.79 |
| CEMENT MASON/CONCRETE FINISHER | $24.63 | $12.88 | $37.51 |
| PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION (CITY OF NILES & VICINITY) | $33.60 | $19.36 | $52.96 |
| PIPEFITTER, INCLUDES HVAC PIPE AND UNIT INSTALLATION (CITY OF NILES & VICINITY) | $33.60 | $19.36 | $52.96 |
| PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION (NOT INCLUDING THE DONALD C. COOK NUCLEAR GENERATING PLANT & CITY OF NILES AND VICINITY) | $32.50 | $24.97 | $57.47 |
| PIPEFITTER, INCLUDES HVAC PIPE AND UNIT INSTALLATION (NOT INCLUDING THE DONALD C. COOK NUCLEAR GENERATING PLANT & CITY OF NILES AND VICINITY) | $32.50 | $24.97 | $57.47 |
| ROOFER: COMPOSITION | $34.55 | $21.04 | $55.59 |
| ROOFER (SLATE & TILE) | $36.05 | $21.04 | $57.09 |
| SHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION; EXCLUDING HVAC SYSTEM INSTALLATION) | $44.45 | $30.43 | $74.88 |
| TRUCK DRIVER: TRACTOR HAUL TRUCK | $13.57 | $1.18 | $14.75 |
| TRUCK DRIVER: LOWBOY TRUCK | $14.50 | $0.44 | $14.94 |
| TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK | $17.26 | $11.42 | $28.68 |
| OPERATOR: TRACTOR | $19.10 | $8.48 | $27.58 |
| OPERATOR: BULLDOZER | $19.68 | $6.64 | $26.32 |
| LABORER: LANDSCAPE & IRRIGATION | $10.38 | $0.50 | $10.88 |
| IRONWORKER, ORNAMENTAL | $18.48 | $7.93 | $26.41 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.