Residential construction wages: Grand Traverse, Michigan
Wage determination MI20260003 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/MI20260003 on · latest revision 1 · verify at sam.gov/wage-determination/MI20260003/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER | $35.83 | $22.18 | $58.01 |
| ELECTRICIAN | $33.65 | $22.63 | $56.28 |
| OPERATOR: POWER EQUIPMENT: BACKHOE/EXCAVATOR; LOADER; ROLLER PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $44.00 | $25.25 | $69.25 |
| LABORER: COMMON OR GENERAL; MASON TENDER - CEMENT/CONCRETE | $25.02 | $13.45 | $38.47 |
| PLUMBER (INCLUDING HVAC PIPE INSTALLATION) | $30.45 | $10.64 | $41.09 |
| ROOFER | $26.50 | $15.95 | $42.45 |
| SHEETMETAL WORKER (HVAC DUCT AND UNIT INSTALLATION) | $21.54 | $11.91 | $33.45 |
| TRUCK DRIVER: DUMP TRUCK | $12.00 | $1.25 | $13.25 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION | $18.88 | $6.10 | $24.98 |
| PAINTER: SPRAY | $14.36 | $1.98 | $16.34 |
| PAINTER: BRUSH ONLY | $13.44 | $2.17 | $15.61 |
| CEMENT MASON/CONCRETE FINISHER | $19.55 | $6.35 | $25.90 |
| CARPENTER | $13.00 | $3.39 | $16.39 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.