Building construction wages: Ogemaw, Michigan
Wage determination MI20260143 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/MI20260143 on July 24, 2026 · latest revision 1 · verify at sam.gov/wage-determination/MI20260143/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $40.00 | $23.65 | $63.65 |
| BOILERMAKER | $43.50 | $37.64 | $81.14 |
| TILE SETTER | $31.43 | $21.13 | $52.56 |
| CARPENTER (DRYWALL HANGING AND FORM WORK) | $35.86 | $23.69 | $59.55 |
| ELECTRICIAN (RENO, GRANT, TAWAS, BALDWIN, BURLEIGH, SHERMAN & ALABASTER TOWNSHIPS IN IOSCO COUNTY) & ALL TOWNSHIPS EXCEPT FOSTER, ROSE AND GOODAR IN OGERNAW)) | $37.25 | $25.40 | $62.65 |
| POWER EQUIPMENT OPERATOR: GROUP 6 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $31.23 | $25.25 | $56.48 |
| POWER EQUIPMENT OPERATOR: GROUP 5 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 |
| POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID LOADER; FORK TRUCK (OVER 20' LIFT) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 |
| POWER EQUIPMENT OPERATOR: GROUP 3 BACKHOE/EXCAVATOR; BULLDOZER; CRANE; LOADER; PAVER; ROLLER; SCRAPER; STIFF LEG DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 | $66.53 |
| POWER EQUIPMENT OPERATOR: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER; TOWER CRANE, GANTRY CRANE AND WHIRLEY DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $43.93 | $25.25 | $69.18 |
| POWER EQUIPMENT OPERATOR: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $44.13 | $25.25 | $69.38 |
| IRONWORKER, STRUCTURAL | $36.55 | $35.93 | $72.48 |
| IRONWORKER, REINFORCING | $36.55 | $33.37 | $69.92 |
| LABORER: SANDBLASTER | $28.21 | $13.45 | $41.66 |
| LABORER (COMMON OR GENERAL; MASON TENDER - CEMENT/CONCRETE; AND PIPELAYER) | $27.68 | $13.45 | $41.13 |
| PAINTER: BRUSH ONLY | $29.23 | $19.11 | $48.34 |
| CEMENT MASON/CONCRETE FINISHER | $25.47 | $12.38 | $37.85 |
| PLUMBER (HVAC SYSTEM INSTALLATION ONLY) | $38.01 | $21.73 | $59.74 |
| PLUMBER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) | $38.01 | $21.73 | $59.74 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $38.01 | $21.73 | $59.74 |
| PIPEFITTER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) | $38.01 | $21.73 | $59.74 |
| PLUMBER (HVAC SYSTEM INSTALLATION ONLY) | $38.01 | $21.73 | $59.74 |
| PLUMBER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) | $38.01 | $21.73 | $59.74 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $38.01 | $21.73 | $59.74 |
| PIPEFITTER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) | $38.01 | $21.73 | $59.74 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $41.34 | $27.39 | $68.73 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $31.05 | $25.07 | $56.12 |
| SHEET METAL WORKER (EXCLUDING HVAC DUCT & SYSTEM INSTALLATION) | $31.05 | $25.07 | $56.12 |
| TRUCK DRIVER: FLATBED TRUCK | $17.44 | $4.51 | $21.95 |
| TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK | $16.56 | $3.50 | $20.06 |
| ROOFER | $15.28 | $6.61 | $21.89 |
| PAINTER: ROLLER AND SPRAY | $18.05 | $5.04 | $23.09 |
| OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 |
| OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 |
| LABORER: MASON TENDER - BRICK | $14.89 | $3.10 | $17.99 |
| LABORER: LANDSCAPE & IRRIGATION | $14.63 | $0.00 | $14.63 |
| CARPENTER, EXCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $31.75 | $0.00 | $31.75 |
| CARPENTER (METAL STUD INSTALLATION ONLY) | $14.80 | $4.86 | $19.66 |
| BRICKLAYER | $22.25 | $3.10 | $25.35 |