Building construction wages: Barry, Michigan

Wage determination MI20260076 · Active · Standard · verify on SAM.gov

Barry

Get an email when this determination changes.
Substantive rate changes only; no spam. Bidding a specific job? Pin a project instead to lock the revision that applied on your bid date.

Revision history

RevisionPublishedCompare
rev 12026-05-18diff vs rev 0
rev 02026-05-17original

Current rates (rev 1)

Download CSV
ClassificationRateFringeTotal
ASBESTOS WORKER/HEAT & FROST INSULATOR$40.00$23.65$63.65
BOILERMAKER$43.50$36.74$80.24
TILE SETTER (TOWNSHIPS OF BARRY, HOPE, ORANGEVILLE & PRAIRIEVILLE)$32.20$23.46$55.66
TILE FINISHER (TOWNSHIPS OF BARRY, HOPE, ORANGEVILLE & PRAIRIEVILLE)$27.94$21.15$49.09
TILE SETTER (TOWNSHIPS OF ASSYRIA, BALTIMORE, JOHNSTOWN & MAPLE GROVE)$32.20$23.46$55.66
TILE FINISHER (TOWNSHIPS OF ASSYRIA, BALTIMORE, JOHNSTOWN & MAPLE GROVE)$27.94$21.15$49.09
TILE SETTER (TOWNSHIPS OF CARLTON, CASTLETON, HASTINGS, IRVING, RUTLAND, THORNAPPLE, WOODLAND & YANKEE SPRINGS)$32.20$23.46$55.66
TILE FINISHER (TOWNSHIPS OF CARLTON, CASTLETON, HASTINGS, IRVING, RUTLAND, THORNAPPLE, WOODLAND & YANKEE SPRINGS)$27.94$21.15$49.09
CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND FORM WORK$31.50$21.50$53.00
MILLWRIGHT$40.04$26.47$66.51
ELECTRICIAN: LOW VOLTAGE WIRING (TOWNSHIPS OF THORNAPPLE & IRVING)$25.98$16.81$42.79
ELECTRICIAN: LOW VOLTAGE WIRING (TOWNSHIPS OF ASSYRIA, BALTIMORE, CARLTON, CASTLETON, HASTINGS, JOHNSTOWN, MAPLE GROVE & WOODLAND)$34.30$22.16$56.46
OPERATOR: POWER EQUIPMENT: GROUP 5 OILER PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY$31.23$25.25$56.48
OPERATOR: POWER EQUIPMENT: GROUP 4 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY$33.71$25.25$58.96
OPERATOR: POWER EQUIPMENT: GROUP 3 BOOM TRUCK (NON-SWINGING) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY$39.57$25.25$64.82
OPERATOR: POWER EQUIPMENT: GROUP 2 BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY$39.57$25.25$64.82
OPERATOR: POWER EQUIPMENT: GROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; CONCRETE PUMP; GRADER/BLADE; HIGHLIFT; HOIST; ROLLER; SCRAPER; TRENCHER PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY$41.28$25.25$66.53
IRONWORKER, REINFORCING$36.55$29.51$66.06
LABORER: GRADE CHECKER; SANDBLASTER$24.90$12.95$37.85
PAINTER: SPRAY$27.32$16.66$43.98
PAINTER: BRUSH ONLY$27.32$16.66$43.98
PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION (TOWNSHIPS OF CARLTON, IRVING, THORNAPPLE & WOODLAND)$47.40$23.35$70.75
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION; EXCLUDING HVAC SYSTEM INSTALLATION (TOWNSHIPS OF CARLTON, IRVING, THORNAPPLE & WOODLAND)$47.40$23.35$70.75
PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION (TOWNSHIPS OF ASSYRIA, BALTIMORE, CASTLETON, HASTINGS, JOHNSTOWN & MAPLE GROVE)$46.29$25.43$71.72
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION; EXCLUDING HVAC SYSTEM INSTALLATION$46.29$25.43$71.72
PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION (TOWNSHIPS OF BARRY, HOPE, ORANGEVILLE, PRAIRIEVILLE, RUTLAND & YANKEE SPRINGS)$32.50$24.97$57.47
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION; EXCLUDING HVAC SYSTEM INSTALLATION (TOWNSHIPS OF BARRY, HOPE, ORANGEVILLE, PRAIRIEVILLE, RUTLAND & YANKEE SPRINGS)$32.50$24.97$57.47
SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION$42.74$21.53$64.27
TRUCK DRIVER: TRACTOR HAUL TRUCK$13.57$1.18$14.75
TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK$17.00$5.71$22.71
SPRINKLER FITTER (FIRE SPRINKLERS)$17.88$4.73$22.61
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY)$22.28$7.95$30.23
ROOFER$13.86$6.11$19.97
PAINTER: ROLLER$16.21$2.81$19.02
OPERATOR: LOADER$17.16$4.05$21.21
OPERATOR: TRACTOR$15.72$1.92$17.64
OPERATOR: CRANE$19.28$7.55$26.83
OPERATOR: BULLDOZER$18.50$5.81$24.31
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$16.50$6.17$22.67
LABORER: PIPELAYER$18.32$3.28$21.60
LABORER: MASON TENDER - CEMENT/CONCRETE$14.01$2.45$16.46
LABORER: MASON TENDER - BRICK$18.87$2.16$21.03
LABORER: LANDSCAPE & IRRIGATION$10.47$0.00$10.47
LABORER: COMMON OR GENERAL$17.64$5.89$23.53
IRONWORKER, STRUCTURAL$18.13$4.88$23.01
IRONWORKER, ORNAMENTAL$18.48$7.93$26.41
HVAC MECHANIC (INSTALLATION OF HVAC UNIT ONLY, EXCLUDES INSTALLATION OF HVAC PIPE AND DUCT)$16.75$2.75$19.50
GLAZIER$15.29$2.68$17.97
ELECTRICIAN, EXCLUDES LOW VOLTAGE WIRING$21.34$6.81$28.15
DRYWALL FINISHER/TAPER$15.91$2.92$18.83
CEMENT MASON/CONCRETE FINISHER$17.16$4.25$21.41
CARPENTER (FORM WORK ONLY)$18.62$6.42$25.04
CARPENTER (DRYWALL HANGING ONLY)$17.26$2.69$19.95
CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY)$18.49$2.69$21.18
BRICKLAYER$21.45$5.00$26.45