Residential construction wages: Oakland, Michigan
Wage determination MI20260019 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/MI20260019 on · latest revision 1 · verify at sam.gov/wage-determination/MI20260019/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $40.74 | $32.59 | $73.33 |
| TILE SETTER | $40.53 | $23.62 | $64.15 |
| CARPENTER, INCLUDES FLOOR LAYING-CARPET (EXCLUDES FORMWORK) (SINGLE-FAMILY HOMES AND DETATCHED CONDOMINIUMS) | $29.19 | $15.76 | $44.95 |
| CARPENTER, INCLUDES FLOOR LAYING-CARPET (EXCLUDES FORMWORK) (MULTI-FAMILY CONDOMINIUMS) | $31.58 | $16.27 | $47.85 |
| ELECTRICIAN, INCLUDES LOW VOLTAGE WIRING | $30.12 | $14.57 | $44.69 |
| ELEVATOR MECHANIC | $65.01 | $38.44 | $103.45 |
| OPERATOR: POWER EQUIPMENT: GROUP 7 BACKHOE/EXCAVATOR; BOBCAT/SKID LOADER; BULLDOZER; GRADER/BLADE; SCRAPER; LOADER | $45.34 | $25.35 | $70.69 |
| OPERATOR: POWER EQUIPMENT: GROUP 6 REGULAR CRANE OPERATOR | $46.31 | $25.35 | $71.66 |
| OPERATOR: POWER EQUIPMENT: GROUP 5 CRANE WITH BOOM AND JIB OR LEADS 120' OR LONGER | $47.17 | $25.35 | $72.52 |
| OPERATOR: POWER EQUIPMENT: GROUP 4 CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER | $47.99 | $25.35 | $73.34 |
| OPERATOR: POWER EQUIPMENT: GROUP 3 CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER | $48.29 | $25.35 | $73.64 |
| OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE WITH BOOM AND JIB OR LEADS 300' OR LONGER | $49.79 | $25.35 | $75.14 |
| OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE WITH BOOM AND JIB OR LEADS 400' OR LONGER | $51.29 | $25.35 | $76.64 |
| IRONWORKER, STRUCTURAL | $36.55 | $35.93 | $72.48 |
| LANDSCAPE LABORER: GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER | $27.71 | $9.10 | $36.81 |
| LANDSCAPE LABORER: GROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER, SKIDSTEER (OR EQUIVALENT) | $29.93 | $9.10 | $39.03 |
| LABORER (COMMON OR GENERAL; FORMWORK; MASON TENDER - CEMENT/CONCRETE) | $38.00 | $18.25 | $56.25 |
| PAINTER: BRUSH AND ROLLER | $20.14 | $14.72 | $34.86 |
| PLUMBER (EXCLUDING HVAC PIPE INSTALLATION) | $27.06 | $23.52 | $50.58 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $41.61 | $29.35 | $70.96 |
| ROOFER | $42.68 | $28.75 | $71.43 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION | $28.67 | $9.50 | $38.17 |
| TRUCK DRIVER: DUMP TRUCK | $17.00 | $5.71 | $22.71 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $22.32 | $4.51 | $26.83 |
| LABORER: PIPELAYER | $17.99 | $5.46 | $23.45 |
| GLAZIER | $23.00 | $8.17 | $31.17 |
| CEMENT MASON/CONCRETE FINISHER | $19.27 | $5.85 | $25.12 |
| TRUCK DRIVER: PICKUP PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. IF ANY OF THE ABOVE HOLIDAYS FALL ON A SUNDAY, THE FOLLOWING MONDAY SHALL BE CONSIDERED THE HOLIDAY AND, IF WORK IS PERFORMED, THE RATE SHALL BE DOUBLE TIME | $456.70 | $67.10 | $523.80 |
| DAY | $31.03 | $0.70 | $31.73 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.