Building construction wages: Ionia, Michigan

Wage determination MI20260085 · Active · Standard · verify on SAM.gov

Ionia

Get an email when this determination changes.This determination changed once in the last 12 months, most recently 2026-05-18: 2 rate changes, 2 removed (ELECTRICIAN: EXCLUDES LOW VOLTAGE WIRING (TOWNS… $36.52 → $36.52).
Substantive rate changes only; no spam. Bidding a specific job? Pin a project instead to lock the revision that applied on your bid date.

Revision history

RevisionPublishedCompare
rev 12026-05-18diff vs rev 0
rev 02026-05-17original

Current rates (rev 1)

Download CSV

The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.

ClassificationRateFringeTotal
ASBESTOS WORKER/HEAT & FROST INSULATOR$40.00$23.65$63.65
BOILERMAKER$43.50$36.74$80.24
TILE SETTER$32.20$23.46$55.66
TILE FINISHER$27.94$21.15$49.09
CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND FORM WORK (EXCLUDING TOWNSHIPS OF DANBY, ORANGE, PORTLAND & SEBEWA)$28.29$21.42$49.71
CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND FORM WORK (TOWNSHIPS OF DANBY, ORANGE, PORTLAND & SEBEWA)$36.21$20.91$57.12
MILLWRIGHT$40.04$26.47$66.51
ELECTRICIAN: EXCLUDES LOW VOLTAGE WIRING (TOWNSHIPS OF BERLIN, BOSTON, CAMPBELL, EASTON, IONIA, KEENE, LYONS, NORTH PLAINS, ODESSA, ORLEANS, OTISCO & RONALD)$36.52$25.15$61.67
ELECTRICIAN: EXCLUDES LOW VOLTAGE WIRING (TOWNSHIPS OF ORANGE, PORTLAND, SEBEWA AND DANBY)$42.98$29.75$72.73
OPERATOR: POWER EQUIPMENT: GROUP 5 OILER PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY$31.23$25.25$56.48
OPERATOR: POWER EQUIPMENT: GROUP 4 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY$33.71$25.25$58.96
OPERATOR: POWER EQUIPMENT: GROUP 3 BOOM TRUCK (NON-SWINGING) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY$39.57$25.25$64.82
OPERATOR: POWER EQUIPMENT: GROUP 2 BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY$39.57$25.25$64.82
OPERATOR: POWER EQUIPMENT: GROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; CONCRETE PUMP; GRADER/BLADE; HIGHLIFT; HOIST; ROLLER; SCRAPER; TRENCHER PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY$41.28$25.25$66.53
IRONWORKER, REINFORCING$36.55$29.51$66.06
LABORER: COMMON OR GENERAL; GRADE CHECKER; SANDBLASTER (EXCLUDING THE CITY OF PORTLAND)$24.90$12.95$37.85
LABORER: COMMON OR GENERAL; GRADE CHECKER; SANDBLASTER (CITY OF PORTLAND)$32.53$13.45$45.98
PAINTER: BRUSH AND SPRAY$28.75$18.68$47.43
PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION (REMAINDER OF COUNTY)$47.40$23.35$70.75
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION; EXCLUDING HVAC SYSTEM INSTALLATION (REMAINDER OF COUNTY)$47.40$23.35$70.75
PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION (TOWNSHIPS OF DANBY & PORTLAND)$46.29$25.43$71.72
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION; EXCLUDING HVAC SYSTEM INSTALLATION$46.29$25.43$71.72
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1 (AREA 2: LEVEL D WHEN CAPPING LANDFILL)$42.74$21.53$64.27
TRUCK DRIVER: TRACTOR HAUL TRUCK$13.57$1.18$14.75
TRUCK DRIVER: DUMP TRUCK$17.00$5.71$22.71
SPRINKLER FITTER (FIRE SPRINKLERS)$17.88$4.73$22.61
ROOFER$13.86$6.11$19.97
PAINTER: ROLLER$16.21$2.81$19.02
OPERATOR: LOADER$17.16$4.05$21.21
OPERATOR: TRACTOR$15.72$1.92$17.64
OPERATOR: CRANE$19.28$7.55$26.83
OPERATOR: BULLDOZER$18.50$5.81$24.31
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$16.50$6.17$22.67
LABORER: PIPELAYER$18.32$3.28$21.60
LABORER: MASON TENDER - CEMENT/CONCRETE$14.01$2.45$16.46
LABORER: MASON TENDER - BRICK$18.87$2.16$21.03
LABORER: LANDSCAPE & IRRIGATION$10.47$0.00$10.47
IRONWORKER, STRUCTURAL$18.13$4.88$23.01
IRONWORKER, ORNAMENTAL$18.48$7.93$26.41
HVAC MECHANIC (INSTALLATION OF HVAC UNIT ONLY, EXCLUDES INSTALLATION OF HVAC PIPE AND DUCT)$16.75$2.75$19.50
GLAZIER$15.29$2.68$17.97
DRYWALL FINISHER/TAPER$15.91$2.92$18.83
CEMENT MASON/CONCRETE FINISHER$17.16$4.25$21.41
CARPENTER (FORM WORK ONLY)$18.62$6.42$25.04
CARPENTER (DRYWALL HANGING ONLY)$17.26$2.69$19.95
CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY)$18.49$2.69$21.18
BRICKLAYER$21.45$5.00$26.45