Building construction wages: Ionia, Michigan
Wage determination MI20260085 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/MI20260085 on July 24, 2026 · latest revision 1 · verify at sam.gov/wage-determination/MI20260085/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $40.00 | $23.65 | $63.65 |
| BOILERMAKER | $43.50 | $36.74 | $80.24 |
| TILE SETTER | $32.20 | $23.46 | $55.66 |
| TILE FINISHER | $27.94 | $21.15 | $49.09 |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND FORM WORK (EXCLUDING TOWNSHIPS OF DANBY, ORANGE, PORTLAND & SEBEWA) | $28.29 | $21.42 | $49.71 |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND FORM WORK (TOWNSHIPS OF DANBY, ORANGE, PORTLAND & SEBEWA) | $36.21 | $20.91 | $57.12 |
| MILLWRIGHT | $40.04 | $26.47 | $66.51 |
| ELECTRICIAN: EXCLUDES LOW VOLTAGE WIRING (TOWNSHIPS OF BERLIN, BOSTON, CAMPBELL, EASTON, IONIA, KEENE, LYONS, NORTH PLAINS, ODESSA, ORLEANS, OTISCO & RONALD) | $36.52 | $25.15 | $61.67 |
| ELECTRICIAN: EXCLUDES LOW VOLTAGE WIRING (TOWNSHIPS OF ORANGE, PORTLAND, SEBEWA AND DANBY) | $42.98 | $29.75 | $72.73 |
| OPERATOR: POWER EQUIPMENT: GROUP 5 OILER PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $31.23 | $25.25 | $56.48 |
| OPERATOR: POWER EQUIPMENT: GROUP 4 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $33.71 | $25.25 | $58.96 |
| OPERATOR: POWER EQUIPMENT: GROUP 3 BOOM TRUCK (NON-SWINGING) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 |
| OPERATOR: POWER EQUIPMENT: GROUP 2 BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 |
| OPERATOR: POWER EQUIPMENT: GROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; CONCRETE PUMP; GRADER/BLADE; HIGHLIFT; HOIST; ROLLER; SCRAPER; TRENCHER PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 | $66.53 |
| IRONWORKER, REINFORCING | $36.55 | $29.51 | $66.06 |
| LABORER: COMMON OR GENERAL; GRADE CHECKER; SANDBLASTER (EXCLUDING THE CITY OF PORTLAND) | $24.90 | $12.95 | $37.85 |
| LABORER: COMMON OR GENERAL; GRADE CHECKER; SANDBLASTER (CITY OF PORTLAND) | $32.53 | $13.45 | $45.98 |
| PAINTER: BRUSH AND SPRAY | $28.75 | $18.68 | $47.43 |
| PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION (REMAINDER OF COUNTY) | $47.40 | $23.35 | $70.75 |
| PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION; EXCLUDING HVAC SYSTEM INSTALLATION (REMAINDER OF COUNTY) | $47.40 | $23.35 | $70.75 |
| PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION (TOWNSHIPS OF DANBY & PORTLAND) | $46.29 | $25.43 | $71.72 |
| PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION; EXCLUDING HVAC SYSTEM INSTALLATION | $46.29 | $25.43 | $71.72 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1 (AREA 2: LEVEL D WHEN CAPPING LANDFILL) | $42.74 | $21.53 | $64.27 |
| TRUCK DRIVER: TRACTOR HAUL TRUCK | $13.57 | $1.18 | $14.75 |
| TRUCK DRIVER: DUMP TRUCK | $17.00 | $5.71 | $22.71 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $17.88 | $4.73 | $22.61 |
| ROOFER | $13.86 | $6.11 | $19.97 |
| PAINTER: ROLLER | $16.21 | $2.81 | $19.02 |
| OPERATOR: LOADER | $17.16 | $4.05 | $21.21 |
| OPERATOR: TRACTOR | $15.72 | $1.92 | $17.64 |
| OPERATOR: CRANE | $19.28 | $7.55 | $26.83 |
| OPERATOR: BULLDOZER | $18.50 | $5.81 | $24.31 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $16.50 | $6.17 | $22.67 |
| LABORER: PIPELAYER | $18.32 | $3.28 | $21.60 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $14.01 | $2.45 | $16.46 |
| LABORER: MASON TENDER - BRICK | $18.87 | $2.16 | $21.03 |
| LABORER: LANDSCAPE & IRRIGATION | $10.47 | $0.00 | $10.47 |
| IRONWORKER, STRUCTURAL | $18.13 | $4.88 | $23.01 |
| IRONWORKER, ORNAMENTAL | $18.48 | $7.93 | $26.41 |
| HVAC MECHANIC (INSTALLATION OF HVAC UNIT ONLY, EXCLUDES INSTALLATION OF HVAC PIPE AND DUCT) | $16.75 | $2.75 | $19.50 |
| GLAZIER | $15.29 | $2.68 | $17.97 |
| DRYWALL FINISHER/TAPER | $15.91 | $2.92 | $18.83 |
| CEMENT MASON/CONCRETE FINISHER | $17.16 | $4.25 | $21.41 |
| CARPENTER (FORM WORK ONLY) | $18.62 | $6.42 | $25.04 |
| CARPENTER (DRYWALL HANGING ONLY) | $17.26 | $2.69 | $19.95 |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | $18.49 | $2.69 | $21.18 |
| BRICKLAYER | $21.45 | $5.00 | $26.45 |