Building construction wages: Kent, Michigan

Wage determination MI20260088 · Active · Standard · verify on SAM.gov

Kent

Get an email when this determination changes.No substantive rate changes here in the last 12 months. The watch exists for the day that changes.
Substantive rate changes only; no spam. Bidding a specific job? Pin a project instead to lock the revision that applied on your bid date.

Revision history

RevisionPublishedCompare
rev 12026-05-18diff vs rev 0
rev 02026-05-17original

Current rates (rev 1)

Download CSV

The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.

ClassificationRateFringeTotal
ASBESTOS WORKER/HEAT & FROST INSULATOR$40.00$23.65$63.65
BOILERMAKER$43.50$36.74$80.24
TILE SETTER$32.20$23.46$55.66
TILE FINISHER$27.94$21.15$49.09
MILLWRIGHT$40.04$26.47$66.51
OPERATOR: POWER EQUIPMENT: GROUP 4 OILER PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY$31.23$25.25$56.48
OPERATOR: POWER EQUIPMENT: GROUP 3 BOOM TRUCK (NON-SWINGING) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY$39.57$25.25$64.82
OPERATOR: POWER EQUIPMENT: GROUP 2 BROOM/SWEEPER PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY$39.57$25.25$64.82
OPERATOR: POWER EQUIPMENT: GROUP 1 CONCRETE PUMP; GRADER/BLADE; HIGHLIFT; HOIST; ROLLER; SCRAPER; TRENCHER PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY$41.28$25.25$66.53
IRONWORKER, REINFORCING$36.55$29.51$66.06
LABORER: GRADE CHECKER; SANDBLASTER$26.34$12.95$39.29
PAINTER: BRUSH AND SPRAY$28.75$18.68$47.43
PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION$47.40$23.35$70.75
PIPEFITTER (INCLUDING HVAC PIPE INSTALLATION; EXCLUDING HVAC SYSTEM INSTALLATION)$47.40$23.35$70.75
SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION$35.41$15.86$51.27
TRUCK DRIVER: TRACTOR HAUL TRUCK$13.57$1.18$14.75
TRUCK DRIVER: DUMP TRUCK$17.00$5.71$22.71
SPRINKLER FITTER (FIRE SPRINKLERS)$17.07$4.24$21.31
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY)$18.32$4.66$22.98
ROOFER$14.05$6.06$20.11
PAINTER: ROLLER$16.21$2.81$19.02
OPERATOR: LOADER$17.16$4.05$21.21
OPERATOR: TRACTOR$15.72$1.92$17.64
OPERATOR: FORKLIFT$21.48$9.13$30.61
OPERATOR: CRANE$19.21$6.76$25.97
OPERATOR: BULLDOZER$18.50$5.81$24.31
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$16.50$6.17$22.67
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$20.23$9.10$29.33
LABORER: PIPELAYER$18.32$3.28$21.60
LABORER: MASON TENDER - CEMENT/CONCRETE$14.01$2.45$16.46
LABORER: MASON TENDER - BRICK$18.87$2.16$21.03
LABORER: LANDSCAPE & IRRIGATION$10.47$0.00$10.47
LABORER: COMMON OR GENERAL$13.04$4.80$17.84
IRONWORKER, STRUCTURAL$18.07$4.84$22.91
IRONWORKER, ORNAMENTAL$18.48$7.93$26.41
HVAC MECHANIC (INSTALLATION OF HVAC UNIT ONLY, EXCLUDES INSTALLATION OF HVAC PIPE AND DUCT)$16.75$2.75$19.50
GLAZIER$15.29$2.68$17.97
ELECTRICIAN, EXCLUDES LOW VOLTAGE WIRING$20.68$6.39$27.07
CEMENT MASON/CONCRETE FINISHER$17.16$4.25$21.41
CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL FINISHING/TAPING, DRYWALL HANGING, AND FORMWORK$18.14$4.59$22.73
CARPENTER (FORM WORK ONLY)$18.62$6.42$25.04
CARPENTER (DRYWALL HANGING ONLY)$16.28$2.69$18.97
CARPENTER (DRYWALL FINISHING/TAPING ONLY)$17.35$2.69$20.04
CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY)$18.61$2.69$21.30
BRICKLAYER$21.45$5.00$26.45

Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.