Building construction wages: Macomb, Michigan

Wage determination MI20260091 · Active · Standard

Macomb

Get an email when this determination changes.
Substantive rate changes only; no spam. Bidding a specific job? Pin a project instead to lock the revision that applied on your bid date.

Revision history

RevisionPublishedCompare
rev 12026-05-18diff vs rev 0
rev 02026-05-17original

Current rates (rev 1) · download CSV · print this page for your bid file

ClassificationRateFringeTotal
ASBESTOS WORKER/HEAT & FROST INSULATOR$40.74$32.59$73.33
BOILERMAKER$43.50$36.74$80.24
TILE SETTER$40.53$23.62$64.15
TILE FINISHER$33.50$23.52$57.02
BRICKLAYER$41.66$26.53$68.19
CARPENTER (INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, METAL STUD INSTALLATION & SCAFFOLD BUILDING)$42.44$31.43$73.87
CARPENTER (FLOOR LAYER - CARPET, RESILIENT, & VINYL FLOORING)$36.76$21.11$57.87
MILLWRIGHT$42.92$39.13$82.05
ELECTRICIAN$51.32$28.54$79.86
ELECTRICIAN, LOW VOLTAGE WIRING AND INSTALLATION OF ALARMS (TECHNICIAN)$39.93$17.97$57.90
ELECTRICIAN$51.32$28.54$79.86
ELECTRICIAN, LOW VOLTAGE WIRING AND INSTALLATION OF ALARMS (TECHNICIAN)$39.93$17.97$57.90
ELEVATOR MECHANIC$65.01$38.44$103.45
OPERATOR: POWER EQUIPMENT: GROUP 9 OILER$35.29$25.35$60.64
OPERATOR: POWER EQUIPMENT: GROUP 8 FORKLIFT & EXTEND-A-BOOM FORKLIFT$43.63$25.35$68.98
OPERATOR: POWER EQUIPMENT: GROUP 7 BACKHOE/EXCAVATOR/TRACKHOE, BOBCAT/SKID LOADER, BROOM/SWEEPER, BULLDOZER, GRADER/BLADE, HIGHLIFT, HOIST, LOADER, ROLLER, SCRAPER, TRACTOR & TRENCHER$45.34$25.35$70.69
OPERATOR: POWER EQUIPMENT: GROUP 6 REGULAR CRANE OPERATOR, AND CONCRETE PUMP WITH BOOM OPERATOR$46.31$25.35$71.66
OPERATOR: POWER EQUIPMENT: GROUP 5 CRANE WITH BOOM AND JIB OR LEADS 120' OR LONGER$47.17$25.35$72.52
OPERATOR: POWER EQUIPMENT: GROUP 4 CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER$47.99$25.35$73.34
OPERATOR: POWER EQUIPMENT: GROUP 3 CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER$48.29$25.35$73.64
OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE WITH BOOM AND JIB OR LEADS 300' OR LONGER$48.79$25.35$74.14
OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE WITH BOOM AND JIB OR LEADS 400' OR LONGER$51.29$25.35$76.64
IRONWORKER: STRUCTURAL$36.55$35.93$72.48
IRONWORKER: REINFORCING$36.55$33.37$69.92
IRONWORKER: STRUCTURAL (METAL BUILDING ERECTION ONLY)$30.02$27.43$57.45
LABORER: ASBESTOS ABATEMENT (REMOVAL FROM FLOORS, WALLS & CEILINGS)$39.08$15.92$55.00
LABORER: LANDSCAPE & IRRIGATION: GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER$27.71$9.10$36.81
LABORER: LANDSCAPE & IRRIGATION: GROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER, SKIDSTEER (OR EQUIVALENT)$29.93$9.10$39.03
LABORER (COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - BRICK/CEMENT/CONCRETE; PIPELAYER; SANDBLASTER)$38.00$18.25$56.25
PAINTER: SPRAY$26.86$17.66$44.52
PAINTER: DRYWALL FINISHING/TAPING$32.85$20.41$53.26
PAINTER: BRUSH AND ROLLER$32.85$20.41$53.26
PAINTER: SPRAY$26.86$17.66$44.52
PAINTER: DRYWALL FINISHING/TAPING$32.85$20.41$53.26
PAINTER: BRUSH AND ROLLER$32.85$20.41$53.26
GLAZIER PAID HOLIDAYS: NEW YEAR'S DAY, DECORATION DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED THAT THE EMPLOYEE HAS WORKED THE LAST FULL REGULAR SCHEDULED WORK DAY PRIOR TO THE HOLIDAY, AND THE FIRST FULL REGULAR SCHEDULED WORK DAY FOLLOWING THE HOLIDAY, PROVIDED THE EMPLOYEE IS PHYSICALLY ABLE TO WORK$42.00$25.55$67.55
CEMENT MASON/CONCRETE FINISHER$30.63$14.07$44.70
PLASTERER$30.63$14.07$44.70
PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION$43.34$32.92$76.26
PIPEFITTER, INCLUDES HVAC PIPE AND UNIT INSTALLATION$41.96$40.85$82.81
ROOFER$42.68$28.75$71.43
SPRINKLER FITTER (FIRE SPRINKLERS)$53.57$33.95$87.52
SHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION; EXCLUDING HVAC SYSTEM INSTALLATION)$42.51$35.77$78.28
TRUCK DRIVER: TRACTOR HAUL TRUCK$13.57$1.18$14.75
IRONWORKER, ORNAMENTAL$18.48$7.93$26.41
INSTALLER - OVERHEAD DOOR$27.98$0.00$27.98
TRUCK DRIVER: GROUP 3 LOWBOY PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. IF ANY OF THE ABOVE HOLIDAYS FALL ON A SUNDAY, THE FOLLOWING MONDAY SHALL BE CONSIDERED THE HOLIDAY AND, IF WORK IS PERFORMED, THE RATE SHALL BE DOUBLE TIME.$456.70$456.70
$67.10 PER DAY$31.28$0.70$31.98
TRUCK DRIVER: GROUP 2 SEMI PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. IF ANY OF THE ABOVE HOLIDAYS FALL ON A SUNDAY, THE FOLLOWING MONDAY SHALL BE CONSIDERED THE HOLIDAY AND, IF WORK IS PERFORMED, THE RATE SHALL BE DOUBLE TIME.$456.70$67.10$523.80
DAY$31.18$0.70$31.88
TRUCK DRIVER DUMP: GROUP 1 DUMP, FLATBED; PICKUP INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. IF ANY OF THE ABOVE HOLIDAYS FALL ON A SUNDAY, THE FOLLOWING MONDAY SHALL BE CONSIDERED THE HOLIDAY AND, IF WORK IS PERFORMED, THE RATE SHALL BE DOUBLE TIME.$31.03$0.70$31.73