| CARPENTER (FORM WORK ONLY) | $31.50 | $21.15 | $52.65 |
| ELECTRICIAN (TOWNSHIPS OF ALLEGAN, CASCO, CHESHIRE, CLYDE, GANGES, GUN PLAIN, HEATH, HOPKINS, LEE, MANLIUS, MARTIN, MONTEREY, OTSEGO, SAUGATUCK, TROWBRIDGE, VALLEY, WATSON & WAYLAND) | $42.78 | $21.48 | $64.26 |
| ELECTRICIAN (TOWNSHIPS OF DORR, FILLMORE, LAKETON, LEIGHTON, OVERISEL & SALEM) | $36.52 | $25.15 | $61.67 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR | $39.95 | $25.25 | $65.20 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 | $65.77 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 | $66.50 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, CRANE, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 | $71.23 |
| OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 5 OILER | $32.98 | $25.25 | $58.23 |
| OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 4 BOOM TRUCK (NON-SWINGING) | $41.32 | $25.25 | $66.57 |
| OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 3 BACKHOE/EXCAVATOR; COMPACTOR; CRANE; SCRAPER | $44.00 | $25.25 | $69.25 |
| OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK | $45.68 | $25.25 | $70.93 |
| OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. | $48.98 | $25.25 | $74.23 |
| IRONWORKER: STRUCTURAL | $36.55 | $34.04 | $70.59 |
| IRONWORKER: REINFORCING | $36.55 | $34.04 | $70.59 |
| LABORER ((4) GRADE CHECKER) | $22.73 | $12.95 | $35.68 |
| LABORER ((1) COMMON OR GENERAL) | $22.42 | $12.95 | $35.37 |
| LABORER: COMMON OR GENERAL (EXCLUDES OPEN CUT CONSTRUCTION) | $27.21 | $13.45 | $40.66 |
| CEMENT MASON/CONCRETE FINISHER (TWPS OF OVERISEL, HEATH, VALLEY, CHESHIRE, SALEM, MONTEREY, ALLEGAN, TROWBRIDGE, DORR, HOPKINS, WATSON, OTSEGO, LEIGHTON, WAYLAND, MARTIN & GUN PLAIN) | $22.31 | $12.83 | $35.14 |
| CEMENT MASON/CONCRETE FINISHER (TWPS OF LEE, CLYDE, MANLIUS, FILLMORE, CASCO, GANGES, SAUGATUCK & LAKETOWN) | $24.63 | $12.88 | $37.51 |
| PLUMBER/PIPEFITTER (TOWNSHIPS OF DORR, FILLMORE, LAKETOWN, LEIGHTON, OVERISEL & SALEM) | $39.89 | $23.82 | $63.71 |
| PLUMBER/PIPEFITTER (REMAINDER OF COUNTY) | $35.20 | $22.35 | $57.55 |
| TRUCK DRIVER: DUMP TRUCK | $14.06 | $1.25 | $15.31 |
| OPERATOR: LOADER | $13.50 | $1.55 | $15.05 |
| OPERATOR: ROLLER | $13.74 | $7.93 | $21.67 |
| OPERATOR: GRADER/BLADE | $15.50 | $3.62 | $19.12 |
| OPERATOR: BULLDOZER | $13.50 | $1.55 | $15.05 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $12.98 | $6.12 | $19.10 |
| LABORER: PIPELAYER | $15.28 | $3.99 | $19.27 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $15.97 | $3.51 | $19.48 |
| LABORER: LANDSCAPE | $10.89 | $1.74 | $12.63 |
| CARPENTER, EXCLUDES FORM WORK | $23.97 | $6.29 | $30.26 |
| TRUCK DRIVER: LOWBOY/SEMI-TRAILER TRUCK | $470.70 | $68.70 | $539.40 |
| DAILY | $33.55 | $0.75 | $34.30 |