Building construction wages: Calhoun, Michigan
Wage determination MI20260079 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/MI20260079 on · latest revision 1 · verify at sam.gov/wage-determination/MI20260079/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $40.00 | $23.65 | $63.65 |
| BOILERMAKER | $43.50 | $36.74 | $80.24 |
| TILE SETTER | $27.35 | $22.20 | $49.55 |
| TILE FINISHER | $26.24 | $21.13 | $47.37 |
| BRICKLAYER | $35.21 | $24.26 | $59.47 |
| CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND FORM WORK | $28.29 | $21.42 | $49.71 |
| MILLWRIGHT | $40.04 | $26.47 | $66.51 |
| ELECTRICIAN | $41.00 | $25.74 | $66.74 |
| OPERATOR: POWER EQUIPMENT: GROUP 7 OILER | $31.23 | $25.25 | $56.48 |
| OPERATOR: POWER EQUIPMENT: GROUP 6 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) | $33.37 | $25.25 | $58.62 |
| OPERATOR: POWER EQUIPMENT: GROUP 5 BOOM TRUCK (NON-SWINGING) | $39.57 | $25.25 | $64.82 |
| OPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) | $39.57 | $25.25 | $64.82 |
| OPERATOR: POWER EQUIPMENT: GROUP 3 BACKHOE/EXCAVATOR/TRACKHOE; CRANE; CONCRETE PUMP; GRADER/BLADE; HIGHLIFT; HOIST; LOADER; ROLLER; SCRAPER; STIFF LEG DERRICK; TRENCHER | $42.25 | $25.25 | $67.50 |
| OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK | $43.93 | $25.25 | $69.18 |
| OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER | $47.28 | $25.25 | $72.53 |
| IRONWORKER: STRUCTURAL | $36.55 | $29.51 | $66.06 |
| IRONWORKER: REINFORCING | $36.55 | $29.51 | $66.06 |
| LABORER (COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; SANDBLASTER) | $27.21 | $13.45 | $40.66 |
| PAINTER: SPRAY | $27.07 | $16.56 | $43.63 |
| PAINTER: DRYWALL FINISHING/TAPING | $27.32 | $16.72 | $44.04 |
| PAINTER: BRUSH AND ROLLER | $27.07 | $16.46 | $43.53 |
| PLASTERER | $21.18 | $12.43 | $33.61 |
| PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION | $46.29 | $25.43 | $71.72 |
| PIPEFITTER, INCLUDES HVAC PIPE AND UNIT INSTALLATION | $46.29 | $25.43 | $71.72 |
| ROOFER | $33.98 | $18.51 | $52.49 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $41.34 | $27.39 | $68.73 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1 (AREA 2: LEVEL D WHEN CAPPING LANDFILL) | $42.74 | $21.53 | $64.27 |
| TRUCK DRIVER: TRACTOR HAUL TRUCK | $13.57 | $1.18 | $14.75 |
| TRUCK DRIVER: LOWBOY TRUCK | $14.50 | $0.44 | $14.94 |
| TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK | $17.26 | $11.42 | $28.68 |
| OPERATOR: TRACTOR | $19.10 | $8.48 | $27.58 |
| OPERATOR: COMPACTOR | $17.68 | $6.70 | $24.38 |
| OPERATOR: BULLDOZER | $19.68 | $6.64 | $26.32 |
| LABORER: LANDSCAPE & IRRIGATION | $10.38 | $0.50 | $10.88 |
| IRONWORKER, ORNAMENTAL | $18.48 | $7.93 | $26.41 |
| CEMENT MASON/CONCRETE FINISHER | $25.23 | $1.80 | $27.03 |