Residential construction wages: Ingham, Michigan
Wage determination MI20260014 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/MI20260014 on · latest revision 1 · verify at sam.gov/wage-determination/MI20260014/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (FORM WORK ONLY) | $36.21 | $21.06 | $57.27 |
| ELECTRICIAN (TOWNSHIPS OF BUNKER HILL, LESLIE, ONONDAGA AND STOCKBRIDGE) | $39.26 | $20.35 | $59.61 |
| ELECTRICIAN (TOWNSHIPS OF ALAIEDON, AURELIUS, DELHI, INGHAM, LANSING, LEROY, LOCKE, MERIDIAN, VEVAY, WHEATFIELD, WHITE OAK AND WILLIAMSON) | $31.20 | $10.97 | $42.17 |
| OPERATOR: POWER EQUIPMENT: GROUP 3 BULLDOZER; CRANE; GRADER/BLADE; LOADER; SCRAPER | $44.00 | $25.25 | $69.25 |
| OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK | $45.68 | $25.25 | $70.93 |
| OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER | $48.98 | $25.25 | $74.23 |
| IRONWORKER, STRUCTURAL | $36.55 | $35.93 | $72.48 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $22.75 | $13.45 | $36.20 |
| PAINTER: BRUSH AND ROLLER | $21.84 | $18.63 | $40.47 |
| PLUMBER (EXCLUDING HVAC PIPE INSTALLATION) | $31.35 | $22.90 | $54.25 |
| PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION | $31.35 | $22.90 | $54.25 |
| ROOFER | $31.18 | $17.22 | $48.40 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION | $32.00 | $10.73 | $42.73 |
| TRUCK DRIVER: DUMP TRUCK | $17.00 | $5.71 | $22.71 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $17.66 | $7.65 | $25.31 |
| OPERATOR: BACKHOE/EXCAVATOR | $19.94 | $5.46 | $25.40 |
| LABORER: PIPELAYER | $17.95 | $5.46 | $23.41 |
| LABORER: LANDSCAPE | $9.64 | $2.81 | $12.45 |
| LABORER: COMMON OR GENERAL | $17.21 | $5.46 | $22.67 |
| CEMENT MASON/CONCRETE FINISHER | $19.27 | $5.85 | $25.12 |
| CARPENTER, EXCLUDES FORM WORK | $17.64 | $6.70 | $24.34 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.