Heavy construction wages: Barry, Michigan
Wage determination MI20260050 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/MI20260050 on · latest revision 1 · verify at sam.gov/wage-determination/MI20260050/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER, INCLUDES FORM WORK | $31.50 | $21.15 | $52.65 |
| ELECTRICIAN (TOWNSHIPS OF BARRY, HOPE, ORANGEVILLE, PRAIRIEVILLE, RUTLAND & YANKEE SPRINGS) | $42.78 | $21.84 | $64.62 |
| ELECTRICIAN (TOWNSHIPS OF ASSYRIA, BALTIMORE, CARLTON, CASTLETON, HASTINGS, JOHNSTOWN, MAPLE GROVE & WOODLAND) | $41.00 | $25.74 | $66.74 |
| POWER EQUIPMENT OPERATOR: Underground Construction (Including Sewer)- GROUP 4 : BROOM/ SWEEPER, FORK TRUCK, TRACTOR, BOBCAT/ SKID STEER /SKID LOADER | $39.95 | $25.25 | $65.20 |
| POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 | $65.77 |
| POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 | $66.50 |
| POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, ROLLER, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 | $71.23 |
| OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 4 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. SWING BOOM TRUCK OPERATOR OVER 12 TONS-$.50 PER HOUR | $35.46 | $25.25 | $60.71 |
| OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 3 BOOM TRUCK (NON-SWINGING) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. SWING BOOM TRUCK OPERATOR OVER 12 TONS-$.50 PER HOUR | $41.32 | $25.25 | $66.57 |
| OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 2 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. SWING BOOM TRUCK OPERATOR OVER 12 TONS-$.50 PER HOUR | $41.32 | $25.25 | $66.57 |
| OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 1 BACKHOE/EXCAVATOR; BORING MACHINE; ROLLER; SCRAPER; TRACTOR; TRENCHER PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. SWING BOOM TRUCK OPERATOR OVER 12 TONS-$.50 PER HOUR | $44.00 | $25.25 | $69.25 |
| IRONWORKER: STRUCTURAL | $36.55 | $34.04 | $70.59 |
| IRONWORKER: REINFORCING | $36.55 | $34.04 | $70.59 |
| LABORER ((4) GRADE CHECKER) | $22.73 | $12.95 | $35.68 |
| LABORER ((2) MASON TENDER-CEMENT/CONCRETE) | $22.55 | $12.95 | $35.50 |
| LABORER ((1) COMMON OR GENERAL) | $22.42 | $12.95 | $35.37 |
| LABORER (COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - CEMENT/CONCRETE) (EXCLUDES OPEN CUT CONSTRUCTION) | $23.34 | $11.60 | $34.94 |
| PAINTER: SPRAY | $22.75 | $11.94 | $34.69 |
| PAINTER: BRUSH & ROLLER | $21.75 | $11.94 | $33.69 |
| CEMENT MASON/CONCRETE FINISHER | $22.31 | $12.83 | $35.14 |
| PLUMBER (TOWNSHIPS OF CARLTON, IRVING, THORNAPPLE & WOODLAND) | $39.89 | $23.82 | $63.71 |
| PLUMBER (TOWNSHIPS OF ASSYRIA, BALTIMORE, CASTLETON, HASTINGS, JOHNSTOWN & MAPLE GROVE) | $42.29 | $23.94 | $66.23 |
| PLUMBER (REMAINDER OF COUNTY) | $35.20 | $22.35 | $57.55 |
| TRUCK DRIVER: TRACTOR HAUL TRUCK | $16.50 | $4.89 | $21.39 |
| TRUCK DRIVER: OFF THE ROAD TRUCK | $20.82 | $3.69 | $24.51 |
| TRUCK DRIVER: DUMP TRUCK | $17.00 | $5.71 | $22.71 |
| PIPEFITTER | $19.90 | $5.63 | $25.53 |
| OPERATOR: LOADER | $17.41 | $4.97 | $22.38 |
| OPERATOR: GRADER/BLADE | $16.64 | $0.00 | $16.64 |
| OPERATOR: CRANE | $18.50 | $5.10 | $23.60 |
| OPERATOR: BULLDOZER | $29.31 | $2.64 | $31.95 |
| LABORER: PIPELAYER | $16.00 | $4.66 | $20.66 |
| LABORER: LANDSCAPE | $12.21 | $1.96 | $14.17 |
| TRUCK DRIVER: LOWBOY/SEMI-TRAILER TRUCK | $470.70 | $68.70 | $539.40 |
| DAILY | $33.55 | $0.75 | $34.30 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.