| BRICKLAYER | $34.19 | $24.65 | $58.84 |
| CARPENTER, INCLUDES FORM WORK | $34.01 | $23.14 | $57.15 |
| ELECTRICIAN: ELECTRICAL CONTRACTS OVER $130,000 (DICKINSON COUNTY) | $33.94 | $21.80 | $55.74 |
| ELECTRICIAN: ELECTRICAL CONTRACTS $180,000 OR LESS (DICKINSON COUNTY) | $31.75 | $21.73 | $53.48 |
| ELECTRICIAN (DELTA COUNTY) | $33.43 | $21.78 | $55.21 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR | $39.95 | $25.25 | $65.20 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 | $65.77 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 | $66.50 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, SCRAPER, LOADER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 | $71.23 |
| OPERATOR: POWER EQUIPMENT: CRANE, MAIN BOOM & JIB 220' OR LONGER (EXCLUDES UNDERGROUND CONSTRUCTION) | $44.92 | $25.00 | $69.92 |
| OPERATOR: POWER EQUIPMENT: CRANE, MAIN BOOM & JIB 140' OR LONGER (EXCLUDES UNDERGROUND CONSTRUCTION) | $44.63 | $25.00 | $69.63 |
| OPERATOR: POWER EQUIPMENT: CRANE, MAIN BOOM & JIB 120' OR LONGER (EXCLUDES UNDERGROUND CONSTRUCTION) | $43.81 | $25.00 | $68.81 |
| OPERATOR POWER EQUIPMENT: GROUP 3 OILER EXCLUDES UNDERGROUND CONSTRUCTION | $35.86 | $12.50 | $48.36 |
| OPERATOR POWER EQUIPMENT: GROUP 2 BOOM TRUCK (NON-SWING) EXCLUDES UNDERGROUND CONSTRUCTION | $37.26 | $25.00 | $62.26 |
| OPERATOR POWER EQUIPMENT: GROUP 1 BACKHOE/EXCAVATOR; BULLDOZER; CRANE; COMPACTOR; SCRAPER; LOADER EXCLUDES UNDERGROUND CONSTRUCTION FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $40.51 | $25.00 | $65.51 |
| IRONWORKER, REINFORCING AND STRUCTURAL (CONTRACTS LESS THAN $10,000,000) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY & CHRISTMAS DAY | $41.05 | $33.67 | $74.72 |
| IRONWORKER, REINFORCING AND STRUCTURAL (CONTRACTS $10,000,000 OR GREATER) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY & CHRISTMAS DAY | $41.05 | $33.67 | $74.72 |
| LABORER ((5) PIPELAYER) | $21.56 | $12.85 | $34.41 |
| LABORER ((4) GRADE CHECKER) | $21.51 | $12.85 | $34.36 |
| LABORER ((2) MASON TENDER-CEMENT/CONCRETE) | $21.33 | $12.85 | $34.18 |
| LABORER ((1) COMMON OR GENERAL) | $21.19 | $12.85 | $34.04 |
| LABORER: COMMON OR GENERAL; MASON TENDER - CEMENT/CONCRETE (EXCLUDES UNDERGROUND CONSTRUCTION) | $32.74 | $13.45 | $46.19 |
| CEMENT MASON/CONCRETE FINISHER | $20.17 | $10.13 | $30.30 |
| PLUMBER/PIPEFITTER | $34.48 | $25.18 | $59.66 |
| TRUCK DRIVER: DUMP TRUCK | $12.63 | $1.25 | $13.88 |
| OPERATOR: ROLLER | $13.74 | $7.93 | $21.67 |
| OPERATOR: GRADER/BLADE | $16.63 | $5.85 | $22.48 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $12.98 | $6.12 | $19.10 |
| LABORER: LANDSCAPE | $10.89 | $1.74 | $12.63 |
| TRUCK DRIVER: LOWBOY/SEMI-TRAILER TRUCK | $470.70 | $68.70 | $539.40 |
| DAILY | $33.55 | $0.75 | $34.30 |