Heavy construction wages: Gogebic, Michigan
Wage determination MI20260036 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/MI20260036 on · latest revision 1 · verify at sam.gov/wage-determination/MI20260036/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER | $34.19 | $24.65 | $58.84 |
| CARPENTER, INCLUDES FORM WORK | $34.01 | $23.14 | $57.15 |
| ELECTRICIAN (ELECTRICAL CONTRACTS OVER $180,000) | $33.94 | $21.80 | $55.74 |
| ELECTRICIAN (ELECTRICAL CONTRACTS OF $180,000 OR LESS) | $31.75 | $21.73 | $53.48 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR | $39.95 | $25.25 | $65.20 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 | $65.77 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 | $66.50 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BORING MACHINE, BULLDOZER, CRANE, LOADER, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 | $71.23 |
| OPERATOR: POWER EQUIPMENT: GROUP 1 BULLDOZER; CRANE; COMPACTOR; SCRAPER; LOADER EXCLUDES UNDERGROUND CONSTRUCTION | $40.51 | $25.00 | $65.51 |
| OPERATOR: POWER EQUIPMENT: CRANE, MAIN BOOM & JIB 220' OR LONGER (EXCLUDES UNDERGROUND CONSTRUCTION) | $44.92 | $25.00 | $69.92 |
| OPERATOR: POWER EQUIPMENT: CRANE, MAIN BOOM & JIB 140' OR LONGER (EXCLUDES UNDERGROUND CONSTRUCTION) | $44.63 | $25.00 | $69.63 |
| OPERATOR POWER EQUIPMENT: GROUP 2 BOOM TRUCK (NON-SWING) EXCLUDES UNDERGROUND CONSTRUCTION | $37.26 | $25.00 | $62.26 |
| IRONWORKER, REINFORCING AND STRUCTURAL (CONTRACTS LESS THAN $10,000,000) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY & CHRISTMAS DAY | $41.05 | $33.67 | $74.72 |
| IRONWORKER, REINFORCING AND STRUCTURAL (CONTRACTS $10,000,000 OR GREATER) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY & CHRISTMAS DAY | $41.05 | $33.67 | $74.72 |
| LABORER ((4) GRADE CHECKER) | $22.96 | $12.95 | $35.91 |
| LABORER ((2) MASON TENDER-CEMENT/CONCRETE) | $22.78 | $12.95 | $35.73 |
| LABORER: MASON TENDER - CEMENT/CONCRETE (EXCLUDES OPEN CUT CONSTRUCTION) | $32.74 | $13.45 | $46.19 |
| CEMENT MASON/CONCRETE FINISHER | $20.17 | $10.13 | $30.30 |
| PLUMBER/PIPEFITTER | $34.48 | $25.18 | $59.66 |
| TRUCK DRIVER: DUMP TRUCK | $12.63 | $1.25 | $13.88 |
| OPERATOR: ROLLER | $13.74 | $7.93 | $21.67 |
| OPERATOR: GRADER/BLADE | $16.63 | $5.85 | $22.48 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $12.98 | $6.12 | $19.10 |
| OPERATOR: BACKHOE/EXCAVATOR | $15.61 | $3.58 | $19.19 |
| LABORER: PIPELAYER | $12.50 | $1.06 | $13.56 |
| LABORER: LANDSCAPE | $10.89 | $1.74 | $12.63 |
| LABORER: COMMON OR GENERAL | $14.71 | $3.35 | $18.06 |
| TRUCK DRIVER: LOWBOY/SEMI-TRAILER TRUCK | $470.70 | $68.70 | $539.40 |
| DAILY | $33.55 | $0.75 | $34.30 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.