Heavy construction wages: Gogebic, Michigan

Wage determination MI20260036 · Active · Standard

Gogebic

Get an email when this determination changes.
Substantive rate changes only; no spam. Bidding a specific job? Pin a project instead to lock the revision that applied on your bid date.

Revision history

RevisionPublishedCompare
rev 12026-05-18diff vs rev 0
rev 02026-05-17original

Current rates (rev 1) · download CSV · print this page for your bid file

ClassificationRateFringeTotal
BRICKLAYER$34.19$24.65$58.84
CARPENTER, INCLUDES FORM WORK$34.01$23.14$57.15
ELECTRICIAN (ELECTRICAL CONTRACTS OVER $180,000)$33.94$21.80$55.74
ELECTRICIAN (ELECTRICAL CONTRACTS OF $180,000 OR LESS)$31.75$21.73$53.48
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR$39.95$25.25$65.20
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM)$40.52$25.25$65.77
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER)$41.25$25.25$66.50
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BORING MACHINE, BULLDOZER, CRANE, LOADER, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY)$45.98$25.25$71.23
OPERATOR: POWER EQUIPMENT: GROUP 1 BULLDOZER; CRANE; COMPACTOR; SCRAPER; LOADER EXCLUDES UNDERGROUND CONSTRUCTION$40.51$25.00$65.51
OPERATOR: POWER EQUIPMENT: CRANE, MAIN BOOM & JIB 220' OR LONGER (EXCLUDES UNDERGROUND CONSTRUCTION)$44.92$25.00$69.92
OPERATOR: POWER EQUIPMENT: CRANE, MAIN BOOM & JIB 140' OR LONGER (EXCLUDES UNDERGROUND CONSTRUCTION)$44.63$25.00$69.63
OPERATOR POWER EQUIPMENT: GROUP 2 BOOM TRUCK (NON-SWING) EXCLUDES UNDERGROUND CONSTRUCTION$37.26$25.00$62.26
IRONWORKER, REINFORCING AND STRUCTURAL (CONTRACTS LESS THAN $10,000,000) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY & CHRISTMAS DAY$41.05$33.67$74.72
IRONWORKER, REINFORCING AND STRUCTURAL (CONTRACTS $10,000,000 OR GREATER) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY & CHRISTMAS DAY$41.05$33.67$74.72
LABORER ((4) GRADE CHECKER)$22.96$12.95$35.91
LABORER ((2) MASON TENDER-CEMENT/CONCRETE)$22.78$12.95$35.73
LABORER: MASON TENDER - CEMENT/CONCRETE (EXCLUDES OPEN CUT CONSTRUCTION)$32.74$13.45$46.19
CEMENT MASON/CONCRETE FINISHER$20.17$10.13$30.30
PLUMBER/PIPEFITTER$34.48$25.18$59.66
TRUCK DRIVER: DUMP TRUCK$12.63$1.25$13.88
OPERATOR: ROLLER$13.74$7.93$21.67
OPERATOR: GRADER/BLADE$16.63$5.85$22.48
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$12.98$6.12$19.10
OPERATOR: BACKHOE/EXCAVATOR$15.61$3.58$19.19
LABORER: PIPELAYER$12.50$1.06$13.56
LABORER: LANDSCAPE$10.89$1.74$12.63
LABORER: COMMON OR GENERAL$14.71$3.35$18.06
TRUCK DRIVER: LOWBOY/SEMI-TRAILER TRUCK$470.70$68.70$539.40
DAILY$33.55$0.75$34.30