Building construction wages: Kalamazoo, Michigan

Wage determination MI20260087 · Active · Standard · verify on SAM.gov

Kalamazoo

Get an email when this determination changes.This determination changed once in the last 12 months, most recently 2026-05-18: 1 removed.
Substantive rate changes only; no spam. Bidding a specific job? Pin a project instead to lock the revision that applied on your bid date.

Revision history

RevisionPublishedCompare
rev 12026-05-18diff vs rev 0
rev 02026-05-17original

Current rates (rev 1)

Download CSV

The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.

ClassificationRateFringeTotal
ASBESTOS WORKER/HEAT & FROST INSULATOR$40.00$23.65$63.65
BOILERMAKER$43.50$36.74$80.24
TILE SETTER$27.35$22.20$49.55
TILE FINISHER$26.24$21.13$47.37
BRICKLAYER$35.21$24.26$59.47
CARPENTER (INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, METAL STUD INSTALLATION & SCAFFOLD BUILDER)$28.29$21.42$49.71
MILLWRIGHT$40.04$26.47$66.51
ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING)$42.78$21.84$64.62
OPERATOR: POWER EQUIPMENT: GROUP 7 OILER$31.23$25.25$56.48
OPERATOR: POWER EQUIPMENT: GROUP 6 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK)$33.37$25.25$58.62
OPERATOR: POWER EQUIPMENT: GROUP 5 BOOM TRUCK (NON-SWINGING)$39.57$25.25$64.82
OPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT)$39.57$25.25$64.82
OPERATOR: POWER EQUIPMENT: GROUP 3 BACKHOE/EXCAVATOR/TRACKHOE; CRANE; CONCRETE PUMP; GRADER/BLADE; HIGHLIFT; HOIST; LOADER; ROLLER; SCRAPER; STIFF LEG DERRICK; TRENCHER$42.25$25.25$67.50
OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK$43.93$25.25$69.18
OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER$47.28$25.25$72.53
IRONWORKER: STRUCTURAL$36.55$29.51$66.06
IRONWORKER: REINFORCING$36.55$29.51$66.06
LABORER (COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; SANDBLASTER)$27.21$13.45$40.66
PAINTER: SPRAY$27.07$16.56$43.63
PAINTER: DRYWALL FINISHING/TAPING$27.32$16.72$44.04
PAINTER: BRUSH AND ROLLER$27.07$16.46$43.53
CEMENT MASON/CONCRETE FINISHER$22.31$12.83$35.14
PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION (EXCLUDING FORT CUSTER)$32.50$24.97$57.47
PIPEFITTER, INCLUDES HVAC PIPE AND UNIT INSTALLATION (EXCLUDING FORT CUSTER)$32.50$24.97$57.47
ROOFER$33.98$18.51$52.49
SPRINKLER FITTER (FIRE SPRINKLERS)$41.34$27.39$68.73
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY)$42.74$21.53$64.27
TRUCK DRIVER: TRACTOR HAUL TRUCK$13.57$1.18$14.75
TRUCK DRIVER: LOWBOY TRUCK$14.50$0.44$14.94
TRUCK DRIVER: DUMP TRUCK$17.26$11.42$28.68
SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION$23.59$5.66$29.25
OPERATOR: TRACTOR$19.10$8.48$27.58
OPERATOR: BULLDOZER$19.68$6.64$26.32
LABORER: LANDSCAPE & IRRIGATION$10.38$0.50$10.88
IRONWORKER, ORNAMENTAL$18.48$7.93$26.41

Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.