Building construction wages: Menominee, Ontonagon, Michigan

Wage determination MI20260156 · Active · Standard · verify on SAM.gov

MenomineeOntonagon

Get an email when this determination changes.
Substantive rate changes only; no spam. Bidding a specific job? Pin a project instead to lock the revision that applied on your bid date.

Revision history

RevisionPublishedCompare
rev 12026-05-18diff vs rev 0
rev 02026-05-17original

Current rates (rev 1)

Download CSV
ClassificationRateFringeTotal
ASBESTOS WORKER/HEAT & FROST INSULATOR (ONTONAGON COUNTY)$53.18$22.78$75.96
ASBESTOS WORKER/HEAT & FROST INSULATOR (MENOMINEE COUNTY)$45.24$30.56$75.80
BOILERMAKER$43.50$37.64$81.14
TILE SETTER$32.19$24.65$56.84
BRICKLAYER$32.19$24.65$56.84
MILLWRIGHT$41.00$23.43$64.43
CARPENTER: INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL FINISHING/TAPING, DRYWALL HANGING, FORM WORK, AND SOFT FLOOR LAYER - CARPET (MENOMINEE COUNTY (EXCEPT FOR THAT PART SOUTH OF COUNTY ROAD K AT AMBERG, WISCONSIN, STARTING ON THE WEST AT THE MENOMINEE RIVER AND ENDING ON THE EAST AT THE BAY OF GREEN BAY) AND ONTONAGON COUNTY)$34.01$23.14$57.15
ELECTRICIAN, EXCLUDES LOW VOLTAGE WIRING (ONTONAGON COUNTY) (Electrical contracts over $180,000)$33.94$21.80$55.74
ELECTRICIAN, EXCLUDES LOW VOLTAGE WIRING (ONTONAGON COUNTY) (Electrical contracts of $180,000 or less)$31.75$21.73$53.48
ELECTRICIAN: EXCLUDES LOW VOLTAGE WIRING (MENOMINEE COUNTY (ALL TOWNSHIPS EXCEPT INGALLSTON, MELON AND MENOMINEE))$33.43$21.78$55.21
POWER EQUIPMENT OPERATOR: GROUP 3 OILER PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE$35.86$12.50$48.36
POWER EQUIPMENT OPERATOR: GROUP 2 FORK TRUCK PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE$37.26$25.00$62.26
POWER EQUIPMENT OPERATOR: GROUP 1 BACKHOE, BULLDOZER; CRANE, FRONT END LOADER, EXCAVATOR, PAVER, ROLLER, AND SCRAPER (SELF-PROPELLED AND TRACTOR DRAWN) PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE$40.51$25.00$65.51
POWER EQUIPMENT OPERATOR: CRANE OPERATOR, MAIN BOOM & JIB 220' OR LONGER PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE$44.92$25.00$69.92
POWER EQUIPMENT OPERATOR: CRANE OPERATOR, MAIN BOOM & JIB 140' OR LONGER PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE$44.63$25.00$69.63
POWER EQUIPMENT OPERATOR: CRANE OPERATOR, MAIN BOOM & JIB 120' OR LONGER PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE$43.81$25.00$68.81
IRONWORKER, REINFORCING AND STRUCTURAL (CONTRACTS LESS THAN $10,000,000) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY & CHRISTMAS DAY$35.20$32.97$68.17
IRONWORKER, REINFORCING AND STRUCTURAL (CONTRACTS $10,000,000 OR GREATER) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY & CHRISTMAS DAY$35.20$32.97$68.17
LABORER (COMMON OR GENERAL; MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; AND SANDBLASTER)$28.18$13.45$41.63
PAINTER (INSULATOR FOAM ONLY)$28.73$15.92$44.65
PAINTER (BRUSH AND SPRAY ONLY)$28.73$15.92$44.65
CEMENT MASON/CONCRETE FINISHER$20.17$10.13$30.30
PLUMBER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION)$34.59$27.53$62.12
PIPEFITTER (HVAC PIPE INSTALLATION ONLY)$34.59$27.53$62.12
PIPEFITTER (EXCLUDES HVAC PIPE & SYSTEM INSTALLATION)$45.44$28.43$73.87
PLUMBER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION)$34.59$27.53$62.12
PIPEFITTER (HVAC PIPE INSTALLATION ONLY)$34.59$27.53$62.12
PIPEFITTER (EXCLUDES HVAC PIPE & SYSTEM INSTALLATION)$45.44$28.43$73.87
PLUMBER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION)$34.59$27.53$62.12
PIPEFITTER (HVAC PIPE INSTALLATION ONLY)$34.59$27.53$62.12
PIPEFITTER (EXCLUDES HVAC PIPE & SYSTEM INSTALLATION)$45.44$28.43$73.87
ROOFER$26.50$15.95$42.45
SHEET METAL WORKER (HVAC DUCT & SYSTEM INSTALLATION)$27.24$29.85$57.09
SHEET METAL WORKER (EXCLUDING HVAC DUCT & SYSTEM INSTALLATION)$32.74$29.85$62.59
TRUCK DRIVER: FLATBED TRUCK$17.44$4.51$21.95
PAINTER: ROLLER$16.58$2.84$19.42
OPERATOR: TRACTOR$19.60$7.31$26.91
OPERATOR: GRADER/BLADE$24.04$6.03$30.07
LABORER: LANDSCAPE & IRRIGATION$14.95$0.00$14.95
GLAZIER$17.50$2.27$19.77