Building construction wages: Clinton, Michigan
Wage determination MI20260081 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/MI20260081 on · latest revision 1 · verify at sam.gov/wage-determination/MI20260081/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $40.00 | $23.65 | $63.65 |
| BOILERMAKER | $43.50 | $36.74 | $80.24 |
| BRICKLAYER: TERRAZZO AND TILE SETTER | $32.20 | $23.46 | $55.66 |
| CARPENTER (SOFT FLOOR LAYER, INCLUDING CARPET & RESILIENT FLOORING) | $36.21 | $21.06 | $57.27 |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK AND METAL STUD INSTALLATION ONLY) | $36.21 | $21.06 | $57.27 |
| MILLWRIGHT | $42.92 | $39.13 | $82.05 |
| ELECTRICIAN (EXCLUDES ALARM INSTALLATION & LOW VOLTAGE WIRING) | $40.50 | $28.30 | $68.80 |
| OPERATOR: POWER EQUIPMENT: GROUP 7 OILER | $31.23 | $25.25 | $56.48 |
| OPERATOR: POWER EQUIPMENT: GROUP 6 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) | $33.71 | $25.25 | $58.96 |
| OPERATOR: POWER EQUIPMENT: GROUP 5 BOOM TRUCK (NON-SWINGING) | $39.57 | $25.25 | $64.82 |
| OPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) | $39.57 | $25.25 | $64.82 |
| OPERATOR: POWER EQUIPMENT: GROUP 3 CONCRETE PUMP; CRANE; HIGHLIFT; HOIST; ROLLER; SCRAPER; STIFF LEG DERRICK; TRENCHER | $41.28 | $25.25 | $66.53 |
| OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK | $43.93 | $25.25 | $69.18 |
| OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER | $47.28 | $25.25 | $72.53 |
| IRONWORKER: STRUCTURAL (EXCLUDING METAL BUILDING ERECTION) | $36.55 | $35.60 | $72.15 |
| IRONWORKER: REINFORCING | $36.55 | $33.37 | $69.92 |
| LABORER: COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; PIPELAYER; SANDBLASTER | $32.53 | $13.45 | $45.98 |
| PAINTER: DRYWALL FINISHING/TAPING | $28.32 | $16.88 | $45.20 |
| PAINTER: BRUSH, ROLLER, SPRAY AND PAPERHANGING | $28.75 | $18.68 | $47.43 |
| CEMENT MASON/CONCRETE FINISHER | $24.64 | $12.88 | $37.52 |
| PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION | $46.29 | $25.43 | $71.72 |
| PIPEFITTER, INCLUDES HVAC PIPE AND UNIT INSTALLATION | $46.29 | $25.43 | $71.72 |
| ROOFER | $33.18 | $17.22 | $50.40 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $41.34 | $27.39 | $68.73 |
| SHEET METAL WORKER (INCLUDING HVAC DUCT WORK; EXCLUDING HVAC DUCT & SYSTEM INSTALLATION) | $42.74 | $21.53 | $64.27 |
| TRUCK DRIVER: TRACTOR HAUL TRUCK | $13.57 | $1.18 | $14.75 |
| TRUCK DRIVER: LOWBOY TRUCK | $14.50 | $0.44 | $14.94 |
| TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK | $16.00 | $7.26 | $23.26 |
| OPERATOR: LOADER | $19.75 | $9.98 | $29.73 |
| OPERATOR: TRACTOR | $19.10 | $8.48 | $27.58 |
| OPERATOR: GRADER/BLADE | $22.00 | $6.29 | $28.29 |
| OPERATOR: BULLDOZER | $19.73 | $7.02 | $26.75 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $21.94 | $8.72 | $30.66 |
| METAL BUILDING ERECTOR | $16.92 | $6.32 | $23.24 |
| LABORER: LANDSCAPE & IRRIGATION | $12.50 | $0.50 | $13.00 |
| IRONWORKER, ORNAMENTAL | $18.48 | $7.93 | $26.41 |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, METAL STUD INSTALLATION, AND CARPET/RESILIENT FLOOR INSTALLATION | $20.41 | $5.69 | $26.10 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.