Building construction wages: Muskegon, Michigan
Wage determination MI20260093 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/MI20260093 on July 24, 2026 · latest revision 1 · verify at sam.gov/wage-determination/MI20260093/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $40.00 | $23.65 | $63.65 |
| BOILERMAKER | $43.50 | $36.74 | $80.24 |
| TILE SETTER | $32.20 | $23.46 | $55.66 |
| TILE FINISHER | $27.94 | $21.15 | $49.09 |
| BRICKLAYER | $35.83 | $22.18 | $58.01 |
| CARPENTER (INCLUDING FORM WORK; EXCLUDING DRYWALL HANGING) | $31.50 | $21.15 | $52.65 |
| OPERATOR: POWER EQUIPMENT: GROUP 5 OILER PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $31.23 | $25.25 | $56.48 |
| OPERATOR: POWER EQUIPMENT: GROUP 4 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $33.71 | $25.25 | $58.96 |
| OPERATOR: POWER EQUIPMENT: GROUP 3 BOOM TRUCK (NON-SWINGING) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 |
| OPERATOR: POWER EQUIPMENT: GROUP 2 BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 |
| OPERATOR: POWER EQUIPMENT: GROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; CONCRETE PUMP; GRADER/BLADE; HIGHLIFT; HOIST; ROLLER; SCRAPER; TRENCHER PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 | $66.53 |
| IRONWORKER: STRUCTURAL | $36.55 | $29.51 | $66.06 |
| IRONWORKER: REINFORCING | $36.55 | $29.51 | $66.06 |
| LABORER: COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - BRICK; SANDBLASTER | $28.56 | $12.95 | $41.51 |
| PAINTER: BRUSH AND SPRAY | $28.75 | $18.68 | $47.43 |
| CEMENT MASON/CONCRETE FINISHER | $21.15 | $12.78 | $33.93 |
| PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION | $47.40 | $23.35 | $70.75 |
| PIPEFITTER (INCLUDING HVAC PIPE INSTALLATION; EXCLUDING HVAC SYSTEM INSTALLATION) | $47.40 | $23.35 | $70.75 |
| ROOFER | $32.65 | $14.80 | $47.45 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION | $35.41 | $15.86 | $51.27 |
| TRUCK DRIVER: TRACTOR HAUL TRUCK | $13.57 | $1.18 | $14.75 |
| TRUCK DRIVER: DUMP TRUCK | $17.00 | $5.71 | $22.71 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $16.70 | $4.02 | $20.72 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $19.05 | $6.51 | $25.56 |
| PAINTER: ROLLER | $17.28 | $3.43 | $20.71 |
| OPERATOR: LOADER | $16.38 | $3.44 | $19.82 |
| OPERATOR: TRACTOR | $15.72 | $1.92 | $17.64 |
| OPERATOR: CRANE | $19.13 | $7.02 | $26.15 |
| OPERATOR: BULLDOZER | $17.56 | $4.95 | $22.51 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $14.96 | $4.01 | $18.97 |
| LABORER: PIPELAYER | $18.32 | $3.28 | $21.60 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $14.82 | $3.59 | $18.41 |
| LABORER: LANDSCAPE & IRRIGATION | $8.93 | $1.62 | $10.55 |
| IRONWORKER, ORNAMENTAL | $18.48 | $7.93 | $26.41 |
| HVAC MECHANIC (LOW VOLTAGE WIRING AND INSTALLATION OF HVAC TEMPERATURE CONTROLS) | $21.32 | $8.01 | $29.33 |
| HVAC MECHANIC (INSTALLATION OF HVAC UNIT ONLY, EXCLUDES INSTALLATION OF HVAC PIPE AND DUCT) | $18.92 | $4.71 | $23.63 |
| ELECTRICIAN, EXCLUDES LOW VOLTAGE WIRING AND INSTALLATION OF HVAC/TEMPERATURE CONTROLS | $22.69 | $9.10 | $31.79 |
| CARPENTER (DRYWALL HANGING ONLY) | $17.26 | $2.69 | $19.95 |