Heavy construction wages: Alpena + 8 more counties, Michigan
Wage determination MI20260042 · Active · Standard
AlpenaCrawfordIoscoMontmorencyOgemawOscodaOtsegoPresque IsleRoscommon
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1) · download CSV · print this page for your bid file
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER, INCLUDES FORM WORK (ALL OTHER COUNTIES) | $30.83 | $21.09 | $51.92 |
| CARPENTER, INCLUDES FORM WORK (IOSCO & OGEMAW COUNTIES) | $35.86 | $23.69 | $59.55 |
| ELECTRICIAN (CRAWFORD (DOES NOT INCLUDE THE TOWNSHIP OF LOVELLS), OTSEGO (DOES NOT INCLUDE THE TOWNSHIPS OF CHARLTON, CHESTER AND DOVER) & ROSCOMMON (DOES NOT INCLUDE THE TOWNSHIPS OF BACKUS, NESTOR AND ROSCOMMON) COUNTIES) | $36.62 | $23.05 | $59.67 |
| ELECTRICIAN (ALPENA, CRAWFORD (TOWNSHIP OF LOVELLS); IOSCO (TOWNSHIPS OF AUSABLE, OSCODA, PLAINFIELD & WILBUR), MONTMORENCY, OGEMAW (TOWNSHIPS OF FOSTER, ROSE & GOODAR), OSCODA, OTSEGO (TOWNSHIPS OF CHARLTON, CHESTER AND DOVER) & PRESQUE ISLE COUNTIES) | $37.75 | $25.60 | $63.35 |
| ELECTRICIAN (IOSCO (TOWNSHIPS OF ALABASTER, BALDWIN, BURLEIGH, GRANT, RENO, SHERMAN & TAWAS), OGEMAW (ALL TOWNSHIPS EXCEPT FOSTER, GOODAR & ROSE) & ROSCOMMON (TOWNSHIPS OF BACKUS, NESTOR AND ROSCOMMON) COUNTIES) | $40.00 | $26.52 | $66.52 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR | $39.95 | $25.25 | $65.20 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 | $65.77 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 | $66.50 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, SCRAPER, LOADER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 | $71.23 |
| OPERATOR: POWER EQUIPMENT:EXCLUDES UNDERGROUND CONSTRUCTION GROUP 3 BACKHOE/EXCAVATOR; BULLDOZER; COMPACTOR; CRANE; SCRAPER | $44.00 | $25.25 | $69.25 |
| OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 5 OILER | $32.98 | $25.25 | $58.23 |
| OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 4 BOOM TRUCK (NON-SWINGING) | $41.32 | $25.25 | $66.57 |
| OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK | $45.68 | $25.25 | $70.93 |
| OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. | $48.98 | $25.25 | $74.23 |
| IRONWORKER: STRUCTURAL | $36.55 | $35.93 | $72.48 |
| IRONWORKER: REINFORCING | $36.55 | $33.37 | $69.92 |
| LABORER ((4) GRADE CHECKER) | $22.73 | $12.95 | $35.68 |
| LABORER ((1) COMMON OR GENERAL) | $22.42 | $12.95 | $35.37 |
| LABORER: COMMON OR GENERAL (ALPENA, CRAWFORD, IOSCO, MONTMORENCY, OSCODA, OTSEGO & PRESQUE ISLE COUNTIES) (EXCLUDES OPEN CUT CONSTRUCTION) | $25.02 | $13.45 | $38.47 |
| LABORER: COMMON 3.323OR GENERAL (ALPENA, CRAWFORD, IOSCO, MONTMORENCY, OSCODA, OTSEGO & PRESQUE ISLE COUNTIES) (EXCLUDES OPEN CUT CONSTRUCTION) | $23.32 | $13.45 | $36.77 |
| LABORER: COMMON OR GENERAL (OGEMAW & ROSCOMMON COUNTIES) (EXCLUDES OPEN CUT CONSTRUCTION) | $27.68 | $13.45 | $41.13 |
| CEMENT MASON/CONCRETE FINISHER (IOSCO & OGEMAW COUNTIES) | $25.47 | $12.38 | $37.85 |
| CEMENT MASON/CONCRETE FINISHER (ALPENA, CRAWFORD, MONTMORENCY, OSCODA, OTSEGO, PRESQUE ISLE & ROSCOMMON COUNTIES) | $23.10 | $12.38 | $35.48 |
| PLUMBER | $43.50 | $21.10 | $64.60 |
| TRUCK DRIVER: DUMP TRUCK | $11.10 | $1.25 | $12.35 |
| OPERATOR: LOADER | $16.07 | $8.37 | $24.44 |
| OPERATOR: ROLLER | $13.74 | $7.93 | $21.67 |
| OPERATOR: GRADER/BLADE | $15.50 | $3.62 | $19.12 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $12.98 | $6.12 | $19.10 |
| LABORER: PIPELAYER | $15.28 | $3.99 | $19.27 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $15.97 | $3.51 | $19.48 |
| LABORER: LANDSCAPE | $10.89 | $1.74 | $12.63 |
| TRUCK DRIVER: LOWBOY/SEMI-TRAILER TRUCK | $470.70 | $68.70 | $539.40 |
| DAILY | $33.55 | $0.75 | $34.30 |