Heavy construction wages: Lake + 4 more counties, Michigan
Wage determination MI20260049 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/MI20260049 on · latest revision 1 · verify at sam.gov/wage-determination/MI20260049/1
LakeMasonSanilacSt JosephSt Joseph
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (FORM WORK ONLY) (LAKE & MASON COUNTIES) | $31.50 | $21.15 | $52.65 |
| CARPENTER: FORM WORK ONLY (ST. JOSEPH COUNTY) | $28.29 | $21.42 | $49.71 |
| CARPENTER: FORM WORK ONLY (SANILAC COUNTY) | $42.44 | $31.43 | $73.87 |
| ELECTRICIAN (SANILAC COUNTY) | $51.32 | $28.54 | $79.86 |
| ELECTRICIAN (ST. JOSEPH COUNTY) | $42.78 | $21.84 | $64.62 |
| ELECTRICIAN (LAKE (TOWNSHIPS OF CHASE, CHERRY VALLEY, LAKE, PINORA, PLEASANT PLAINS, SWEETWATER, WEBBER & YATES) & MASON (TOWNSHIPS OF AMBER, BRANCH, CUSTER, EDEN, HAMLIN. LOGAN, PERE MARQUETTE, RIVERTON, SHERIDAN, SHERMAN, SUMMIT & VICTORY) COUNTIES) | $36.52 | $25.15 | $61.67 |
| ELECTRICIAN (LAKE (TOWNSHIPS OF DOVER, EDEN, ELK, ELLSWORTH, NEWKIRK, PEACOCK & SAUBLE) & MASON (TOWNSHIPS OF FREESOIL, GRANT & MEADE) COUNTIES) | $36.62 | $23.05 | $59.67 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR | $39.95 | $25.25 | $65.20 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 | $65.77 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 | $66.50 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, SCRAPER, LOADER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 | $71.23 |
| OPERATING ENGINEERS: GROUP 5 (AREA 2) | $32.98 | $25.25 | $58.23 |
| OPERATING ENGINEERS: GROUP 4 (AREA 2) | $41.32 | $25.25 | $66.57 |
| OPERATING ENGINEERS: GROUP 3 (AREA 2) | $44.00 | $25.25 | $69.25 |
| OPERATING ENGINEERS: GROUP 2 (AREA 2) | $45.68 | $25.25 | $70.93 |
| OPERATING ENGINEERS: GROUP 1 (AREA 2) | $48.98 | $25.25 | $74.23 |
| OPERATING ENGINEER: GROUP 5 (AREA 1) | $32.98 | $25.25 | $58.23 |
| OPERATING ENGINEER: GROUP 4 (AREA 1) | $41.32 | $25.25 | $66.57 |
| OPERATING ENGINEER: GROUP 3 (AREA 1) | $44.00 | $25.25 | $69.25 |
| OPERATING ENGINEER: GROUP 2 (AREA 1) | $45.68 | $25.25 | $70.93 |
| OPERATING ENGINEER: GROUP 1 (AREA 1) | $48.98 | $25.25 | $74.23 |
| IRONWORKER: STRUCTURAL (SANILAC COUNTY) | $36.55 | $35.93 | $72.48 |
| IRONWORKER: REINFORCING (SANILAC COUNTY) | $36.55 | $33.37 | $69.92 |
| IRONWORKER: STRUCTURAL (LAKE, MASON & ST. JOSEPH COUNTIES) | $36.55 | $34.04 | $70.59 |
| IRONWORKER: REINFORCING (LAKE, MASON & ST. JOSEPH COUNTIES) | $36.55 | $34.04 | $70.59 |
| LABORER: (4) GRADE CHECKER (LAKE, MASON, ST. JOE) | $22.73 | $12.95 | $35.68 |
| LABORER: (1) COMMON OR GENERAL (LAKE, MASON, ST. JOE) | $22.42 | $12.95 | $35.37 |
| LABORER: (4) GRADE CHECKER (SANILAC) | $22.73 | $12.95 | $35.68 |
| LABORER: (1) COMMON OR GENERAL (SANILAC) | $22.42 | $12.95 | $35.37 |
| LABORER: COMMON OR GENERAL (ST. JOSEPH COUNTY) (EXCLUDES OPEN CUT CONSTRUCTION) | $27.21 | $13.45 | $40.66 |
| LABORER: COMMON OR GENERAL (LAKE & MASON COUNTIES) (EXCLUDES OPEN CUT CONSTRUCTION) | $28.56 | $12.95 | $41.51 |
| LABORER: COMMON OR GENERAL (SANILAC COUNTY) (EXCLUDES OPEN CUT CONSTRUCTION) | $30.35 | $17.90 | $48.25 |
| CEMENT MASON/CONCRETE FINISHER (ST. JOSEPH COUNTY) | $24.63 | $12.88 | $37.51 |
| CEMENT MASON/CONCRETE FINISHER (LAKE & MASON COUNTIES) | $22.02 | $12.38 | $34.40 |
| CEMENT MASON/CONCRETE FINISHER (SANILAC COUNTY) | $32.23 | $22.11 | $54.34 |
| PLUMBER (SANILAC COUNTY) | $35.77 | $35.13 | $70.90 |
| PLUMBER/PIPEFITTER (LAKE & MASON COUNTIES) | $39.89 | $23.82 | $63.71 |
| PLUMBER/PIPEFITTER (ST JOSEPH COUNTY) | $35.20 | $22.35 | $57.55 |
| PIPEFITTER (SANILAC COUNTY) | $40.41 | $29.35 | $69.76 |
| TRUCK DRIVER: DUMP TRUCK | $14.06 | $1.25 | $15.31 |
| OPERATOR: ROLLER | $13.74 | $7.93 | $21.67 |
| OPERATOR: GRADER/BLADE | $15.50 | $3.62 | $19.12 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $12.98 | $6.12 | $19.10 |
| LABORER: PIPELAYER | $15.28 | $3.99 | $19.27 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $15.97 | $3.51 | $19.48 |
| LABORER: LANDSCAPE | $10.89 | $1.74 | $12.63 |
| CARPENTER, EXCLUDES FORM WORK | $23.97 | $6.29 | $30.26 |
| TRUCK DRIVER: LOWBOY/SEMI-TRAILER TRUCK | $470.70 | $68.70 | $539.40 |
| DAILY | $33.55 | $0.75 | $34.30 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.