Building construction wages: Saginaw, Michigan

Wage determination MI20260097 · Active · Standard · verify on SAM.gov

Saginaw

Get an email when this determination changes.This determination changed once in the last 12 months, most recently 2026-05-18: 2 rate changes (ELECTRICIAN (ALARM INSTALLATION) $30.25 → $30.25).
Substantive rate changes only; no spam. Bidding a specific job? Pin a project instead to lock the revision that applied on your bid date.

Revision history

RevisionPublishedCompare
rev 12026-05-18diff vs rev 0
rev 02026-05-17original

Current rates (rev 1)

Download CSV

The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.

ClassificationRateFringeTotal
ASBESTOS WORKER/HEAT & FROST INSULATOR$40.00$23.65$63.65
BOILERMAKER$43.50$36.74$80.24
TILE SETTER$31.43$21.13$52.56
TILE FINISHER$26.24$21.13$47.37
PLASTERER$33.01$24.54$57.55
BRICKLAYER$35.14$24.20$59.34
CARPENTER (INCLUDING ACOUSTICAL CEILING INSTALLATION & DRYWALL HANGING; EXCLUDING FORM WORK)$35.86$23.69$59.55
LATHER$24.29$13.66$37.95
ELECTRICIAN (EXCLUDING ALARM INSTALLATION)$39.50$25.03$64.53
ELECTRICIAN (ALARM INSTALLATION)$30.25$15.00$45.25
OPERATOR: POWER EQUIPMENT: GROUP 7 OILER$31.23$25.25$56.48
OPERATOR: POWER EQUIPMENT: GROUP 6 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK)$33.71$25.25$58.96
OPERATOR: POWER EQUIPMENT: GROUP 5 BOOM TRUCK (NON-SWINGING)$39.57$25.25$64.82
OPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT)$39.57$25.25$64.82
OPERATOR: POWER EQUIPMENT: GROUP 3 CONCRETE PUMP; CRANE; GRADER/BLADE; HIGHLIFT; HOIST; ROLLER; SCRAPER; STIFF LEG DERRICK; TRENCHER$41.28$25.25$66.53
OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK$43.93$25.25$69.18
OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER$47.28$25.25$72.53
IRONWORKER: STRUCTURAL$36.55$35.93$72.48
IRONWORKER: REINFORCING$36.55$33.37$69.92
LABORER: LANDSCAPE AND IRRIGATION: GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER$27.71$9.10$36.81
LABORER: LANDSCAPE AND IRRIGATION: GROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER AND SKIDSTEER (OR EQUIVALENT)$29.93$9.10$39.03
LABORER: SANDBLASTER$28.21$13.45$41.66
LABORER: COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - BRICK/CEMENT/CONCRETE; PIPELAYER$27.68$13.45$41.13
PAINTER: DRYWALL FINISHING/TAPING$30.22$22.22$52.44
PAINTER: BRUSH AND SPRAY$29.23$19.11$48.34
CEMENT MASON/CONCRETE FINISHER$25.47$12.38$37.85
PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION$46.00$22.99$68.99
PIPEFITTER, INCLUDES HVAC PIPE AND UNIT INSTALLATION$46.00$22.99$68.99
ROOFER$30.38$19.87$50.25
SPRINKLER FITTER (FIRE SPRINKLERS)$41.34$27.39$68.73
SHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION; EXCLUDING HVAC SYSTEM INSTALLATION)$26.83$23.78$50.61
TRUCK DRIVER: TRACTOR HAUL TRUCK$13.57$1.18$14.75
TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK$12.00$0.00$12.00
PAINTER: ROLLER$22.02$6.02$28.04
OPERATOR: LOADER$17.62$0.00$17.62
OPERATOR: TRACTOR$19.10$8.48$27.58
OPERATOR: BULLDOZER$17.50$8.67$26.17
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$18.31$13.84$32.15
IRONWORKER, ORNAMENTAL$18.48$7.93$26.41
FLOOR LAYER: VINYL FLOORING$16.81$3.73$20.54
CARPENTER (FORM WORK ONLY)$16.50$1.65$18.15

Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.