| ASBESTOS WORKER/HEAT & FROST INSULATOR | $40.00 | $23.65 | $63.65 |
| BOILERMAKER | $43.50 | $37.64 | $81.14 |
| TILE SETTER | $31.43 | $21.13 | $52.56 |
| PLASTERER | $33.09 | $26.58 | $59.67 |
| BRICKLAYER | $35.14 | $24.20 | $59.34 |
| CARPENTER (EXCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, METAL STUD INSTALLATION, AND SOFT FLOOR LAYER - CARPET) | $35.86 | $23.69 | $59.55 |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION, FORM WORK, METAL STUD INSTALLATION, AND LATHER DRYWALL HANGING) | $35.86 | $23.69 | $59.55 |
| MILLWRIGHT | $42.92 | $39.13 | $82.05 |
| ELECTRICIAN, LOW VOLTAGE WIRING ONLY (TECHNICIAN) | $37.62 | $14.80 | $52.42 |
| ELECTRICIAN, LOW VOLTAGE WIRING ONLY (INSTALLER) | $30.12 | $14.57 | $44.69 |
| ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING) | $51.32 | $28.44 | $79.76 |
| ELECTRICIAN, LOW VOLTAGE WIRING ONLY (TECHNICIAN) | $37.62 | $14.80 | $52.42 |
| ELECTRICIAN, LOW VOLTAGE WIRING ONLY (INSTALLER) | $30.12 | $14.57 | $44.69 |
| ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING) | $51.32 | $28.44 | $79.76 |
| OPERATOR: POWER EQUIPMENT: GROUP 6 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $31.23 | $25.25 | $56.48 |
| OPERATOR: POWER EQUIPMENT: GROUP 5 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $33.71 | $25.25 | $58.96 |
| OPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; FORK TRUCK (OVER 20' LIFT) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 |
| OPERATOR: POWER EQUIPMENT: GROUP 3 BACKHOE/EXCAVATOR; CRANE; LOADER; PAVER; SCRAPER; STIFF LEG DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 | $66.53 |
| OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $43.93 | $25.25 | $69.18 |
| OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $47.28 | $25.25 | $72.53 |
| IRONWORKER: STRUCTURAL (METAL BUILDING ERECTION ONLY) | $30.02 | $27.43 | $57.45 |
| IRONWORKER, STRUCTURAL | $36.55 | $35.93 | $72.48 |
| IRONWORKER, REINFORCING | $36.55 | $33.37 | $69.92 |
| LABORER: SANDBLASTER | $26.73 | $13.45 | $40.18 |
| LABORER: COMMON OR GENERAL; MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; AND PIPELAYER | $26.20 | $13.45 | $39.65 |
| PAINTER: DRYWALL FINISHING/TAPING | $23.79 | $12.02 | $35.81 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $23.79 | $12.02 | $35.81 |
| CEMENT MASON/CONCRETE FINISHER | $25.47 | $12.38 | $37.85 |
| PLUMBER: EXCLUDING HVAC PIPE AND SYSTEM INSTALLATION (PORTION OF HURON COUNTY LYING WEST OF M-53) | $43.50 | $22.10 | $65.60 |
| PIPEFITTER: HVAC PIPE INSTALLATION ONLY (PORTION OF HURON COUNTY LYING WEST OF M-53) | $45.50 | $21.75 | $67.25 |
| PIPEFITTER: EXCLUDES HVAC PIPE AND SYSTEM INSTALLATION (PORTION OF HURON COUNTY LYING WEST OF M-53) | $45.50 | $21.75 | $67.25 |
| PLUMBER: EXCLUDING HVAC PIPE AND SYSTEM INSTALLATION (PORTION OF HURON COUNTY LYING WEST OF M-53) | $43.50 | $22.10 | $65.60 |
| PIPEFITTER: HVAC PIPE INSTALLATION ONLY (PORTION OF HURON COUNTY LYING WEST OF M-53) | $45.50 | $21.75 | $67.25 |
| PIPEFITTER: EXCLUDES HVAC PIPE AND SYSTEM INSTALLATION (PORTION OF HURON COUNTY LYING WEST OF M-53) | $45.50 | $21.75 | $67.25 |
| PLUMBER: EXCLUDING HVAC PIPE & SYSTEM INSTALLATION (PORTION OF HURON COUNTY LYING EAST OF M-53) | $36.69 | $32.74 | $69.43 |
| PIPEFITTER: INCLUDES HVAC PIPE INSTALLATION; EXCLUDES HVAC SYSTEM INSTALLATION (PORTION OF HURON COUNTY LYING EAST OF M-53) | $41.96 | $40.85 | $82.81 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $41.34 | $27.39 | $68.73 |
| SHEET METAL WORKER (HVAC DUCT & SYSTEM INSTALLATION) | $26.83 | $23.78 | $50.61 |
| SHEET METAL WORKER (EXCLUDING HVAC DUCT & SYSTEM INSTALLATION) | $26.83 | $23.78 | $50.61 |
| TRUCK DRIVER: FLATBED TRUCK | $16.80 | $3.97 | $20.77 |
| TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK | $15.65 | $3.12 | $18.77 |
| ROOFER | $15.73 | $7.41 | $23.14 |
| OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 |
| OPERATOR: ROLLER | $28.02 | $7.07 | $35.09 |
| OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 |
| OPERATOR: BULLDOZER | $22.34 | $1.22 | $23.56 |
| LABORER: LANDSCAPE & IRRIGATION | $12.84 | $0.00 | $12.84 |
| GLAZIER | $16.95 | $4.74 | $21.69 |
| CARPENTER (FLOOR LAYING-CARPET ONLY) | $19.59 | $7.57 | $27.16 |