Building construction wages: Huron, Michigan

Wage determination MI20260125 · Active · Standard · verify on SAM.gov

Huron

Get an email when this determination changes.This determination changed once in the last 12 months, most recently 2026-08-13: 5 rate changes (PLUMBER: EXCLUDING HVAC PIPE & SYSTEM INSTALLAT… $36.69 → $45.34).
Substantive rate changes only; no spam. Bidding a specific job? Pin a project instead to lock the revision that applied on your bid date.

Revision history

RevisionPublishedCompare
rev 22026-08-13diff vs rev 1
rev 12026-05-18diff vs rev 0
rev 02026-05-17original

Current rates (rev 2)

Download CSV

The CSV and the printed sheet are snapshots of rev 2. If DOL revises this determination after you save one, the watch above tells you exactly what moved.

ClassificationRateFringeTotal
ASBESTOS WORKER/HEAT & FROST INSULATOR$40.00$23.65$63.65
BOILERMAKER$43.50$37.64$81.14
BRICKLAYER$35.14$24.20$59.34
PLASTERER$33.09$26.58$59.67
TILE SETTER$31.43$21.13$52.56
CARPENTER (EXCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, METAL STUD INSTALLATION, AND SOFT FLOOR LAYER - CARPET)$35.86$23.69$59.55
CARPENTER (ACOUSTICAL CEILING INSTALLATION, FORM WORK, METAL STUD INSTALLATION, AND LATHER DRYWALL HANGING)$35.86$23.69$59.55
MILLWRIGHT$42.92$39.13$82.05
ELECTRICIAN, LOW VOLTAGE WIRING ONLY (INSTALLER)$30.12$14.57$44.69
ELECTRICIAN, LOW VOLTAGE WIRING ONLY (TECHNICIAN)$37.62$14.80$52.42
ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING)$51.32$28.44$79.76
OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY$47.28$25.25$72.53
OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY$43.93$25.25$69.18
OPERATOR: POWER EQUIPMENT: GROUP 3 BACKHOE/EXCAVATOR; CRANE; LOADER; PAVER; SCRAPER; STIFF LEG DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY$41.28$25.25$66.53
OPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; FORK TRUCK (OVER 20' LIFT) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY$39.57$25.25$64.82
OPERATOR: POWER EQUIPMENT: GROUP 5 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY$33.71$25.25$58.96
OPERATOR: POWER EQUIPMENT: GROUP 6 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY$31.23$25.25$56.48
IRONWORKER: STRUCTURAL (METAL BUILDING ERECTION ONLY)$30.02$27.43$57.45
IRONWORKER, REINFORCING$36.55$33.37$69.92
IRONWORKER, STRUCTURAL$36.55$35.93$72.48
LABORER: COMMON OR GENERAL; MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; AND PIPELAYER$26.20$13.45$39.65
LABORER: SANDBLASTER$26.73$13.45$40.18
PAINTER: BRUSH, ROLLER AND SPRAY$23.79$12.02$35.81
PAINTER: DRYWALL FINISHING/TAPING$23.79$12.02$35.81
CEMENT MASON/CONCRETE FINISHER$25.47$12.38$37.85
PIPEFITTER: EXCLUDES HVAC PIPE AND SYSTEM INSTALLATION (PORTION OF HURON COUNTY LYING WEST OF M-53)$47.00$24.18$71.18
PIPEFITTER: HVAC PIPE INSTALLATION ONLY (PORTION OF HURON COUNTY LYING WEST OF M-53)$47.00$24.18$71.18
PLUMBER: EXCLUDING HVAC PIPE AND SYSTEM INSTALLATION (PORTION OF HURON COUNTY LYING WEST OF M-53)$47.00$24.18$71.18
PLUMBER: EXCLUDING HVAC PIPE & SYSTEM INSTALLATION (PORTION OF HURON COUNTY LYING EAST OF M-53)$45.34$37.21$82.55
PIPEFITTER: INCLUDES HVAC PIPE INSTALLATION; EXCLUDES HVAC SYSTEM INSTALLATION (PORTION OF HURON COUNTY LYING EAST OF M-53)$45.96$43.90$89.86
SPRINKLER FITTER (FIRE SPRINKLERS)$41.34$27.39$68.73
SHEET METAL WORKER (EXCLUDING HVAC DUCT & SYSTEM INSTALLATION)$26.83$23.78$50.61
SHEET METAL WORKER (HVAC DUCT & SYSTEM INSTALLATION)$26.83$23.78$50.61
CARPENTER (FLOOR LAYING-CARPET ONLY)$19.59$7.57$27.16
GLAZIER$16.95$4.74$21.69
LABORER: LANDSCAPE & IRRIGATION$12.84$0.00$12.84
OPERATOR: BULLDOZER$22.34$1.22$23.56
OPERATOR: GRADER/BLADE$24.04$6.03$30.07
OPERATOR: ROLLER$28.02$7.07$35.09
OPERATOR: TRACTOR$19.60$7.31$26.91
ROOFER$15.73$7.41$23.14
TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK$15.65$3.12$18.77
TRUCK DRIVER: FLATBED TRUCK$16.80$3.97$20.77

Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.