Heavy construction wages: Van Buren, Michigan

Wage determination MI20260073 · Active · Standard

Van Buren

Get an email when this determination changes.
Substantive rate changes only; no spam. Bidding a specific job? Pin a project instead to lock the revision that applied on your bid date.

Revision history

RevisionPublishedCompare
rev 12026-05-18diff vs rev 0
rev 02026-05-17original

Current rates (rev 1) · download CSV · print this page for your bid file

ClassificationRateFringeTotal
CARPENTER, INCLUDES FORM WORK$28.29$21.42$49.71
ELECTRICIAN$42.78$21.84$64.62
POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR, BOBCAT/ SKID STEER /SKID LOADER$39.95$25.25$65.20
POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER)$41.25$25.25$66.50
POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 1 BORING MACHINE, BULLDOZER, CRANE, GRADER/ BLADE, ROLLER, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY)$45.98$25.25$71.23
POWER EQUIPMENT OPERATO, UNDERGROUND CONSTRUCTION (INCLUDING SEWER)R: GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM)$40.52$25.25$65.77
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 6 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY.$35.46$25.25$60.71
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 5 BOOM TRUCK (NON-SWINGING) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY.$41.32$25.25$66.57
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 4 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY.$41.32$25.25$66.57
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 3 BORING MACHINE; BULLDOZER; GRADER/BLADE; ROLLER; SCRAPER; TRACTOR; TRENCHER; REGULAR CRANE AND STIFF LEG DERRICK PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY.$44.00$25.25$69.25
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY.$45.68$25.25$70.93
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY.$48.98$25.25$74.23
IRONWORKER: STRUCTURAL$36.55$34.04$70.59
IRONWORKER: REINFORCING$36.55$34.04$70.59
LABORER ((5) PIPELAYER)$22.85$12.95$35.80
LABORER ((4) GRADE CHECKER)$22.73$12.95$35.68
LABORER ((2) MASON TENDER-CEMENT/CONCRETE)$22.55$12.95$35.50
LABORER ((1) COMMON OR GENERAL)$22.42$12.95$35.37
LABORER (COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - CEMENT/CONCRETE) (EXCLUDES OPEN CUT CONSTRUCTION)$27.21$13.45$40.66
PAINTER: SPRAY$22.75$11.94$34.69
PAINTER: BRUSH & ROLLER$21.75$11.94$33.69
CEMENT MASON/CONCRETE FINISHER (TWPS OF SOUTH HAVEN, COVERT, GENEVA, BANGOR, HARTFORD, KEELER, HAMILTON, LAWRENCE, ARLINGTON & COLUMBIA)$24.63$12.88$37.51
CEMENT MASON/CONCRETE FINISHER (TWPS OF BLOOMINGDALE, WAVERLY, PAW PAW, DECATUR, PORTER, ANTWERP, ALMENA & PINEGROVE)$22.31$12.83$35.14
PLUMBER$35.20$22.35$57.55
TRUCK DRIVER: OFF THE ROAD TRUCK$20.82$3.69$24.51
TRUCK DRIVER: DUMP TRUCK$18.00$6.43$24.43
OPERATOR: LOADER$19.19$6.00$25.19
OPERATOR: BACKHOE/EXCAVATOR$19.09$2.48$21.57
LABORER: LANDSCAPE$12.25$0.00$12.25
TRUCK DRIVER: TRACTOR HAUL TRUCK$68.70$0.75$69.45
TRUCK DRIVER: LOWBOY/SEMI-TRAILER TRUCK$470.70$68.70$539.40
DAILY$33.55$0.75$34.30