Residential construction wages: Berrien, Cass, Michigan

Wage determination MI20260026 · Active · Standard

BerrienCass

Get an email when this determination changes.
Substantive rate changes only; no spam. Bidding a specific job? Pin a project instead to lock the revision that applied on your bid date.

Revision history

RevisionPublishedCompare
rev 22026-05-18diff vs rev 1
rev 12026-05-17diff vs rev 0
rev 02026-01-30original

Current rates (rev 2) · download CSV · print this page for your bid file

ClassificationRateFringeTotal
ELECTRICIAN$27.00$18.29$45.29
OPERATOR: POWER EQUIPMENT: GROUP 3 BULLDOZER; CRANE; GRADER/BLADE; LOADER; SCRAPER; STIFF LEG DERRICK$44.00$25.25$69.25
OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK$45.68$25.25$70.93
OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER.$48.98$25.25$74.23
IRONWORKER, STRUCTURAL$31.75$22.84$54.59
LABORER: MASON TENDER - CEMENT/CONCRETE$27.21$13.45$40.66
PAINTER: BRUSH AND ROLLER$21.75$11.94$33.69
PIPEFITTER: HVAC PIPE INSTALLATION ONLY (BERRIEN (CITY OF NILES & VICINITY) & CASS COUNTIES)$20.96$19.18$40.14
ROOFER: COMPOSITION$34.55$21.04$55.59
ROOFER (SLATE & TILE)$36.05$21.04$57.09
SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION$44.45$30.43$74.88
TRUCK DRIVER: DUMP TRUCK$17.00$5.71$22.71
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION$26.17$7.55$33.72
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$17.66$7.65$25.31
OPERATOR: BACKHOE/EXCAVATOR$19.94$5.46$25.40
LABORER: PIPELAYER$17.95$5.46$23.41
LABORER: LANDSCAPE$9.64$2.81$12.45
LABORER: COMMON OR GENERAL$16.87$5.46$22.33
CEMENT MASON/CONCRETE FINISHER$19.27$5.85$25.12
CARPENTER$18.81$6.38$25.19