Building construction wages: Newaygo, Michigan
Wage determination MI20260094 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/MI20260094 on · latest revision 1 · verify at sam.gov/wage-determination/MI20260094/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $40.00 | $23.65 | $63.65 |
| BOILERMAKER | $43.50 | $36.74 | $80.24 |
| TILE SETTER | $32.20 | $23.46 | $55.66 |
| TILE FINISHER | $27.94 | $21.15 | $49.09 |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND FORM WORK | $31.50 | $21.50 | $53.00 |
| MILLWRIGHT | $40.04 | $26.47 | $66.51 |
| OPERATOR: POWER EQUIPMENT: GROUP 7 OILER | $31.23 | $25.25 | $56.48 |
| OPERATOR: POWER EQUIPMENT: GROUP 6 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) | $33.71 | $25.25 | $58.96 |
| OPERATOR: POWER EQUIPMENT: GROUP 5 BOOM TRUCK (NON-SWINGING) | $39.57 | $25.25 | $64.82 |
| OPERATOR: POWER EQUIPMENT: GROUP 4 BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) | $39.57 | $25.25 | $64.82 |
| OPERATOR: POWER EQUIPMENT: GROUP 3 BACKHOE/EXCAVATOR/TRACKHOE; CONCRETE PUMP; CRANE; GRADER/BLADE; HIGHLIFT; HOIST; ROLLER; SCRAPER; STIFF LEG DERRICK; TRENCHER; STIFF LEG DERRICK | $41.28 | $25.25 | $66.53 |
| OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK | $43.93 | $25.25 | $69.18 |
| OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER | $47.28 | $25.25 | $72.53 |
| IRONWORKER, REINFORCING | $36.55 | $29.51 | $66.06 |
| LABORER: COMMON OR GENERAL; GRADE CHECKER; SANDBLASTER | $28.56 | $12.95 | $41.51 |
| PAINTER: BRUSH AND SPRAY | $28.75 | $18.68 | $47.43 |
| PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION | $47.40 | $23.35 | $70.75 |
| PIPEFITTER (INCLUDING HVAC PIPE INSTALLATION; EXCLUDING HVAC SYSTEM INSTALLATION) | $47.40 | $23.35 | $70.75 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION | $35.41 | $15.86 | $51.27 |
| TRUCK DRIVER: TRACTOR HAUL TRUCK | $13.57 | $1.18 | $14.75 |
| TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK | $17.00 | $5.71 | $22.71 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $17.88 | $4.73 | $22.61 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $22.28 | $7.95 | $30.23 |
| ROOFER | $13.86 | $6.11 | $19.97 |
| PAINTER: ROLLER | $16.21 | $2.81 | $19.02 |
| OPERATOR: LOADER | $17.16 | $4.05 | $21.21 |
| OPERATOR: TRACTOR | $15.72 | $1.92 | $17.64 |
| OPERATOR: BULLDOZER | $18.50 | $5.81 | $24.31 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $16.50 | $6.17 | $22.67 |
| LABORER: PIPELAYER | $18.32 | $3.28 | $21.60 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $14.01 | $2.45 | $16.46 |
| LABORER: MASON TENDER - BRICK | $18.87 | $2.16 | $21.03 |
| LABORER: LANDSCAPE & IRRIGATION | $10.47 | $0.00 | $10.47 |
| IRONWORKER, STRUCTURAL | $18.13 | $4.88 | $23.01 |
| IRONWORKER, ORNAMENTAL | $18.48 | $7.93 | $26.41 |
| HVAC MECHANIC (INSTALLATION OF HVAC UNIT ONLY, EXCLUDES INSTALLATION OF HVAC PIPE AND DUCT) | $16.75 | $2.75 | $19.50 |
| GLAZIER | $15.29 | $2.68 | $17.97 |
| ELECTRICIAN, EXCLUDES LOW VOLTAGE WIRING | $21.34 | $6.81 | $28.15 |
| DRYWALL FINISHER/TAPER | $15.91 | $2.92 | $18.83 |
| CEMENT MASON/CONCRETE FINISHER | $17.16 | $4.25 | $21.41 |
| CARPENTER (FORM WORK ONLY) | $18.62 | $6.42 | $25.04 |
| CARPENTER (DRYWALL HANGING ONLY) | $17.26 | $2.69 | $19.95 |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | $18.49 | $2.69 | $21.18 |
| BRICKLAYER | $21.45 | $5.00 | $26.45 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.