Heavy construction wages: Antrim + 5 more counties, Michigan
Wage determination MI20260043 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/MI20260043 on · latest revision 1 · verify at sam.gov/wage-determination/MI20260043/1
AntrimCharlevoixLeelanauManisteeMissaukeeWexford
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER, INCLUDES FORM WORK | $30.83 | $21.09 | $51.92 |
| ELECTRICIAN | $36.62 | $23.05 | $59.67 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR | $39.95 | $25.25 | $65.20 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 | $65.77 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 | $66.50 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BORING MACHINE, CRANE, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 | $71.23 |
| OPERATING ENGINEERS: GROUP 5 (AREA 2) | $32.98 | $25.25 | $58.23 |
| OPERATING ENGINEERS: GROUP 4 (AREA 2) | $41.32 | $25.25 | $66.57 |
| OPERATING ENGINEERS: GROUP 3 (AREA 2) | $44.00 | $25.25 | $69.25 |
| OPERATING ENGINEERS: GROUP 2 (AREA 2) | $45.68 | $25.25 | $70.93 |
| OPERATING ENGINEERS: GROUP 1 (AREA 2) | $48.98 | $25.25 | $74.23 |
| OPERATING ENGINEER: GROUP 5 (AREA 1) | $32.98 | $25.25 | $58.23 |
| OPERATING ENGINEER: GROUP 4 (AREA 1) | $41.32 | $25.25 | $66.57 |
| OPERATING ENGINEER: GROUP 3 (AREA 1) | $44.00 | $25.25 | $69.25 |
| OPERATING ENGINEER: GROUP 2 (AREA 1) | $45.68 | $25.25 | $70.93 |
| OPERATING ENGINEER: GROUP 1 (AREA 1) | $48.98 | $25.25 | $74.23 |
| IRONWORKER: STRUCTURAL | $36.55 | $34.04 | $70.59 |
| IRONWORKER: REINFORCING | $36.55 | $34.04 | $70.59 |
| LABORER ((4) GRADE CHECKER) | $22.73 | $12.95 | $35.68 |
| LABORER ((1) COMMON OR GENERAL) | $22.42 | $12.95 | $35.37 |
| LABORER: COMMON OR GENERAL (MANISTEE COUNTY) (EXCLUDES OPEN CUT CONSTRUCTION) | $26.70 | $12.95 | $39.65 |
| LABORER: COMMON OR GENERAL (ANTRIM, CHARLEVOIX, LEELANAU, MISSAUKEE & WXFORD COUNTIES) (EXCLUDES OPEN CUT CONSTRUCTION) | $25.02 | $13.45 | $38.47 |
| CEMENT MASON/CONCRETE FINISHER | $23.10 | $12.38 | $35.48 |
| PLUMBER (ANTRIM, CHARLEVOIX, LEELANAU, MISSAUKEE & WEXFORD COUNTIES) | $43.50 | $22.10 | $65.60 |
| PLUMBER (MANISTEE COUNTY) | $39.89 | $23.82 | $63.71 |
| TRUCK DRIVER: DUMP TRUCK | $12.63 | $1.25 | $13.88 |
| OPERATOR: LOADER | $13.68 | $8.41 | $22.09 |
| OPERATOR: ROLLER | $13.74 | $7.93 | $21.67 |
| OPERATOR: GRADER/BLADE | $15.50 | $3.62 | $19.12 |
| OPERATOR: BULLDOZER | $16.17 | $9.51 | $25.68 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $12.98 | $6.12 | $19.10 |
| OPERATOR: BACKHOE/EXCAVATOR | $16.05 | $9.55 | $25.60 |
| LABORER: PIPELAYER | $15.28 | $3.99 | $19.27 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $15.97 | $3.51 | $19.48 |
| LABORER: LANDSCAPE | $10.89 | $1.74 | $12.63 |
| TRUCK DRIVER: LOWBOY/SEMI-TRAILER TRUCK | $470.70 | $68.70 | $539.40 |
| DAILY | $33.55 | $0.75 | $34.30 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.