Building construction wages: Gratiot, Michigan

Wage determination MI20260122 · Active · Standard

Gratiot

Get an email when this determination changes.
Substantive rate changes only; no spam. Bidding a specific job? Pin a project instead to lock the revision that applied on your bid date.

Revision history

RevisionPublishedCompare
rev 12026-05-18diff vs rev 0
rev 02026-05-17original

Current rates (rev 1) · download CSV · print this page for your bid file

ClassificationRateFringeTotal
ASBESTOS WORKER/HEAT & FROST INSULATOR$40.00$23.65$63.65
BOILERMAKER$43.50$37.64$81.14
TILE SETTER$31.43$21.13$52.56
PLASTERER$33.09$26.58$59.67
TILE SETTER$31.43$21.13$52.56
PLASTERER$33.09$26.58$59.67
CARPENTER (ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION)$35.86$23.69$59.55
MILLWRIGHT$42.92$39.13$82.05
ELECTRICIAN: EXCLUDES LOW VOLTAGE WIRING (TOWNSHIPS OF ARCADA, BETHANY, ELBA, EMERSON, HAMILTON, LAFAYETTE, NEW HAVEN, NEWARK, NORTH STAR, PINE RIVER, SEVILLE, SUMNER, WASHINGTON, & WHEELER)$34.25$23.13$57.38
OPERATOR: POWER EQUIPMENT: GROUP 6 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY$31.23$25.25$56.48
OPERATOR: POWER EQUIPMENT: GROUP 5 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY$33.71$25.25$58.96
OPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; FORK TRUCK (OVER 20' LIFT) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY$39.57$25.25$64.82
OPERATOR: POWER EQUIPMENT: GROUP 3 BACKHOE/EXCAVATOR; CRANE; LOADER; PAVER; SCRAPER; STIFF LEG DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY$41.28$25.25$66.53
OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER; TOWER CRANE; GANTRY CRANE AND WHIRLEY DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY$43.93$25.25$69.18
OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY$47.28$25.25$72.53
IRONWORKER: STRUCTURAL (METAL BUILDING ERECTION ONLY)$30.02$27.43$57.45
IRONWORKER, STRUCTURAL$36.55$35.93$72.48
IRONWORKER, REINFORCING$36.55$33.37$69.92
LABORER: SANDBLASTER$28.21$13.45$41.66
LABORER: MASON TENDER - CEMENT/CONCRETE AND PIPELAYER$27.68$13.45$41.13
PAINTER: DRYWALL FINISHING/TAPING$30.22$22.22$52.44
PAINTER: BRUSH, ROLLER AND SPRAY$29.23$19.11$48.34
CEMENT MASON/CONCRETE FINISHER$25.47$12.38$37.85
PLUMBER (EXCLUDING HVAC PIPE AND SYSTEM INSTALLATION)$43.50$22.10$65.60
PIPEFITTER (HVAC PIPE INSTALLATION ONLY)$45.50$21.75$67.25
PIPEFITTER (EXCLUDES HVAC PIPE AND SYSTEM INSTALLATION)$45.50$21.75$67.25
PLUMBER (EXCLUDING HVAC PIPE AND SYSTEM INSTALLATION)$43.50$22.10$65.60
PIPEFITTER (HVAC PIPE INSTALLATION ONLY)$45.50$21.75$67.25
PIPEFITTER (EXCLUDES HVAC PIPE AND SYSTEM INSTALLATION)$45.50$21.75$67.25
SPRINKLER FITTER (FIRE SPRINKLERS)$41.34$27.39$68.73
SHEET METAL WORKER (HVAC DUCT & SYSTEM INSTALLATION)$26.83$23.78$50.61
SHEET METAL WORKER (EXCLUDING HVAC DUCT & SYSTEM INSTALLATION)$26.83$23.78$50.61
TRUCK DRIVER: FLATBED TRUCK$16.80$3.97$20.77
TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK$15.65$3.12$18.77
ROOFER$15.73$7.41$23.14
OPERATOR: TRACTOR$19.60$7.31$26.91
OPERATOR: ROLLER$28.02$7.07$35.09
OPERATOR: GRADER/BLADE$24.04$6.03$30.07
OPERATOR: BULLDOZER$22.34$1.22$23.56
LABORER: MASON TENDER - BRICK$15.03$3.10$18.13
LABORER: LANDSCAPE & IRRIGATION$12.84$0.00$12.84
LABORER: COMMON OR GENERAL$10.70$1.22$11.92
GLAZIER$16.95$4.74$21.69
CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, METAL STUD INSTALLATION, AND SOFT FLOOR LAYING-CARPET$15.80$1.22$17.02
CARPENTER (FLOOR LAYING-CARPET ONLY)$19.59$7.57$27.16
BRICKLAYER$22.20$3.10$25.30