| County / area | Classification | Rate | Fringe | Total | Determination |
|---|---|---|---|---|---|
| Alcona | LABORER ((1) COMMON OR GENERAL) | $22.42 | $12.95 | $35.37 | MI20260029 Heavy |
| Alcona | LABORER ((4) GRADE CHECKER) | $22.73 | $12.95 | $35.68 | MI20260029 Heavy |
| Alcona | LABORER: COMMON OR GENERAL | $15.46 | $6.09 | $21.55 | MI20260102 Building |
| Alcona | LABORER: COMMON OR GENERAL (EXCLUDES OPEN CUT CONSTRUCTION) | $25.02 | $13.45 | $38.47 | MI20260029 Heavy |
| Alcona | LABORER: LANDSCAPE | $10.89 | $1.74 | $12.63 | MI20260029 Heavy |
| Alcona | LABORER: LANDSCAPE & IRRIGATION | $14.63 | $0.00 | $14.63 | MI20260102 Building |
| Alcona | LABORER: MASON TENDER - BRICK | $14.89 | $3.10 | $17.99 | MI20260102 Building |
| Alcona | LABORER: MASON TENDER - CEMENT/CONCRETE | $15.97 | $3.51 | $19.48 | MI20260029 Heavy |
| Alcona | LABORER: MASON TENDER - CEMENT/CONCRETE AND PIPELAYER | $25.02 | $13.45 | $38.47 | MI20260102 Building |
| Alcona | LABORER: PIPELAYER | $15.28 | $3.99 | $19.27 | MI20260029 Heavy |
| Alcona | LABORER: SANDBLASTER | $26.23 | $13.45 | $39.68 | MI20260102 Building |
| Alcona + 9 more | LABORER: COMMON OR GENERAL; MASON TENDER - CEMENT/CONCRETE (ALCONA, ALPENA, CHEBOYGAN, CRAWFORD, IOSCO, MONTMORENCY, OSCODA, OTSEGO & PRESQUE ISLE COUNTIES) | $25.02 | $13.45 | $38.47 | MI20260006 Residential |
| Alcona + 9 more | LABORER: COMMON OR GENERAL; MASON TENDER - CEMENT/CONCRETE (OGEMAW COUNTY) | $27.68 | $13.45 | $41.13 | MI20260006 Residential |
| Alger | LABORER ((1) COMMON OR GENERAL) | $21.19 | $12.85 | $34.04 | MI20260030 Heavy |
| Alger | LABORER ((2) MASON TENDER-CEMENT/CONCRETE) | $21.33 | $12.85 | $34.18 | MI20260030 Heavy |
| Alger | LABORER ((4) GRADE CHECKER) | $21.51 | $12.85 | $34.36 | MI20260030 Heavy |
| Alger | LABORER ((5) PIPELAYER) | $21.56 | $12.85 | $34.41 | MI20260030 Heavy |
| Alger | LABORER (COMMON OR GENERAL; MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; AND SANDBLASTER) | $28.18 | $13.45 | $41.63 | MI20260103 Building |
| Alger | LABORER: COMMON OR GENERAL; MASON TENDER - CEMENT/CONCRETE (EXCLUDES UNDERGROUND CONSTRUCTION) | $32.74 | $13.45 | $46.19 | MI20260030 Heavy |
| Alger | LABORER: LANDSCAPE | $10.89 | $1.74 | $12.63 | MI20260030 Heavy |
| Alger | LABORER: LANDSCAPE | $14.95 | $0.00 | $14.95 | MI20260103 Building |
| Alger + 12 more | LABORER: COMMON OR GENERAL; MASON TENDER - CEMENT/CONCRETE | $24.05 | $6.45 | $30.50 | MI20260007 Residential |
| Allegan | LABORER : COMMON OR GENERAL; SANDBLASTER | $27.21 | $13.45 | $40.66 | MI20260104 Building |
| Allegan | LABORER ((1) COMMON OR GENERAL) | $22.42 | $12.95 | $35.37 | MI20260031 Heavy |
| Allegan | LABORER ((4) GRADE CHECKER) | $22.73 | $12.95 | $35.68 | MI20260031 Heavy |
| Allegan | LABORER: COMMON OR GENERAL (EXCLUDES OPEN CUT CONSTRUCTION) | $27.21 | $13.45 | $40.66 | MI20260031 Heavy |
| Allegan | LABORER: LANDSCAPE | $10.89 | $1.74 | $12.63 | MI20260031 Heavy |
| Allegan | LABORER: LANDSCAPE & IRRIGATION | $12.84 | $0.00 | $12.84 | MI20260104 Building |
| Allegan | LABORER: MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE | $30.72 | $12.95 | $43.67 | MI20260104 Building |
| Allegan | LABORER: MASON TENDER - CEMENT/CONCRETE | $15.97 | $3.51 | $19.48 | MI20260031 Heavy |
| Allegan | LABORER: PIPELAYER | $15.28 | $3.99 | $19.27 | MI20260031 Heavy |
| Alpena | LABORER: COMMON OR GENERAL | $15.46 | $6.09 | $21.55 | MI20260105 Building |
| Alpena | LABORER: LANDSCAPE & IRRIGATION | $14.63 | $0.00 | $14.63 | MI20260105 Building |
| Alpena | LABORER: MASON TENDER - BRICK | $14.89 | $3.10 | $17.99 | MI20260105 Building |
| Alpena | LABORER: MASON TENDER - CEMENT/CONCRETE AND PIPELAYER | $25.02 | $13.45 | $38.47 | MI20260105 Building |
| Alpena | LABORER: SANDBLASTER | $26.23 | $13.45 | $39.68 | MI20260105 Building |
| Alpena + 8 more | LABORER ((1) COMMON OR GENERAL) | $22.42 | $12.95 | $35.37 | MI20260042 Heavy |
| Alpena + 8 more | LABORER ((4) GRADE CHECKER) | $22.73 | $12.95 | $35.68 | MI20260042 Heavy |
| Alpena + 8 more | LABORER: COMMON 3.323OR GENERAL (ALPENA, CRAWFORD, IOSCO, MONTMORENCY, OSCODA, OTSEGO & PRESQUE ISLE COUNTIES) (EXCLUDES OPEN CUT CONSTRUCTION) | $23.32 | $13.45 | $36.77 | MI20260042 Heavy |
| Alpena + 8 more | LABORER: COMMON OR GENERAL (ALPENA, CRAWFORD, IOSCO, MONTMORENCY, OSCODA, OTSEGO & PRESQUE ISLE COUNTIES) (EXCLUDES OPEN CUT CONSTRUCTION) | $25.02 | $13.45 | $38.47 | MI20260042 Heavy |
| Alpena + 8 more | LABORER: COMMON OR GENERAL (OGEMAW & ROSCOMMON COUNTIES) (EXCLUDES OPEN CUT CONSTRUCTION) | $27.68 | $13.45 | $41.13 | MI20260042 Heavy |
| Alpena + 8 more | LABORER: LANDSCAPE | $10.89 | $1.74 | $12.63 | MI20260042 Heavy |
| Alpena + 8 more | LABORER: MASON TENDER - CEMENT/CONCRETE | $15.97 | $3.51 | $19.48 | MI20260042 Heavy |
| Alpena + 8 more | LABORER: PIPELAYER | $15.28 | $3.99 | $19.27 | MI20260042 Heavy |
| Antrim | LABORER (MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; AND PIPELAYER) | $25.02 | $13.45 | $38.47 | MI20260106 Building |
| Antrim | LABORER: COMMON OR GENERAL | $13.55 | $3.55 | $17.10 | MI20260106 Building |
| Antrim | LABORER: LANDSCAPE & IRRIGATION | $11.04 | $4.39 | $15.43 | MI20260106 Building |
| Antrim | LABORER: SANDBLASTER | $26.23 | $13.45 | $39.68 | MI20260106 Building |
| Antrim + 5 more | LABORER ((1) COMMON OR GENERAL) | $22.42 | $12.95 | $35.37 | MI20260043 Heavy |
| Antrim + 5 more | LABORER ((4) GRADE CHECKER) | $22.73 | $12.95 | $35.68 | MI20260043 Heavy |
| Antrim + 5 more | LABORER: COMMON OR GENERAL (ANTRIM, CHARLEVOIX, LEELANAU, MISSAUKEE & WXFORD COUNTIES) (EXCLUDES OPEN CUT CONSTRUCTION) | $25.02 | $13.45 | $38.47 | MI20260043 Heavy |
| Antrim + 5 more | LABORER: COMMON OR GENERAL (MANISTEE COUNTY) (EXCLUDES OPEN CUT CONSTRUCTION) | $26.70 | $12.95 | $39.65 | MI20260043 Heavy |
| Antrim + 5 more | LABORER: LANDSCAPE | $10.89 | $1.74 | $12.63 | MI20260043 Heavy |
| Antrim + 5 more | LABORER: MASON TENDER - CEMENT/CONCRETE | $15.97 | $3.51 | $19.48 | MI20260043 Heavy |
| Antrim + 5 more | LABORER: PIPELAYER | $15.28 | $3.99 | $19.27 | MI20260043 Heavy |
| Antrim + 8 more | LABORER: COMMON OR GENERAL; MASON TENDER - CEMENT/CONCRETE (ANTRIM, BENZIE, CHARLEVOIX, EMMET, KALKASKA, LEELANAU, MISSAUKEE & WEXFORD COUNTIES) | $25.02 | $13.45 | $38.47 | MI20260009 Residential |
| Antrim + 8 more | LABORER: COMMON OR GENERAL; MASON TENDER - CEMENT/CONCRETE (EXCLUDES OPEN CUT CONSTRUCTION) (MANISTEE COUNTY) | $23.34 | $11.60 | $34.94 | MI20260009 Residential |
| Arenac | LABORER (MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; AND PIPELAYER) | $27.68 | $13.45 | $41.13 | MI20260107 Building |
| Arenac | LABORER: COMMON OR GENERAL | $8.00 | $0.00 | $8.00 | MI20260107 Building |
| Arenac | LABORER: LANDSCAPE & IRRIGATION | $12.84 | $0.00 | $12.84 | MI20260107 Building |
| Arenac | LABORER: SANDBLASTER | $28.21 | $13.45 | $41.66 | MI20260107 Building |
| Baraga | LABORER (COMMON OR GENERAL; MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; AND SANDBLASTER) | $28.18 | $13.45 | $41.63 | MI20260108 Building |
| Baraga | LABORER: LANDSCAPE & IRRIGATION | $14.95 | $0.00 | $14.95 | MI20260108 Building |
| Baraga + 7 more | LABORER ((1) COMMON OR GENERAL) | $21.19 | $12.85 | $34.04 | MI20260045 Heavy |
| Baraga + 7 more | LABORER ((2) MASON TENDER-CEMENT/CONCRETE) | $21.33 | $12.85 | $34.18 | MI20260045 Heavy |
| Baraga + 7 more | LABORER ((4) GRADE CHECKER) | $21.51 | $12.85 | $34.36 | MI20260045 Heavy |
| Baraga + 7 more | LABORER ((5) PIPELAYER) | $21.56 | $12.85 | $34.41 | MI20260045 Heavy |
| Baraga + 7 more | LABORER: COMMON OR GENERAL; MASON TENDER - CEMENT/CONCRETE (EXCLUDES UNDERGROUND CONSTRUCTION) | $32.74 | $13.45 | $46.19 | MI20260045 Heavy |
| Baraga + 7 more | LABORER: LANDSCAPE | $10.89 | $1.74 | $12.63 | MI20260045 Heavy |
| Barry | LABORER ((1) COMMON OR GENERAL) | $22.42 | $12.95 | $35.37 | MI20260050 Heavy |
| Barry | LABORER ((2) MASON TENDER-CEMENT/CONCRETE) | $22.55 | $12.95 | $35.50 | MI20260050 Heavy |
| Barry | LABORER ((4) GRADE CHECKER) | $22.73 | $12.95 | $35.68 | MI20260050 Heavy |
| Barry | LABORER (COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - CEMENT/CONCRETE) (EXCLUDES OPEN CUT CONSTRUCTION) | $23.34 | $11.60 | $34.94 | MI20260050 Heavy |
| Barry | LABORER: COMMON OR GENERAL | $17.64 | $5.89 | $23.53 | MI20260076 Building |
| Barry | LABORER: GRADE CHECKER; SANDBLASTER | $24.90 | $12.95 | $37.85 | MI20260076 Building |
| Barry | LABORER: LANDSCAPE | $12.21 | $1.96 | $14.17 | MI20260050 Heavy |
| Barry | LABORER: LANDSCAPE & IRRIGATION | $10.47 | $0.00 | $10.47 | MI20260076 Building |
| Barry | LABORER: MASON TENDER - BRICK | $18.87 | $2.16 | $21.03 | MI20260076 Building |
| Barry | LABORER: MASON TENDER - CEMENT/CONCRETE | $14.01 | $2.45 | $16.46 | MI20260076 Building |
| Barry | LABORER: PIPELAYER | $16.00 | $4.66 | $20.66 | MI20260050 Heavy |
| Barry | LABORER: PIPELAYER | $18.32 | $3.28 | $21.60 | MI20260076 Building |
| Bay | LABORER ((1) COMMON OR GENERAL) | $22.42 | $12.95 | $35.37 | MI20260051 Heavy |
| Bay | LABORER ((2) MASON TENDER-CEMENT/CONCRETE) | $22.55 | $12.95 | $35.50 | MI20260051 Heavy |
| Bay | LABORER ((4) GRADE CHECKER) | $22.73 | $12.55 | $35.28 | MI20260051 Heavy |
| Bay | LABORER ((5) PIPELAYER) | $22.85 | $12.95 | $35.80 | MI20260051 Heavy |
| Bay | LABORER ((7) LANDSCAPER) | $18.41 | $12.95 | $31.36 | MI20260051 Heavy |
| Bay | LABORER: COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - BRICK/CEMENT/CONCRETE; PIPELAYER | $27.68 | $13.45 | $41.13 | MI20260077 Building |
| Bay | LABORER: COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - CEMENT/CONCRETE; PIPELAYER (EXCLUDES OPEN CUT CONSTRUCTION) | $27.68 | $13.45 | $41.13 | MI20260051 Heavy |
| Bay | LABORER: COMMON OR GENERAL; MASON TENDER - CEMENT/CONCRETE | $27.68 | $13.45 | $41.13 | MI20260011 Residential |
| Bay | LABORER: LANDSCAPE | $9.64 | $2.81 | $12.45 | MI20260011 Residential |
| Bay | LABORER: LANDSCAPE AND IRRIGATION: GROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER AND SKIDSTEER (OR EQUIVALENT) | $29.93 | $9.10 | $39.03 | MI20260077 Building |
| Bay | LABORER: LANDSCAPE AND IRRIGATION: GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER | $27.71 | $9.10 | $36.81 | MI20260077 Building |
| Bay | LABORER: PIPELAYER | $17.95 | $5.46 | $23.41 | MI20260011 Residential |
| Bay | LABORER: SANDBLASTER | $28.21 | $13.45 | $41.66 | MI20260077 Building |
| Bay | LANDSCAPE LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER AND SKIDSTEER (OR EQUIVALENT) | $29.93 | $9.10 | $39.03 | MI20260051 Heavy |
| Bay | LANDSCAPE LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER | $27.71 | $9.10 | $36.81 | MI20260051 Heavy |
| Benzie | LABORER (COMMON OR GENERAL; MASON TENDER - CEMENT/CONCRETE; AND PIPELAYER) | $25.02 | $13.45 | $38.47 | MI20260109 Building |
| Benzie | LABORER: LANDSCAPE & IRRIGATION | $11.04 | $4.39 | $15.43 | MI20260109 Building |
| Benzie | LABORER: MASON TENDER - BRICK | $14.26 | $4.56 | $18.82 | MI20260109 Building |
| Benzie | LABORER: SANDBLASTER | $26.23 | $13.45 | $39.68 | MI20260109 Building |
| Benzie, Kalkaska | LABORER ((1) COMMON OR GENERAL) | $22.42 | $12.95 | $35.37 | MI20260046 Heavy |
| Benzie, Kalkaska | LABORER ((4) GRADE CHECKER) | $22.73 | $12.95 | $35.68 | MI20260046 Heavy |
| Benzie, Kalkaska | LABORER: COMMON OR GENERAL (EXCLUDES OPEN CUT CONSTRUCTION) | $25.02 | $13.45 | $38.47 | MI20260046 Heavy |
| Benzie, Kalkaska | LABORER: LANDSCAPE | $10.89 | $1.74 | $12.63 | MI20260046 Heavy |
| Benzie, Kalkaska | LABORER: MASON TENDER - CEMENT/CONCRETE | $15.97 | $3.51 | $19.48 | MI20260046 Heavy |
| Benzie, Kalkaska | LABORER: PIPELAYER | $15.28 | $3.99 | $19.27 | MI20260046 Heavy |
| Berrien | LABORER ((1) COMMON OR GENERAL) | $22.42 | $12.95 | $35.37 | MI20260052 Heavy |
| Berrien | LABORER ((2) MASON TENDER-CEMENT/CONCRETE) | $22.55 | $12.95 | $35.50 | MI20260052 Heavy |
| Berrien | LABORER ((4) GRADE CHECKER) | $22.73 | $12.95 | $35.68 | MI20260052 Heavy |
| Berrien | LABORER ((5) PIPELAYER) | $22.85 | $12.95 | $35.80 | MI20260052 Heavy |
| Berrien | LABORER (COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; SANDBLASTER) | $27.21 | $13.45 | $40.66 | MI20260078 Building |
| Berrien | LABORER (COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - CEMENT/CONCRETE) (EXCLUDES OPEN CUT CONSTRUCTION) | $27.21 | $13.45 | $40.66 | MI20260052 Heavy |
| Berrien | LABORER: LANDSCAPE | $12.25 | $0.00 | $12.25 | MI20260052 Heavy |
| Berrien | LABORER: LANDSCAPE & IRRIGATION | $10.38 | $0.50 | $10.88 | MI20260078 Building |
| Berrien, Cass | LABORER: COMMON OR GENERAL | $16.87 | $5.46 | $22.33 | MI20260026 Residential |
| Berrien, Cass | LABORER: LANDSCAPE | $9.64 | $2.81 | $12.45 | MI20260026 Residential |
| Berrien, Cass | LABORER: MASON TENDER - CEMENT/CONCRETE | $27.21 | $13.45 | $40.66 | MI20260026 Residential |
| Berrien, Cass | LABORER: PIPELAYER | $17.95 | $5.46 | $23.41 | MI20260026 Residential |
| Branch | LABORER : COMMON OR GENERAL; SANDBLASTER | $27.21 | $13.45 | $40.66 | MI20260110 Building |
| Branch | LABORER: LANDSCAPE & IRRIGATION | $12.84 | $0.00 | $12.84 | MI20260110 Building |
| Branch | LABORER: MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE | $30.72 | $12.95 | $43.67 | MI20260110 Building |
| Calhoun | LABORER ((1) COMMON OR GENERAL) | $22.42 | $12.95 | $35.37 | MI20260053 Heavy |
| Calhoun | LABORER ((2) MASON TENDER-CEMENT/CONCRETE) | $22.55 | $12.95 | $35.50 | MI20260053 Heavy |
| Calhoun | LABORER ((4) GRADE CHECKER) | $22.73 | $12.55 | $35.28 | MI20260053 Heavy |
| Calhoun | LABORER ((5) PIPELAYER) | $22.85 | $12.95 | $35.80 | MI20260053 Heavy |
| Calhoun | LABORER ((7) LANDSCAPER) | $18.41 | $12.95 | $31.36 | MI20260053 Heavy |
| Calhoun | LABORER (COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; SANDBLASTER) | $27.21 | $13.45 | $40.66 | MI20260079 Building |
| Calhoun | LABORER (COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - CEMENT/CONCRETE) (EXCLUDES OPEN CUT CONSTRUCTION) | $27.21 | $13.45 | $40.66 | MI20260053 Heavy |
| Calhoun | LABORER: COMMON OR GENERAL | $16.87 | $5.46 | $22.33 | MI20260012 Residential |
| Calhoun | LABORER: LANDSCAPE | $9.64 | $2.81 | $12.45 | MI20260012 Residential |
| Calhoun | LABORER: LANDSCAPE & IRRIGATION | $10.38 | $0.50 | $10.88 | MI20260079 Building |
| Calhoun | LABORER: MASON TENDER - CEMENT/CONCRETE | $27.21 | $13.45 | $40.66 | MI20260012 Residential |
| Calhoun | LABORER: PIPELAYER | $17.95 | $5.46 | $23.41 | MI20260012 Residential |
| Calhoun | LANDSCAPE LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER AND SKIDSTEER (OR EQUIVALENT) | $29.93 | $9.10 | $39.03 | MI20260053 Heavy |
| Calhoun | LANDSCAPE LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER | $27.71 | $9.10 | $36.81 | MI20260053 Heavy |
| Cass | LABORER ((1) COMMON OR GENERAL) | $22.42 | $12.95 | $35.37 | MI20260054 Heavy |
| Cass | LABORER ((2) MASON TENDER-CEMENT/CONCRETE) | $22.55 | $12.95 | $35.50 | MI20260054 Heavy |
| Cass | LABORER ((4) GRADE CHECKER) | $22.73 | $12.95 | $35.68 | MI20260054 Heavy |
| Cass | LABORER ((5) PIPELAYER) | $22.85 | $12.95 | $35.80 | MI20260054 Heavy |
| Cass | LABORER (COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; SANDBLASTER) | $27.21 | $13.45 | $40.66 | MI20260080 Building |
| Cass | LABORER (COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - CEMENT/CONCRETE) (EXCLUDES OPEN CUT CONSTRUCTION) | $27.21 | $13.45 | $40.66 | MI20260054 Heavy |
| Cass | LABORER: LANDSCAPE | $12.25 | $0.00 | $12.25 | MI20260054 Heavy |
| Cass | LABORER: LANDSCAPE & IRRIGATION | $10.38 | $0.50 | $10.88 | MI20260080 Building |
| Charlevoix | LABORER (COMON OR GENERAL; MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; AND PIPELAYER) | $25.02 | $13.45 | $38.47 | MI20260111 Building |
| Charlevoix | LABORER: LANDSCAPE & IRRIGATION | $11.04 | $4.39 | $15.43 | MI20260111 Building |
| Charlevoix | LABORER: SANDBLASTER | $26.23 | $13.45 | $39.68 | MI20260111 Building |
| Cheboygan | LABORER ((1) COMMON OR GENERAL) | $22.42 | $12.95 | $35.37 | MI20260032 Heavy |
| Cheboygan | LABORER ((4) GRADE CHECKER) | $22.73 | $12.95 | $35.68 | MI20260032 Heavy |
| Cheboygan | LABORER: COMMON OR GENERAL | $15.46 | $6.09 | $21.55 | MI20260112 Building |
| Cheboygan | LABORER: COMMON OR GENERAL (EXCLUDES OPEN CUT CONSTRUCTION) | $25.02 | $13.45 | $38.47 | MI20260032 Heavy |
| Cheboygan | LABORER: LANDSCAPE | $10.89 | $1.74 | $12.63 | MI20260032 Heavy |
| Cheboygan | LABORER: LANDSCAPE & IRRIGATION | $14.63 | $0.00 | $14.63 | MI20260112 Building |
| Cheboygan | LABORER: MASON TENDER - BRICK | $14.89 | $3.10 | $17.99 | MI20260112 Building |
| Cheboygan | LABORER: MASON TENDER - CEMENT/CONCRETE | $15.97 | $3.51 | $19.48 | MI20260032 Heavy |
| Cheboygan | LABORER: MASON TENDER - CEMENT/CONCRETE AND PIPELAYER | $25.02 | $13.45 | $38.47 | MI20260112 Building |
| Cheboygan | LABORER: PIPELAYER | $15.28 | $3.99 | $19.27 | MI20260032 Heavy |
| Cheboygan | LABORER: SANDBLASTER | $26.23 | $13.45 | $39.68 | MI20260112 Building |
| Chippewa | LABORER ((1) COMMON OR GENERAL) | $21.19 | $12.85 | $34.04 | MI20260033 Heavy |
| Chippewa | LABORER ((2) MASON TENDER-CEMENT/CONCRETE) | $21.33 | $12.85 | $34.18 | MI20260033 Heavy |
| Chippewa | LABORER ((4) GRADE CHECKER) | $21.51 | $12.85 | $34.36 | MI20260033 Heavy |
| Chippewa | LABORER ((5) PIPELAYER) | $21.56 | $12.85 | $34.41 | MI20260033 Heavy |
| Chippewa | LABORER (COMMON OR GENERAL; MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; AND SANDBLASTER) | $28.18 | $13.45 | $41.63 | MI20260113 Building |
| Chippewa | LABORER: COMMON OR GENERAL; MASON TENDER - CEMENT/CONCRETE (EXCLUDES UNDERGROUND CONSTRUCTION) | $32.74 | $13.45 | $46.19 | MI20260033 Heavy |
| Chippewa | LABORER: LANDSCAPE | $10.89 | $1.74 | $12.63 | MI20260033 Heavy |
| Chippewa | LABORER: LANDSCAPE & IRRIGATION | $14.95 | $0.00 | $14.95 | MI20260113 Building |
| Chippewa, Delta | LABORER: COMMON OR GENERAL; MASON TENDER - CEMENT/CONCRETE | $24.05 | $6.45 | $30.50 | MI20260010 Residential |
| Clare | LABORER ((1) COMMON OR GENERAL) | $22.42 | $12.95 | $35.37 | MI20260034 Heavy |
| Clare | LABORER ((2) MASON TENDER-CEMENT/CONCRETE) | $22.55 | $12.95 | $35.50 | MI20260034 Heavy |
| Clare | LABORER ((4) GRADE CHECKER) | $22.73 | $12.55 | $35.28 | MI20260034 Heavy |
| Clare | LABORER ((5) PIPELAYER) | $22.85 | $12.95 | $35.80 | MI20260034 Heavy |
| Clare | LABORER ((7) LANDSCAPER) | $18.41 | $12.95 | $31.36 | MI20260034 Heavy |
| Clare | LABORER (MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; AND PIPELAYER) | $27.68 | $13.45 | $41.13 | MI20260114 Building |
| Clare | LABORER: COMMON OR GENERAL | $17.99 | $4.61 | $22.60 | MI20260114 Building |
| Clare | LABORER: LANDSCAPE & IRRIGATION | $12.84 | $0.00 | $12.84 | MI20260114 Building |
| Clare | LABORER: SANDBLASTER | $28.21 | $13.45 | $41.66 | MI20260114 Building |
| Clare + 20 more | LABORER, COMMON OR GENERAL; MASON TENDER-CEMENT/CONCRETE (SHIAWASSEE COUNTIES) | $29.46 | $16.10 | $45.56 | MI20260008 Residential |
| Clare + 20 more | LABORER: COMMON OR GENERAL; MASON TENDER - CEMENT/CONCRETE (ALLEGAN, BRANCH & ST. JOSEPH COUNTIES) | $26.70 | $12.95 | $39.65 | MI20260008 Residential |
| Clare + 20 more | LABORER: COMMON OR GENERAL; MASON TENDER - CEMENT/CONCRETE (ARENAC, CLARE, GLADWIN, GRATIOT, HURON, ISABELLA & MIDLAND COUNTIES) | $27.68 | $13.45 | $41.13 | MI20260008 Residential |
| Clare + 20 more | LABORER: COMMON OR GENERAL; MASON TENDER - CEMENT/CONCRETE (HILLSDALE & LENAWEE COUNTIES) | $31.87 | $14.45 | $46.32 | MI20260008 Residential |
| Clare + 20 more | LABORER: COMMON OR GENERAL; MASON TENDER - CEMENT/CONCRETE (LAKE, MASON, MECOSTA, MONTCALM, OCEANA & OSCEOLA COUNTIES) | $23.34 | $11.60 | $34.94 | MI20260008 Residential |
| Clare + 20 more | LABORER: COMMON OR GENERAL; MASON TENDER-CEMENT/CONCRETE (SANALIC COUNTY) | $31.30 | $18.40 | $49.70 | MI20260008 Residential |
| Clare + 83 more | LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION AREA 1: GROUP 1- ASPHALT SHOVELER OR LOADER; ASPHALT PLANT MISC.; BURLAP PERSON; YARD PERSON; DUMPER (WAGON, TRUCK, ETC.); JOINT FILLING LABORER; MISCELLANEOUS LABORER; UNSKILLED LABORER; PAVEMENT REINFORCEING; HANDLING AND PLACING (E.G. WIRE MESH, STEEL MATS, DOWEL BARS); MASON'S TENDER OR BRICKLAYER'S TENDER ON MANHOLES; MANHOLE BUILDER; HEADWALLS, ETC.; WATERPROOFING (OTHER THAN BUILDLINGS), SEAL COATING AND SLURRY MIX, SHORING, UNDERPINNING; PRESSURE GROUTING; BRIDGE PIN AND HANGER REMOVAL; MATERIAL RECYCLING LABORER; HORIZONTAL PAVER LABORER (BRICK, CONCRETE, CLAY, STONE, AND ASPHALT); GROUND STABILIZATION AND MODIFICATION LABORER; GROUTING; WATERBLASTING; TOP PERSON; RAILROAD TRACK AND TRESTLE LABORER; CARPENTERS' TENDER; GUARD RAIL BUILDERS' TENDER; EARTH RETENTION BARRIER AND WALL AND M.S.E. WALL INSTALLER'S TENDER; ASPHALT RAKER TENDER; SIGN INSTALLER; REMOTE CONTROL OPERATED EQUIPMENT. (AREA 1: GENESE, MACOMB, MONROE, OAKLAND, WASHTENAW AND WAYNE COUNTIES) | $35.51 | $14.45 | $49.96 | MI20260001 Highway |
| Clare + 83 more | LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION AREA 1: GROUP 2- MIXER OPERATOR (LESS THAN 5 SACKS); AIR OR ELECTRIC TOOL OPERATOR (JACKHAMMER, ETC.); SPREADER; BOXPERSON (ASPHALT, STONE, GRAVEL); CONCRETE PADDLER; POWER CHAIN SAW OPERATOR; PAVING BATCH TRUCK DUMPER; TUNNEL MUCKER (HIGHWAY WORK ONLY); CONCRETE SAW (UNDER 40 H.P.) AND DRY PACK MACHINE; ROTO-MILL GROUNDS PERSON. (AREA 1: GENESE, MACOMB, MONROE, OAKLAND, WASHTENAW AND WAYNE COUNTIES) | $31.96 | $14.45 | $46.41 | MI20260001 Highway |
| Clare + 83 more | LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION AREA 1: GROUP 3- TUNNEL MINER (HIGHWAY WORK ONLY); FINISHERS TENDERS; GUARD RAIL BUILDERS; HIGHWAY AND MEDIAN BARRIER INSTALLER; EARTH RETENTION BARRIER AND WALL AND M.S.E. WALL INSTALLER'S (INCLUDING SOUND, RETAINING AND CRASH BARRIERS); FENCE ERECTOR; BOTTOM PERSON; POWEDER PERSON; WAGON DRILL AND AIR TRACK OPERATOR; DIAMOND AND CORE DRILLS; GRADE CHECKER; CERTIFIED WELDERS; CURB AND SIDE RAIL SETTER'S TENDER. (AREA 1: GENESE, MACOMB, MONROE, OAKLAND, WASHTENAW AND WAYNE COUNTIES) | $35.82 | $14.45 | $50.27 | MI20260001 Highway |
| Clare + 83 more | LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION AREA 1: GROUP 4- ASPHALT RAKER. (AREA 1: GENESE, MACOMB, MONROE, OAKLAND, WASHTENAW AND WAYNE COUNTIES) | $35.90 | $14.45 | $50.35 | MI20260001 Highway |
| Clare + 83 more | LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION AREA 1: GROUP 5- PIPE LAYERS, OXY-GUN. (AREA 1: GENESE, MACOMB, MONROE, OAKLAND, WASHTENAW AND WAYNE COUNTIES) | $36.11 | $14.45 | $50.56 | MI20260001 Highway |
| Clare + 83 more | LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION AREA 1: GROUP 6- LINE-FORM SETTER FOR CURB OR PAVEMENT; ASPHALT SCREED CHECKER/SCREW MAN ON ASPHALT PAVING MACHINES. (AREA 1: GENESE, MACOMB, MONROE, OAKLAND, WASHTENAW AND WAYNE COUNTIES) | $36.41 | $14.45 | $50.86 | MI20260001 Highway |
| Clare + 83 more | LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION AREA 2: GROUP 1- ASPHALT SHOVELER OR LOADER; ASPHALT PLANT MISC.; BURLAP PERSON; YARD PERSON; DUMPER (WAGON, TRUCK, ETC.); JOINT FILLING LABORER; MISCELLANEOUS LABORER; UNSKILLED LABORER; PAVEMENT REINFORCEING; HANDLING AND PLACING (E.G. WIRE MESH, STEEL MATS, DOWEL BARS); MASON'S TENDER OR BRICKLAYER'S TENDER ON MANHOLES; MANHOLE BUILDER; HEADWALLS, ETC.; WATERPROOFING (OTHER THAN BUILDLINGS), SEAL COATING AND SLURRY MIX, SHORING, UNDERPINNING; PRESSURE GROUTING; BRIDGE PIN AND HANGER REMOVAL; MATERIAL RECYCLING LABORER; HORIZONTAL PAVER LABORER (BRICK, CONCRETE, CLAY, STONE, AND ASPHALT); GROUND STABILIZATION AND MODIFICATION LABORER; GROUTING; WATERBLASTING; TOP PERSON; RAILROAD TRACK AND TRESTLE LABORER; CARPENTERS' TENDER; GUARD RAIL BUILDERS' TENDER; EARTH RETENTION BARRIER AND WALL AND M.S.E. WALL INSTALLER'S TENDER; ASPHALT RAKER TENDER; SIGN INSTALLER; REMOTE CONTROL OPERATED EQUIPMENT. (AREA 2: ALLEGAN, BARRY, BAY, BERRIEN, BRANCH, CALHOUN, CASS, CLINTON, EATON, GRATIOT, HILLSDALE, HURON, INGHAM, JACKSON, KALAMAZOO, LAPEER, LENAWEE, LIVINGSTON, MIDLAND, MUSKEGON, SAGINAW, SANILACK, SHIAWASSEE, ST. CLAIR, ST. JOSEPH, TUSCOLA, AND VAN BUREN COUNTIES) | $33.37 | $14.45 | $47.82 | MI20260001 Highway |
| Clare + 83 more | LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION AREA 2: GROUP 2- MIXER OPERATOR (LESS THAN 5 SACKS); AIR OR ELECTRIC TOOL OPERATOR (JACKHAMMER, ETC.); SPREADER; BOXPERSON (ASPHALT, STONE, GRAVEL); CONCRETE PADDLER; POWER CHAIN SAW OPERATOR; PAVING BATCH TRUCK DUMPER; TUNNEL MUCKER (HIGHWAY WORK ONLY); CONCRETE SAW (UNDER 40 H.P.) AND DRY PACK MACHINE; ROTO-MILL GROUNDS PERSON. (AREA 2: ALLEGAN, BARRY, BAY, BERRIEN, BRANCH, CALHOUN, CASS, CLINTON, EATON, GRATIOT, HILLSDALE, HURON, INGHAM, JACKSON, KALAMAZOO, LAPEER, LENAWEE, LIVINGSTON, MIDLAND, MUSKEGON, SAGINAW, SANILACK, SHIAWASSEE, ST. CLAIR, ST. JOSEPH, TUSCOLA, AND VAN BUREN COUNTIES) | $30.03 | $14.45 | $44.48 | MI20260001 Highway |
| Clare + 83 more | LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION AREA 2: GROUP 3- TUNNEL MINER (HIGHWAY WORK ONLY); FINISHERS TENDERS; GUARD RAIL BUILDERS; HIGHWAY AND MEDIAN BARRIER INSTALLER; EARTH RETENTION BARRIER AND WALL AND M.S.E. WALL INSTALLER'S (INCLUDING SOUND, RETAINING AND CRASH BARRIERS); FENCE ERECTOR; BOTTOM PERSON; POWEDER PERSON; WAGON DRILL AND AIR TRACK OPERATOR; DIAMOND AND CORE DRILLS; GRADE CHECKER; CERTIFIED WELDERS; CURB AND SIDE RAIL SETTER'S TENDER. (AREA 2: ALLEGAN, BARRY, BAY, BERRIEN, BRANCH, CALHOUN, CASS, CLINTON, EATON, GRATIOT, HILLSDALE, HURON, INGHAM, JACKSON, KALAMAZOO, LAPEER, LENAWEE, LIVINGSTON, MIDLAND, MUSKEGON, SAGINAW, SANILACK, SHIAWASSEE, ST. CLAIR, ST. JOSEPH, TUSCOLA, AND VAN BUREN COUNTIES) | $33.81 | $14.45 | $48.26 | MI20260001 Highway |
| Clare + 83 more | LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION AREA 2: GROUP 4- ASPHALT RAKER. (AREA 2: ALLEGAN, BARRY, BAY, BERRIEN, BRANCH, CALHOUN, CASS, CLINTON, EATON, GRATIOT, HILLSDALE, HURON, INGHAM, JACKSON, KALAMAZOO, LAPEER, LENAWEE, LIVINGSTON, MIDLAND, MUSKEGON, SAGINAW, SANILACK, SHIAWASSEE, ST. CLAIR, ST. JOSEPH, TUSCOLA, AND VAN BUREN COUNTIES) | $34.16 | $14.45 | $48.61 | MI20260001 Highway |
| Clare + 83 more | LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION AREA 2: GROUP 5- PIPE LAYERS, OXY-GUN. (AREA 2: ALLEGAN, BARRY, BAY, BERRIEN, BRANCH, CALHOUN, CASS, CLINTON, EATON, GRATIOT, HILLSDALE, HURON, INGHAM, JACKSON, KALAMAZOO, LAPEER, LENAWEE, LIVINGSTON, MIDLAND, MUSKEGON, SAGINAW, SANILACK, SHIAWASSEE, ST. CLAIR, ST. JOSEPH, TUSCOLA, AND VAN BUREN COUNTIES) | $34.03 | $14.45 | $48.48 | MI20260001 Highway |
| Clare + 83 more | LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION AREA 2: GROUP 6- LINE-FORM SETTER FOR CURB OR PAVEMENT; ASPHALT SCREED CHECKER/SCREW MAN ON ASPHALT PAVING MACHINES. (AREA 2: ALLEGAN, BARRY, BAY, BERRIEN, BRANCH, CALHOUN, CASS, CLINTON, EATON, GRATIOT, HILLSDALE, HURON, INGHAM, JACKSON, KALAMAZOO, LAPEER, LENAWEE, LIVINGSTON, MIDLAND, MUSKEGON, SAGINAW, SANILACK, SHIAWASSEE, ST. CLAIR, ST. JOSEPH, TUSCOLA, AND VAN BUREN COUNTIES) | $34.37 | $14.45 | $48.82 | MI20260001 Highway |
| Clare + 83 more | LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION AREA 3: GROUP 1- ASPHALT SHOVELER OR LOADER; ASPHALT PLANT MISC.; BURLAP PERSON; YARD PERSON; DUMPER (WAGON, TRUCK, ETC.); JOINT FILLING LABORER; MISCELLANEOUS LABORER; UNSKILLED LABORER; PAVEMENT REINFORCEING; HANDLING AND PLACING (E.G. WIRE MESH, STEEL MATS, DOWEL BARS); MASON'S TENDER OR BRICKLAYER'S TENDER ON MANHOLES; MANHOLE BUILDER; HEADWALLS, ETC.; WATERPROOFING (OTHER THAN BUILDLINGS), SEAL COATING AND SLURRY MIX, SHORING, UNDERPINNING; PRESSURE GROUTING; BRIDGE PIN AND HANGER REMOVAL; MATERIAL RECYCLING LABORER; HORIZONTAL PAVER LABORER (BRICK, CONCRETE, CLAY, STONE, AND ASPHALT); GROUND STABILIZATION AND MODIFICATION LABORER; GROUTING; WATERBLASTING; TOP PERSON; RAILROAD TRACK AND TRESTLE LABORER; CARPENTERS' TENDER; GUARD RAIL BUILDERS' TENDER; EARTH RETENTION BARRIER AND WALL AND M.S.E. WALL INSTALLER'S TENDER; ASPHALT RAKER TENDER; SIGN INSTALLER; REMOTE CONTROL OPERATED EQUIPMENT. (AREA 3: ALCONA, ALPENA, ANTRIM, ARENAC, BENZIE, CHARLEVOIX, CHEBOYGAN, CLARE, CRAWFORD, EMMET, GLADWIN, GRAND TRAVERSE, IONIA, IOSCO, ISABELLA, KALKASKA, KENT, LAKE, LEELANAU, MANISTEE, MASON, MECOSTA, MISSAUKEE, MONTCALM, MONTMORENCY, NEWAYGO, OCEANA, OGEMAW, OSCEOLA, OSCODA, OTSEGO, OTTAWA, PREQUE ISLE, ROSCOMMON, AND WEXFORD COUNTIES) | $32.62 | $14.45 | $47.07 | MI20260001 Highway |
| Clare + 83 more | LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION AREA 3: GROUP 2- MIXER OPERATOR (LESS THAN 5 SACKS); AIR OR ELECTRIC TOOL OPERATOR (JACKHAMMER, ETC.); SPREADER; BOXPERSON (ASPHALT, STONE, GRAVEL); CONCRETE PADDLER; POWER CHAIN SAW OPERATOR; PAVING BATCH TRUCK DUMPER; TUNNEL MUCKER (HIGHWAY WORK ONLY); CONCRETE SAW (UNDER 40 H.P.) AND DRY PACK MACHINE; ROTO-MILL GROUNDS PERSON. (AREA 3: ALCONA, ALPENA, ANTRIM, ARENAC, BENZIE, CHARLEVOIX, CHEBOYGAN, CLARE, CRAWFORD, EMMET, GLADWIN, GRAND TRAVERSE, IONIA, IOSCO, ISABELLA, KALKASKA, KENT, LAKE, LEELANAU, MANISTEE, MASON, MECOSTA, MISSAUKEE, MONTCALM, MONTMORENCY, NEWAYGO, OCEANA, OGEMAW, OSCEOLA, OSCODA, OTSEGO, OTTAWA, PREQUE ISLE, ROSCOMMON, AND WEXFORD COUNTIES) | $33.83 | $14.45 | $48.28 | MI20260001 Highway |
| Clare + 83 more | LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION AREA 3: GROUP 3- TUNNEL MINER (HIGHWAY WORK ONLY); FINISHERS TENDERS; GUARD RAIL BUILDERS; HIGHWAY AND MEDIAN BARRIER INSTALLER; EARTH RETENTION BARRIER AND WALL AND M.S.E. WALL INSTALLER'S (INCLUDING SOUND, RETAINING AND CRASH BARRIERS); FENCE ERECTOR; BOTTOM PERSON; POWEDER PERSON; WAGON DRILL AND AIR TRACK OPERATOR; DIAMOND AND CORE DRILLS; GRADE CHECKER; CERTIFIED WELDERS; CURB AND SIDE RAIL SETTER'S TENDER. (AREA 3: ALCONA, ALPENA, ANTRIM, ARENAC, BENZIE, CHARLEVOIX, CHEBOYGAN, CLARE, CRAWFORD, EMMET, GLADWIN, GRAND TRAVERSE, IONIA, IOSCO, ISABELLA, KALKASKA, KENT, LAKE, LEELANAU, MANISTEE, MASON, MECOSTA, MISSAUKEE, MONTCALM, MONTMORENCY, NEWAYGO, OCEANA, OGEMAW, OSCEOLA, OSCODA, OTSEGO, OTTAWA, PREQUE ISLE, ROSCOMMON, AND WEXFORD COUNTIES) | $33.12 | $14.45 | $47.57 | MI20260001 Highway |
| Clare + 83 more | LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION AREA 3: GROUP 4- ASPHALT RAKER. (AREA 3: ALCONA, ALPENA, ANTRIM, ARENAC, BENZIE, CHARLEVOIX, CHEBOYGAN, CLARE, CRAWFORD, EMMET, GLADWIN, GRAND TRAVERSE, IONIA, IOSCO, ISABELLA, KALKASKA, KENT, LAKE, LEELANAU, MANISTEE, MASON, MECOSTA, MISSAUKEE, MONTCALM, MONTMORENCY, NEWAYGO, OCEANA, OGEMAW, OSCEOLA, OSCODA, OTSEGO, OTTAWA, PREQUE ISLE, ROSCOMMON, AND WEXFORD COUNTIES) | $33.56 | $14.45 | $48.01 | MI20260001 Highway |
| Clare + 83 more | LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION AREA 3: GROUP 5- PIPE LAYERS, OXY-GUN. (AREA 3: ALCONA, ALPENA, ANTRIM, ARENAC, BENZIE, CHARLEVOIX, CHEBOYGAN, CLARE, CRAWFORD, EMMET, GLADWIN, GRAND TRAVERSE, IONIA, IOSCO, ISABELLA, KALKASKA, KENT, LAKE, LEELANAU, MANISTEE, MASON, MECOSTA, MISSAUKEE, MONTCALM, MONTMORENCY, NEWAYGO, OCEANA, OGEMAW, OSCEOLA, OSCODA, OTSEGO, OTTAWA, PREQUE ISLE, ROSCOMMON, AND WEXFORD COUNTIES) | $33.18 | $14.45 | $47.63 | MI20260001 Highway |
| Clare + 83 more | LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION AREA 3: GROUP 6- LINE-FORM SETTER FOR CURB OR PAVEMENT; ASPHALT SCREED CHECKER/SCREW MAN ON ASPHALT PAVING MACHINES. (AREA 3: ALCONA, ALPENA, ANTRIM, ARENAC, BENZIE, CHARLEVOIX, CHEBOYGAN, CLARE, CRAWFORD, EMMET, GLADWIN, GRAND TRAVERSE, IONIA, IOSCO, ISABELLA, KALKASKA, KENT, LAKE, LEELANAU, MANISTEE, MASON, MECOSTA, MISSAUKEE, MONTCALM, MONTMORENCY, NEWAYGO, OCEANA, OGEMAW, OSCEOLA, OSCODA, OTSEGO, OTTAWA, PREQUE ISLE, ROSCOMMON, AND WEXFORD COUNTIES) | $33.61 | $14.45 | $48.06 | MI20260001 Highway |
| Clare + 83 more | LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION AREA 4: GROUP 1- ASPHALT SHOVELER OR LOADER; ASPHALT PLANT MISC.; BURLAP PERSON; YARD PERSON; DUMPER (WAGON, TRUCK, ETC.); JOINT FILLING LABORER; MISCELLANEOUS LABORER; UNSKILLED LABORER; PAVEMENT REINFORCEING; HANDLING AND PLACING (E.G. WIRE MESH, STEEL MATS, DOWEL BARS); MASON'S TENDER OR BRICKLAYER'S TENDER ON MANHOLES; MANHOLE BUILDER; HEADWALLS, ETC.; WATERPROOFING (OTHER THAN BUILDLINGS), SEAL COATING AND SLURRY MIX, SHORING, UNDERPINNING; PRESSURE GROUTING; BRIDGE PIN AND HANGER REMOVAL; MATERIAL RECYCLING LABORER; HORIZONTAL PAVER LABORER (BRICK, CONCRETE, CLAY, STONE, AND ASPHALT); GROUND STABILIZATION AND MODIFICATION LABORER; GROUTING; WATERBLASTING; TOP PERSON; RAILROAD TRACK AND TRESTLE LABORER; CARPENTERS' TENDER; GUARD RAIL BUILDERS' TENDER; EARTH RETENTION BARRIER AND WALL AND M.S.E. WALL INSTALLER'S TENDER; ASPHALT RAKER TENDER; SIGN INSTALLER; REMOTE CONTROL OPERATED EQUIPMENT. (AREA 4: ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC, MARQUETTE, MENOMINEE, ONTONAGON, AND SCHOOL CRAFT COUNTIES) | $33.52 | $13.45 | $46.97 | MI20260001 Highway |
| Clare + 83 more | LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION AREA 4: GROUP 2- MIXER OPERATOR (LESS THAN 5 SACKS); AIR OR ELECTRIC TOOL OPERATOR (JACKHAMMER, ETC.); SPREADER; BOXPERSON (ASPHALT, STONE, GRAVEL); CONCRETE PADDLER; POWER CHAIN SAW OPERATOR; PAVING BATCH TRUCK DUMPER; TUNNEL MUCKER (HIGHWAY WORK ONLY); CONCRETE SAW (UNDER 40 H.P.) AND DRY PACK MACHINE; ROTO-MILL GROUNDS PERSON. (AREA 4: ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC, MARQUETTE, MENOMINEE, ONTONAGON, AND SCHOOL CRAFT COUNTIES) | $33.73 | $13.45 | $47.18 | MI20260001 Highway |
| Clare + 83 more | LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION AREA 4: GROUP 3- TUNNEL MINER (HIGHWAY WORK ONLY); FINISHERS TENDERS; GUARD RAIL BUILDERS; HIGHWAY AND MEDIAN BARRIER INSTALLER; EARTH RETENTION BARRIER AND WALL AND M.S.E. WALL INSTALLER'S (INCLUDING SOUND, RETAINING AND CRASH BARRIERS); FENCE ERECTOR; BOTTOM PERSON; POWEDER PERSON; WAGON DRILL AND AIR TRACK OPERATOR; DIAMOND AND CORE DRILLS; GRADE CHECKER; CERTIFIED WELDERS; CURB AND SIDE RAIL SETTER'S TENDER. (AREA 4: ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC, MARQUETTE, MENOMINEE, ONTONAGON, AND SCHOOL CRAFT COUNTIES) | $34.02 | $13.45 | $47.47 | MI20260001 Highway |
| Clare + 83 more | LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION AREA 4: GROUP 4- ASPHALT RAKER. (AREA 4: ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC, MARQUETTE, MENOMINEE, ONTONAGON, AND SCHOOL CRAFT COUNTIES) | $34.46 | $13.45 | $47.91 | MI20260001 Highway |
| Clare + 83 more | LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION AREA 4: GROUP 5- PIPE LAYERS, OXY-GUN. (AREA 4: ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC, MARQUETTE, MENOMINEE, ONTONAGON, AND SCHOOL CRAFT COUNTIES) | $34.08 | $13.45 | $47.53 | MI20260001 Highway |
| Clare + 83 more | LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION AREA 4: GROUP 6- LINE-FORM SETTER FOR CURB OR PAVEMENT; ASPHALT SCREED CHECKER/SCREW MAN ON ASPHALT PAVING MACHINES. (AREA 4: ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC, MARQUETTE, MENOMINEE, ONTONAGON, AND SCHOOL CRAFT COUNTIES) | $34.51 | $13.45 | $47.96 | MI20260001 Highway |
| Clare + 83 more | LABORER: DISTRIBUTION WORK - THE CONSTRUCTION, INSTALLATION, TREATING AND RECONDITIONING OF DISTRIBUTION PIPELINES TRANSPORTING COAL, OIL, GAS OR OTHER SIMILAR MATERIALS, VAPORS OR LIQUIDS, INCLUDING PIPELINES WITHIN PRIVATE PROPERTY BOUNDARIES, UP TO AND INCLUDING THE METER SETTINGS ON RESIDENTIAL, COMMERCIAL, INDUSTRIAL, INSTITUTIONAL, PRIVATE AND PUBLIC STRUCTURES. ALL WORK COVERING PUMPING STATIONS AND TANK FARMS NOT COVERED BY THE BUILDING TRADES AGREEMENT. OTHER DISTRIBUTION LINES WITH THE EXCEPTION OF SEWER, WATER AND CABLE TELEVISION ARE INCLUDED. UNDERGROUND DUCT LAYER PAY: $.40 PER HOUR ABOVE THE BASE PAY RATE. (ZONE 1 - MACOMB, OAKLAND AND WAYNE) | $28.41 | $13.45 | $41.86 | MI20260001 Highway |
| Clare + 83 more | LABORER: DISTRIBUTION WORK - THE CONSTRUCTION, INSTALLATION, TREATING AND RECONDITIONING OF DISTRIBUTION PIPELINES TRANSPORTING COAL, OIL, GAS OR OTHER SIMILAR MATERIALS, VAPORS OR LIQUIDS, INCLUDING PIPELINES WITHIN PRIVATE PROPERTY BOUNDARIES, UP TO AND INCLUDING THE METER SETTINGS ON RESIDENTIAL, COMMERCIAL, INDUSTRIAL, INSTITUTIONAL, PRIVATE AND PUBLIC STRUCTURES. ALL WORK COVERING PUMPING STATIONS AND TANK FARMS NOT COVERED BY THE BUILDING TRADES AGREEMENT. OTHER DISTRIBUTION LINES WITH THE EXCEPTION OF SEWER, WATER AND CABLE TELEVISION ARE INCLUDED. UNDERGROUND DUCT LAYER PAY: $.40 PER HOUR ABOVE THE BASE PAY RATE. (ZONE 2 - MONROE AND WASHTENAW) | $24.55 | $13.45 | $38.00 | MI20260001 Highway |
| Clare + 83 more | LABORER: DISTRIBUTION WORK - THE CONSTRUCTION, INSTALLATION, TREATING AND RECONDITIONING OF DISTRIBUTION PIPELINES TRANSPORTING COAL, OIL, GAS OR OTHER SIMILAR MATERIALS, VAPORS OR LIQUIDS, INCLUDING PIPELINES WITHIN PRIVATE PROPERTY BOUNDARIES, UP TO AND INCLUDING THE METER SETTINGS ON RESIDENTIAL, COMMERCIAL, INDUSTRIAL, INSTITUTIONAL, PRIVATE AND PUBLIC STRUCTURES. ALL WORK COVERING PUMPING STATIONS AND TANK FARMS NOT COVERED BY THE BUILDING TRADES AGREEMENT. OTHER DISTRIBUTION LINES WITH THE EXCEPTION OF SEWER, WATER AND CABLE TELEVISION ARE INCLUDED. UNDERGROUND DUCT LAYER PAY: $.40 PER HOUR ABOVE THE BASE PAY RATE. (ZONE 3 - BAY, GENESEE, LAPEER, MIDLAND, SAGINAW, SANILAC, SHIAWASSEE AND ST. CLAIR) | $23.55 | $13.45 | $37.00 | MI20260001 Highway |
| Clare + 83 more | LABORER: DISTRIBUTION WORK - THE CONSTRUCTION, INSTALLATION, TREATING AND RECONDITIONING OF DISTRIBUTION PIPELINES TRANSPORTING COAL, OIL, GAS OR OTHER SIMILAR MATERIALS, VAPORS OR LIQUIDS, INCLUDING PIPELINES WITHIN PRIVATE PROPERTY BOUNDARIES, UP TO AND INCLUDING THE METER SETTINGS ON RESIDENTIAL, COMMERCIAL, INDUSTRIAL, INSTITUTIONAL, PRIVATE AND PUBLIC STRUCTURES. ALL WORK COVERING PUMPING STATIONS AND TANK FARMS NOT COVERED BY THE BUILDING TRADES AGREEMENT. OTHER DISTRIBUTION LINES WITH THE EXCEPTION OF SEWER, WATER AND CABLE TELEVISION ARE INCLUDED. UNDERGROUND DUCT LAYER PAY: $.40 PER HOUR ABOVE THE BASE PAY RATE. (ZONE 4 - ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC, MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT) | $22.92 | $13.45 | $36.37 | MI20260001 Highway |
| Clare + 83 more | LABORER: DISTRIBUTION WORK - THE CONSTRUCTION, INSTALLATION, TREATING AND RECONDITIONING OF DISTRIBUTION PIPELINES TRANSPORTING COAL, OIL, GAS OR OTHER SIMILAR MATERIALS, VAPORS OR LIQUIDS, INCLUDING PIPELINES WITHIN PRIVATE PROPERTY BOUNDARIES, UP TO AND INCLUDING THE METER SETTINGS ON RESIDENTIAL, COMMERCIAL, INDUSTRIAL, INSTITUTIONAL, PRIVATE AND PUBLIC STRUCTURES. ALL WORK COVERING PUMPING STATIONS AND TANK FARMS NOT COVERED BY THE BUILDING TRADES AGREEMENT. OTHER DISTRIBUTION LINES WITH THE EXCEPTION OF SEWER, WATER AND CABLE TELEVISION ARE INCLUDED. UNDERGROUND DUCT LAYER PAY: $.40 PER HOUR ABOVE THE BASE PAY RATE. (ZONE 5 - REMAINING COUNTIES IN MICHIGAN) | $22.95 | $13.45 | $36.40 | MI20260001 Highway |
| Clare + 83 more | LABORER: DISTRIBUTION WORK: ZONE 1 - MACOMB, OAKLAND AND WAYNE DISTRIBUTION WORK - THE CONSTRUCTION, INSTALLATION, TREATING AND RECONDITIONING OF DISTRIBUTION PIPELINES TRANSPORTING COAL, OIL, GAS OR OTHER SIMILAR MATERIALS, VAPORS OR LIQUIDS, INCLUDING PIPELINES WITHIN PRIVATE PROPERTY BOUNDARIES, UP TO AND INCLUDING THE METER SETTINGS ON RESIDENTIAL, COMMERCIAL, INDUSTRIAL, INSTITUTIONAL, PRIVATE AND PUBLIC STRUCTURES. ALL WORK COVERING PUMPING STATIONS AND TANK FARMS NOT COVERED BY THE BUILDING TRADES AGREEMENT. OTHER DISTRIBUTION LINES WITH THE EXCEPTION OF SEWER, WATER AND CABLE TELEVISION ARE INCLUDED. UNDERGROUND DUCT LAYER PAY: $.40 PER HOUR ABOVE THE BASE PAY RATE | $28.41 | $13.45 | $41.86 | MI20260157 Heavy |
| Clare + 83 more | LABORER: DISTRIBUTION WORK: ZONE 2 - MONROE AND WASHTENAW DISTRIBUTION WORK - THE CONSTRUCTION, INSTALLATION, TREATING AND RECONDITIONING OF DISTRIBUTION PIPELINES TRANSPORTING COAL, OIL, GAS OR OTHER SIMILAR MATERIALS, VAPORS OR LIQUIDS, INCLUDING PIPELINES WITHIN PRIVATE PROPERTY BOUNDARIES, UP TO AND INCLUDING THE METER SETTINGS ON RESIDENTIAL, COMMERCIAL, INDUSTRIAL, INSTITUTIONAL, PRIVATE AND PUBLIC STRUCTURES. ALL WORK COVERING PUMPING STATIONS AND TANK FARMS NOT COVERED BY THE BUILDING TRADES AGREEMENT. OTHER DISTRIBUTION LINES WITH THE EXCEPTION OF SEWER, WATER AND CABLE TELEVISION ARE INCLUDED. UNDERGROUND DUCT LAYER PAY: $.40 PER HOUR ABOVE THE BASE PAY RATE | $24.55 | $13.45 | $38.00 | MI20260157 Heavy |
| Clare + 83 more | LABORER: DISTRIBUTION WORK: ZONE 3 - BAY, GENESEE, LAPEER, MIDLAND, SAGINAW, SANILAC, SHIAWASSEE AND ST. CLAIR DISTRIBUTION WORK - THE CONSTRUCTION, INSTALLATION, TREATING AND RECONDITIONING OF DISTRIBUTION PIPELINES TRANSPORTING COAL, OIL, GAS OR OTHER SIMILAR MATERIALS, VAPORS OR LIQUIDS, INCLUDING PIPELINES WITHIN PRIVATE PROPERTY BOUNDARIES, UP TO AND INCLUDING THE METER SETTINGS ON RESIDENTIAL, COMMERCIAL, INDUSTRIAL, INSTITUTIONAL, PRIVATE AND PUBLIC STRUCTURES. ALL WORK COVERING PUMPING STATIONS AND TANK FARMS NOT COVERED BY THE BUILDING TRADES AGREEMENT. OTHER DISTRIBUTION LINES WITH THE EXCEPTION OF SEWER, WATER AND CABLE TELEVISION ARE INCLUDED. UNDERGROUND DUCT LAYER PAY: $.40 PER HOUR ABOVE THE BASE PAY RATE | $23.55 | $13.45 | $37.00 | MI20260157 Heavy |
| Clare + 83 more | LABORER: DISTRIBUTION WORK: ZONE 4 - ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC, MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT DISTRIBUTION WORK - THE CONSTRUCTION, INSTALLATION, TREATING AND RECONDITIONING OF DISTRIBUTION PIPELINES TRANSPORTING COAL, OIL, GAS OR OTHER SIMILAR MATERIALS, VAPORS OR LIQUIDS, INCLUDING PIPELINES WITHIN PRIVATE PROPERTY BOUNDARIES, UP TO AND INCLUDING THE METER SETTINGS ON RESIDENTIAL, COMMERCIAL, INDUSTRIAL, INSTITUTIONAL, PRIVATE AND PUBLIC STRUCTURES. ALL WORK COVERING PUMPING STATIONS AND TANK FARMS NOT COVERED BY THE BUILDING TRADES AGREEMENT. OTHER DISTRIBUTION LINES WITH THE EXCEPTION OF SEWER, WATER AND CABLE TELEVISION ARE INCLUDED. UNDERGROUND DUCT LAYER PAY: $.40 PER HOUR ABOVE THE BASE PAY RATE | $22.92 | $13.45 | $36.37 | MI20260157 Heavy |
| Clare + 83 more | LABORER: DISTRIBUTION WORK: ZONE 5 - REMAINING COUNTIES IN MICHIGAN DISTRIBUTION WORK - THE CONSTRUCTION, INSTALLATION, TREATING AND RECONDITIONING OF DISTRIBUTION PIPELINES TRANSPORTING COAL, OIL, GAS OR OTHER SIMILAR MATERIALS, VAPORS OR LIQUIDS, INCLUDING PIPELINES WITHIN PRIVATE PROPERTY BOUNDARIES, UP TO AND INCLUDING THE METER SETTINGS ON RESIDENTIAL, COMMERCIAL, INDUSTRIAL, INSTITUTIONAL, PRIVATE AND PUBLIC STRUCTURES. ALL WORK COVERING PUMPING STATIONS AND TANK FARMS NOT COVERED BY THE BUILDING TRADES AGREEMENT. OTHER DISTRIBUTION LINES WITH THE EXCEPTION OF SEWER, WATER AND CABLE TELEVISION ARE INCLUDED. UNDERGROUND DUCT LAYER PAY: $.40 PER HOUR ABOVE THE BASE PAY RATE | $22.95 | $13.45 | $36.40 | MI20260157 Heavy |
| Clare + 83 more | LABORERS - HAZARDOUS WASTE ABATEMENT: class a | $17.64 | $12.90 | $30.54 | MI20260158 Heavy |
| Clare + 83 more | LABORERS - HAZARDOUS WASTE ABATEMENT: CLASS A (ALCONA, ALPENA, ANTRIM, BENZIE, CHARLEVOIX, CHEBOYGAN, CRAWFORD, EMMET, GRAND TRAVERSE, IOSCO, KALKASKA, LEELANAU, MISSAUKEE, MONTMORENCY, OSCODA, OTSEGO, PRESQUE ISLE, AND WEXFORD COUNTIES- ZONE 10) | $17.64 | $12.90 | $30.54 | MI20260001 Highway |
| Clare + 83 more | LABORERS - HAZARDOUS WASTE ABATEMENT: class b | $18.64 | $12.90 | $31.54 | MI20260158 Heavy |
| Clare + 83 more | LABORERS - HAZARDOUS WASTE ABATEMENT: CLASS B (ALCONA, ALPENA, ANTRIM, BENZIE, CHARLEVOIX, CHEBOYGAN, CRAWFORD, EMMET, GRAND TRAVERSE, IOSCO, KALKASKA, LEELANAU, MISSAUKEE, MONTMORENCY, OSCODA, OTSEGO, PRESQUE ISLE, AND WEXFORD COUNTIES- ZONE 10) | $18.64 | $12.90 | $31.54 | MI20260001 Highway |
| Clare + 83 more | LABORERS - HAZARDOUS WASTE ABATEMENT: LEVEL A, B, C. (OAKLAND COUNTY AND THE NORTHEAST PORTION OF LIVINGSTON COUNTY BORDERED BY OAK GROVE ROAD ON THE WEST AND M-59 ON THE SOUTH - ZONE 2) | $29.93 | $16.90 | $46.83 | MI20260001 Highway |
| Clare + 83 more | LABORERS - HAZARDOUS WASTE ABATEMENT: LEVELS A, B OR C. (ALLEGAN, BARRY, BERRIEN, BRANCH, CALHOUN, CASS, IONIA COUNTY (EXCEPT THE CITY OF PORTLAND); KALAMAZOO, KENT, LAKE, MANISTEE, MASON, MECOSTA, MONTCALM, MUSKEGON, NEWAYGO, OCEANA, OSCEOLA, OTTAWA, ST. JOSEPH AND VAN BUREN COUNTIES - ZONE 9) | $21.88 | $13.26 | $35.14 | MI20260001 Highway |
| Clare + 83 more | LABORERS - HAZARDOUS WASTE ABATEMENT: LEVELS A, B OR C. (ARENAC, BAY, CLARE, GLADWIN, GRATIOT, HURON, ISABELLA, MIDLAND, OGEMAW, ROSCOMMON, SAGINAW AND TUSCOLA COUNTIES - ZONE 8) | $23.74 | $12.95 | $36.69 | MI20260001 Highway |
| Clare + 83 more | LABORERS - HAZARDOUS WASTE ABATEMENT: LEVELS A, B OR C. (CLINTON, EATON AND INGHAM COUNTIES; IONIA COUNTY (CITY OF PORTLAND); LIVINGSTON COUNTY (WEST OF OAK GROVE RD., INCLUDING THE CITY OF HOWELL) - ZONE 6) | $26.33 | $12.95 | $39.28 | MI20260001 Highway |
| Clare + 83 more | LABORERS - HAZARDOUS WASTE ABATEMENT: LEVELS A, B OR C. (GENESEE, LAPEER AND SHIAWASSEE COUNTIES - ZONE 7) | $24.20 | $13.80 | $38.00 | MI20260001 Highway |
| Clare + 83 more | LABORERS - HAZARDOUS WASTE ABATEMENT: LEVELS A, B OR C. (HILLSDALE, JACKSON AND LENAWEE COUNTIES - ZONE 4) | $27.13 | $14.95 | $42.08 | MI20260001 Highway |
| Clare + 83 more | LABORERS - HAZARDOUS WASTE ABATEMENT: LEVELS A, B OR C. (LIVINGSTON COUNTY (EAST OF OAK GROVE RD. AND SOUTH OF M-59, EXCLUDING THE CITY OF HOWELL); AND WASHTENAW COUNTY - ZONE 3) | $29.93 | $14.20 | $44.13 | MI20260001 Highway |
| Clare + 83 more | LABORERS - HAZARDOUS WASTE ABATEMENT: LEVELS A, B OR C. (MACOMB AND WAYNE COUNTIES - ZONE 1) | $29.93 | $16.90 | $46.83 | MI20260001 Highway |
| Clare + 83 more | LABORERS - HAZARDOUS WASTE ABATEMENT: LEVELS A, B OR C. (MONROE COUNTY - ZONE 4) | $31.75 | $14.90 | $46.65 | MI20260001 Highway |
| Clare + 83 more | LABORERS - HAZARDOUS WASTE ABATEMENT: LEVELS A, B OR C. (SANILAC AND ST. CLAIR COUNTIES - ZONE 5) | $26.21 | $16.62 | $42.83 | MI20260001 Highway |
| Clare + 83 more | LABORERS - HAZARDOUS WASTE ABATEMENT: LEVELS A, B, OR C (ALCONA, ALPENA, ANTRIM, BENZIE, CHARLEVOIX, CHEBOYGAN, CRAWFORD, EMMET, GRAND TRAVERSE, IOSCO, KALKASKA, LEELANAU, MISSAUKEE, MONTMORENCY, OSCODA, OTSEGO, PRESQUE ISLE, AND WEXFORD COUNTIES- ZONE 10) | $17.45 | $12.75 | $30.20 | MI20260001 Highway |
| Clare + 83 more | LABORERS - HAZARDOUS WASTE ABATEMENT: LEVELS A, B, OR C (ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC, MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT COUNTIES - ZONE 11) | $25.18 | $12.90 | $38.08 | MI20260001 Highway |
| Clare + 83 more | LABORERS - HAZARDOUS WASTE ABATEMENT: WORK PERFORMED IN CONJUNCTION WITH SITE PREPARATION NOT REQUIRING THE USE OF PERSONAL PROTECTIVE EQUIPMENT; ALSO, LEVEL D (GENESEE, LAPEER AND SHIAWASSEE COUNTIES - ZONE 7) | $23.20 | $13.80 | $37.00 | MI20260001 Highway |
| Clare + 83 more | LABORERS - HAZARDOUS WASTE ABATEMENT: WORK PERFORMED IN CONJUNCTION WITH SITE PREPARATION NOT REQUIRING THE USE OF PERSONAL PROTECTIVE EQUIPMENT; ALSO, LEVEL D (LIVINGSTON COUNTY (EAST OF OAK GROVE RD. AND SOUTH OF M-59, EXCLUDING THE CITY OF HOWELL); AND WASHTENAW COUNTY - ZONE 3) | $28.93 | $14.20 | $43.13 | MI20260001 Highway |
| Clare + 83 more | LABORERS - HAZARDOUS WASTE ABATEMENT: WORK PERFORMED IN CONJUNCTION WITH SITE PREPARATION NOT REQUIRING THE USE OF PERSONAL PROTECTIVE EQUIPMENT; ALSO, LEVEL D. (ALLEGAN, BARRY, BERRIEN, BRANCH, CALHOUN, CASS, IONIA COUNTY (EXCEPT THE CITY OF PORTLAND); KALAMAZOO, KENT, LAKE, MANISTEE, MASON, MECOSTA, MONTCALM, MUSKEGON, NEWAYGO, OCEANA, OSCEOLA, OTTAWA, ST. JOSEPH AND VAN BUREN COUNTIES - ZONE 9) | $20.80 | $12.90 | $33.70 | MI20260001 Highway |
| Clare + 83 more | LABORERS - HAZARDOUS WASTE ABATEMENT: WORK PERFORMED IN CONJUNCTION WITH SITE PREPARATION NOT REQUIRING THE USE OF PERSONAL PROTECTIVE EQUIPMENT; ALSO, LEVEL D. (ARENAC, BAY, CLARE, GLADWIN, GRATIOT, HURON, ISABELLA, MIDLAND, OGEMAW, ROSCOMMON, SAGINAW AND TUSCOLA COUNTIES - ZONE 8) | $20.80 | $12.90 | $33.70 | MI20260001 Highway |
| Clare + 83 more | LABORERS - HAZARDOUS WASTE ABATEMENT: WORK PERFORMED IN CONJUNCTION WITH SITE PREPARATION NOT REQUIRING THE USE OF PERSONAL PROTECTIVE EQUIPMENT; ALSO, LEVEL D. (CLINTON, EATON AND INGHAM COUNTIES; IONIA COUNTY (CITY OF PORTLAND); LIVINGSTON COUNTY (WEST OF OAK GROVE RD., INCLUDING THE CITY OF HOWELL) - ZONE 6) | $24.64 | $12.90 | $37.54 | MI20260001 Highway |
| Clare + 83 more | LABORERS - HAZARDOUS WASTE ABATEMENT: WORK PERFORMED IN CONJUNCTION WITH SITE PREPARATION NOT REQUIRING THE USE OF PERSONAL PROTECTIVE EQUIPMENT; ALSO, LEVEL D. (MACOMB AND WAYNE COUNTIES - ZONE 1) | $28.93 | $16.90 | $45.83 | MI20260001 Highway |
| Clare + 83 more | LABORERS - HAZARDOUS WASTE ABATEMENT: WORK PERFORMED IN CONJUNCTION WITH SITE PREPARATION NOT REQUIRING THE USE OF PERSONAL PROTECTIVE EQUIPMENT; ALSO, LEVEL D. (MONROE COUNTY - ZONE 4) | $31.75 | $14.90 | $46.65 | MI20260001 Highway |
| Clare + 83 more | LABORERS - HAZARDOUS WASTE ABATEMENT: WORK PERFORMED IN CONJUNCTION WITH SITE PREPARATION NOT REQUIRING THE USE OF PERSONAL PROTECTIVE EQUIPMENT; ALSO, LEVEL D. (OAKLAND COUNTY AND THE NORTHEAST PORTION OF LIVINGSTON COUNTY BORDERED BY OAK GROVE ROAD ON THE WEST AND M-59 ON THE SOUTH - ZONE 2) | $28.93 | $16.90 | $45.83 | MI20260001 Highway |
| Clare + 83 more | LABORERS - HAZARDOUS WASTE ABATEMENT: WORK PERFORMED IN CONJUNCTION WITH SITE PREPARATION NOT REQUIRING THE USE OF PERSONAL PROTECTIVE EQUIPMENT; ALSO, LEVEL D. (SANILAC AND ST. CLAIR COUNTIES - ZONE 5) | $24.75 | $16.35 | $41.10 | MI20260001 Highway |
| Clare + 83 more | LABORERS - HAZARDOUS WASTE ABATEMENT: WORK PERFORMED IN CONJUNCTION WITH SITE PREPARATION NOT REQUIRING THE USE OF PERSONAL PROTECTIVE EQUIPMENT; ALSO, LEVEL D(ALCONA, ALPENA, ANTRIM, BENZIE, CHARLEVOIX, CHEBOYGAN, CRAWFORD, EMMET, GRAND TRAVERSE, IOSCO, KALKASKA, LEELANAU, MISSAUKEE, MONTMORENCY, OSCODA, OTSEGO, PRESQUE ISLE, AND WEXFORD COUNTIES- ZONE 10) | $16.45 | $12.75 | $29.20 | MI20260001 Highway |
| Clare + 83 more | LABORERS - HAZARDOUS WASTE ABATEMENT: WORK PERFORMED IN CONJUNCTION WITH SITE PREPARATION NOT REQUIRING THE USE OF PERSONAL PROTETIVE EQUIPMENT; ALSO, LEVEL D. (HILLSDALE, JACKSON AND LENAWEE COUNTIES - ZONE 4) | $24.17 | $12.90 | $37.07 | MI20260001 Highway |
| Clare + 83 more | LABORERS - HAZARDOUS WASTE ABATEMENT: WORK PERFORMED IN CONUNCTION WITH SITE PREPARATION NOT REQUIRING THE USE OF PERSONAL PROTECTIVE EQUIPMENT; ALSO, LEVEL D. (ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC, MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT COUNTIES - ZONE 11) | $22.58 | $12.90 | $35.48 | MI20260001 Highway |
| Clare + 83 more | LABORERS - HAZARDOUS WASTE ABATEMENT:, ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC, MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT COUNTIES - ZONE 11 (LEVELS A, B OR C) | $25.18 | $12.90 | $38.08 | MI20260158 Heavy |
| Clare + 83 more | LABORERS - HAZARDOUS WASTE ABATEMENT:, ALLEGAN, BARRY, BERRIEN, BRANCH, CALHOUN, CASS, IONIA COUNTY (EXCEPT THE CITY OF PORTLAND); KALAMAZOO, KENT, LAKE, MANISTEE, MASON, MECOSTA, MONTCALM, MUSKEGON, NEWAYGO, OCEANA, OSCEOLA, OTTAWA, ST. JOSEPH AND VAN BUREN COUNTIES - ZONE 9 (LEVELS A, B OR C) | $21.88 | $13.26 | $35.14 | MI20260158 Heavy |
| Clare + 83 more | LABORERS - HAZARDOUS WASTE ABATEMENT:, ALLEGAN, BARRY, BERRIEN, BRANCH, CALHOUN, CASS, IONIA COUNTY (EXCEPT THE CITY OF PORTLAND); KALAMAZOO, KENT, LAKE, MANISTEE, MASON, MECOSTA, MONTCALM, MUSKEGON, NEWAYGO, OCEANA, OSCEOLA, OTTAWA, ST. JOSEPH AND VAN BUREN COUNTIES - ZONE 9 WORK PERFORMED IN CONJUNCTION WITH SITE PREPARATION NOT REQUIRING THE USE OF PERSONAL PROTECTIVE EQUIPMENT; ALSO, LEVEL D | $20.80 | $12.90 | $33.70 | MI20260158 Heavy |
| Clare + 83 more | LABORERS - HAZARDOUS WASTE ABATEMENT:, ARENAC, BAY, CLARE, GLADWIN, GRATIOT, HURON, ISABELLA, MIDLAND, OGEMAW, ROSCOMMON, SAGINAW AND TUSCOLA COUNTIES - ZONE 8 (LEVELS A, B OR C) | $23.74 | $12.95 | $36.69 | MI20260158 Heavy |
| Clare + 83 more | LABORERS - HAZARDOUS WASTE ABATEMENT:, CLINTON, EATON AND INGHAM COUNTIES; IONIA COUNTY (CITY OF PORTLAND); LIVINGSTON COUNTY (WEST OF OAK GROVE RD., INCLUDING THE CITY OF HOWELL) - ZONE 6 (LEVELS A, B OR C) | $26.33 | $12.95 | $39.28 | MI20260158 Heavy |
| Clare + 83 more | LABORERS - HAZARDOUS WASTE ABATEMENT:, GENESEE, LAPEER AND SHIAWASSEE COUNTIES - ZONE 7 (LEVELS A, B OR C) | $24.20 | $13.80 | $38.00 | MI20260158 Heavy |
| Clare + 83 more | LABORERS - HAZARDOUS WASTE ABATEMENT:, GENESEE, LAPEER AND SHIAWASSEE COUNTIES - ZONE 7 WORK PERFORMED IN CONJUNCTION WITH SITE PREPARATION NOT REQUIRING THE USE OF PERSONAL PROTECTIVE EQUIPMENT; ALSO, LEVEL D | $23.20 | $13.80 | $37.00 | MI20260158 Heavy |
| Clare + 83 more | LABORERS - HAZARDOUS WASTE ABATEMENT:, HILLSDALE, JACKSON AND LENAWEE COUNTIES - ZONE 4 (LEVELS A, B OR C) | $27.13 | $14.95 | $42.08 | MI20260158 Heavy |
| Clare + 83 more | LABORERS - HAZARDOUS WASTE ABATEMENT:, LIVINGSTON COUNTY (EAST OF OAK GROVE RD. AND SOUTH OF M-59, EXCLUDING THE CITY OF HOWELL); AND WASHTENAW COUNTY - ZONE 3 (LEVELS A, B OR C) | $29.93 | $14.20 | $44.13 | MI20260158 Heavy |
| Clare + 83 more | LABORERS - HAZARDOUS WASTE ABATEMENT:, LIVINGSTON COUNTY (EAST OF OAK GROVE RD. AND SOUTH OF M-59, EXCLUDING THE CITY OF HOWELL); AND WASHTENAW COUNTY - ZONE 3 WORK PERFORMED IN CONJUNCTION WITH SITE PREPARATION NOT REQUIRING THE USE OF PERSONAL PROTECTIVE EQUIPMENT; ALSO, LEVEL D | $28.93 | $14.20 | $43.13 | MI20260158 Heavy |
| Clare + 83 more | LABORERS - HAZARDOUS WASTE ABATEMENT:, MACOMB AND WAYNE COUNTIES - ZONE 1 (LEVELS A, B OR C) | $29.93 | $16.90 | $46.83 | MI20260158 Heavy |
| Clare + 83 more | LABORERS - HAZARDOUS WASTE ABATEMENT:, MACOMB AND WAYNE COUNTIES - ZONE 1 WORK PERFORMED IN CONJUNCTION WITH SITE PREPARATION NOT REQUIRING THE USE OF PERSONAL PROTECTIVE EQUIPMENT; ALSO, LEVEL D | $28.93 | $16.90 | $45.83 | MI20260158 Heavy |
| Clare + 83 more | LABORERS - HAZARDOUS WASTE ABATEMENT:, MONROE COUNTY - ZONE 4 (LEVELS A, B OR C) | $31.75 | $14.90 | $46.65 | MI20260158 Heavy |
| Clare + 83 more | LABORERS - HAZARDOUS WASTE ABATEMENT:, MONROE COUNTY - ZONE 4 WORK PERFORMED IN CONJUNCTION WITH SITE PREPARATION NOT REQUIRING THE USE OF PERSONAL PROTECTIVE EQUIPMENT; ALSO, LEVEL D | $31.75 | $14.90 | $46.65 | MI20260158 Heavy |
| Clare + 83 more | LABORERS - HAZARDOUS WASTE ABATEMENT:, OAKLAND COUNTY AND THE NORTHEAST PORTION OF LIVINGSTON COUNTY BORDERED BY OAK GROVE ROAD ON THE WEST AND M-59 ON THE SOUTH - ZONE 2 (LEVEL A, B, C) | $29.93 | $16.90 | $46.83 | MI20260158 Heavy |
| Clare + 83 more | LABORERS - HAZARDOUS WASTE ABATEMENT:, OAKLAND COUNTY AND THE NORTHEAST PORTION OF LIVINGSTON COUNTY BORDERED BY OAK GROVE ROAD ON THE WEST AND M-59 ON THE SOUTH - ZONE 2 WORK PERFORMED IN CONJUNCTION WITH SITE PREPARATION NOT REQUIRING THE USE OF PERSONAL PROTECTIVE EQUIPMENT; ALSO, LEVEL D | $28.93 | $16.90 | $45.83 | MI20260158 Heavy |
| Clare + 83 more | LABORERS - HAZARDOUS WASTE ABATEMENT:, SANILAC AND ST. CLAIR COUNTIES - ZONE 5 (LEVELS A, B OR C) | $26.21 | $16.62 | $42.83 | MI20260158 Heavy |
| Clare + 83 more | LABORERS - OPEN CUT: GROUP 1- CONSTRUCTION LABORER. BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARATION, LAND BALANCING, DEMOLITION AND REMOVAL OF CONCRETE AND UNDERGROUND APPURTENANCES, GRADING, PAVING, SEWERS, UTILITIES AND IMPROVEMENTS; RETENTION, OXIDATION, FLOCCULATION AND IRRIGATION FACILITIES, AND ALSO INCLUDING BUT NOT LIMITED TO UNDERGROUND PIPING, CONDUITS, STEEL SHEETING FOR UNDERGROUND CONSTRUCTION, AND ALL WORK INCIDENTAL THERETO, AND GENERAL EXCAVATION. FOR ALL AREAS EXCEPT THE UPPER PENINSULA, OPEN CUT CONSTRUCTION WORK SHALL ALSO BE CONSTRUED TO MEAN WATERFRONT WORK, PIERS, DOCKS, SEAWALLS, BREAKWALLS, MARINAS AND ALL INCIDENTAL WORK. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY STRUCTURAL MODIFICATIONS, ALTERATIONS, ADDITIONS AND REPAIRS TO BUILDINGS, OR HIGHWAY WORK, INCLUDING ROADS, STREETS, BRIDGE CONSTRUCTION AND PARKING LOTS OR STEEL ERECTION WORK AND EXCAVATION FOR THE BUILDING ITSELF AND BACK FILLING INSIDE OF AND WITHIN 5 FT. OF THE BUILDING AND FOUNDATIONS, FOOTINGS AND PIERS FOR THE BUILDING. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY WORK COVERED UNDER TUNNEL, SHAFT AND CAISSON WORK. (ZONE 5 - ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC, MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT COUNTIES) | $29.98 | $22.75 | $52.73 | MI20260001 Highway |
| Clare + 83 more | LABORERS - OPEN CUT: GROUP 1- CONSTRUCTION LABORER. CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARATION, LAND BALANCING, DEMOLITION AND REMOVAL OF CONCRETE AND UNDERGROUND APPURTENANCES, GRADING, PAVING, SEWERS, UTILITIES AND IMPROVEMENTS; RETENTION, OXIDATION, FLOCCULATION AND IRRIGATION FACILITIES, AND ALSO INCLUDING BUT NOT LIMITED TO UNDERGROUND PIPING, CONDUITS, STEEL SHEETING FOR UNDERGROUND CONSTRUCTION, AND ALL WORK INCIDENTAL THERETO, AND GENERAL EXCAVATION. FOR ALL AREAS EXCEPT THE UPPER PENINSULA, OPEN CUT CONSTRUCTION WORK SHALL ALSO BE CONSTRUED TO MEAN WATERFRONT WORK, PIERS, DOCKS, SEAWALLS, BREAKWALLS, MARINAS AND ALL INCIDENTAL WORK. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY STRUCTURAL MODIFICATIONS, ALTERATIONS, ADDITIONS AND REPAIRS TO BUILDINGS, OR HIGHWAY WORK, INCLUDING ROADS, STREETS, BRIDGE CONSTRUCTION AND PARKING LOTS OR STEEL ERECTION WORK AND EXCAVATION FOR THE BUILDING ITSELF AND BACK FILLING INSIDE OF AND WITHIN 5 FT. OF THE BUILDING AND FOUNDATIONS, FOOTINGS AND PIERS FOR THE BUILDING. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY WORK COVERED UNDER TUNNEL, SHAFT AND CAISSON WORK. (ZONE 2 - LIVINGSTON COUNTY (EAST OF M-151 (OAK GROVE RD.)); MONROE AND WASHTENAW COUNTIES) | $32.10 | $17.45 | $49.55 | MI20260001 Highway |
| Clare + 83 more | LABORERS - OPEN CUT: GROUP 1- CONSTRUCTION LABORER. CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARATION, LAND BALANCING, DEMOLITION AND REMOVAL OF CONCRETE AND UNDERGROUND APPURTENANCES, GRADING, PAVING, SEWERS, UTILITIES AND IMPROVEMENTS; RETENTION, OXIDATION, FLOCCULATION AND IRRIGATION FACILITIES, AND ALSO INCLUDING BUT NOT LIMITED TO UNDERGROUND PIPING, CONDUITS, STEEL SHEETING FOR UNDERGROUND CONSTRUCTION, AND ALL WORK INCIDENTAL THERETO, AND GENERAL EXCAVATION. FOR ALL AREAS EXCEPT THE UPPER PENINSULA, OPEN CUT CONSTRUCTION WORK SHALL ALSO BE CONSTRUED TO MEAN WATERFRONT WORK, PIERS, DOCKS, SEAWALLS, BREAKWALLS, MARINAS AND ALL INCIDENTAL WORK. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY STRUCTURAL MODIFICATIONS, ALTERATIONS, ADDITIONS AND REPAIRS TO BUILDINGS, OR HIGHWAY WORK, INCLUDING ROADS, STREETS, BRIDGE CONSTRUCTION AND PARKING LOTS OR STEEL ERECTION WORK AND EXCAVATION FOR THE BUILDING ITSELF AND BACK FILLING INSIDE OF AND WITHIN 5 FT. OF THE BUILDING AND FOUNDATIONS, FOOTINGS AND PIERS FOR THE BUILDING. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY WORK COVERED UNDER TUNNEL, SHAFT AND CAISSON WORK. (ZONE 3 - CLINTON, EATON, GENESEE, HILLSDALE AND INGHAM COUNTIES; IONIA COUNTY (CITY OF PORTLAND); JACKSON, LAPEER AND LENAWEE COUNTIES; LIVINGSTON COUNTY (WEST OF M-151 OAK GROVE RD.); SANILAC, ST. CLAIR AND SHIAWASSEE COUNTIES) | $30.29 | $17.45 | $47.74 | MI20260001 Highway |
| Clare + 83 more | LABORERS - OPEN CUT: GROUP 1- CONSTRUCTION LABORER. SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARATION, LAND BALANCING, DEMOLITION AND REMOVAL OF CONCRETE AND UNDERGROUND APPURTENANCES, GRADING, PAVING, SEWERS, UTILITIES AND IMPROVEMENTS; RETENTION, OXIDATION, FLOCCULATION AND IRRIGATION FACILITIES, AND ALSO INCLUDING BUT NOT LIMITED TO UNDERGROUND PIPING, CONDUITS, STEEL SHEETING FOR UNDERGROUND CONSTRUCTION, AND ALL WORK INCIDENTAL THERETO, AND GENERAL EXCAVATION. FOR ALL AREAS EXCEPT THE UPPER PENINSULA, OPEN CUT CONSTRUCTION WORK SHALL ALSO BE CONSTRUED TO MEAN WATERFRONT WORK, PIERS, DOCKS, SEAWALLS, BREAKWALLS, MARINAS AND ALL INCIDENTAL WORK. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY STRUCTURAL MODIFICATIONS, ALTERATIONS, ADDITIONS AND REPAIRS TO BUILDINGS, OR HIGHWAY WORK, INCLUDING ROADS, STREETS, BRIDGE CONSTRUCTION AND PARKING LOTS OR STEEL ERECTION WORK AND EXCAVATION FOR THE BUILDING ITSELF AND BACK FILLING INSIDE OF AND WITHIN 5 FT. OF THE BUILDING AND FOUNDATIONS, FOOTINGS AND PIERS FOR THE BUILDING. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY WORK COVERED UNDER TUNNEL, SHAFT AND CAISSON WORK. (ZONE 1 - MACOMB, OAKLAND AND WAYNE COUNTIES) | $29.98 | $22.75 | $52.73 | MI20260001 Highway |
| Clare + 83 more | LABORERS - OPEN CUT: GROUP 1- CONSTRUCTION LABORER. SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARATION, LAND BALANCING, DEMOLITION AND REMOVAL OF CONCRETE AND UNDERGROUND APPURTENANCES, GRADING, PAVING, SEWERS, UTILITIES AND IMPROVEMENTS; RETENTION, OXIDATION, FLOCCULATION AND IRRIGATION FACILITIES, AND ALSO INCLUDING BUT NOT LIMITED TO UNDERGROUND PIPING, CONDUITS, STEEL SHEETING FOR UNDERGROUND CONSTRUCTION, AND ALL WORK INCIDENTAL THERETO, AND GENERAL EXCAVATION. FOR ALL AREAS EXCEPT THE UPPER PENINSULA, OPEN CUT CONSTRUCTION WORK SHALL ALSO BE CONSTRUED TO MEAN WATERFRONT WORK, PIERS, DOCKS, SEAWALLS, BREAKWALLS, MARINAS AND ALL INCIDENTAL WORK. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY STRUCTURAL MODIFICATIONS, ALTERATIONS, ADDITIONS AND REPAIRS TO BUILDINGS, OR HIGHWAY WORK, INCLUDING ROADS, STREETS, BRIDGE CONSTRUCTION AND PARKING LOTS OR STEEL ERECTION WORK AND EXCAVATION FOR THE BUILDING ITSELF AND BACK FILLING INSIDE OF AND WITHIN 5 FT. OF THE BUILDING AND FOUNDATIONS, FOOTINGS AND PIERS FOR THE BUILDING. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY WORK COVERED UNDER TUNNEL, SHAFT AND CAISSON WORK. (ZONE 4 - ALCONA, ALLEGAN, ALPENA, ANTRIM, ARENAC, BARRY, BAY, BENZIE, BERRIEN, BRANCH, CALHOUN, CASS, CHARLEVOIX, CHEBOYGAN, CLARE, CRAWFORD, EMMET, GLADWIN, GRAND TRAVERSE, GRATIOT AND HURON COUNTIES; IONIA COUNTY (EXCEPT THE CITY OF PORTLAND); IOSCO, ISABELLA, KALAMAZOO, KALKASKA, KENT, LAKE,LEELANAU, MANISTEE, MASON, MECOSTA, MIDLAND, MISSAUKEE, MONTCALM, MONTMORENCY, MUSKEGON, NEWAYGO, OCEANA, OGEMAW, OSCEOLA, OSCODA, OTSEGO, OTTAWA, PRESQUE ISLE, ROSCOOMMON, SAGINAW, ST. JOSEPH, TUSCOLA, VAN BUREN, AND WEXFORD COUNTIES) | $28.72 | $18.45 | $47.17 | MI20260001 Highway |
| Clare + 83 more | LABORERS - OPEN CUT: GROUP 2- MORTAR AND MATERIAL MIXER, CONCRETE FORM PERSON, SIGNAL PERSON, WELL POINT PERSON, MANHOLE, HEADWALL AND CATCH BASIN BUILDER, HEADWALL, SEAWALL, BREAKWALL AND DOCK BUILDER. SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARATION, LAND BALANCING, DEMOLITION AND REMOVAL OF CONCRETE AND UNDERGROUND APPURTENANCES, GRADING, PAVING, SEWERS, UTILITIES AND IMPROVEMENTS; RETENTION, OXIDATION, FLOCCULATION AND IRRIGATION FACILITIES, AND ALSO INCLUDING BUT NOT LIMITED TO UNDERGROUND PIPING, CONDUITS, STEEL SHEETING FOR UNDERGROUND CONSTRUCTION, AND ALL WORK INCIDENTAL THERETO, AND GENERAL EXCAVATION. FOR ALL AREAS EXCEPT THE UPPER PENINSULA, OPEN CUT CONSTRUCTION WORK SHALL ALSO BE CONSTRUED TO MEAN WATERFRONT WORK, PIERS, DOCKS, SEAWALLS, BREAKWALLS, MARINAS AND ALL INCIDENTAL WORK. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY STRUCTURAL MODIFICATIONS, ALTERATIONS, ADDITIONS AND REPAIRS TO BUILDINGS, OR HIGHWAY WORK, INCLUDING ROADS, STREETS, BRIDGE CONSTRUCTION AND PARKING LOTS OR STEEL ERECTION WORK AND EXCAVATION FOR THE BUILDING ITSELF AND BACK FILLING INSIDE OF AND WITHIN 5 FT. OF THE BUILDING AND FOUNDATIONS, FOOTINGS AND PIERS FOR THE BUILDING. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY WORK COVERED UNDER TUNNEL, SHAFT AND CAISSON WORK. (ZONE 1 - MACOMB, OAKLAND AND WAYNE COUNTIES) | $31.98 | $22.75 | $54.73 | MI20260001 Highway |
| Clare + 83 more | LABORERS - OPEN CUT: GROUP 2- MORTAR AND MATERIAL MIXER, CONCRETE FORM PERSON, SIGNAL PERSON, WELL POINT PERSON, MANHOLE, HEADWALL AND CATCH BASIN BUILDER, HEADWALL, SEAWALL, BREAKWALL AND DOCK BUILDER. SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARATION, LAND BALANCING, DEMOLITION AND REMOVAL OF CONCRETE AND UNDERGROUND APPURTENANCES, GRADING, PAVING, SEWERS, UTILITIES AND IMPROVEMENTS; RETENTION, OXIDATION, FLOCCULATION AND IRRIGATION FACILITIES, AND ALSO INCLUDING BUT NOT LIMITED TO UNDERGROUND PIPING, CONDUITS, STEEL SHEETING FOR UNDERGROUND CONSTRUCTION, AND ALL WORK INCIDENTAL THERETO, AND GENERAL EXCAVATION. FOR ALL AREAS EXCEPT THE UPPER PENINSULA, OPEN CUT CONSTRUCTION WORK SHALL ALSO BE CONSTRUED TO MEAN WATERFRONT WORK, PIERS, DOCKS, SEAWALLS, BREAKWALLS, MARINAS AND ALL INCIDENTAL WORK. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY STRUCTURAL MODIFICATIONS, ALTERATIONS, ADDITIONS AND REPAIRS TO BUILDINGS, OR HIGHWAY WORK, INCLUDING ROADS, STREETS, BRIDGE CONSTRUCTION AND PARKING LOTS OR STEEL ERECTION WORK AND EXCAVATION FOR THE BUILDING ITSELF AND BACK FILLING INSIDE OF AND WITHIN 5 FT. OF THE BUILDING AND FOUNDATIONS, FOOTINGS AND PIERS FOR THE BUILDING. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY WORK COVERED UNDER TUNNEL, SHAFT AND CAISSON WORK. (ZONE 2 - LIVINGSTON COUNTY (EAST OF M-151 (OAK GROVE RD.)); MONROE AND WASHTENAW COUNTIES) | $34.10 | $17.45 | $51.55 | MI20260001 Highway |
| Clare + 83 more | LABORERS - OPEN CUT: GROUP 2- MORTAR AND MATERIAL MIXER, CONCRETE FORM PERSON, SIGNAL PERSON, WELL POINT PERSON, MANHOLE, HEADWALL AND CATCH BASIN BUILDER, HEADWALL, SEAWALL, BREAKWALL AND DOCK BUILDER. SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARATION, LAND BALANCING, DEMOLITION AND REMOVAL OF CONCRETE AND UNDERGROUND APPURTENANCES, GRADING, PAVING, SEWERS, UTILITIES AND IMPROVEMENTS; RETENTION, OXIDATION, FLOCCULATION AND IRRIGATION FACILITIES, AND ALSO INCLUDING BUT NOT LIMITED TO UNDERGROUND PIPING, CONDUITS, STEEL SHEETING FOR UNDERGROUND CONSTRUCTION, AND ALL WORK INCIDENTAL THERETO, AND GENERAL EXCAVATION. FOR ALL AREAS EXCEPT THE UPPER PENINSULA, OPEN CUT CONSTRUCTION WORK SHALL ALSO BE CONSTRUED TO MEAN WATERFRONT WORK, PIERS, DOCKS, SEAWALLS, BREAKWALLS, MARINAS AND ALL INCIDENTAL WORK. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY STRUCTURAL MODIFICATIONS, ALTERATIONS, ADDITIONS AND REPAIRS TO BUILDINGS, OR HIGHWAY WORK, INCLUDING ROADS, STREETS, BRIDGE CONSTRUCTION AND PARKING LOTS OR STEEL ERECTION WORK AND EXCAVATION FOR THE BUILDING ITSELF AND BACK FILLING INSIDE OF AND WITHIN 5 FT. OF THE BUILDING AND FOUNDATIONS, FOOTINGS AND PIERS FOR THE BUILDING. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY WORK COVERED UNDER TUNNEL, SHAFT AND CAISSON WORK. (ZONE 3 - CLINTON, EATON, GENESEE, HILLSDALE AND INGHAM COUNTIES; IONIA COUNTY (CITY OF PORTLAND); JACKSON, LAPEER AND LENAWEE COUNTIES; LIVINGSTON COUNTY (WEST OF M-151 OAK GROVE RD.); SANILAC, ST. CLAIR AND SHIAWASSEE COUNTIES) | $32.29 | $17.45 | $49.74 | MI20260001 Highway |
| Clare + 83 more | LABORERS - OPEN CUT: GROUP 2- MORTAR AND MATERIAL MIXER, CONCRETE FORM PERSON, SIGNAL PERSON, WELL POINT PERSON, MANHOLE, HEADWALL AND CATCH BASIN BUILDER, HEADWALL, SEAWALL, BREAKWALL AND DOCK BUILDER.MORTAR AND MATERIAL MIXER, CONCRETE FORM PERSON, SIGNAL PERSON, WELL POINT PERSON, MANHOLE, HEADWALL AND CATCH BASIN BUILDER, HEADWALL, SEAWALL, BREAKWALL AND DOCK BUILDER SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARATION, LAND BALANCING, DEMOLITION AND REMOVAL OF CONCRETE AND UNDERGROUND APPURTENANCES, GRADING, PAVING, SEWERS, UTILITIES AND IMPROVEMENTS; RETENTION, OXIDATION, FLOCCULATION AND IRRIGATION FACILITIES, AND ALSO INCLUDING BUT NOT LIMITED TO UNDERGROUND PIPING, CONDUITS, STEEL SHEETING FOR UNDERGROUND CONSTRUCTION, AND ALL WORK INCIDENTAL THERETO, AND GENERAL EXCAVATION. FOR ALL AREAS EXCEPT THE UPPER PENINSULA, OPEN CUT CONSTRUCTION WORK SHALL ALSO BE CONSTRUED TO MEAN WATERFRONT WORK, PIERS, DOCKS, SEAWALLS, BREAKWALLS, MARINAS AND ALL INCIDENTAL WORK. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY STRUCTURAL MODIFICATIONS, ALTERATIONS, ADDITIONS AND REPAIRS TO BUILDINGS, OR HIGHWAY WORK, INCLUDING ROADS, STREETS, BRIDGE CONSTRUCTION AND PARKING LOTS OR STEEL ERECTION WORK AND EXCAVATION FOR THE BUILDING ITSELF AND BACK FILLING INSIDE OF AND WITHIN 5 FT. OF THE BUILDING AND FOUNDATIONS, FOOTINGS AND PIERS FOR THE BUILDING. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY WORK COVERED UNDER TUNNEL, SHAFT AND CAISSON WORK. (ZONE 5 - ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC, MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT COUNTIES) | $30.09 | $19.45 | $49.54 | MI20260001 Highway |
| Clare + 83 more | LABORERS - OPEN CUT: GROUP 2- MORTAR AND MATERIAL MIXER, CONCRETE FORM PERSON, SIGNAL PERSON, WELL POINT PERSON, MANHOLE, HEADWALL AND CATCH BASIN BUILDER, HEADWALL, SEAWALL, BREAKWALL AND DOCK BUILDER.SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARATION, LAND BALANCING, DEMOLITION AND REMOVAL OF CONCRETE AND UNDERGROUND APPURTENANCES, GRADING, PAVING, SEWERS, UTILITIES AND IMPROVEMENTS; RETENTION, OXIDATION, FLOCCULATION AND IRRIGATION FACILITIES, AND ALSO INCLUDING BUT NOT LIMITED TO UNDERGROUND PIPING, CONDUITS, STEEL SHEETING FOR UNDERGROUND CONSTRUCTION, AND ALL WORK INCIDENTAL THERETO, AND GENERAL EXCAVATION. FOR ALL AREAS EXCEPT THE UPPER PENINSULA, OPEN CUT CONSTRUCTION WORK SHALL ALSO BE CONSTRUED TO MEAN WATERFRONT WORK, PIERS, DOCKS, SEAWALLS, BREAKWALLS, MARINAS AND ALL INCIDENTAL WORK. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY STRUCTURAL MODIFICATIONS, ALTERATIONS, ADDITIONS AND REPAIRS TO BUILDINGS, OR HIGHWAY WORK, INCLUDING ROADS, STREETS, BRIDGE CONSTRUCTION AND PARKING LOTS OR STEEL ERECTION WORK AND EXCAVATION FOR THE BUILDING ITSELF AND BACK FILLING INSIDE OF AND WITHIN 5 FT. OF THE BUILDING AND FOUNDATIONS, FOOTINGS AND PIERS FOR THE BUILDING. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY WORK COVERED UNDER TUNNEL, SHAFT AND CAISSON WORK. (ZONE 4 - ALCONA, ALLEGAN, ALPENA, ANTRIM, ARENAC, BARRY, BAY, BENZIE, BERRIEN, BRANCH, CALHOUN, CASS, CHARLEVOIX, CHEBOYGAN, CLARE, CRAWFORD, EMMET, GLADWIN, GRAND TRAVERSE, GRATIOT AND HURON COUNTIES; IONIA COUNTY (EXCEPT THE CITY OF PORTLAND); IOSCO, ISABELLA, KALAMAZOO, KALKASKA, KENT, LAKE,LEELANAU, MANISTEE, MASON, MECOSTA, MIDLAND, MISSAUKEE, MONTCALM, MONTMORENCY, MUSKEGON, NEWAYGO, OCEANA, OGEMAW, OSCEOLA, OSCODA, OTSEGO, OTTAWA, PRESQUE ISLE, ROSCOOMMON, SAGINAW, ST. JOSEPH, TUSCOLA, VAN BUREN, AND WEXFORD COUNTIES) | $30.72 | $18.45 | $49.17 | MI20260001 Highway |
| Clare + 83 more | LABORERS - OPEN CUT: GROUP 3- AIR, GASOLINE AND ELECTRIC TOOL OPERATOR, VIBRATOR OPERATOR, DRILLER, PUMP PERSON, TAR KETTLE OPERATOR, BRACER, RODDER, REINFORCED STEEL OR MESH PERSON (E.G., WIRE MESH, STEEL MATS, DOWEL BARS, ETC.), WELDER, PIPE JACKING AND BORING PERSON, WAGON DRILL AND AIR TRACK OPERATOR AND CONCRETE SAW OPERATOR (UNDER 40 H.P.), WINDLASS AND TUGGER PERSON AND DIRECTIONAL BORING PERSON. AIR, GASOLINE AND ELECTRIC TOOL OPERATOR, VIBRATOR OPERATOR, DRILLER, PUMP PERSON, TAR KETTLE OPERATOR, BRACER, RODDER, REINFORCED STEEL OR MESH PERSON (E.G., WIRE MESH, STEEL MATS, DOWEL BARS, ETC.), WELDER, PIPE JACKING AND BORING PERSON, WAGON DRILL AND AIR TRACK OPERATOR AND CONCRETE SAW OPERATOR (UNDER 40 H.P.), WINDLASS AND TUGGER PERSON AND DIRECTIONAL BORING PERSON SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARATION, LAND BALANCING, DEMOLITION AND REMOVAL OF CONCRETE AND UNDERGROUND APPURTENANCES, GRADING, PAVING, SEWERS, UTILITIES AND IMPROVEMENTS; RETENTION, OXIDATION, FLOCCULATION AND IRRIGATION FACILITIES, AND ALSO INCLUDING BUT NOT LIMITED TO UNDERGROUND PIPING, CONDUITS, STEEL SHEETING FOR UNDERGROUND CONSTRUCTION, AND ALL WORK INCIDENTAL THERETO, AND GENERAL EXCAVATION. FOR ALL AREAS EXCEPT THE UPPER PENINSULA, OPEN CUT CONSTRUCTION WORK SHALL ALSO BE CONSTRUED TO MEAN WATERFRONT WORK, PIERS, DOCKS, SEAWALLS, BREAKWALLS, MARINAS AND ALL INCIDENTAL WORK. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY STRUCTURAL MODIFICATIONS, ALTERATIONS, ADDITIONS AND REPAIRS TO BUILDINGS, OR HIGHWAY WORK, INCLUDING ROADS, STREETS, BRIDGE CONSTRUCTION AND PARKING LOTS OR STEEL ERECTION WORK AND EXCAVATION FOR THE BUILDING ITSELF AND BACK FILLING INSIDE OF AND WITHIN 5 FT. OF THE BUILDING AND FOUNDATIONS, FOOTINGS AND PIERS FOR THE BUILDING. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY WORK COVERED UNDER TUNNEL, SHAFT AND CAISSON WORK. (ZONE 5 - ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC, MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT COUNTIES) | $26.09 | $19.45 | $45.54 | MI20260001 Highway |
| Clare + 83 more | LABORERS - OPEN CUT: GROUP 3- AIR, GASOLINE AND ELECTRIC TOOL OPERATOR, VIBRATOR OPERATOR, DRILLER, PUMP PERSON, TAR KETTLE OPERATOR, BRACER, RODDER, REINFORCED STEEL OR MESH PERSON (E.G., WIRE MESH, STEEL MATS, DOWEL BARS, ETC.), WELDER, PIPE JACKING AND BORING PERSON, WAGON DRILL AND AIR TRACK OPERATOR AND CONCRETE SAW OPERATOR (UNDER 40 H.P.), WINDLASS AND TUGGER PERSON AND DIRECTIONAL BORING PERSON. SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARATION, LAND BALANCING, DEMOLITION AND REMOVAL OF CONCRETE AND UNDERGROUND APPURTENANCES, GRADING, PAVING, SEWERS, UTILITIES AND IMPROVEMENTS; RETENTION, OXIDATION, FLOCCULATION AND IRRIGATION FACILITIES, AND ALSO INCLUDING BUT NOT LIMITED TO UNDERGROUND PIPING, CONDUITS, STEEL SHEETING FOR UNDERGROUND CONSTRUCTION, AND ALL WORK INCIDENTAL THERETO, AND GENERAL EXCAVATION. FOR ALL AREAS EXCEPT THE UPPER PENINSULA, OPEN CUT CONSTRUCTION WORK SHALL ALSO BE CONSTRUED TO MEAN WATERFRONT WORK, PIERS, DOCKS, SEAWALLS, BREAKWALLS, MARINAS AND ALL INCIDENTAL WORK. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY STRUCTURAL MODIFICATIONS, ALTERATIONS, ADDITIONS AND REPAIRS TO BUILDINGS, OR HIGHWAY WORK, INCLUDING ROADS, STREETS, BRIDGE CONSTRUCTION AND PARKING LOTS OR STEEL ERECTION WORK AND EXCAVATION FOR THE BUILDING ITSELF AND BACK FILLING INSIDE OF AND WITHIN 5 FT. OF THE BUILDING AND FOUNDATIONS, FOOTINGS AND PIERS FOR THE BUILDING. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY WORK COVERED UNDER TUNNEL, SHAFT AND CAISSON WORK. (ZONE 1 - MACOMB, OAKLAND AND WAYNE COUNTIES) | $28.14 | $22.75 | $50.89 | MI20260001 Highway |
| Clare + 83 more | LABORERS - OPEN CUT: GROUP 3- AIR, GASOLINE AND ELECTRIC TOOL OPERATOR, VIBRATOR OPERATOR, DRILLER, PUMP PERSON, TAR KETTLE OPERATOR, BRACER, RODDER, REINFORCED STEEL OR MESH PERSON (E.G., WIRE MESH, STEEL MATS, DOWEL BARS, ETC.), WELDER, PIPE JACKING AND BORING PERSON, WAGON DRILL AND AIR TRACK OPERATOR AND CONCRETE SAW OPERATOR (UNDER 40 H.P.), WINDLASS AND TUGGER PERSON AND DIRECTIONAL BORING PERSON. SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARATION, LAND BALANCING, DEMOLITION AND REMOVAL OF CONCRETE AND UNDERGROUND APPURTENANCES, GRADING, PAVING, SEWERS, UTILITIES AND IMPROVEMENTS; RETENTION, OXIDATION, FLOCCULATION AND IRRIGATION FACILITIES, AND ALSO INCLUDING BUT NOT LIMITED TO UNDERGROUND PIPING, CONDUITS, STEEL SHEETING FOR UNDERGROUND CONSTRUCTION, AND ALL WORK INCIDENTAL THERETO, AND GENERAL EXCAVATION. FOR ALL AREAS EXCEPT THE UPPER PENINSULA, OPEN CUT CONSTRUCTION WORK SHALL ALSO BE CONSTRUED TO MEAN WATERFRONT WORK, PIERS, DOCKS, SEAWALLS, BREAKWALLS, MARINAS AND ALL INCIDENTAL WORK. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY STRUCTURAL MODIFICATIONS, ALTERATIONS, ADDITIONS AND REPAIRS TO BUILDINGS, OR HIGHWAY WORK, INCLUDING ROADS, STREETS, BRIDGE CONSTRUCTION AND PARKING LOTS OR STEEL ERECTION WORK AND EXCAVATION FOR THE BUILDING ITSELF AND BACK FILLING INSIDE OF AND WITHIN 5 FT. OF THE BUILDING AND FOUNDATIONS, FOOTINGS AND PIERS FOR THE BUILDING. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY WORK COVERED UNDER TUNNEL, SHAFT AND CAISSON WORK. (ZONE 2 - LIVINGSTON COUNTY (EAST OF M-151 (OAK GROVE RD.)); MONROE AND WASHTENAW COUNTIES) | $30.10 | $17.45 | $47.55 | MI20260001 Highway |
| Clare + 83 more | LABORERS - OPEN CUT: GROUP 3- AIR, GASOLINE AND ELECTRIC TOOL OPERATOR, VIBRATOR OPERATOR, DRILLER, PUMP PERSON, TAR KETTLE OPERATOR, BRACER, RODDER, REINFORCED STEEL OR MESH PERSON (E.G., WIRE MESH, STEEL MATS, DOWEL BARS, ETC.), WELDER, PIPE JACKING AND BORING PERSON, WAGON DRILL AND AIR TRACK OPERATOR AND CONCRETE SAW OPERATOR (UNDER 40 H.P.), WINDLASS AND TUGGER PERSON AND DIRECTIONAL BORING PERSON. SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARATION, LAND BALANCING, DEMOLITION AND REMOVAL OF CONCRETE AND UNDERGROUND APPURTENANCES, GRADING, PAVING, SEWERS, UTILITIES AND IMPROVEMENTS; RETENTION, OXIDATION, FLOCCULATION AND IRRIGATION FACILITIES, AND ALSO INCLUDING BUT NOT LIMITED TO UNDERGROUND PIPING, CONDUITS, STEEL SHEETING FOR UNDERGROUND CONSTRUCTION, AND ALL WORK INCIDENTAL THERETO, AND GENERAL EXCAVATION. FOR ALL AREAS EXCEPT THE UPPER PENINSULA, OPEN CUT CONSTRUCTION WORK SHALL ALSO BE CONSTRUED TO MEAN WATERFRONT WORK, PIERS, DOCKS, SEAWALLS, BREAKWALLS, MARINAS AND ALL INCIDENTAL WORK. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY STRUCTURAL MODIFICATIONS, ALTERATIONS, ADDITIONS AND REPAIRS TO BUILDINGS, OR HIGHWAY WORK, INCLUDING ROADS, STREETS, BRIDGE CONSTRUCTION AND PARKING LOTS OR STEEL ERECTION WORK AND EXCAVATION FOR THE BUILDING ITSELF AND BACK FILLING INSIDE OF AND WITHIN 5 FT. OF THE BUILDING AND FOUNDATIONS, FOOTINGS AND PIERS FOR THE BUILDING. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY WORK COVERED UNDER TUNNEL, SHAFT AND CAISSON WORK. (ZONE 3 - CLINTON, EATON, GENESEE, HILLSDALE AND INGHAM COUNTIES; IONIA COUNTY (CITY OF PORTLAND); JACKSON, LAPEER AND LENAWEE COUNTIES; LIVINGSTON COUNTY (WEST OF M-151 OAK GROVE RD.); SANILAC, ST. CLAIR AND SHIAWASSEE COUNTIES) | $28.29 | $17.45 | $45.74 | MI20260001 Highway |
| Clare + 83 more | LABORERS - OPEN CUT: GROUP 3- AIR, GASOLINE AND ELECTRIC TOOL OPERATOR, VIBRATOR OPERATOR, DRILLER, PUMP PERSON, TAR KETTLE OPERATOR, BRACER, RODDER, REINFORCED STEEL OR MESH PERSON (E.G., WIRE MESH, STEEL MATS, DOWEL BARS, ETC.), WELDER, PIPE JACKING AND BORING PERSON, WAGON DRILL AND AIR TRACK OPERATOR AND CONCRETE SAW OPERATOR (UNDER 40 H.P.), WINDLASS AND TUGGER PERSON AND DIRECTIONAL BORING PERSON. SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARATION, LAND BALANCING, DEMOLITION AND REMOVAL OF CONCRETE AND UNDERGROUND APPURTENANCES, GRADING, PAVING, SEWERS, UTILITIES AND IMPROVEMENTS; RETENTION, OXIDATION, FLOCCULATION AND IRRIGATION FACILITIES, AND ALSO INCLUDING BUT NOT LIMITED TO UNDERGROUND PIPING, CONDUITS, STEEL SHEETING FOR UNDERGROUND CONSTRUCTION, AND ALL WORK INCIDENTAL THERETO, AND GENERAL EXCAVATION. FOR ALL AREAS EXCEPT THE UPPER PENINSULA, OPEN CUT CONSTRUCTION WORK SHALL ALSO BE CONSTRUED TO MEAN WATERFRONT WORK, PIERS, DOCKS, SEAWALLS, BREAKWALLS, MARINAS AND ALL INCIDENTAL WORK. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY STRUCTURAL MODIFICATIONS, ALTERATIONS, ADDITIONS AND REPAIRS TO BUILDINGS, OR HIGHWAY WORK, INCLUDING ROADS, STREETS, BRIDGE CONSTRUCTION AND PARKING LOTS OR STEEL ERECTION WORK AND EXCAVATION FOR THE BUILDING ITSELF AND BACK FILLING INSIDE OF AND WITHIN 5 FT. OF THE BUILDING AND FOUNDATIONS, FOOTINGS AND PIERS FOR THE BUILDING. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY WORK COVERED UNDER TUNNEL, SHAFT AND CAISSON WORK. (ZONE 4 - ALCONA, ALLEGAN, ALPENA, ANTRIM, ARENAC, BARRY, BAY, BENZIE, BERRIEN, BRANCH, CALHOUN, CASS, CHARLEVOIX, CHEBOYGAN, CLARE, CRAWFORD, EMMET, GLADWIN, GRAND TRAVERSE, GRATIOT AND HURON COUNTIES; IONIA COUNTY (EXCEPT THE CITY OF PORTLAND); IOSCO, ISABELLA, KALAMAZOO, KALKASKA, KENT, LAKE,LEELANAU, MANISTEE, MASON, MECOSTA, MIDLAND, MISSAUKEE, MONTCALM, MONTMORENCY, MUSKEGON, NEWAYGO, OCEANA, OGEMAW, OSCEOLA, OSCODA, OTSEGO, OTTAWA, PRESQUE ISLE, ROSCOOMMON, SAGINAW, ST. JOSEPH, TUSCOLA, VAN BUREN, AND WEXFORD COUNTIES) | $26.72 | $18.45 | $45.17 | MI20260001 Highway |
| Clare + 83 more | LABORERS - OPEN CUT: GROUP 4- TRENCH OR EXCAVATING GRADE PERSON. CONSTRUCTION LABORER SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARATION, LAND BALANCING, DEMOLITION AND REMOVAL OF CONCRETE AND UNDERGROUND APPURTENANCES, GRADING, PAVING, SEWERS, UTILITIES AND IMPROVEMENTS; RETENTION, OXIDATION, FLOCCULATION AND IRRIGATION FACILITIES, AND ALSO INCLUDING BUT NOT LIMITED TO UNDERGROUND PIPING, CONDUITS, STEEL SHEETING FOR UNDERGROUND CONSTRUCTION, AND ALL WORK INCIDENTAL THERETO, AND GENERAL EXCAVATION. FOR ALL AREAS EXCEPT THE UPPER PENINSULA, OPEN CUT CONSTRUCTION WORK SHALL ALSO BE CONSTRUED TO MEAN WATERFRONT WORK, PIERS, DOCKS, SEAWALLS, BREAKWALLS, MARINAS AND ALL INCIDENTAL WORK. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY STRUCTURAL MODIFICATIONS, ALTERATIONS, ADDITIONS AND REPAIRS TO BUILDINGS, OR HIGHWAY WORK, INCLUDING ROADS, STREETS, BRIDGE CONSTRUCTION AND PARKING LOTS OR STEEL ERECTION WORK AND EXCAVATION FOR THE BUILDING ITSELF AND BACK FILLING INSIDE OF AND WITHIN 5 FT. OF THE BUILDING AND FOUNDATIONS, FOOTINGS AND PIERS FOR THE BUILDING. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY WORK COVERED UNDER TUNNEL, SHAFT AND CAISSON WORK. (ZONE 2 - LIVINGSTON COUNTY (EAST OF M-151 (OAK GROVE RD.)); MONROE AND WASHTENAW COUNTIES) | $25.10 | $16.72 | $41.82 | MI20260001 Highway |
| Clare + 83 more | LABORERS - OPEN CUT: GROUP 4- TRENCH OR EXCAVATING GRADE PERSON. CONSTRUCTION LABORER SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARATION, LAND BALANCING, DEMOLITION AND REMOVAL OF CONCRETE AND UNDERGROUND APPURTENANCES, GRADING, PAVING, SEWERS, UTILITIES AND IMPROVEMENTS; RETENTION, OXIDATION, FLOCCULATION AND IRRIGATION FACILITIES, AND ALSO INCLUDING BUT NOT LIMITED TO UNDERGROUND PIPING, CONDUITS, STEEL SHEETING FOR UNDERGROUND CONSTRUCTION, AND ALL WORK INCIDENTAL THERETO, AND GENERAL EXCAVATION. FOR ALL AREAS EXCEPT THE UPPER PENINSULA, OPEN CUT CONSTRUCTION WORK SHALL ALSO BE CONSTRUED TO MEAN WATERFRONT WORK, PIERS, DOCKS, SEAWALLS, BREAKWALLS, MARINAS AND ALL INCIDENTAL WORK. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY STRUCTURAL MODIFICATIONS, ALTERATIONS, ADDITIONS AND REPAIRS TO BUILDINGS, OR HIGHWAY WORK, INCLUDING ROADS, STREETS, BRIDGE CONSTRUCTION AND PARKING LOTS OR STEEL ERECTION WORK AND EXCAVATION FOR THE BUILDING ITSELF AND BACK FILLING INSIDE OF AND WITHIN 5 FT. OF THE BUILDING AND FOUNDATIONS, FOOTINGS AND PIERS FOR THE BUILDING. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY WORK COVERED UNDER TUNNEL, SHAFT AND CAISSON WORK. (ZONE 3 - CLINTON, EATON, GENESEE, HILLSDALE AND INGHAM COUNTIES; IONIA COUNTY (CITY OF PORTLAND); JACKSON, LAPEER AND LENAWEE COUNTIES; LIVINGSTON COUNTY (WEST OF M-151 OAK GROVE RD.); SANILAC, ST. CLAIR AND SHIAWASSEE COUNTIES) | $23.30 | $16.72 | $40.02 | MI20260001 Highway |
| Clare + 83 more | LABORERS - OPEN CUT: GROUP 4- TRENCH OR EXCAVATING GRADE PERSON. CONSTRUCTION LABORER SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARATION, LAND BALANCING, DEMOLITION AND REMOVAL OF CONCRETE AND UNDERGROUND APPURTENANCES, GRADING, PAVING, SEWERS, UTILITIES AND IMPROVEMENTS; RETENTION, OXIDATION, FLOCCULATION AND IRRIGATION FACILITIES, AND ALSO INCLUDING BUT NOT LIMITED TO UNDERGROUND PIPING, CONDUITS, STEEL SHEETING FOR UNDERGROUND CONSTRUCTION, AND ALL WORK INCIDENTAL THERETO, AND GENERAL EXCAVATION. FOR ALL AREAS EXCEPT THE UPPER PENINSULA, OPEN CUT CONSTRUCTION WORK SHALL ALSO BE CONSTRUED TO MEAN WATERFRONT WORK, PIERS, DOCKS, SEAWALLS, BREAKWALLS, MARINAS AND ALL INCIDENTAL WORK. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY STRUCTURAL MODIFICATIONS, ALTERATIONS, ADDITIONS AND REPAIRS TO BUILDINGS, OR HIGHWAY WORK, INCLUDING ROADS, STREETS, BRIDGE CONSTRUCTION AND PARKING LOTS OR STEEL ERECTION WORK AND EXCAVATION FOR THE BUILDING ITSELF AND BACK FILLING INSIDE OF AND WITHIN 5 FT. OF THE BUILDING AND FOUNDATIONS, FOOTINGS AND PIERS FOR THE BUILDING. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY WORK COVERED UNDER TUNNEL, SHAFT AND CAISSON WORK. (ZONE 5 - ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC, MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT COUNTIES) | $22.56 | $16.72 | $39.28 | MI20260001 Highway |
| Clare + 83 more | LABORERS - OPEN CUT: GROUP 4- TRENCH OR EXCAVATING GRADE PERSON. SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARATION, LAND BALANCING, DEMOLITION AND REMOVAL OF CONCRETE AND UNDERGROUND APPURTENANCES, GRADING, PAVING, SEWERS, UTILITIES AND IMPROVEMENTS; RETENTION, OXIDATION, FLOCCULATION AND IRRIGATION FACILITIES, AND ALSO INCLUDING BUT NOT LIMITED TO UNDERGROUND PIPING, CONDUITS, STEEL SHEETING FOR UNDERGROUND CONSTRUCTION, AND ALL WORK INCIDENTAL THERETO, AND GENERAL EXCAVATION. FOR ALL AREAS EXCEPT THE UPPER PENINSULA, OPEN CUT CONSTRUCTION WORK SHALL ALSO BE CONSTRUED TO MEAN WATERFRONT WORK, PIERS, DOCKS, SEAWALLS, BREAKWALLS, MARINAS AND ALL INCIDENTAL WORK. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY STRUCTURAL MODIFICATIONS, ALTERATIONS, ADDITIONS AND REPAIRS TO BUILDINGS, OR HIGHWAY WORK, INCLUDING ROADS, STREETS, BRIDGE CONSTRUCTION AND PARKING LOTS OR STEEL ERECTION WORK AND EXCAVATION FOR THE BUILDING ITSELF AND BACK FILLING INSIDE OF AND WITHIN 5 FT. OF THE BUILDING AND FOUNDATIONS, FOOTINGS AND PIERS FOR THE BUILDING. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY WORK COVERED UNDER TUNNEL, SHAFT AND CAISSON WORK. (ZONE 1 - MACOMB, OAKLAND AND WAYNE COUNTIES) | $23.71 | $16.72 | $40.43 | MI20260001 Highway |
| Clare + 83 more | LABORERS - OPEN CUT: GROUP 4- TRENCH OR EXCAVATING GRADE PERSON. SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARATION, LAND BALANCING, DEMOLITION AND REMOVAL OF CONCRETE AND UNDERGROUND APPURTENANCES, GRADING, PAVING, SEWERS, UTILITIES AND IMPROVEMENTS; RETENTION, OXIDATION, FLOCCULATION AND IRRIGATION FACILITIES, AND ALSO INCLUDING BUT NOT LIMITED TO UNDERGROUND PIPING, CONDUITS, STEEL SHEETING FOR UNDERGROUND CONSTRUCTION, AND ALL WORK INCIDENTAL THERETO, AND GENERAL EXCAVATION. FOR ALL AREAS EXCEPT THE UPPER PENINSULA, OPEN CUT CONSTRUCTION WORK SHALL ALSO BE CONSTRUED TO MEAN WATERFRONT WORK, PIERS, DOCKS, SEAWALLS, BREAKWALLS, MARINAS AND ALL INCIDENTAL WORK. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY STRUCTURAL MODIFICATIONS, ALTERATIONS, ADDITIONS AND REPAIRS TO BUILDINGS, OR HIGHWAY WORK, INCLUDING ROADS, STREETS, BRIDGE CONSTRUCTION AND PARKING LOTS OR STEEL ERECTION WORK AND EXCAVATION FOR THE BUILDING ITSELF AND BACK FILLING INSIDE OF AND WITHIN 5 FT. OF THE BUILDING AND FOUNDATIONS, FOOTINGS AND PIERS FOR THE BUILDING. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY WORK COVERED UNDER TUNNEL, SHAFT AND CAISSON WORK. (ZONE 4 - ALCONA, ALLEGAN, ALPENA, ANTRIM, ARENAC, BARRY, BAY, BENZIE, BERRIEN, BRANCH, CALHOUN, CASS, CHARLEVOIX, CHEBOYGAN, CLARE, CRAWFORD, EMMET, GLADWIN, GRAND TRAVERSE, GRATIOT AND HURON COUNTIES; IONIA COUNTY (EXCEPT THE CITY OF PORTLAND); IOSCO, ISABELLA, KALAMAZOO, KALKASKA, KENT, LAKE,LEELANAU, MANISTEE, MASON, MECOSTA, MIDLAND, MISSAUKEE, MONTCALM, MONTMORENCY, MUSKEGON, NEWAYGO, OCEANA, OGEMAW, OSCEOLA, OSCODA, OTSEGO, OTTAWA, PRESQUE ISLE, ROSCOOMMON, SAGINAW, ST. JOSEPH, TUSCOLA, VAN BUREN, AND WEXFORD COUNTIES) | $22.33 | $16.72 | $39.05 | MI20260001 Highway |
| Clare + 83 more | LABORERS - OPEN CUT: GROUP 5- PIE LAYER (INCLUDING CROCK, METAL PIPE, MULTI-PLATE OR OTHER CONDUITS). CONSTRUCTION LABORER SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARATION, LAND BALANCING, DEMOLITION AND REMOVAL OF CONCRETE AND UNDERGROUND APPURTENANCES, GRADING, PAVING, SEWERS, UTILITIES AND IMPROVEMENTS; RETENTION, OXIDATION, FLOCCULATION AND IRRIGATION FACILITIES, AND ALSO INCLUDING BUT NOT LIMITED TO UNDERGROUND PIPING, CONDUITS, STEEL SHEETING FOR UNDERGROUND CONSTRUCTION, AND ALL WORK INCIDENTAL THERETO, AND GENERAL EXCAVATION. FOR ALL AREAS EXCEPT THE UPPER PENINSULA, OPEN CUT CONSTRUCTION WORK SHALL ALSO BE CONSTRUED TO MEAN WATERFRONT WORK, PIERS, DOCKS, SEAWALLS, BREAKWALLS, MARINAS AND ALL INCIDENTAL WORK. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY STRUCTURAL MODIFICATIONS, ALTERATIONS, ADDITIONS AND REPAIRS TO BUILDINGS, OR HIGHWAY WORK, INCLUDING ROADS, STREETS, BRIDGE CONSTRUCTION AND PARKING LOTS OR STEEL ERECTION WORK AND EXCAVATION FOR THE BUILDING ITSELF AND BACK FILLING INSIDE OF AND WITHIN 5 FT. OF THE BUILDING AND FOUNDATIONS, FOOTINGS AND PIERS FOR THE BUILDING. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY WORK COVERED UNDER TUNNEL, SHAFT AND CAISSON WORK. (ZONE 2 - LIVINGSTON COUNTY (EAST OF M-151 (OAK GROVE RD.)); MONROE AND WASHTENAW COUNTIES) | $25.25 | $16.72 | $41.97 | MI20260001 Highway |
| Clare + 83 more | LABORERS - OPEN CUT: GROUP 5- PIE LAYER (INCLUDING CROCK, METAL PIPE, MULTI-PLATE OR OTHER CONDUITS). CONSTRUCTION LABORER SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARATION, LAND BALANCING, DEMOLITION AND REMOVAL OF CONCRETE AND UNDERGROUND APPURTENANCES, GRADING, PAVING, SEWERS, UTILITIES AND IMPROVEMENTS; RETENTION, OXIDATION, FLOCCULATION AND IRRIGATION FACILITIES, AND ALSO INCLUDING BUT NOT LIMITED TO UNDERGROUND PIPING, CONDUITS, STEEL SHEETING FOR UNDERGROUND CONSTRUCTION, AND ALL WORK INCIDENTAL THERETO, AND GENERAL EXCAVATION. FOR ALL AREAS EXCEPT THE UPPER PENINSULA, OPEN CUT CONSTRUCTION WORK SHALL ALSO BE CONSTRUED TO MEAN WATERFRONT WORK, PIERS, DOCKS, SEAWALLS, BREAKWALLS, MARINAS AND ALL INCIDENTAL WORK. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY STRUCTURAL MODIFICATIONS, ALTERATIONS, ADDITIONS AND REPAIRS TO BUILDINGS, OR HIGHWAY WORK, INCLUDING ROADS, STREETS, BRIDGE CONSTRUCTION AND PARKING LOTS OR STEEL ERECTION WORK AND EXCAVATION FOR THE BUILDING ITSELF AND BACK FILLING INSIDE OF AND WITHIN 5 FT. OF THE BUILDING AND FOUNDATIONS, FOOTINGS AND PIERS FOR THE BUILDING. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY WORK COVERED UNDER TUNNEL, SHAFT AND CAISSON WORK. (ZONE 3 - CLINTON, EATON, GENESEE, HILLSDALE AND INGHAM COUNTIES; IONIA COUNTY (CITY OF PORTLAND); JACKSON, LAPEER AND LENAWEE COUNTIES; LIVINGSTON COUNTY (WEST OF M-151 OAK GROVE RD.); SANILAC, ST. CLAIR AND SHIAWASSEE COUNTIES) | $23.44 | $16.72 | $40.16 | MI20260001 Highway |
| Clare + 83 more | LABORERS - OPEN CUT: GROUP 5- PIE LAYER (INCLUDING CROCK, METAL PIPE, MULTI-PLATE OR OTHER CONDUITS). CONSTRUCTION LABORER SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARATION, LAND BALANCING, DEMOLITION AND REMOVAL OF CONCRETE AND UNDERGROUND APPURTENANCES, GRADING, PAVING, SEWERS, UTILITIES AND IMPROVEMENTS; RETENTION, OXIDATION, FLOCCULATION AND IRRIGATION FACILITIES, AND ALSO INCLUDING BUT NOT LIMITED TO UNDERGROUND PIPING, CONDUITS, STEEL SHEETING FOR UNDERGROUND CONSTRUCTION, AND ALL WORK INCIDENTAL THERETO, AND GENERAL EXCAVATION. FOR ALL AREAS EXCEPT THE UPPER PENINSULA, OPEN CUT CONSTRUCTION WORK SHALL ALSO BE CONSTRUED TO MEAN WATERFRONT WORK, PIERS, DOCKS, SEAWALLS, BREAKWALLS, MARINAS AND ALL INCIDENTAL WORK. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY STRUCTURAL MODIFICATIONS, ALTERATIONS, ADDITIONS AND REPAIRS TO BUILDINGS, OR HIGHWAY WORK, INCLUDING ROADS, STREETS, BRIDGE CONSTRUCTION AND PARKING LOTS OR STEEL ERECTION WORK AND EXCAVATION FOR THE BUILDING ITSELF AND BACK FILLING INSIDE OF AND WITHIN 5 FT. OF THE BUILDING AND FOUNDATIONS, FOOTINGS AND PIERS FOR THE BUILDING. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY WORK COVERED UNDER TUNNEL, SHAFT AND CAISSON WORK. (ZONE 5 - ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC, MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT COUNTIES) | $22.34 | $16.72 | $39.06 | MI20260001 Highway |
| Clare + 83 more | LABORERS - OPEN CUT: GROUP 5- PIE LAYER (INCLUDING CROCK, METAL PIPE, MULTI-PLATE OR OTHER CONDUITS). SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARATION, LAND BALANCING, DEMOLITION AND REMOVAL OF CONCRETE AND UNDERGROUND APPURTENANCES, GRADING, PAVING, SEWERS, UTILITIES AND IMPROVEMENTS; RETENTION, OXIDATION, FLOCCULATION AND IRRIGATION FACILITIES, AND ALSO INCLUDING BUT NOT LIMITED TO UNDERGROUND PIPING, CONDUITS, STEEL SHEETING FOR UNDERGROUND CONSTRUCTION, AND ALL WORK INCIDENTAL THERETO, AND GENERAL EXCAVATION. FOR ALL AREAS EXCEPT THE UPPER PENINSULA, OPEN CUT CONSTRUCTION WORK SHALL ALSO BE CONSTRUED TO MEAN WATERFRONT WORK, PIERS, DOCKS, SEAWALLS, BREAKWALLS, MARINAS AND ALL INCIDENTAL WORK. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY STRUCTURAL MODIFICATIONS, ALTERATIONS, ADDITIONS AND REPAIRS TO BUILDINGS, OR HIGHWAY WORK, INCLUDING ROADS, STREETS, BRIDGE CONSTRUCTION AND PARKING LOTS OR STEEL ERECTION WORK AND EXCAVATION FOR THE BUILDING ITSELF AND BACK FILLING INSIDE OF AND WITHIN 5 FT. OF THE BUILDING AND FOUNDATIONS, FOOTINGS AND PIERS FOR THE BUILDING. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY WORK COVERED UNDER TUNNEL, SHAFT AND CAISSON WORK. (ZONE 1 - MACOMB, OAKLAND AND WAYNE COUNTIES) | $24.17 | $16.72 | $40.89 | MI20260001 Highway |
| Clare + 83 more | LABORERS - OPEN CUT: GROUP 5- PIE LAYER (INCLUDING CROCK, METAL PIPE, MULTI-PLATE OR OTHER CONDUITS). SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARATION, LAND BALANCING, DEMOLITION AND REMOVAL OF CONCRETE AND UNDERGROUND APPURTENANCES, GRADING, PAVING, SEWERS, UTILITIES AND IMPROVEMENTS; RETENTION, OXIDATION, FLOCCULATION AND IRRIGATION FACILITIES, AND ALSO INCLUDING BUT NOT LIMITED TO UNDERGROUND PIPING, CONDUITS, STEEL SHEETING FOR UNDERGROUND CONSTRUCTION, AND ALL WORK INCIDENTAL THERETO, AND GENERAL EXCAVATION. FOR ALL AREAS EXCEPT THE UPPER PENINSULA, OPEN CUT CONSTRUCTION WORK SHALL ALSO BE CONSTRUED TO MEAN WATERFRONT WORK, PIERS, DOCKS, SEAWALLS, BREAKWALLS, MARINAS AND ALL INCIDENTAL WORK. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY STRUCTURAL MODIFICATIONS, ALTERATIONS, ADDITIONS AND REPAIRS TO BUILDINGS, OR HIGHWAY WORK, INCLUDING ROADS, STREETS, BRIDGE CONSTRUCTION AND PARKING LOTS OR STEEL ERECTION WORK AND EXCAVATION FOR THE BUILDING ITSELF AND BACK FILLING INSIDE OF AND WITHIN 5 FT. OF THE BUILDING AND FOUNDATIONS, FOOTINGS AND PIERS FOR THE BUILDING. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY WORK COVERED UNDER TUNNEL, SHAFT AND CAISSON WORK. (ZONE 4 - ALCONA, ALLEGAN, ALPENA, ANTRIM, ARENAC, BARRY, BAY, BENZIE, BERRIEN, BRANCH, CALHOUN, CASS, CHARLEVOIX, CHEBOYGAN, CLARE, CRAWFORD, EMMET, GLADWIN, GRAND TRAVERSE, GRATIOT AND HURON COUNTIES; IONIA COUNTY (EXCEPT THE CITY OF PORTLAND); IOSCO, ISABELLA, KALAMAZOO, KALKASKA, KENT, LAKE,LEELANAU, MANISTEE, MASON, MECOSTA, MIDLAND, MISSAUKEE, MONTCALM, MONTMORENCY, MUSKEGON, NEWAYGO, OCEANA, OGEMAW, OSCEOLA, OSCODA, OTSEGO, OTTAWA, PRESQUE ISLE, ROSCOOMMON, SAGINAW, ST. JOSEPH, TUSCOLA, VAN BUREN, AND WEXFORD COUNTIES) | $22.45 | $16.72 | $39.17 | MI20260001 Highway |
| Clare + 83 more | LABORERS - OPEN CUT: GROUP 6- GROUTING MAN, AUDIO-VIDUAL TELEVISION OPERATIONS AND ALL OTHER OPERATIONS IN CONNECTION WITH CLOSED CIRCUIT TELEVITION INSPECTION, PIPE CLEANING AND PIPE RELINING WORK AND THE INSTALLATION AND REPAIR OF WATER SERVICE PIPE AND APPURTENANCES. CONSTRUCTION LABORER SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARATION, LAND BALANCING, DEMOLITION AND REMOVAL OF CONCRETE AND UNDERGROUND APPURTENANCES, GRADING, PAVING, SEWERS, UTILITIES AND IMPROVEMENTS; RETENTION, OXIDATION, FLOCCULATION AND IRRIGATION FACILITIES, AND ALSO INCLUDING BUT NOT LIMITED TO UNDERGROUND PIPING, CONDUITS, STEEL SHEETING FOR UNDERGROUND CONSTRUCTION, AND ALL WORK INCIDENTAL THERETO, AND GENERAL EXCAVATION. FOR ALL AREAS EXCEPT THE UPPER PENINSULA, OPEN CUT CONSTRUCTION WORK SHALL ALSO BE CONSTRUED TO MEAN WATERFRONT WORK, PIERS, DOCKS, SEAWALLS, BREAKWALLS, MARINAS AND ALL INCIDENTAL WORK. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY STRUCTURAL MODIFICATIONS, ALTERATIONS, ADDITIONS AND REPAIRS TO BUILDINGS, OR HIGHWAY WORK, INCLUDING ROADS, STREETS, BRIDGE CONSTRUCTION AND PARKING LOTS OR STEEL ERECTION WORK AND EXCAVATION FOR THE BUILDING ITSELF AND BACK FILLING INSIDE OF AND WITHIN 5 FT. OF THE BUILDING AND FOUNDATIONS, FOOTINGS AND PIERS FOR THE BUILDING. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY WORK COVERED UNDER TUNNEL, SHAFT AND CAISSON WORK. (ZONE 2 - LIVINGSTON COUNTY (EAST OF M-151 (OAK GROVE RD.)); MONROE AND WASHTENAW COUNTIES) | $22.55 | $16.72 | $39.27 | MI20260001 Highway |
| Clare + 83 more | LABORERS - OPEN CUT: GROUP 6- GROUTING MAN, AUDIO-VIDUAL TELEVISION OPERATIONS AND ALL OTHER OPERATIONS IN CONNECTION WITH CLOSED CIRCUIT TELEVITION INSPECTION, PIPE CLEANING AND PIPE RELINING WORK AND THE INSTALLATION AND REPAIR OF WATER SERVICE PIPE AND APPURTENANCES. SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARATION, LAND BALANCING, DEMOLITION AND REMOVAL OF CONCRETE AND UNDERGROUND APPURTENANCES, GRADING, PAVING, SEWERS, UTILITIES AND IMPROVEMENTS; RETENTION, OXIDATION, FLOCCULATION AND IRRIGATION FACILITIES, AND ALSO INCLUDING BUT NOT LIMITED TO UNDERGROUND PIPING, CONDUITS, STEEL SHEETING FOR UNDERGROUND CONSTRUCTION, AND ALL WORK INCIDENTAL THERETO, AND GENERAL EXCAVATION. FOR ALL AREAS EXCEPT THE UPPER PENINSULA, OPEN CUT CONSTRUCTION WORK SHALL ALSO BE CONSTRUED TO MEAN WATERFRONT WORK, PIERS, DOCKS, SEAWALLS, BREAKWALLS, MARINAS AND ALL INCIDENTAL WORK. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY STRUCTURAL MODIFICATIONS, ALTERATIONS, ADDITIONS AND REPAIRS TO BUILDINGS, OR HIGHWAY WORK, INCLUDING ROADS, STREETS, BRIDGE CONSTRUCTION AND PARKING LOTS OR STEEL ERECTION WORK AND EXCAVATION FOR THE BUILDING ITSELF AND BACK FILLING INSIDE OF AND WITHIN 5 FT. OF THE BUILDING AND FOUNDATIONS, FOOTINGS AND PIERS FOR THE BUILDING. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY WORK COVERED UNDER TUNNEL, SHAFT AND CAISSON WORK. (ZONE 1 - MACOMB, OAKLAND AND WAYNE COUNTIES) | $22.00 | $16.72 | $38.72 | MI20260001 Highway |
| Clare + 83 more | LABORERS - OPEN CUT: GROUP 6- GROUTING MAN, AUDIO-VIDUAL TELEVISION OPERATIONS AND ALL OTHER OPERATIONS IN CONNECTION WITH CLOSED CIRCUIT TELEVITION INSPECTION, PIPE CLEANING AND PIPE RELINING WORK AND THE INSTALLATION AND REPAIR OF WATER SERVICE PIPE AND APPURTENANCES. SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARATION, LAND BALANCING, DEMOLITION AND REMOVAL OF CONCRETE AND UNDERGROUND APPURTENANCES, GRADING, PAVING, SEWERS, UTILITIES AND IMPROVEMENTS; RETENTION, OXIDATION, FLOCCULATION AND IRRIGATION FACILITIES, AND ALSO INCLUDING BUT NOT LIMITED TO UNDERGROUND PIPING, CONDUITS, STEEL SHEETING FOR UNDERGROUND CONSTRUCTION, AND ALL WORK INCIDENTAL THERETO, AND GENERAL EXCAVATION. FOR ALL AREAS EXCEPT THE UPPER PENINSULA, OPEN CUT CONSTRUCTION WORK SHALL ALSO BE CONSTRUED TO MEAN WATERFRONT WORK, PIERS, DOCKS, SEAWALLS, BREAKWALLS, MARINAS AND ALL INCIDENTAL WORK. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY STRUCTURAL MODIFICATIONS, ALTERATIONS, ADDITIONS AND REPAIRS TO BUILDINGS, OR HIGHWAY WORK, INCLUDING ROADS, STREETS, BRIDGE CONSTRUCTION AND PARKING LOTS OR STEEL ERECTION WORK AND EXCAVATION FOR THE BUILDING ITSELF AND BACK FILLING INSIDE OF AND WITHIN 5 FT. OF THE BUILDING AND FOUNDATIONS, FOOTINGS AND PIERS FOR THE BUILDING. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY WORK COVERED UNDER TUNNEL, SHAFT AND CAISSON WORK. (ZONE 3 - CLINTON, EATON, GENESEE, HILLSDALE AND INGHAM COUNTIES; IONIA COUNTY (CITY OF PORTLAND); JACKSON, LAPEER AND LENAWEE COUNTIES; LIVINGSTON COUNTY (WEST OF M-151 OAK GROVE RD.); SANILAC, ST. CLAIR AND SHIAWASSEE COUNTIES) | $20.74 | $16.72 | $37.46 | MI20260001 Highway |
| Clare + 83 more | LABORERS - OPEN CUT: GROUP 6- GROUTING MAN, AUDIO-VIDUAL TELEVISION OPERATIONS AND ALL OTHER OPERATIONS IN CONNECTION WITH CLOSED CIRCUIT TELEVITION INSPECTION, PIPE CLEANING AND PIPE RELINING WORK AND THE INSTALLATION AND REPAIR OF WATER SERVICE PIPE AND APPURTENANCES. SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARATION, LAND BALANCING, DEMOLITION AND REMOVAL OF CONCRETE AND UNDERGROUND APPURTENANCES, GRADING, PAVING, SEWERS, UTILITIES AND IMPROVEMENTS; RETENTION, OXIDATION, FLOCCULATION AND IRRIGATION FACILITIES, AND ALSO INCLUDING BUT NOT LIMITED TO UNDERGROUND PIPING, CONDUITS, STEEL SHEETING FOR UNDERGROUND CONSTRUCTION, AND ALL WORK INCIDENTAL THERETO, AND GENERAL EXCAVATION. FOR ALL AREAS EXCEPT THE UPPER PENINSULA, OPEN CUT CONSTRUCTION WORK SHALL ALSO BE CONSTRUED TO MEAN WATERFRONT WORK, PIERS, DOCKS, SEAWALLS, BREAKWALLS, MARINAS AND ALL INCIDENTAL WORK. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY STRUCTURAL MODIFICATIONS, ALTERATIONS, ADDITIONS AND REPAIRS TO BUILDINGS, OR HIGHWAY WORK, INCLUDING ROADS, STREETS, BRIDGE CONSTRUCTION AND PARKING LOTS OR STEEL ERECTION WORK AND EXCAVATION FOR THE BUILDING ITSELF AND BACK FILLING INSIDE OF AND WITHIN 5 FT. OF THE BUILDING AND FOUNDATIONS, FOOTINGS AND PIERS FOR THE BUILDING. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY WORK COVERED UNDER TUNNEL, SHAFT AND CAISSON WORK. (ZONE 4 - ALCONA, ALLEGAN, ALPENA, ANTRIM, ARENAC, BARRY, BAY, BENZIE, BERRIEN, BRANCH, CALHOUN, CASS, CHARLEVOIX, CHEBOYGAN, CLARE, CRAWFORD, EMMET, GLADWIN, GRAND TRAVERSE, GRATIOT AND HURON COUNTIES; IONIA COUNTY (EXCEPT THE CITY OF PORTLAND); IOSCO, ISABELLA, KALAMAZOO, KALKASKA, KENT, LAKE,LEELANAU, MANISTEE, MASON, MECOSTA, MIDLAND, MISSAUKEE, MONTCALM, MONTMORENCY, MUSKEGON, NEWAYGO, OCEANA, OGEMAW, OSCEOLA, OSCODA, OTSEGO, OTTAWA, PRESQUE ISLE, ROSCOOMMON, SAGINAW, ST. JOSEPH, TUSCOLA, VAN BUREN, AND WEXFORD COUNTIES) | $19.67 | $16.72 | $36.39 | MI20260001 Highway |
| Clare + 83 more | LABORERS - OPEN CUT: GROUP 6- GROUTING MAN, AUDIO-VIDUAL TELEVISION OPERATIONS AND ALL OTHER OPERATIONS IN CONNECTION WITH CLOSED CIRCUIT TELEVITION INSPECTION, PIPE CLEANING AND PIPE RELINING WORK AND THE INSTALLATION AND REPAIR OF WATER SERVICE PIPE AND APPURTENANCES. SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARATION, LAND BALANCING, DEMOLITION AND REMOVAL OF CONCRETE AND UNDERGROUND APPURTENANCES, GRADING, PAVING, SEWERS, UTILITIES AND IMPROVEMENTS; RETENTION, OXIDATION, FLOCCULATION AND IRRIGATION FACILITIES, AND ALSO INCLUDING BUT NOT LIMITED TO UNDERGROUND PIPING, CONDUITS, STEEL SHEETING FOR UNDERGROUND CONSTRUCTION, AND ALL WORK INCIDENTAL THERETO, AND GENERAL EXCAVATION. FOR ALL AREAS EXCEPT THE UPPER PENINSULA, OPEN CUT CONSTRUCTION WORK SHALL ALSO BE CONSTRUED TO MEAN WATERFRONT WORK, PIERS, DOCKS, SEAWALLS, BREAKWALLS, MARINAS AND ALL INCIDENTAL WORK. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY STRUCTURAL MODIFICATIONS, ALTERATIONS, ADDITIONS AND REPAIRS TO BUILDINGS, OR HIGHWAY WORK, INCLUDING ROADS, STREETS, BRIDGE CONSTRUCTION AND PARKING LOTS OR STEEL ERECTION WORK AND EXCAVATION FOR THE BUILDING ITSELF AND BACK FILLING INSIDE OF AND WITHIN 5 FT. OF THE BUILDING AND FOUNDATIONS, FOOTINGS AND PIERS FOR THE BUILDING. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY WORK COVERED UNDER TUNNEL, SHAFT AND CAISSON WORK. (ZONE 5 - ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC, MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT COUNTIES) | $19.99 | $16.72 | $36.71 | MI20260001 Highway |
| Clare + 83 more | LABORERS - OPEN CUT: GROUP 7- RESTORATION LABORER, SEEDING, SODDING, PLANTING, CUTTING, MULCHING AND TOP SOIL GRADING; AND THE RESTORATION OF PROPERTY SUCH AS REPLACING MAILBOXES, WOOD CHIPS, PLANTER BOXES, FLAGSTONES, ETC. SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARATION, LAND BALANCING, DEMOLITION AND REMOVAL OF CONCRETE AND UNDERGROUND APPURTENANCES, GRADING, PAVING, SEWERS, UTILITIES AND IMPROVEMENTS; RETENTION, OXIDATION, FLOCCULATION AND IRRIGATION FACILITIES, AND ALSO INCLUDING BUT NOT LIMITED TO UNDERGROUND PIPING, CONDUITS, STEEL SHEETING FOR UNDERGROUND CONSTRUCTION, AND ALL WORK INCIDENTAL THERETO, AND GENERAL EXCAVATION. FOR ALL AREAS EXCEPT THE UPPER PENINSULA, OPEN CUT CONSTRUCTION WORK SHALL ALSO BE CONSTRUED TO MEAN WATERFRONT WORK, PIERS, DOCKS, SEAWALLS, BREAKWALLS, MARINAS AND ALL INCIDENTAL WORK. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY STRUCTURAL MODIFICATIONS, ALTERATIONS, ADDITIONS AND REPAIRS TO BUILDINGS, OR HIGHWAY WORK, INCLUDING ROADS, STREETS, BRIDGE CONSTRUCTION AND PARKING LOTS OR STEEL ERECTION WORK AND EXCAVATION FOR THE BUILDING ITSELF AND BACK FILLING INSIDE OF AND WITHIN 5 FT. OF THE BUILDING AND FOUNDATIONS, FOOTINGS AND PIERS FOR THE BUILDING. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY WORK COVERED UNDER TUNNEL, SHAFT AND CAISSON WORK. (ZONE 1 - MACOMB, OAKLAND AND WAYNE COUNTIES) | $17.84 | $16.72 | $34.56 | MI20260001 Highway |
| Clare + 83 more | LABORERS - OPEN CUT: GROUP 7- RESTORATION LABORER, SEEDING, SODDING, PLANTING, CUTTING, MULCHING AND TOP SOIL GRADING; AND THE RESTORATION OF PROPERTY SUCH AS REPLACING MAILBOXES, WOOD CHIPS, PLANTER BOXES, FLAGSTONES, ETC. SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARATION, LAND BALANCING, DEMOLITION AND REMOVAL OF CONCRETE AND UNDERGROUND APPURTENANCES, GRADING, PAVING, SEWERS, UTILITIES AND IMPROVEMENTS; RETENTION, OXIDATION, FLOCCULATION AND IRRIGATION FACILITIES, AND ALSO INCLUDING BUT NOT LIMITED TO UNDERGROUND PIPING, CONDUITS, STEEL SHEETING FOR UNDERGROUND CONSTRUCTION, AND ALL WORK INCIDENTAL THERETO, AND GENERAL EXCAVATION. FOR ALL AREAS EXCEPT THE UPPER PENINSULA, OPEN CUT CONSTRUCTION WORK SHALL ALSO BE CONSTRUED TO MEAN WATERFRONT WORK, PIERS, DOCKS, SEAWALLS, BREAKWALLS, MARINAS AND ALL INCIDENTAL WORK. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY STRUCTURAL MODIFICATIONS, ALTERATIONS, ADDITIONS AND REPAIRS TO BUILDINGS, OR HIGHWAY WORK, INCLUDING ROADS, STREETS, BRIDGE CONSTRUCTION AND PARKING LOTS OR STEEL ERECTION WORK AND EXCAVATION FOR THE BUILDING ITSELF AND BACK FILLING INSIDE OF AND WITHIN 5 FT. OF THE BUILDING AND FOUNDATIONS, FOOTINGS AND PIERS FOR THE BUILDING. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY WORK COVERED UNDER TUNNEL, SHAFT AND CAISSON WORK. (ZONE 2 - LIVINGSTON COUNTY (EAST OF M-151 (OAK GROVE RD.)); MONROE AND WASHTENAW COUNTIES) | $22.11 | $16.72 | $38.83 | MI20260001 Highway |
| Clare + 83 more | LABORERS - OPEN CUT: GROUP 7- RESTORATION LABORER, SEEDING, SODDING, PLANTING, CUTTING, MULCHING AND TOP SOIL GRADING; AND THE RESTORATION OF PROPERTY SUCH AS REPLACING MAILBOXES, WOOD CHIPS, PLANTER BOXES, FLAGSTONES, ETC. SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARATION, LAND BALANCING, DEMOLITION AND REMOVAL OF CONCRETE AND UNDERGROUND APPURTENANCES, GRADING, PAVING, SEWERS, UTILITIES AND IMPROVEMENTS; RETENTION, OXIDATION, FLOCCULATION AND IRRIGATION FACILITIES, AND ALSO INCLUDING BUT NOT LIMITED TO UNDERGROUND PIPING, CONDUITS, STEEL SHEETING FOR UNDERGROUND CONSTRUCTION, AND ALL WORK INCIDENTAL THERETO, AND GENERAL EXCAVATION. FOR ALL AREAS EXCEPT THE UPPER PENINSULA, OPEN CUT CONSTRUCTION WORK SHALL ALSO BE CONSTRUED TO MEAN WATERFRONT WORK, PIERS, DOCKS, SEAWALLS, BREAKWALLS, MARINAS AND ALL INCIDENTAL WORK. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY STRUCTURAL MODIFICATIONS, ALTERATIONS, ADDITIONS AND REPAIRS TO BUILDINGS, OR HIGHWAY WORK, INCLUDING ROADS, STREETS, BRIDGE CONSTRUCTION AND PARKING LOTS OR STEEL ERECTION WORK AND EXCAVATION FOR THE BUILDING ITSELF AND BACK FILLING INSIDE OF AND WITHIN 5 FT. OF THE BUILDING AND FOUNDATIONS, FOOTINGS AND PIERS FOR THE BUILDING. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY WORK COVERED UNDER TUNNEL, SHAFT AND CAISSON WORK. (ZONE 3 - CLINTON, EATON, GENESEE, HILLSDALE AND INGHAM COUNTIES; IONIA COUNTY (CITY OF PORTLAND); JACKSON, LAPEER AND LENAWEE COUNTIES; LIVINGSTON COUNTY (WEST OF M-151 OAK GROVE RD.); SANILAC, ST. CLAIR AND SHIAWASSEE COUNTIES) | $22.23 | $16.72 | $38.95 | MI20260001 Highway |
| Clare + 83 more | LABORERS - OPEN CUT: GROUP 7- RESTORATION LABORER, SEEDING, SODDING, PLANTING, CUTTING, MULCHING AND TOP SOIL GRADING; AND THE RESTORATION OF PROPERTY SUCH AS REPLACING MAILBOXES, WOOD CHIPS, PLANTER BOXES, FLAGSTONES, ETC. SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARATION, LAND BALANCING, DEMOLITION AND REMOVAL OF CONCRETE AND UNDERGROUND APPURTENANCES, GRADING, PAVING, SEWERS, UTILITIES AND IMPROVEMENTS; RETENTION, OXIDATION, FLOCCULATION AND IRRIGATION FACILITIES, AND ALSO INCLUDING BUT NOT LIMITED TO UNDERGROUND PIPING, CONDUITS, STEEL SHEETING FOR UNDERGROUND CONSTRUCTION, AND ALL WORK INCIDENTAL THERETO, AND GENERAL EXCAVATION. FOR ALL AREAS EXCEPT THE UPPER PENINSULA, OPEN CUT CONSTRUCTION WORK SHALL ALSO BE CONSTRUED TO MEAN WATERFRONT WORK, PIERS, DOCKS, SEAWALLS, BREAKWALLS, MARINAS AND ALL INCIDENTAL WORK. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY STRUCTURAL MODIFICATIONS, ALTERATIONS, ADDITIONS AND REPAIRS TO BUILDINGS, OR HIGHWAY WORK, INCLUDING ROADS, STREETS, BRIDGE CONSTRUCTION AND PARKING LOTS OR STEEL ERECTION WORK AND EXCAVATION FOR THE BUILDING ITSELF AND BACK FILLING INSIDE OF AND WITHIN 5 FT. OF THE BUILDING AND FOUNDATIONS, FOOTINGS AND PIERS FOR THE BUILDING. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY WORK COVERED UNDER TUNNEL, SHAFT AND CAISSON WORK. (ZONE 4 - ALCONA, ALLEGAN, ALPENA, ANTRIM, ARENAC, BARRY, BAY, BENZIE, BERRIEN, BRANCH, CALHOUN, CASS, CHARLEVOIX, CHEBOYGAN, CLARE, CRAWFORD, EMMET, GLADWIN, GRAND TRAVERSE, GRATIOT AND HURON COUNTIES; IONIA COUNTY (EXCEPT THE CITY OF PORTLAND); IOSCO, ISABELLA, KALAMAZOO, KALKASKA, KENT, LAKE,LEELANAU, MANISTEE, MASON, MECOSTA, MIDLAND, MISSAUKEE, MONTCALM, MONTMORENCY, MUSKEGON, NEWAYGO, OCEANA, OGEMAW, OSCEOLA, OSCODA, OTSEGO, OTTAWA, PRESQUE ISLE, ROSCOOMMON, SAGINAW, ST. JOSEPH, TUSCOLA, VAN BUREN, AND WEXFORD COUNTIES) | $22.30 | $16.72 | $39.02 | MI20260001 Highway |
| Clare + 83 more | LABORERS - OPEN CUT: GROUP 7- RESTORATION LABORER, SEEDING, SODDING, PLANTING, CUTTING, MULCHING AND TOP SOIL GRADING; AND THE RESTORATION OF PROPERTY SUCH AS REPLACING MAILBOXES, WOOD CHIPS, PLANTER BOXES, FLAGSTONES, ETC. SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARATION, LAND BALANCING, DEMOLITION AND REMOVAL OF CONCRETE AND UNDERGROUND APPURTENANCES, GRADING, PAVING, SEWERS, UTILITIES AND IMPROVEMENTS; RETENTION, OXIDATION, FLOCCULATION AND IRRIGATION FACILITIES, AND ALSO INCLUDING BUT NOT LIMITED TO UNDERGROUND PIPING, CONDUITS, STEEL SHEETING FOR UNDERGROUND CONSTRUCTION, AND ALL WORK INCIDENTAL THERETO, AND GENERAL EXCAVATION. FOR ALL AREAS EXCEPT THE UPPER PENINSULA, OPEN CUT CONSTRUCTION WORK SHALL ALSO BE CONSTRUED TO MEAN WATERFRONT WORK, PIERS, DOCKS, SEAWALLS, BREAKWALLS, MARINAS AND ALL INCIDENTAL WORK. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY STRUCTURAL MODIFICATIONS, ALTERATIONS, ADDITIONS AND REPAIRS TO BUILDINGS, OR HIGHWAY WORK, INCLUDING ROADS, STREETS, BRIDGE CONSTRUCTION AND PARKING LOTS OR STEEL ERECTION WORK AND EXCAVATION FOR THE BUILDING ITSELF AND BACK FILLING INSIDE OF AND WITHIN 5 FT. OF THE BUILDING AND FOUNDATIONS, FOOTINGS AND PIERS FOR THE BUILDING. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY WORK COVERED UNDER TUNNEL, SHAFT AND CAISSON WORK. (ZONE 5 - ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC, MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT COUNTIES) | $22.45 | $16.72 | $39.17 | MI20260001 Highway |
| Clare + 83 more | LABORERS - TUNNEL, SHAFT AND CAISSON: GROUP 1- TUNNEL, SHAFT AND CAISSON LABORER, DUMP, SHANTY, HOG HOUSE TENDER, TESTING (ON GAS) AND WATCHMAN. SCOPE OF WORK: TUNNEL, SHAFT, AND CAISSON WORK OF EVERY TYPE AND DESCRIPTION AND ALL OPERATIONS INCIDENTAL THERETO, INCLUDING, BUT NOT LIMITED TO, SHAFTS AND TUNNELS FOR SEWERS , WATER, SUBWAYS, TRANSPORTATION, DIVERSION, SEWERAGE, CAVERNS, SHELTERS, AQUAFERS, RESERVOIRS, MISSILE SILOS AND STEEL SHEETING FOR UNDERGROUND CONSTRUCTION. (AREA 1: MACOMB, OAKLAND, AND WAYNE COUNTIES) | $30.13 | $22.75 | $52.88 | MI20260001 Highway |
| Clare + 83 more | LABORERS - TUNNEL, SHAFT AND CAISSON: GROUP 1- TUNNEL, SHAFT AND CAISSON LABORER, DUMP, SHANTY, HOG HOUSE TENDER, TESTING (ON GAS) AND WATCHMAN. SCOPE OF WORK: TUNNEL, SHAFT, AND CAISSON WORK OF EVERY TYPE AND DESCRIPTION AND ALL OPERATIONS INCIDENTAL THERETO, INCLUDING, BUT NOT LIMITED TO, SHAFTS AND TUNNELS FOR SEWERS , WATER, SUBWAYS, TRANSPORTATION, DIVERSION, SEWERAGE, CAVERNS, SHELTERS, AQUAFERS, RESERVOIRS, MISSILE SILOS AND STEEL SHEETING FOR UNDERGROUND CONSTRUCTION.(AREA 2: REMAINING COUNTIES) | $32.13 | $17.95 | $50.08 | MI20260001 Highway |
| Clare + 83 more | LABORERS - TUNNEL, SHAFT AND CAISSON: GROUP 2- MANHOLE, HEADWALL, CATCH BASIN BUILDER, BRICKLAYER TENDER, MORTAR MACHINE AND MATERIAL MIXER. SCOPE OF WORK: TUNNEL, SHAFT, AND CAISSON WORK OF EVERY TYPE AND DESCRIPTION AND ALL OPERATIONS INCIDENTAL THERETO, INCLUDING, BUT NOT LIMITED TO, SHAFTS AND TUNNELS FOR SEWERS , WATER, SUBWAYS, TRANSPORTATION, DIVERSION, SEWERAGE, CAVERNS, SHELTERS, AQUAFERS, RESERVOIRS, MISSILE SILOS AND STEEL SHEETING FOR UNDERGROUND CONSTRUCTION. (AREA 1: MACOMB, OAKLAND, AND WAYNE COUNTIES) | $32.13 | $22.75 | $54.88 | MI20260001 Highway |
| Clare + 83 more | LABORERS - TUNNEL, SHAFT AND CAISSON: GROUP 2- MANHOLE, HEADWALL, CATCH BASIN BUILDER, BRICKLAYER TENDER, MORTAR MACHINE AND MATERIAL MIXER. SCOPE OF WORK: TUNNEL, SHAFT, AND CAISSON WORK OF EVERY TYPE AND DESCRIPTION AND ALL OPERATIONS INCIDENTAL THERETO, INCLUDING, BUT NOT LIMITED TO, SHAFTS AND TUNNELS FOR SEWERS , WATER, SUBWAYS, TRANSPORTATION, DIVERSION, SEWERAGE, CAVERNS, SHELTERS, AQUAFERS, RESERVOIRS, MISSILE SILOS AND STEEL SHEETING FOR UNDERGROUND CONSTRUCTION.(AREA 2: REMAINING COUNTIES) | $34.40 | $17.95 | $52.35 | MI20260001 Highway |
| Clare + 83 more | LABORERS - TUNNEL, SHAFT AND CAISSON: GROUP 3- AIR TOOL OPERATOR (JACKHAMMER, BUSH HAMMER AND GRINTER), FIRST BOTTOM, SECOND BOTTOM, CAGE TENDER, CAR PUSHER, CARRIER, CONCRETE, CONCRETE FORM, CONCRETE REPAIR, CEMENT INVERT LABORER, CEMENT FINISHER, CONCRETE SHOVELER, CONVEYOR, FLOOR, GASOLINE AND ELECTRIC TOOL OPERATOR, GUNITE, GROUT OPERATOR, WELDER, HEADING DINKY PERSON, INSIDE LOCK TENDER, PEA GRAVEL OPERATOR, PUMP, OUTSIDE LOCK TENDER, SCAFFOLD, TOP SIGNAL PERSON, SWITCH PERSON, TRACK, TUGGER, UTILITY PERSON, VIBRATOR, WINCH OPERATOR, PIPE JACKING, WAGON DRILL AND AIR TRACK OPERATOR AND CONCRETE SAW OPERATOR (UNDER 40 H.P.). EVERY TYPE AND DESCRIPTION AND ALL OPERATIONS INCIDENTAL THERETO, INCLUDING, BUT NOT LIMITED TO, SHAFTS AND TUNNELS FOR SEWERS , WATER, SUBWAYS, TRANSPORTATION, DIVERSION, SEWERAGE, CAVERNS, SHELTERS, AQUAFERS, RESERVOIRS, MISSILE SILOS AND STEEL SHEETING FOR UNDERGROUND CONSTRUCTION. (AREA 1: MACOMB, OAKLAND, AND WAYNE COUNTIES) | $28.13 | $22.75 | $50.88 | MI20260001 Highway |
| Clare + 83 more | LABORERS - TUNNEL, SHAFT AND CAISSON: GROUP 3- AIR TOOL OPERATOR (JACKHAMMER, BUSH HAMMER AND GRINTER), FIRST BOTTOM, SECOND BOTTOM, CAGE TENDER, CAR PUSHER, CARRIER, CONCRETE, CONCRETE FORM, CONCRETE REPAIR, CEMENT INVERT LABORER, CEMENT FINISHER, CONCRETE SHOVELER, CONVEYOR, FLOOR, GASOLINE AND ELECTRIC TOOL OPERATOR, GUNITE, GROUT OPERATOR, WELDER, HEADING DINKY PERSON, INSIDE LOCK TENDER, PEA GRAVEL OPERATOR, PUMP, OUTSIDE LOCK TENDER, SCAFFOLD, TOP SIGNAL PERSON, SWITCH PERSON, TRACK, TUGGER, UTILITY PERSON, VIBRATOR, WINCH OPERATOR, PIPE JACKING, WAGON DRILL AND AIR TRACK OPERATOR AND CONCRETE SAW OPERATOR (UNDER 40 H.P.). EVERY TYPE AND DESCRIPTION AND ALL OPERATIONS INCIDENTAL THERETO, INCLUDING, BUT NOT LIMITED TO, SHAFTS AND TUNNELS FOR SEWERS , WATER, SUBWAYS, TRANSPORTATION, DIVERSION, SEWERAGE, CAVERNS, SHELTERS, AQUAFERS, RESERVOIRS, MISSILE SILOS AND STEEL SHEETING FOR UNDERGROUND CONSTRUCTION.(AREA 2: REMAINING COUNTIES) | $28.00 | $17.45 | $45.45 | MI20260001 Highway |
| Clare + 83 more | LABORERS - TUNNEL, SHAFT AND CAISSON: GROUP 4- TUNNEL, SHAFT, AND CAISSON MUCKER, BRACER, LINER PLATE, LONG HAUL DINKY DRIVER AND WELL POINT. SCOPE OF WORK: TUNNEL, SHAFT, AND CAISSON WORK OF EVERY TYPE AND DESCRIPTION AND ALL OPERATIONS INCIDENTAL THERETO, INCLUDING, BUT NOT LIMITED TO, SHAFTS AND TUNNELS FOR SEWERS , WATER, SUBWAYS, TRANSPORTATION, DIVERSION, SEWERAGE, CAVERNS, SHELTERS, AQUAFERS, RESERVOIRS, MISSILE SILOS AND STEEL SHEETING FOR UNDERGROUND CONSTRUCTION. (AREA 1: MACOMB, OAKLAND, AND WAYNE COUNTIES) | $23.97 | $16.93 | $40.90 | MI20260001 Highway |
| Clare + 83 more | LABORERS - TUNNEL, SHAFT AND CAISSON: GROUP 4- TUNNEL, SHAFT, AND CAISSON MUCKER, BRACER, LINER PLATE, LONG HAUL DINKY DRIVER AND WELL POINT. SCOPE OF WORK: TUNNEL, SHAFT, AND CAISSON WORK OF EVERY TYPE AND DESCRIPTION AND ALL OPERATIONS INCIDENTAL THERETO, INCLUDING, BUT NOT LIMITED TO, SHAFTS AND TUNNELS FOR SEWERS , WATER, SUBWAYS, TRANSPORTATION, DIVERSION, SEWERAGE, CAVERNS, SHELTERS, AQUAFERS, RESERVOIRS, MISSILE SILOS AND STEEL SHEETING FOR UNDERGROUND CONSTRUCTION.(AREA 2: REMAINING COUNTIES) | $29.57 | $16.93 | $46.50 | MI20260001 Highway |
| Clare + 83 more | LABORERS - TUNNEL, SHAFT AND CAISSON: GROUP 5- TUNNEL, SHAFT AND CAISSON MINER, DRILL RUNNER, KEY BOARD OPERATOR, POWER KNIFE OPERATOR, REINFORCED STEEL OR MESH (E.G. WIRE MESH, STELL MATS, DOWEL BARS, ETC.). SCOPE OF WORK: TUNNEL, SHAFT, AND CAISSON WORK OF EVERY TYPE AND DESCRIPTION AND ALL OPERATIONS INCIDENTAL THERETO, INCLUDING, BUT NOT LIMITED TO, SHAFTS AND TUNNELS FOR SEWERS , WATER, SUBWAYS, TRANSPORTATION, DIVERSION, SEWERAGE, CAVERNS, SHELTERS, AQUAFERS, RESERVOIRS, MISSILE SILOS AND STEEL SHEETING FOR UNDERGROUND CONSTRUCTION. (AREA 1: MACOMB, OAKLAND, AND WAYNE COUNTIES) | $24.22 | $16.93 | $41.15 | MI20260001 Highway |
| Clare + 83 more | LABORERS - TUNNEL, SHAFT AND CAISSON: GROUP 5- TUNNEL, SHAFT AND CAISSON MINER, DRILL RUNNER, KEY BOARD OPERATOR, POWER KNIFE OPERATOR, REINFORCED STEEL OR MESH (E.G. WIRE MESH, STELL MATS, DOWEL BARS, ETC.). SCOPE OF WORK: TUNNEL, SHAFT, AND CAISSON WORK OF EVERY TYPE AND DESCRIPTION AND ALL OPERATIONS INCIDENTAL THERETO, INCLUDING, BUT NOT LIMITED TO, SHAFTS AND TUNNELS FOR SEWERS , WATER, SUBWAYS, TRANSPORTATION, DIVERSION, SEWERAGE, CAVERNS, SHELTERS, AQUAFERS, RESERVOIRS, MISSILE SILOS AND STEEL SHEETING FOR UNDERGROUND CONSTRUCTION.(AREA 2: REMAINING COUNTIES) | $25.76 | $16.93 | $42.69 | MI20260001 Highway |
| Clare + 83 more | LABORERS - TUNNEL, SHAFT AND CAISSON: GROUP 6- DYNAMITE AND POWDER. SCOPE OF WORK: TUNNEL, SHAFT, AND CAISSON WORK OF EVERY TYPE AND DESCRIPTION AND ALL OPERATIONS INCIDENTAL THERETO, INCLUDING, BUT NOT LIMITED TO, SHAFTS AND TUNNELS FOR SEWERS , WATER, SUBWAYS, TRANSPORTATION, DIVERSION, SEWERAGE, CAVERNS, SHELTERS, AQUAFERS, RESERVOIRS, MISSILE SILOS AND STEEL SHEETING FOR UNDERGROUND CONSTRUCTION. (AREA 1: MACOMB, OAKLAND, AND WAYNE COUNTIES) | $24.55 | $16.93 | $41.48 | MI20260001 Highway |
| Clare + 83 more | LABORERS - TUNNEL, SHAFT AND CAISSON: GROUP 6- DYNAMITE AND POWDER. SCOPE OF WORK: TUNNEL, SHAFT, AND CAISSON WORK OF EVERY TYPE AND DESCRIPTION AND ALL OPERATIONS INCIDENTAL THERETO, INCLUDING, BUT NOT LIMITED TO, SHAFTS AND TUNNELS FOR SEWERS , WATER, SUBWAYS, TRANSPORTATION, DIVERSION, SEWERAGE, CAVERNS, SHELTERS, AQUAFERS, RESERVOIRS, MISSILE SILOS AND STEEL SHEETING FOR UNDERGROUND CONSTRUCTION.(AREA 2: REMAINING COUNTIES) | $26.07 | $16.93 | $43.00 | MI20260001 Highway |
| Clare + 83 more | LABORERS - TUNNEL, SHAFT AND CAISSON: GROUP 7- RESTORATION LABORER, SEEDING, SODDING, PLANTING, CUTTING, MULCHING AND TOP SOIL GRADING; AND THE RESTORATION OF PROPERTY SUCH AS REPLACING MAILBOXES, WOOD CHIPS, PLANTER BOXES, FLAGSTONES, ETC. SCOPE OF WORK: TUNNEL, SHAFT, AND CAISSON WORK OF EVERY TYPE AND DESCRIPTION AND ALL OPERATIONS INCIDENTAL THERETO, INCLUDING, BUT NOT LIMITED TO, SHAFTS AND TUNNELS FOR SEWERS , WATER, SUBWAYS, TRANSPORTATION, DIVERSION, SEWERAGE, CAVERNS, SHELTERS, AQUAFERS, RESERVOIRS, MISSILE SILOS AND STEEL SHEETING FOR UNDERGROUND CONSTRUCTION. (AREA 1: MACOMB, OAKLAND, AND WAYNE COUNTIES) | $17.83 | $16.93 | $34.76 | MI20260001 Highway |
| Clare + 83 more | LABORERS - TUNNEL, SHAFT AND CAISSON: GROUP 7- RESTORATION LABORER, SEEDING, SODDING, PLANTING, CUTTING, MULCHING AND TOP SOIL GRADING; AND THE RESTORATION OF PROPERTY SUCH AS REPLACING MAILBOXES, WOOD CHIPS, PLANTER BOXES, FLAGSTONES, ETC. SCOPE OF WORK: TUNNEL, SHAFT, AND CAISSON WORK OF EVERY TYPE AND DESCRIPTION AND ALL OPERATIONS INCIDENTAL THERETO, INCLUDING, BUT NOT LIMITED TO, SHAFTS AND TUNNELS FOR SEWERS , WATER, SUBWAYS, TRANSPORTATION, DIVERSION, SEWERAGE, CAVERNS, SHELTERS, AQUAFERS, RESERVOIRS, MISSILE SILOS AND STEEL SHEETING FOR UNDERGROUND CONSTRUCTION.(AREA 2: REMAINING COUNTIES) | $25.57 | $16.93 | $42.50 | MI20260001 Highway |
| Clinton | LABORER ((1) COMMON OR GENERAL) | $23.39 | $13.15 | $36.54 | MI20260055 Heavy |
| Clinton | LABORER ((2) MASON TENDER-CEMENT/CONCRETE) | $23.53 | $13.15 | $36.68 | MI20260055 Heavy |
| Clinton | LABORER ((4) GRADE CHECKER) | $23.70 | $13.15 | $36.85 | MI20260055 Heavy |
| Clinton | LABORER ((5) PIPELAYER) | $23.84 | $13.15 | $36.99 | MI20260055 Heavy |
| Clinton | LABORER: COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; PIPELAYER; SANDBLASTER | $32.53 | $13.45 | $45.98 | MI20260081 Building |
| Clinton | LABORER: COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - CEMENT/CONCRETE; PIPELAYER (EXCLUDES OPEN CUT CONSTRUCTION) | $32.53 | $13.45 | $45.98 | MI20260055 Heavy |
| Clinton | LABORER: LANDSCAPE | $12.25 | $0.00 | $12.25 | MI20260055 Heavy |
| Clinton | LABORER: LANDSCAPE & IRRIGATION | $12.50 | $0.50 | $13.00 | MI20260081 Building |
| Clinton, Eaton | LABORER: COMMON OR GENERAL | $16.19 | $5.46 | $21.65 | MI20260027 Residential |
| Clinton, Eaton | LABORER: LANDSCAPE | $9.64 | $2.81 | $12.45 | MI20260027 Residential |
| Clinton, Eaton | LABORER: MASON TENDER - CEMENT/CONCRETE | $22.75 | $13.45 | $36.20 | MI20260027 Residential |
| Clinton, Eaton | LABORER: PIPELAYER | $17.95 | $5.46 | $23.41 | MI20260027 Residential |
| Crawford | LABORER (MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; AND PIPELAYER) | $25.02 | $13.45 | $38.47 | MI20260115 Building |
| Crawford | LABORER: COMMON OR GENERAL | $18.55 | $0.00 | $18.55 | MI20260115 Building |
| Crawford | LABORER: LANDSCAPE & IRRIGATION | $11.44 | $3.69 | $15.13 | MI20260115 Building |
| Crawford | LABORER: SANDBLASTER | $26.23 | $13.45 | $39.68 | MI20260115 Building |
| Delta | LABORER (COMMON OR GENERAL; MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; AND SANDBLASTER) | $28.18 | $13.45 | $41.63 | MI20260116 Building |
| Delta | LABORER: LANDSCAPE & IRRIGATION | $14.95 | $0.00 | $14.95 | MI20260116 Building |
| Delta, Dickinson | LABORER ((1) COMMON OR GENERAL) | $21.19 | $12.85 | $34.04 | MI20260047 Heavy |
| Delta, Dickinson | LABORER ((2) MASON TENDER-CEMENT/CONCRETE) | $21.33 | $12.85 | $34.18 | MI20260047 Heavy |
| Delta, Dickinson | LABORER ((4) GRADE CHECKER) | $21.51 | $12.85 | $34.36 | MI20260047 Heavy |
| Delta, Dickinson | LABORER ((5) PIPELAYER) | $21.56 | $12.85 | $34.41 | MI20260047 Heavy |
| Delta, Dickinson | LABORER: COMMON OR GENERAL; MASON TENDER - CEMENT/CONCRETE (EXCLUDES UNDERGROUND CONSTRUCTION) | $32.74 | $13.45 | $46.19 | MI20260047 Heavy |
| Delta, Dickinson | LABORER: LANDSCAPE | $10.89 | $1.74 | $12.63 | MI20260047 Heavy |
| Dickinson | LABORER (COMMON OR GENERAL; MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; AND SANDBLASTER) | $28.18 | $13.45 | $41.63 | MI20260117 Building |
| Dickinson | LABORER: LANDSCAPE & IRRIGATION | $14.95 | $0.00 | $14.95 | MI20260117 Building |
| Eaton | LABORER ((2) MASON TENDER-CEMENT/CONCRETE) | $23.53 | $13.15 | $36.68 | MI20260056 Heavy |
| Eaton | LABORER ((4) GRADE CHECKER) | $23.70 | $13.15 | $36.85 | MI20260056 Heavy |
| Eaton | LABORER ((5) PIPELAYER) | $23.84 | $13.15 | $36.99 | MI20260056 Heavy |
| Eaton | LABORER (COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - CEMENT/CONCRETE; PIPELAYER; SANDBLASTER) | $32.53 | $13.45 | $45.98 | MI20260082 Building |
| Eaton | LABORER: COMMON OR GENERAL | $17.75 | $6.40 | $24.15 | MI20260056 Heavy |
| Eaton | LABORER: GRADE CHECKER; MASON TENDER - CEMENT/CONCRETE; PIPELAYER (EXCLUDES OPEN CUT CONSTRUCTION) | $32.53 | $13.45 | $45.98 | MI20260056 Heavy |
| Eaton | LABORER: LANDSCAPE | $12.25 | $0.00 | $12.25 | MI20260056 Heavy |
| Eaton | LABORER: LANDSCAPE & IRRIGATION | $10.38 | $0.50 | $10.88 | MI20260082 Building |
| Eaton | LABORER: MASON TENDER - BRICK | $16.75 | $4.75 | $21.50 | MI20260082 Building |
| Emmet | LABORER ((4) GRADE CHECKER) | $22.73 | $12.95 | $35.68 | MI20260035 Heavy |
| Emmet | LABORER (COMON OR GENERAL; MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; AND PIPELAYER) | $25.02 | $13.45 | $38.47 | MI20260118 Building |
| Emmet | LABORER: COMMON OR GENERAL | $13.13 | $6.75 | $19.88 | MI20260035 Heavy |
| Emmet | LABORER: LANDSCAPE | $10.89 | $1.74 | $12.63 | MI20260035 Heavy |
| Emmet | LABORER: LANDSCAPE & IRRIGATION | $11.04 | $4.39 | $15.43 | MI20260118 Building |
| Emmet | LABORER: MASON TENDER - CEMENT/CONCRETE | $15.97 | $3.51 | $19.48 | MI20260035 Heavy |
| Emmet | LABORER: PIPELAYER | $15.28 | $3.99 | $19.27 | MI20260035 Heavy |
| Emmet | LABORER: SANDBLASTER | $26.23 | $13.45 | $39.68 | MI20260118 Building |
| Genesee | LABORER ((1) COMMON OR GENERAL) | $23.39 | $13.15 | $36.54 | MI20260057 Heavy |
| Genesee | LABORER ((2) MASON TENDER-CEMENT/CONCRETE) | $23.53 | $13.15 | $36.68 | MI20260057 Heavy |
| Genesee | LABORER ((4) GRADE CHECKER) | $23.70 | $13.15 | $36.85 | MI20260057 Heavy |
| Genesee | LABORER ((5) PIPELAYER) | $23.84 | $13.52 | $37.36 | MI20260057 Heavy |
| Genesee | LABORER ((7) LANDSCAPE) | $18.29 | $12.85 | $31.14 | MI20260057 Heavy |
| Genesee | LABORER: COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - BRICK/CEMENT/CONCRETE, PIPELAYER; SANDBLASTER | $29.46 | $16.10 | $45.56 | MI20260083 Building |
| Genesee | LABORER: COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - CEMENT/CONCRETE; PIPELAYER (EXCLUDES OPEN CUT CONSTRUCTION) | $29.46 | $16.10 | $45.56 | MI20260057 Heavy |
| Genesee | LABORER: COMMON OR GENERAL; MASON TENDER - CEMENT/CONCRETE | $29.46 | $16.10 | $45.56 | MI20260013 Residential |
| Genesee | LABORER: LANDSCAPE & IRRIGATION: GROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER, SKIDSTEER (OR EQUIVALENT) | $29.93 | $9.10 | $39.03 | MI20260083 Building |
| Genesee | LABORER: LANDSCAPE & IRRIGATION: GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER | $27.71 | $9.10 | $36.81 | MI20260083 Building |
| Genesee | LABORER: PIPELAYER | $17.99 | $5.46 | $23.45 | MI20260013 Residential |
| Genesee | LANDSCAPE LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER AND SKIDSTEER (OR EQUIVALENT) | $29.93 | $9.10 | $39.03 | MI20260057 Heavy |
| Genesee | LANDSCAPE LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER | $27.71 | $9.10 | $36.81 | MI20260057 Heavy |
| Genesee | LANDSCAPE LABORER: GROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER, SKIDSTEER (OR EQUIVALENT) | $29.93 | $9.10 | $39.03 | MI20260013 Residential |
| Genesee | LANDSCAPE LABORER: GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER | $27.71 | $9.10 | $36.81 | MI20260013 Residential |
| Gladwin | LABORER (MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; AND PIPELAYER) | $27.68 | $13.45 | $41.13 | MI20260119 Building |
| Gladwin | LABORER: COMMON OR GENERAL | $11.75 | $1.22 | $12.97 | MI20260119 Building |
| Gladwin | LABORER: LANDSCAPE & IRRIGATION | $12.84 | $0.00 | $12.84 | MI20260119 Building |
| Gladwin | LABORER: SANDBLASTER | $28.21 | $13.45 | $41.66 | MI20260119 Building |
| Gogebic | LABORER ((2) MASON TENDER-CEMENT/CONCRETE) | $22.78 | $12.95 | $35.73 | MI20260036 Heavy |
| Gogebic | LABORER ((4) GRADE CHECKER) | $22.96 | $12.95 | $35.91 | MI20260036 Heavy |
| Gogebic | LABORER (COMMON OR GENERAL; MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; AND SANDBLASTER) | $28.18 | $13.45 | $41.63 | MI20260120 Building |
| Gogebic | LABORER: COMMON OR GENERAL | $14.71 | $3.35 | $18.06 | MI20260036 Heavy |
| Gogebic | LABORER: LANDSCAPE | $10.89 | $1.74 | $12.63 | MI20260036 Heavy |
| Gogebic | LABORER: LANDSCAPE & IRRIGATION | $14.95 | $0.00 | $14.95 | MI20260120 Building |
| Gogebic | LABORER: MASON TENDER - CEMENT/CONCRETE (EXCLUDES OPEN CUT CONSTRUCTION) | $32.74 | $13.45 | $46.19 | MI20260036 Heavy |
| Gogebic | LABORER: PIPELAYER | $12.50 | $1.06 | $13.56 | MI20260036 Heavy |
| Grand Traverse | LABORER ((1) COMMON OR GENERAL) | $22.42 | $12.95 | $35.37 | MI20260037 Heavy |
| Grand Traverse | LABORER ((4) GRADE CHECKER) | $22.73 | $12.95 | $35.68 | MI20260037 Heavy |
| Grand Traverse | LABORER (MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; AND PIPELAYER) | $25.02 | $13.45 | $38.47 | MI20260121 Building |
| Grand Traverse | LABORER: COMMON OR GENERAL | $13.77 | $3.54 | $17.31 | MI20260121 Building |
| Grand Traverse | LABORER: COMMON OR GENERAL (EXCLUDES OPEN CUT CONSTRUCTION) | $25.02 | $13.45 | $38.47 | MI20260037 Heavy |
| Grand Traverse | LABORER: COMMON OR GENERAL; MASON TENDER - CEMENT/CONCRETE | $25.02 | $13.45 | $38.47 | MI20260003 Residential |
| Grand Traverse | LABORER: LANDSCAPE | $10.89 | $1.74 | $12.63 | MI20260037 Heavy |
| Grand Traverse | LABORER: LANDSCAPE & IRRIGATION | $11.04 | $4.39 | $15.43 | MI20260121 Building |
| Grand Traverse | LABORER: MASON TENDER - CEMENT/CONCRETE | $15.97 | $3.51 | $19.48 | MI20260037 Heavy |
| Grand Traverse | LABORER: PIPELAYER | $15.28 | $3.99 | $19.27 | MI20260037 Heavy |
| Grand Traverse | LABORER: SANDBLASTER | $26.23 | $13.45 | $39.68 | MI20260121 Building |
| Gratiot | LABORER ((1) COMMON OR GENERAL) | $22.42 | $12.95 | $35.37 | MI20260038 Heavy |
| Gratiot | LABORER ((4) GRADE CHECKER) | $22.73 | $12.95 | $35.68 | MI20260038 Heavy |
| Gratiot | LABORER: COMMON OR GENERAL | $10.70 | $1.22 | $11.92 | MI20260122 Building |
| Gratiot | LABORER: COMMON OR GENERAL (EXCLUDES OPEN CUT CONSTRUCTION) | $27.68 | $13.45 | $41.13 | MI20260038 Heavy |
| Gratiot | LABORER: LANDSCAPE | $10.89 | $1.74 | $12.63 | MI20260038 Heavy |
| Gratiot | LABORER: LANDSCAPE & IRRIGATION | $12.84 | $0.00 | $12.84 | MI20260122 Building |
| Gratiot | LABORER: MASON TENDER - BRICK | $15.03 | $3.10 | $18.13 | MI20260122 Building |
| Gratiot | LABORER: MASON TENDER - CEMENT/CONCRETE | $15.97 | $3.51 | $19.48 | MI20260038 Heavy |
| Gratiot | LABORER: MASON TENDER - CEMENT/CONCRETE AND PIPELAYER | $27.68 | $13.45 | $41.13 | MI20260122 Building |
| Gratiot | LABORER: PIPELAYER | $15.28 | $3.99 | $19.27 | MI20260038 Heavy |
| Gratiot | LABORER: SANDBLASTER | $28.21 | $13.45 | $41.66 | MI20260122 Building |
| Hillsdale | LABORER (COMMON OR GENERAL; MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; PIPELAYER; AND SANDBLASTER) | $32.35 | $13.45 | $45.80 | MI20260123 Building |
| Hillsdale | LABORER: LANDSCAPE & IRRIGATION | $12.84 | $0.00 | $12.84 | MI20260123 Building |
| Houghton | LABORER (COMMON OR GENERAL; MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; AND SANDBLASTER) | $28.18 | $13.45 | $41.63 | MI20260124 Building |
| Houghton | LABORER: LANDSCAPE & IRRIGATION | $14.95 | $0.00 | $14.95 | MI20260124 Building |
| Huron | LABORER: COMMON OR GENERAL; MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; AND PIPELAYER | $26.20 | $13.45 | $39.65 | MI20260125 Building |
| Huron | LABORER: LANDSCAPE & IRRIGATION | $12.84 | $0.00 | $12.84 | MI20260125 Building |
| Huron | LABORER: SANDBLASTER | $26.73 | $13.45 | $40.18 | MI20260125 Building |
| Ingham | LABORER ((1) COMMON OR GENERAL) | $23.39 | $13.15 | $36.54 | MI20260058 Heavy |
| Ingham | LABORER ((2) MASON TENDER-CEMENT/CONCRETE) | $23.53 | $13.15 | $36.68 | MI20260058 Heavy |
| Ingham | LABORER ((4) GRADE CHECKER) | $23.70 | $13.15 | $36.85 | MI20260058 Heavy |
| Ingham | LABORER ((5) PIPELAYER) | $23.84 | $13.15 | $36.99 | MI20260058 Heavy |
| Ingham | LABORER: COMMON OR GENERAL | $17.21 | $5.46 | $22.67 | MI20260014 Residential |
| Ingham | LABORER: COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; PIPELAYER; SANDBLASTER | $32.53 | $13.45 | $45.98 | MI20260084 Building |
| Ingham | LABORER: COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - CEMENT/CONCRETE; PIPELAYER (EXCLUDES OPEN CUT CONSTRUCTION) | $32.53 | $13.45 | $45.98 | MI20260058 Heavy |
| Ingham | LABORER: LANDSCAPE | $9.64 | $2.81 | $12.45 | MI20260014 Residential |
| Ingham | LABORER: LANDSCAPE | $12.25 | $0.00 | $12.25 | MI20260058 Heavy |
| Ingham | LABORER: LANDSCAPE & IRRIGATION | $8.00 | $0.00 | $8.00 | MI20260084 Building |
| Ingham | LABORER: MASON TENDER - CEMENT/CONCRETE | $22.75 | $13.45 | $36.20 | MI20260014 Residential |
| Ingham | LABORER: PIPELAYER | $17.95 | $5.46 | $23.41 | MI20260014 Residential |
| Ionia | LABORER ((2) MASON TENDER-CEMENT/CONCRETE) | $22.55 | $12.95 | $35.50 | MI20260059 Heavy |
| Ionia | LABORER ((4) GRADE CHECKER) | $22.73 | $12.95 | $35.68 | MI20260059 Heavy |
| Ionia | LABORER: COMMON OR GENERAL | $13.23 | $3.58 | $16.81 | MI20260059 Heavy |
| Ionia | LABORER: COMMON OR GENERAL; GRADE CHECKER; SANDBLASTER (CITY OF PORTLAND) | $32.53 | $13.45 | $45.98 | MI20260085 Building |
| Ionia | LABORER: COMMON OR GENERAL; GRADE CHECKER; SANDBLASTER (EXCLUDING THE CITY OF PORTLAND) | $24.90 | $12.95 | $37.85 | MI20260085 Building |
| Ionia | LABORER: GRADE CHECKER; MASON TENDER - CEMENT/CONCRETE (CITY OF PORTLAND) (EXCLUDES OPEN CUT CONSTRUCTION) | $32.53 | $13.45 | $45.98 | MI20260059 Heavy |
| Ionia | LABORER: GRADE CHECKER; MASON TENDER - CEMENT/CONCRETE (EXCLUDING THE CITY OF PORTLAND) (EXCLUDES OPEN CUT CONSTRUCTION) | $28.56 | $12.95 | $41.51 | MI20260059 Heavy |
| Ionia | LABORER: LANDSCAPE | $12.21 | $1.96 | $14.17 | MI20260059 Heavy |
| Ionia | LABORER: LANDSCAPE & IRRIGATION | $10.47 | $0.00 | $10.47 | MI20260085 Building |
| Ionia | LABORER: MASON TENDER - BRICK | $18.87 | $2.16 | $21.03 | MI20260085 Building |
| Ionia | LABORER: MASON TENDER - CEMENT/CONCRETE | $14.01 | $2.45 | $16.46 | MI20260085 Building |
| Ionia | LABORER: PIPELAYER | $16.00 | $4.66 | $20.66 | MI20260059 Heavy |
| Ionia | LABORER: PIPELAYER | $18.32 | $3.28 | $21.60 | MI20260085 Building |
| Iosco | LABORER: COMMON OR GENERAL | $11.00 | $0.00 | $11.00 | MI20260126 Building |
| Iosco | LABORER: LANDSCAPE & IRRIGATION | $14.63 | $0.00 | $14.63 | MI20260126 Building |
| Iosco | LABORER: MASON TENDER - BRICK | $14.89 | $3.10 | $17.99 | MI20260126 Building |
| Iosco | LABORER: MASON TENDER - CEMENT/CONCRETE AND PIPELAYER | $25.02 | $13.45 | $38.47 | MI20260126 Building |
| Iosco | LABORER: SANDBLASTER | $26.23 | $13.45 | $39.68 | MI20260126 Building |
| Iron, Keweenaw | LABORER (COMMON OR GENERAL; MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; AND SANDBLASTER) | $28.18 | $13.45 | $41.63 | MI20260155 Building |
| Iron, Keweenaw | LABORER: LANDSCAPE & IRRIGATION | $14.95 | $0.00 | $14.95 | MI20260155 Building |
| Iron, Marquette | LABORER ((1) COMMON OR GENERAL) | $21.19 | $12.85 | $34.04 | MI20260048 Heavy |
| Iron, Marquette | LABORER ((2) MASON TENDER-CEMENT/CONCRETE) | $21.33 | $12.85 | $34.18 | MI20260048 Heavy |
| Iron, Marquette | LABORER ((4) GRADE CHECKER) | $21.51 | $12.85 | $34.36 | MI20260048 Heavy |
| Iron, Marquette | LABORER ((5) PIPELAYER) | $21.56 | $12.85 | $34.41 | MI20260048 Heavy |
| Iron, Marquette | LABORER: COMMON OR GENERAL; MASON TENDER - CEMENT/CONCRETE (EXCLUDES UNDERGROUND CONSTRUCTION) | $32.74 | $13.45 | $46.19 | MI20260048 Heavy |
| Iron, Marquette | LABORER: LANDSCAPE | $10.89 | $1.74 | $12.63 | MI20260048 Heavy |
| Isabella | LABORER ((4) GRADE CHECKER) | $22.73 | $12.95 | $35.68 | MI20260039 Heavy |
| Isabella | LABORER: COMMON OR GENERAL | $19.79 | $5.95 | $25.74 | MI20260039 Heavy |
| Isabella | LABORER: COMMON OR GENERAL | $16.72 | $1.22 | $17.94 | MI20260127 Building |
| Isabella | LABORER: LANDSCAPE | $10.89 | $1.74 | $12.63 | MI20260039 Heavy |
| Isabella | LABORER: LANDSCAPE & IRRIGATION | $12.84 | $0.00 | $12.84 | MI20260127 Building |
| Isabella | LABORER: MASON TENDER - BRICK | $15.36 | $3.10 | $18.46 | MI20260127 Building |
| Isabella | LABORER: MASON TENDER - CEMENT/CONCRETE | $15.97 | $3.51 | $19.48 | MI20260039 Heavy |
| Isabella | LABORER: MASON TENDER - CEMENT/CONCRETE AND PIPELAYER | $27.68 | $13.45 | $41.13 | MI20260127 Building |
| Isabella | LABORER: PIPELAYER | $15.28 | $3.99 | $19.27 | MI20260039 Heavy |
| Isabella | LABORER: SANDBLASTER | $28.21 | $13.45 | $41.66 | MI20260127 Building |
| Jackson | LABORER ((1) COMMON OR GENERAL) | $23.39 | $13.15 | $36.54 | MI20260060 Heavy |
| Jackson | LABORER ((2) MASON TENDER-CEMENT/CONCRETE) | $23.53 | $13.15 | $36.68 | MI20260060 Heavy |
| Jackson | LABORER ((4) GRADE CHECKER) | $23.70 | $13.15 | $36.85 | MI20260060 Heavy |
| Jackson | LABORER ((5) PIPELAYER) | $23.84 | $13.52 | $37.36 | MI20260060 Heavy |
| Jackson | LABORER ((7) LANDSCAPE) | $18.29 | $12.85 | $31.14 | MI20260060 Heavy |
| Jackson | LABORER (COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - BRICK/CEMENT/CONCRETE; PIPELAYER; SANDBLASTER) | $32.35 | $13.45 | $45.80 | MI20260086 Building |
| Jackson | LABORER (COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - CEMENT/CONCRETE; PIPELAYER) | $32.35 | $13.45 | $45.80 | MI20260060 Heavy |
| Jackson | LABORER: COMMON OR GENERAL; MASON TENDER - CEMENT/CONCRETE | $16.37 | $12.75 | $29.12 | MI20260015 Residential |
| Jackson | LABORER: LANDSCAPE | $9.64 | $2.81 | $12.45 | MI20260015 Residential |
| Jackson | LABORER: LANDSCAPE AND IRRIGATION: GROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER AND SKIDSTEER (OR EQUIVALENT) | $29.93 | $9.10 | $39.03 | MI20260086 Building |
| Jackson | LABORER: LANDSCAPE AND IRRIGATION: GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER | $27.71 | $9.10 | $36.81 | MI20260086 Building |
| Jackson | LABORER: PIPELAYER | $17.95 | $5.46 | $23.41 | MI20260015 Residential |
| Jackson | LANDSCAPE LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER AND SKIDSTEER (OR EQUIVALENT) | $29.93 | $9.10 | $39.03 | MI20260060 Heavy |
| Jackson | LANDSCAPE LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER | $27.71 | $9.10 | $36.81 | MI20260060 Heavy |
| Kalamazoo | LABORER ((1) COMMON OR GENERAL) | $22.42 | $12.95 | $35.37 | MI20260061 Heavy |
| Kalamazoo | LABORER ((2) MASON TENDER-CEMENT/CONCRETE) | $22.55 | $12.95 | $35.50 | MI20260061 Heavy |
| Kalamazoo | LABORER ((4) GRADE CHECKER) | $22.73 | $12.95 | $35.68 | MI20260061 Heavy |
| Kalamazoo | LABORER ((5) PIPELAYER) | $22.85 | $12.95 | $35.80 | MI20260061 Heavy |
| Kalamazoo | LABORER (COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; SANDBLASTER) | $27.21 | $13.45 | $40.66 | MI20260087 Building |
| Kalamazoo | LABORER (COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - CEMENT/CONCRETE) (EXCLUDES OPEN CUT CONSTRUCTION) | $27.21 | $13.45 | $40.66 | MI20260061 Heavy |
| Kalamazoo | LABORER: COMMON OR GENERAL | $16.87 | $5.46 | $22.33 | MI20260016 Residential |
| Kalamazoo | LABORER: LANDSCAPE | $9.64 | $2.81 | $12.45 | MI20260016 Residential |
| Kalamazoo | LABORER: LANDSCAPE | $12.25 | $0.00 | $12.25 | MI20260061 Heavy |
| Kalamazoo | LABORER: LANDSCAPE & IRRIGATION | $10.38 | $0.50 | $10.88 | MI20260087 Building |
| Kalamazoo | LABORER: MASON TENDER - CEMENT/CONCRETE | $27.21 | $13.45 | $40.66 | MI20260016 Residential |
| Kalamazoo | LABORER: PIPELAYER | $17.95 | $5.46 | $23.41 | MI20260016 Residential |
| Kalkaska | LABORER (COMON OR GENERAL; MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; AND PIPELAYER) | $25.02 | $13.45 | $38.47 | MI20260128 Building |
| Kalkaska | LABORER: LANDSCAPE & IRRIGATION | $11.04 | $4.39 | $15.43 | MI20260128 Building |
| Kalkaska | LABORER: SANDBLASTER | $26.23 | $13.45 | $39.68 | MI20260128 Building |
| Kent | LABORER ((2) MASON TENDER-CEMENT/CONCRETE) | $22.55 | $12.95 | $35.50 | MI20260062 Heavy |
| Kent | LABORER ((4) GRADE CHECKER) | $22.73 | $12.95 | $35.68 | MI20260062 Heavy |
| Kent | LABORER: COMMON OR GENERAL | $12.43 | $3.06 | $15.49 | MI20260062 Heavy |
| Kent | LABORER: COMMON OR GENERAL | $13.04 | $4.80 | $17.84 | MI20260088 Building |
| Kent | LABORER: GRADE CHECKER; MASON TENDER - CEMENT/CONCRETE (EXCLUDING THE CITY OF PORTLAND) (EXCLUDES OPEN CUT CONSTRUCTION) | $28.56 | $12.95 | $41.51 | MI20260062 Heavy |
| Kent | LABORER: GRADE CHECKER; SANDBLASTER | $26.34 | $12.95 | $39.29 | MI20260088 Building |
| Kent | LABORER: LANDSCAPE | $12.12 | $2.04 | $14.16 | MI20260062 Heavy |
| Kent | LABORER: LANDSCAPE & IRRIGATION | $10.47 | $0.00 | $10.47 | MI20260088 Building |
| Kent | LABORER: MASON TENDER - BRICK | $18.87 | $2.16 | $21.03 | MI20260088 Building |
| Kent | LABORER: MASON TENDER - CEMENT/CONCRETE | $14.01 | $2.45 | $16.46 | MI20260088 Building |
| Kent | LABORER: PIPELAYER | $16.00 | $4.66 | $20.66 | MI20260062 Heavy |
| Kent | LABORER: PIPELAYER | $18.32 | $3.28 | $21.60 | MI20260088 Building |
| Lake | LABORER: COMMON OR GENERAL; SANDBLASTER EXCLUDES OPEN CUT CONSTRUCTION | $23.34 | $11.60 | $34.94 | MI20260129 Building |
| Lake | LABORER: LANDSCAPE | $12.84 | $0.00 | $12.84 | MI20260129 Building |
| Lake | LABORER: MASON TENDER - BRICK/CEMENT/CONCRETE EXCLUDES OPEN CUT CONSTRUCTION | $30.72 | $12.95 | $43.67 | MI20260129 Building |
| Lake + 4 more | LABORER: (1) COMMON OR GENERAL (LAKE, MASON, ST. JOE) | $22.42 | $12.95 | $35.37 | MI20260049 Heavy |
| Lake + 4 more | LABORER: (1) COMMON OR GENERAL (SANILAC) | $22.42 | $12.95 | $35.37 | MI20260049 Heavy |
| Lake + 4 more | LABORER: (4) GRADE CHECKER (LAKE, MASON, ST. JOE) | $22.73 | $12.95 | $35.68 | MI20260049 Heavy |
| Lake + 4 more | LABORER: (4) GRADE CHECKER (SANILAC) | $22.73 | $12.95 | $35.68 | MI20260049 Heavy |
| Lake + 4 more | LABORER: COMMON OR GENERAL (LAKE & MASON COUNTIES) (EXCLUDES OPEN CUT CONSTRUCTION) | $28.56 | $12.95 | $41.51 | MI20260049 Heavy |
| Lake + 4 more | LABORER: COMMON OR GENERAL (SANILAC COUNTY) (EXCLUDES OPEN CUT CONSTRUCTION) | $30.35 | $17.90 | $48.25 | MI20260049 Heavy |
| Lake + 4 more | LABORER: COMMON OR GENERAL (ST. JOSEPH COUNTY) (EXCLUDES OPEN CUT CONSTRUCTION) | $27.21 | $13.45 | $40.66 | MI20260049 Heavy |
| Lake + 4 more | LABORER: LANDSCAPE | $10.89 | $1.74 | $12.63 | MI20260049 Heavy |
| Lake + 4 more | LABORER: MASON TENDER - CEMENT/CONCRETE | $15.97 | $3.51 | $19.48 | MI20260049 Heavy |
| Lake + 4 more | LABORER: PIPELAYER | $15.28 | $3.99 | $19.27 | MI20260049 Heavy |
| Lapeer | LABORER ((1) COMMON OR GENERAL) | $23.39 | $13.15 | $36.54 | MI20260063 Heavy |
| Lapeer | LABORER ((2) MASON TENDER-CEMENT/CONCRETE) | $23.53 | $13.15 | $36.68 | MI20260063 Heavy |
| Lapeer | LABORER ((4) GRADE CHECKER) | $23.70 | $13.15 | $36.85 | MI20260063 Heavy |
| Lapeer | LABORER ((5) PIPELAYER) | $23.84 | $13.52 | $37.36 | MI20260063 Heavy |
| Lapeer | LABORER ((7) LANDSCAPE) | $18.29 | $12.85 | $31.14 | MI20260063 Heavy |
| Lapeer | LABORER: ASBESTOS ABATEMENT (REMOVAL FROM FLOORS, WALLS & CEILINGS) | $39.08 | $15.92 | $55.00 | MI20260089 Building |
| Lapeer | LABORER: COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - BRICK/CEMENT/CONCRETE, PIPELAYER; SANDBLASTER | $29.46 | $16.10 | $45.56 | MI20260089 Building |
| Lapeer | LABORER: COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - CEMENT/CONCRETE; PIPELAYER (EXCLUDES OPEN CUT CONSTRUCTION) | $29.46 | $16.10 | $45.56 | MI20260063 Heavy |
| Lapeer | LABORER: LANDSCAPE & IRRIGATION: GROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER, SKIDSTEER (OR EQUIVALENT) | $29.93 | $9.10 | $39.03 | MI20260089 Building |
| Lapeer | LABORER: LANDSCAPE & IRRIGATION: GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER | $27.71 | $9.10 | $36.81 | MI20260089 Building |
| Lapeer | LANDSCAPE LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER AND SKIDSTEER (OR EQUIVALENT) | $29.93 | $9.10 | $39.03 | MI20260063 Heavy |
| Lapeer | LANDSCAPE LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER | $27.71 | $9.10 | $36.81 | MI20260063 Heavy |
| Lapeer + 3 more | LABORER: COMMON OR GENERAL; FORMWORK; MASON TENDER - CEMENT/CONCRETE (LAPEER COUNTY) | $29.46 | $16.10 | $45.56 | MI20260028 Residential |
| Lapeer + 3 more | LABORER: COMMON OR GENERAL; FORMWORK; MASON TENDER - CEMENT/CONCRETE (LIVINGSTON COUNTY (NORTH OF HIGHWAY M-59 AND EAST OF OAK GROVE ROAD)) | $38.00 | $18.25 | $56.25 | MI20260028 Residential |
| Lapeer + 3 more | LABORER: COMMON OR GENERAL; FORMWORK; MASON TENDER - CEMENT/CONCRETE (LIVINGSTON COUNTY) | $38.11 | $15.45 | $53.56 | MI20260028 Residential |
| Lapeer + 3 more | LABORER: PIPELAYER | $17.99 | $5.46 | $23.45 | MI20260028 Residential |
| Lapeer + 3 more | LABORERS: COMMON OR GENERAL; FORMWORK; MASON TENDER - CEMENT/CONCRETE (MACOMB AND WAYNE COUNTIES) | $38.00 | $18.25 | $56.25 | MI20260028 Residential |
| Lapeer + 3 more | LANDSCAPE LABORER: GROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER, SKIDSTEER (OR EQUIVALENT) | $29.93 | $9.10 | $39.03 | MI20260028 Residential |
| Lapeer + 3 more | LANDSCAPE LABORER: GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER | $27.71 | $9.10 | $36.81 | MI20260028 Residential |
| Leelanau | LABORER (MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; AND PIPELAYER) | $25.02 | $13.45 | $38.47 | MI20260130 Building |
| Leelanau | LABORER: COMMON OR GENERAL | $12.25 | $4.15 | $16.40 | MI20260130 Building |
| Leelanau | LABORER: LANDSCAPE & IRRIGATION | $11.04 | $4.39 | $15.43 | MI20260130 Building |
| Leelanau | LABORER: SANDBLASTER | $26.23 | $13.45 | $39.68 | MI20260130 Building |
| Lenawee | LABORER (COMMON OR GENERAL; MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; PIPELAYER; AND SANDBLASTER) | $32.35 | $13.45 | $45.80 | MI20260131 Building |
| Lenawee | LABORER: LANDSCAPE & IRRIGATION | $12.84 | $0.00 | $12.84 | MI20260131 Building |
| Lenawee + 10 more | LABORER: (1) COMMON OR GENERAL (ARENAC, BRANCH, GLADWIN, HURON, MECOSTA, MIDLAND, OSCEOLA, TUSCOLA) | $22.42 | $12.95 | $35.37 | MI20260044 Heavy |
| Lenawee + 10 more | LABORER: (1) COMMON OR GENERAL (HILLSDALE, LENAWEE, SHIAWASSEE) | $23.39 | $13.15 | $36.54 | MI20260044 Heavy |
| Lenawee + 10 more | LABORER: (4) GRADE CHECKER (ARENAC, BRANCH, GLADWIN, HURON, MECOSTA, MIDLAND, OSCEOLA, TUSCOLA) | $22.73 | $12.95 | $35.68 | MI20260044 Heavy |
| Lenawee + 10 more | LABORER: (4) GRADE CHECKER (HILLSDALE, LENAWEE, SHIAWASSEE) | $23.70 | $13.15 | $36.85 | MI20260044 Heavy |
| Lenawee + 10 more | LABORER: COMMON OR GENERAL (ARENAC, GLADWIN, HURON, MIDLAND & TUSCOLA COUNTIES) EXCLUDES OPEN CUT CONSTRUCTION | $27.68 | $13.45 | $41.13 | MI20260044 Heavy |
| Lenawee + 10 more | LABORER: COMMON OR GENERAL (BRANCH COUNTY) (EXCLUDES OPEN CUT CONSTRUCTION) | $27.21 | $13.45 | $40.66 | MI20260044 Heavy |
| Lenawee + 10 more | LABORER: COMMON OR GENERAL (HILLSDALE & LENAWEE COUNTIES) (EXCLUDES OPEN CUT CONSTRUCTION) | $32.35 | $13.45 | $45.80 | MI20260044 Heavy |
| Lenawee + 10 more | LABORER: COMMON OR GENERAL (MECOSTA & OSCEOLA COUNTIES) (EXCLUDES OPEN CUT CONSTRUCTION) | $26.70 | $12.95 | $39.65 | MI20260044 Heavy |
| Lenawee + 10 more | LABORER: COMMON OR GENERAL (SHIAWASSEE COUNTY) (EXCLUDES OPEN CUT CONSTRUCTION) | $29.46 | $16.11 | $45.57 | MI20260044 Heavy |
| Lenawee + 10 more | LABORER: LANDSCAPE | $10.89 | $1.74 | $12.63 | MI20260044 Heavy |
| Lenawee + 10 more | LABORER: MASON TENDER - CEMENT/CONCRETE | $15.97 | $3.51 | $19.48 | MI20260044 Heavy |
| Lenawee + 10 more | LABORER: PIPELAYER | $15.28 | $3.99 | $19.27 | MI20260044 Heavy |
| Livingston | LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 1 COMMON OR GENERAL; GRADE CHECKER (EAST OF OAK GROVE ROAD AND SOUTH OF M-59, NOT INCLUDING THE CITY OF HOWELL) COMMON OR GENERAL; GRADE CHECKER | $38.11 | $15.45 | $53.56 | MI20260064 Heavy |
| Livingston | LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 2 MASON TENDER - CEMENT/CONCRETE (EAST OF OAK GROVE ROAD AND SOUTH OF M-59, NOT INCLUDING THE CITY OF HOWELL) | $38.33 | $15.45 | $53.78 | MI20260064 Heavy |
| Livingston | LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 3 PIPELAYER (EAST OF OAK GROVE ROAD AND SOUTH OF M-59, NOT INCLUDING THE CITY OF HOWELL) | $38.47 | $15.45 | $53.92 | MI20260064 Heavy |
| Livingston | LABORER: (1) COMMON OR GENERAL (EASTERN PART OF LIVINGSTON) | $25.20 | $12.95 | $38.15 | MI20260064 Heavy |
| Livingston | LABORER: (1) COMMON OR GENERAL (WESTERN PART OF LIVINGSTON) | $25.20 | $12.95 | $38.15 | MI20260064 Heavy |
| Livingston | LABORER: (2) MASON TENDER-CEMENT/CONCRETE (EASTERN PART OF LIVINGSTON) | $25.31 | $12.95 | $38.26 | MI20260064 Heavy |
| Livingston | LABORER: (2) MASON TENDER-CEMENT/CONCRETE (WESTERN PART OF LIVINGSTON) | $25.31 | $12.95 | $38.26 | MI20260064 Heavy |
| Livingston | LABORER: (4) GRADE CHECKER (EASTERN PART OF LIVINGSTON) | $25.50 | $12.95 | $38.45 | MI20260064 Heavy |
| Livingston | LABORER: (4) GRADE CHECKER (WESTERN PART OF LIVINGSTON) | $25.50 | $12.95 | $38.45 | MI20260064 Heavy |
| Livingston | LABORER: (5) PIPELAYER (EASTERN PART OF LIVINGSTON) | $25.65 | $12.95 | $38.60 | MI20260064 Heavy |
| Livingston | LABORER: (5) PIPELAYER (WESTERN PART OF LIVINGSTON) | $25.45 | $12.95 | $38.40 | MI20260064 Heavy |
| Livingston | LABORER: (7) LANDSCAPE (EASTERN PART OF LIVINGSTON) | $19.59 | $12.95 | $32.54 | MI20260064 Heavy |
| Livingston | LABORER: (7) LANDSCAPE (WESTERN PART OF LIVINGSTON) | $19.59 | $12.95 | $32.54 | MI20260064 Heavy |
| Livingston | LABORER: ASBESTOS ABATEMENT (REMOVAL FROM FLOORS, WALLS & CEILINGS) | $39.08 | $15.92 | $55.00 | MI20260090 Building |
| Livingston | LABORER: COMMON OR GENERAL | $17.64 | $4.95 | $22.59 | MI20260090 Building |
| Livingston | LABORER: COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - CEMENT/CONCRETE; PIPELAYER (EAST OF OAK GROVE ROAD AND NORTH OF M-59, NOT INCLUDING THE CITY OF HOWELL) (EXCLUDES OPEN CUT CONSTRUCTION) | $38.00 | $18.25 | $56.25 | MI20260064 Heavy |
| Livingston | LABORER: COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - CEMENT/CONCRETE; PIPELAYER (WEST OF OAK GROVE ROAD TO WEST OF PINKNEY ROAD AND DEXTER PINKNEY ROAD, INCLUDING THE CITY OF HOWELL) (EXCLUDES OPEN CUT CONSTRUCTION) | $32.53 | $13.45 | $45.98 | MI20260064 Heavy |
| Livingston | LABORER: COMMON OR GENERAL; GRADE CHECKER; SANDBLASTER (EAST OF OAK GROVE ROAD AND SOUTH OF M-59, NOT INCLUDING THE CITY OF HOWELL) | $38.11 | $15.45 | $53.56 | MI20260090 Building |
| Livingston | LABORER: GRADE CHECKER; MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; PIPELAYER; SANDBLASTER (WEST OF OAK GROVE ROAD TO WEST OF PINKNEY ROAD AND DEXTER PINKNEY ROAD, INCLUDING THE CITY OF HOWELL) | $32.53 | $13.45 | $45.98 | MI20260090 Building |
| Livingston | LABORER: GRADE CHECKER; MASON TENDER - BRICK/CEMENT/CONCRETE; PIPELAYER; SANDBLASTER (EAST OF OAK GROVE RD. & NORTH OF M-59 (DOES NOT INCLUDE THE CITY OF HOWELL)) | $38.00 | $18.25 | $56.25 | MI20260090 Building |
| Livingston | LABORER: LANDSCAPE & IRRIGATION: GROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER, SKIDSTEER (OR EQUIVALENT) | $29.93 | $9.10 | $39.03 | MI20260090 Building |
| Livingston | LABORER: LANDSCAPE & IRRIGATION: GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER | $27.71 | $9.10 | $36.81 | MI20260090 Building |
| Livingston | LABORER: MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE (EAST OF OAK GROVE ROAD AND SOUTH OF M-59, NOT INCLUDING THE CITY OF HOWELL) | $38.33 | $15.45 | $53.78 | MI20260090 Building |
| Livingston | LABORER: PIPELAYER (EAST OF OAK GROVE ROAD AND SOUTH OF M-59, NOT INCLUDING THE CITY OF HOWELL) | $38.47 | $15.45 | $53.92 | MI20260090 Building |
| Livingston | LANDSCAPE LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER AND SKIDSTEER (OR EQUIVALENT) | $29.93 | $9.10 | $39.03 | MI20260064 Heavy |
| Livingston | LANDSCAPE LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER | $27.71 | $9.10 | $36.81 | MI20260064 Heavy |
| Luce | LABORER (COMMON OR GENERAL; MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; AND SANDBLASTER) | $28.18 | $13.45 | $41.63 | MI20260132 Building |
| Luce | LABORER: LANDSCAPE & IRRIGATION | $14.95 | $0.00 | $14.95 | MI20260132 Building |
| Mackinac | LABORER (COMMON OR GENERAL; MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; AND SANDBLASTER) | $28.18 | $13.45 | $41.63 | MI20260133 Building |
| Mackinac | LABORER: LANDSCAPE & IRRIGATION | $14.95 | $0.00 | $14.95 | MI20260133 Building |
| Macomb | LABORER ((4) GRADE CHECKER) | $24.11 | $16.95 | $41.06 | MI20260065 Heavy |
| Macomb | LABORER ((5) PIPELAYER) | $24.17 | $16.95 | $41.12 | MI20260065 Heavy |
| Macomb | LABORER (COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - BRICK/CEMENT/CONCRETE; PIPELAYER; SANDBLASTER) | $38.00 | $18.25 | $56.25 | MI20260091 Building |
| Macomb | LABORER: ASBESTOS ABATEMENT (REMOVAL FROM FLOORS, WALLS & CEILINGS) | $39.08 | $15.92 | $55.00 | MI20260091 Building |
| Macomb | LABORER: LANDSCAPE & IRRIGATION: GROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER, SKIDSTEER (OR EQUIVALENT) | $29.93 | $9.10 | $39.03 | MI20260091 Building |
| Macomb | LABORER: LANDSCAPE & IRRIGATION: GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER | $27.71 | $9.10 | $36.81 | MI20260091 Building |
| Macomb | LABORERS: COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - CEMENT/CONCRETE; PIPELAYER (EXCLUDES OPEN CUT CONSTRUCTION) | $38.00 | $18.25 | $56.25 | MI20260065 Heavy |
| Macomb | LANDSCAPE LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER AND SKIDSTEER (OR EQUIVALENT) | $29.93 | $9.10 | $39.03 | MI20260065 Heavy |
| Macomb | LANDSCAPE LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER | $27.71 | $9.10 | $36.81 | MI20260065 Heavy |
| Manistee | LABORER: COMMON OR GENERAL; SANDBLASTER EXCLUDES OPEN CUT CONSTRUCTION | $23.34 | $11.60 | $34.94 | MI20260134 Building |
| Manistee | LABORER: LANDSCAPE & IRRIGATION | $11.04 | $4.39 | $15.43 | MI20260134 Building |
| Manistee | LABORER: MASON TENDER - BRICK/CEMENT/CONCRETE EXCLUDES OPEN CUT CONSTRUCTION | $30.72 | $12.95 | $43.67 | MI20260134 Building |
| Marquette | LABORER (COMMON OR GENERAL; MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; AND SANDBLASTER) | $28.18 | $13.45 | $41.63 | MI20260135 Building |
| Marquette | LABORER: LANDSCAPE & IRRIGATION | $14.25 | $0.00 | $14.25 | MI20260135 Building |
| Mason | LABORER: COMMON OR GENERAL; SANDBLASTER EXCLUDES OPEN CUT CONSTRUCTION | $23.34 | $11.60 | $34.94 | MI20260136 Building |
| Mason | LABORER: LANDSCAPE & IRRIGATION | $12.84 | $0.00 | $12.84 | MI20260136 Building |
| Mason | LABORER: MASON TENDER - BRICK/CEMENT/CONCRETE EXCLUDES OPEN CUT CONSTRUCTION | $30.72 | $12.95 | $43.67 | MI20260136 Building |
| Mecosta | LABORER: COMMON OR GENERAL; SANDBLASTER EXCLUDES OPEN CUT CONSTRUCTION | $23.34 | $11.60 | $34.94 | MI20260137 Building |
| Mecosta | LABORER: LANDSCAPE & IRRIGATION | $12.84 | $0.00 | $12.84 | MI20260137 Building |
| Mecosta | LABORER: MASON TENDER - BRICK/CEMENT/CONCRETE EXCLUDES OPEN CUT CONSTRUCTION | $30.72 | $12.95 | $43.67 | MI20260137 Building |
| Menominee, Ontonagon | LABORER (COMMON OR GENERAL; MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; AND SANDBLASTER) | $28.18 | $13.45 | $41.63 | MI20260156 Building |
| Menominee, Ontonagon | LABORER: LANDSCAPE & IRRIGATION | $14.95 | $0.00 | $14.95 | MI20260156 Building |
| Midland | LABORER (COMMON OR GENERAL; MASON TENDER - CEMENT/CONCRETE; AND PIPELAYER) | $27.68 | $13.45 | $41.13 | MI20260138 Building |
| Midland | LABORER: LANDSCAPE & IRRIGATION | $12.84 | $0.00 | $12.84 | MI20260138 Building |
| Midland | LABORER: MASON TENDER - BRICK | $14.25 | $3.89 | $18.14 | MI20260138 Building |
| Midland | LABORER: SANDBLASTER | $28.21 | $13.45 | $41.66 | MI20260138 Building |
| Missaukee | LABORER (MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; AND PIPELAYER) | $25.02 | $13.45 | $38.47 | MI20260139 Building |
| Missaukee | LABORER: COMMON OR GENERAL | $12.92 | $4.99 | $17.91 | MI20260139 Building |
| Missaukee | LABORER: LANDSCAPE & IRRIGATION | $11.04 | $4.39 | $15.43 | MI20260139 Building |
| Missaukee | LABORER: SANDBLASTER | $26.23 | $13.45 | $39.68 | MI20260139 Building |
| Monroe | LABORER ((1) COMMON OR GENERAL) | $25.20 | $12.95 | $38.15 | MI20260066 Heavy |
| Monroe | LABORER ((2) MASON TENDER-CEMENT/CONCRETE) | $22.11 | $12.95 | $35.06 | MI20260066 Heavy |
| Monroe | LABORER ((4) GRADE CHECKER) | $25.50 | $12.95 | $38.45 | MI20260066 Heavy |
| Monroe | LABORER ((524.20) PIPELAYER) | $25.65 | $12.95 | $38.60 | MI20260066 Heavy |
| Monroe | LABORER ((7) LANDSCAPE) | $19.59 | $12.95 | $32.54 | MI20260066 Heavy |
| Monroe | LABORER (MASON TENDER - CEMENT/CONCRETE) | $38.80 | $15.70 | $54.50 | MI20260017 Residential |
| Monroe | LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 1 COMMON OR GENERAL; GRADE CHECKER | $38.58 | $15.70 | $54.28 | MI20260066 Heavy |
| Monroe | LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 2 MASON TENDER - CEMENT/CONCRETE | $38.80 | $15.70 | $54.50 | MI20260066 Heavy |
| Monroe | LABORER: COMMON OR GENERAL | $38.58 | $15.70 | $54.28 | MI20260017 Residential |
| Monroe | LABORER: COMMON OR GENERAL; GRADE CHECKER; SANDBLASTER | $38.58 | $15.70 | $54.28 | MI20260092 Building |
| Monroe | LABORER: LANDSCAPE & IRRIGATION: GROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER, SKIDSTEER (OR EQUIVALENT) | $29.93 | $9.10 | $39.03 | MI20260092 Building |
| Monroe | LABORER: LANDSCAPE & IRRIGATION: GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER | $27.71 | $9.10 | $36.81 | MI20260092 Building |
| Monroe | LABORER: MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE | $38.80 | $15.70 | $54.50 | MI20260092 Building |
| Monroe | LABORER: PIPELAYER | $17.99 | $5.46 | $23.45 | MI20260017 Residential |
| Monroe | LANDSCAPE LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER AND SKIDSTEER (OR EQUIVALENT) | $29.93 | $9.10 | $39.03 | MI20260066 Heavy |
| Monroe | LANDSCAPE LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER | $27.71 | $9.10 | $36.81 | MI20260066 Heavy |
| Monroe | LANDSCAPE LABORER: GROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER, SKIDSTEER (OR EQUIVALENT) | $29.93 | $9.10 | $39.03 | MI20260017 Residential |
| Monroe | LANDSCAPE LABORER: GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER | $27.71 | $9.10 | $36.81 | MI20260017 Residential |
| Montcalm | LABORER ((4) GRADE CHECKER) | $22.73 | $12.95 | $35.68 | MI20260040 Heavy |
| Montcalm | LABORER: COMMON OR GENERAL | $11.15 | $4.31 | $15.46 | MI20260040 Heavy |
| Montcalm | LABORER: COMMON OR GENERAL; SANDBLASTER EXCLUDES OPEN CUT CONSTRUCTION | $23.34 | $11.60 | $34.94 | MI20260140 Building |
| Montcalm | LABORER: LANDSCAPE | $10.89 | $1.74 | $12.63 | MI20260040 Heavy |
| Montcalm | LABORER: LANDSCAPE & IRRIGATION | $12.84 | $0.00 | $12.84 | MI20260140 Building |
| Montcalm | LABORER: MASON TENDER - BRICK/CEMENT/CONCRETE EXCLUDES OPEN CUT CONSTRUCTION | $30.72 | $12.95 | $43.67 | MI20260140 Building |
| Montcalm | LABORER: MASON TENDER - CEMENT/CONCRETE | $15.97 | $3.51 | $19.48 | MI20260040 Heavy |
| Montcalm | LABORER: PIPELAYER | $15.28 | $3.99 | $19.27 | MI20260040 Heavy |
| Montmorency | LABORER (COMMON OR GENERAL; MASON TENDER - CEMENT/CONCRETE; AND PIPELAYER) | $25.02 | $13.45 | $38.47 | MI20260141 Building |
| Montmorency | LABORER: LANDSCAPE & IRRIGATION | $14.63 | $0.00 | $14.63 | MI20260141 Building |
| Montmorency | LABORER: MASON TENDER - BRICK | $14.89 | $3.10 | $17.99 | MI20260141 Building |
| Montmorency | LABORER: SANDBLASTER | $26.23 | $13.45 | $39.68 | MI20260141 Building |
| Muskegon | LABORER ((1) COMMON OR GENERAL) | $22.42 | $12.95 | $35.37 | MI20260067 Heavy |
| Muskegon | LABORER ((2) MASON TENDER-CEMENT/CONCRETE) | $22.55 | $12.95 | $35.50 | MI20260067 Heavy |
| Muskegon | LABORER ((4) GRADE CHECKER) | $22.73 | $12.95 | $35.68 | MI20260067 Heavy |
| Muskegon | LABORER (COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - CEMENT/CONCRETE) (EXCLUDES OPEN CUT CONSTRUCTION) | $24.55 | $13.45 | $38.00 | MI20260067 Heavy |
| Muskegon | LABORER: COMMON OR GENERAL | $13.03 | $4.65 | $17.68 | MI20260018 Residential |
| Muskegon | LABORER: COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - BRICK; SANDBLASTER | $28.56 | $12.95 | $41.51 | MI20260093 Building |
| Muskegon | LABORER: LANDSCAPE | $9.64 | $2.81 | $12.45 | MI20260018 Residential |
| Muskegon | LABORER: LANDSCAPE | $12.21 | $1.96 | $14.17 | MI20260067 Heavy |
| Muskegon | LABORER: LANDSCAPE & IRRIGATION | $8.93 | $1.62 | $10.55 | MI20260093 Building |
| Muskegon | LABORER: MASON TENDER - CEMENT/CONCRETE | $23.34 | $11.60 | $34.94 | MI20260018 Residential |
| Muskegon | LABORER: MASON TENDER - CEMENT/CONCRETE | $14.82 | $3.59 | $18.41 | MI20260093 Building |
| Muskegon | LABORER: PIPELAYER | $17.95 | $5.46 | $23.41 | MI20260018 Residential |
| Muskegon | LABORER: PIPELAYER | $15.54 | $4.16 | $19.70 | MI20260067 Heavy |
| Muskegon | LABORER: PIPELAYER | $18.32 | $3.28 | $21.60 | MI20260093 Building |
| Newaygo | LABORER ((1) COMMON OR GENERAL) | $22.42 | $12.95 | $35.37 | MI20260068 Heavy |
| Newaygo | LABORER ((2) MASON TENDER-CEMENT/CONCRETE) | $22.55 | $12.95 | $35.50 | MI20260068 Heavy |
| Newaygo | LABORER ((4) GRADE CHECKER) | $22.73 | $12.95 | $35.68 | MI20260068 Heavy |
| Newaygo | LABORER (COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - CEMENT/CONCRETE) (EXCLUDES OPEN CUT CONSTRUCTION) | $24.55 | $13.45 | $38.00 | MI20260068 Heavy |
| Newaygo | LABORER: COMMON OR GENERAL; GRADE CHECKER; SANDBLASTER | $28.56 | $12.95 | $41.51 | MI20260094 Building |
| Newaygo | LABORER: LANDSCAPE | $12.21 | $1.96 | $14.17 | MI20260068 Heavy |
| Newaygo | LABORER: LANDSCAPE & IRRIGATION | $10.47 | $0.00 | $10.47 | MI20260094 Building |
| Newaygo | LABORER: MASON TENDER - BRICK | $18.87 | $2.16 | $21.03 | MI20260094 Building |
| Newaygo | LABORER: MASON TENDER - CEMENT/CONCRETE | $14.01 | $2.45 | $16.46 | MI20260094 Building |
| Newaygo | LABORER: PIPELAYER | $16.00 | $4.66 | $20.66 | MI20260068 Heavy |
| Newaygo | LABORER: PIPELAYER | $18.32 | $3.28 | $21.60 | MI20260094 Building |
| Newaygo + 3 more | LABORER: COMMON OR GENERAL | $13.05 | $4.65 | $17.70 | MI20260025 Residential |
| Newaygo + 3 more | LABORER: LANDSCAPE | $9.64 | $2.81 | $12.45 | MI20260025 Residential |
| Newaygo + 3 more | LABORER: MASON TENDER - CEMENT/CONCRETE (IONIA COUNTY (CITY OF PORTLAND)) | $16.72 | $12.75 | $29.47 | MI20260025 Residential |
| Newaygo + 3 more | LABORER: MASON TENDER - CEMENT/CONCRETE (ZONE 1: BARRY) | $27.21 | $13.45 | $40.66 | MI20260025 Residential |
| Newaygo + 3 more | LABORER: PIPELAYER | $17.95 | $5.46 | $23.41 | MI20260025 Residential |
| Oakland | LABORER ((4) GRADE CHECKER) | $24.11 | $16.95 | $41.06 | MI20260069 Heavy |
| Oakland | LABORER ((5) PIPELAYER) | $24.17 | $16.95 | $41.12 | MI20260069 Heavy |
| Oakland | LABORER (COMMON OR GENERAL; FORMWORK; MASON TENDER - CEMENT/CONCRETE) | $38.00 | $18.25 | $56.25 | MI20260019 Residential |
| Oakland | LABORER (COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - BRICK/CEMENT/CONCRETE; PIPELAYER; SANDBLASTER) | $38.00 | $18.25 | $56.25 | MI20260095 Building |
| Oakland | LABORER: ASBESTOS ABATEMENT (REMOVAL FROM FLOORS, WALLS & CEILINGS) | $39.08 | $15.92 | $55.00 | MI20260095 Building |
| Oakland | LABORER: COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - CEMENT/CONCRETE; PIPELAYER (EXCLUDES OPEN CUT CONSTRUCTION) | $38.00 | $18.25 | $56.25 | MI20260069 Heavy |
| Oakland | LABORER: LANDSCAPE & IRRIGATION: GROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER, SKIDSTEER (OR EQUIVALENT) | $29.93 | $9.10 | $39.03 | MI20260095 Building |
| Oakland | LABORER: LANDSCAPE & IRRIGATION: GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER | $27.71 | $9.10 | $36.81 | MI20260095 Building |
| Oakland | LABORER: PIPELAYER | $17.99 | $5.46 | $23.45 | MI20260019 Residential |
| Oakland | LANDSCAPE LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER AND SKIDSTEER (OR EQUIVALENT) | $29.93 | $9.10 | $39.03 | MI20260069 Heavy |
| Oakland | LANDSCAPE LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER | $27.71 | $9.10 | $36.81 | MI20260069 Heavy |
| Oakland | LANDSCAPE LABORER: GROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER, SKIDSTEER (OR EQUIVALENT) | $29.93 | $9.10 | $39.03 | MI20260019 Residential |
| Oakland | LANDSCAPE LABORER: GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER | $27.71 | $9.10 | $36.81 | MI20260019 Residential |
| Oceana | LABORER ((4) GRADE CHECKER) | $22.73 | $12.95 | $35.68 | MI20260041 Heavy |
| Oceana | LABORER: COMMON OR GENERAL | $13.48 | $5.21 | $18.69 | MI20260041 Heavy |
| Oceana | LABORER: COMMON OR GENERAL; SANDBLASTER EXCLUDES OPEN CUT CONSTRUCTION | $23.34 | $11.60 | $34.94 | MI20260142 Building |
| Oceana | LABORER: LANDSCAPE | $10.89 | $1.74 | $12.63 | MI20260041 Heavy |
| Oceana | LABORER: LANDSCAPE & IRRIGATION | $12.84 | $0.00 | $12.84 | MI20260142 Building |
| Oceana | LABORER: MASON TENDER - BRICK/CEMENT/CONCRETE EXCLUDES OPEN CUT CONSTRUCTION | $30.72 | $12.95 | $43.67 | MI20260142 Building |
| Oceana | LABORER: MASON TENDER - CEMENT/CONCRETE | $15.97 | $3.51 | $19.48 | MI20260041 Heavy |
| Oceana | LABORER: PIPELAYER | $15.28 | $3.99 | $19.27 | MI20260041 Heavy |
| Ogemaw | LABORER (COMMON OR GENERAL; MASON TENDER - CEMENT/CONCRETE; AND PIPELAYER) | $27.68 | $13.45 | $41.13 | MI20260143 Building |
| Ogemaw | LABORER: LANDSCAPE & IRRIGATION | $14.63 | $0.00 | $14.63 | MI20260143 Building |
| Ogemaw | LABORER: MASON TENDER - BRICK | $14.89 | $3.10 | $17.99 | MI20260143 Building |
| Ogemaw | LABORER: SANDBLASTER | $28.21 | $13.45 | $41.66 | MI20260143 Building |
| Osceola | LABORER: COMMON OR GENERAL; SANDBLASTER EXCLUDES OPEN CUT CONSTRUCTION | $23.34 | $11.60 | $34.94 | MI20260144 Building |
| Osceola | LABORER: LANDSCAPE & IRRIGATION | $12.84 | $0.00 | $12.84 | MI20260144 Building |
| Osceola | LABORER: MASON TENDER - BRICK/CEMENT/CONCRETE EXCLUDES OPEN CUT CONSTRUCTION | $30.72 | $12.95 | $43.67 | MI20260144 Building |
| Oscoda | LABORER: COMMON OR GENERAL | $15.46 | $6.09 | $21.55 | MI20260145 Building |
| Oscoda | LABORER: LANDSCAPE & IRRIGATION | $14.63 | $0.00 | $14.63 | MI20260145 Building |
| Oscoda | LABORER: MASON TENDER - BRICK | $14.89 | $3.10 | $17.99 | MI20260145 Building |
| Oscoda | LABORER: MASON TENDER - CEMENT/CONCRETE AND PIPELAYER | $25.02 | $13.45 | $38.47 | MI20260145 Building |
| Oscoda | LABORER: SANDBLASTER | $26.23 | $13.45 | $39.68 | MI20260145 Building |
| Otsego | LABORER: COMMON OR GENERAL | $14.60 | $4.27 | $18.87 | MI20260146 Building |
| Otsego | LABORER: LANDSCAPE & IRRIGATION | $14.63 | $0.00 | $14.63 | MI20260146 Building |
| Otsego | LABORER: MASON TENDER - BRICK | $14.89 | $3.10 | $17.99 | MI20260146 Building |
| Otsego | LABORER: MASON TENDER - CEMENT/CONCRETE AND PIPELAYER | $25.02 | $13.45 | $38.47 | MI20260146 Building |
| Otsego | LABORER: SANDBLASTER | $26.23 | $13.45 | $39.68 | MI20260146 Building |
| Ottawa | LABORER ((2) MASON TENDER-CEMENT/CONCRETE) | $22.55 | $12.95 | $35.50 | MI20260070 Heavy |
| Ottawa | LABORER ((4) GRADE CHECKER) | $22.73 | $12.95 | $35.68 | MI20260070 Heavy |
| Ottawa | LABORER: COMMON OR GENERAL | $13.03 | $4.65 | $17.68 | MI20260020 Residential |
| Ottawa | LABORER: COMMON OR GENERAL | $12.72 | $5.00 | $17.72 | MI20260070 Heavy |
| Ottawa | LABORER: COMMON OR GENERAL; GRADE CHECKER; SANDBLASTER | $28.56 | $12.95 | $41.51 | MI20260096 Building |
| Ottawa | LABORER: GRADE CHECKER; MASON TENDER - CEMENT/CONCRETE (EXCLUDES OPEN CUT CONSTRUCTION) | $24.55 | $13.45 | $38.00 | MI20260070 Heavy |
| Ottawa | LABORER: LANDSCAPE | $9.64 | $2.81 | $12.45 | MI20260020 Residential |
| Ottawa | LABORER: LANDSCAPE | $12.21 | $1.96 | $14.17 | MI20260070 Heavy |
| Ottawa | LABORER: LANDSCAPE & IRRIGATION | $8.93 | $1.62 | $10.55 | MI20260096 Building |
| Ottawa | LABORER: MASON TENDER - BRICK | $17.61 | $4.13 | $21.74 | MI20260096 Building |
| Ottawa | LABORER: MASON TENDER - CEMENT/CONCRETE | $23.34 | $11.60 | $34.94 | MI20260020 Residential |
| Ottawa | LABORER: MASON TENDER - CEMENT/CONCRETE | $14.82 | $3.59 | $18.41 | MI20260096 Building |
| Ottawa | LABORER: PIPELAYER | $17.95 | $5.46 | $23.41 | MI20260020 Residential |
| Ottawa | LABORER: PIPELAYER | $13.25 | $3.21 | $16.46 | MI20260070 Heavy |
| Ottawa | LABORER: PIPELAYER | $18.32 | $3.28 | $21.60 | MI20260096 Building |
| Presque Isle | LABORER: COMMON OR GENERAL | $15.46 | $6.09 | $21.55 | MI20260147 Building |
| Presque Isle | LABORER: LANDSCAPE & IRRIGATION | $14.63 | $0.00 | $14.63 | MI20260147 Building |
| Presque Isle | LABORER: MASON TENDER - BRICK | $14.89 | $3.10 | $17.99 | MI20260147 Building |
| Presque Isle | LABORER: MASON TENDER - CEMENT/CONCRETE AND PIPELAYER | $25.02 | $13.45 | $38.47 | MI20260147 Building |
| Presque Isle | LABORER: SANDBLASTER | $26.23 | $13.45 | $39.68 | MI20260147 Building |
| Roscommon | LABORER (COMMON OR GENERAL; MASON TENDER - CEMENT/CONCRETE; AND PIPELAYER) | $27.68 | $13.45 | $41.13 | MI20260148 Building |
| Roscommon | LABORER: COMMON OR GENERAL; MASON TENDER - CEMENT/CONCRETE | $27.68 | $13.45 | $41.13 | MI20260004 Residential |
| Roscommon | LABORER: LANDSCAPE & IRRIGATION | $14.63 | $0.00 | $14.63 | MI20260148 Building |
| Roscommon | LABORER: MASON TENDER - BRICK | $14.89 | $3.10 | $17.99 | MI20260148 Building |
| Roscommon | LABORER: SANDBLASTER | $28.21 | $13.45 | $41.66 | MI20260148 Building |
| Saginaw | LABORER ((1) COMMON OR GENERAL) | $22.42 | $12.95 | $35.37 | MI20260071 Heavy |
| Saginaw | LABORER ((2) MASON TENDER-CEMENT/CONCRETE) | $22.55 | $12.95 | $35.50 | MI20260071 Heavy |
| Saginaw | LABORER ((4) GRADE CHECKER) | $22.73 | $12.55 | $35.28 | MI20260071 Heavy |
| Saginaw | LABORER ((5) PIPELAYER) | $22.85 | $12.95 | $35.80 | MI20260071 Heavy |
| Saginaw | LABORER ((7) LANDSCAPER) | $18.41 | $12.95 | $31.36 | MI20260071 Heavy |
| Saginaw | LABORER: COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - BRICK/CEMENT/CONCRETE; PIPELAYER | $27.68 | $13.45 | $41.13 | MI20260097 Building |
| Saginaw | LABORER: COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - CEMENT/CONCRETE; PIPELAYER (EXCLUDES OPEN CUT CONSTRUCTION) | $27.68 | $13.45 | $41.13 | MI20260071 Heavy |
| Saginaw | LABORER: COMMON OR GENERAL; MASON TENDER - CEMENT/CONCRETE | $27.68 | $13.45 | $41.13 | MI20260021 Residential |
| Saginaw | LABORER: LANDSCAPE | $9.64 | $2.81 | $12.45 | MI20260021 Residential |
| Saginaw | LABORER: LANDSCAPE AND IRRIGATION: GROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER AND SKIDSTEER (OR EQUIVALENT) | $29.93 | $9.10 | $39.03 | MI20260097 Building |
| Saginaw | LABORER: LANDSCAPE AND IRRIGATION: GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER | $27.71 | $9.10 | $36.81 | MI20260097 Building |
| Saginaw | LABORER: PIPELAYER | $17.95 | $5.46 | $23.41 | MI20260021 Residential |
| Saginaw | LABORER: SANDBLASTER | $28.21 | $13.45 | $41.66 | MI20260097 Building |
| Saginaw | LANDSCAPE LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER AND SKIDSTEER (OR EQUIVALENT) | $29.93 | $9.10 | $39.03 | MI20260071 Heavy |
| Saginaw | LANDSCAPE LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER | $27.71 | $9.10 | $36.81 | MI20260071 Heavy |
| Sanilac | LABORER: COMMON OR GENERAL; MASON TENDER - BRICK; PIPELAYER; AND SANDBLASTER EXCLUDES OPEN CUT CONSTRUCTION | $31.30 | $18.40 | $49.70 | MI20260149 Building |
| Sanilac | LABORER: LANDSCAPE & IRRIGATION | $12.84 | $0.00 | $12.84 | MI20260149 Building |
| Sanilac | LABORER: MASON TENDER - CEMENT/CONCRETE | $16.11 | $4.51 | $20.62 | MI20260149 Building |
| Schoolcraft | LABORER (COMMON OR GENERAL; MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; AND SANDBLASTER) | $28.18 | $13.45 | $41.63 | MI20260150 Building |
| Schoolcraft | LABORER: LANDSCAPE & IRRIGATION | $14.95 | $0.00 | $14.95 | MI20260150 Building |
| Shiawassee | LABORER (COMMON OR GENERAL; MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; PIPELAYER; AND SANDBLASTER) | $29.46 | $16.10 | $45.56 | MI20260151 Building |
| Shiawassee | LABORER: LANDSCAPE & IRRIGATION | $12.84 | $0.00 | $12.84 | MI20260151 Building |
| St Clair | LABORER ((1) COMMON OR GENERAL) | $23.39 | $13.15 | $36.54 | MI20260072 Heavy |
| St Clair | LABORER ((2) MASON TENDER-CEMENT/CONCRETE) | $23.53 | $13.15 | $36.68 | MI20260072 Heavy |
| St Clair | LABORER ((4) GRADE CHECKER) | $23.70 | $13.15 | $36.85 | MI20260072 Heavy |
| St Clair | LABORER ((5) PIPELAYER) | $23.84 | $13.52 | $37.36 | MI20260072 Heavy |
| St Clair | LABORER ((7) LANDSCAPE) | $18.29 | $12.85 | $31.14 | MI20260072 Heavy |
| St Clair | LABORER (COMMON OR GENERAL; FORMWORK; MASON TENDER - CEMENT/CONCRETE) | $31.30 | $18.40 | $49.70 | MI20260022 Residential |
| St Clair | LABORER: ASBESTOS ABATEMENT (REMOVAL FROM FLOORS, WALLS & CEILINGS) | $39.08 | $15.92 | $55.00 | MI20260098 Building |
| St Clair | LABORER: COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - BRICK/CEMENT/CONCRETE, PIPELAYER; SANDBLASTER | $31.30 | $18.40 | $49.70 | MI20260098 Building |
| St Clair | LABORER: COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - CEMENT/CONCRETE; PIPELAYER (EXCLUDES OPEN CUT CONSTRUCTION) | $30.35 | $17.90 | $48.25 | MI20260072 Heavy |
| St Clair | LABORER: LANDSCAPE & IRRIGATION: GROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER, SKIDSTEER (OR EQUIVALENT) | $29.93 | $9.10 | $39.03 | MI20260098 Building |
| St Clair | LABORER: LANDSCAPE & IRRIGATION: GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER | $27.71 | $9.10 | $36.81 | MI20260098 Building |
| St Clair | LABORER: PIPELAYER | $17.99 | $5.46 | $23.45 | MI20260022 Residential |
| St Clair | LANDSCAPE LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER AND SKIDSTEER (OR EQUIVALENT) | $29.93 | $9.10 | $39.03 | MI20260072 Heavy |
| St Clair | LANDSCAPE LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER | $27.71 | $9.10 | $36.81 | MI20260072 Heavy |
| St Clair | LANDSCAPE LABORER: GROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER, SKIDSTEER (OR EQUIVALENT) | $29.93 | $9.10 | $39.03 | MI20260022 Residential |
| St Clair | LANDSCAPE LABORER: GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER | $27.71 | $9.10 | $36.81 | MI20260022 Residential |
| St Joseph, St Joseph | LABORER : COMMON OR GENERAL; SANDBLASTER | $27.21 | $13.45 | $40.66 | MI20260152 Building |
| St Joseph, St Joseph | LABORER: LANDSCAPE & IRRIGATION | $12.84 | $0.00 | $12.84 | MI20260152 Building |
| St Joseph, St Joseph | LABORER: MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE | $30.72 | $12.95 | $43.67 | MI20260152 Building |
| Tuscola | LABORER (MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; AND PIPELAYER) | $27.68 | $13.45 | $41.13 | MI20260153 Building |
| Tuscola | LABORER: COMMON OR GENERAL | $15.18 | $4.02 | $19.20 | MI20260153 Building |
| Tuscola | LABORER: COMMON OR GENERAL; MASON TENDER - CEMENT/CONCRETE | $27.68 | $13.45 | $41.13 | MI20260005 Residential |
| Tuscola | LABORER: LANDSCAPE & IRRIGATION | $12.84 | $0.00 | $12.84 | MI20260153 Building |
| Tuscola | LABORER: SANDBLASTER | $28.21 | $13.45 | $41.66 | MI20260153 Building |
| Van Buren | LABORER ((1) COMMON OR GENERAL) | $22.42 | $12.95 | $35.37 | MI20260073 Heavy |
| Van Buren | LABORER ((2) MASON TENDER-CEMENT/CONCRETE) | $22.55 | $12.95 | $35.50 | MI20260073 Heavy |
| Van Buren | LABORER ((4) GRADE CHECKER) | $22.73 | $12.95 | $35.68 | MI20260073 Heavy |
| Van Buren | LABORER ((5) PIPELAYER) | $22.85 | $12.95 | $35.80 | MI20260073 Heavy |
| Van Buren | LABORER (COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - CEMENT/CONCRETE) (EXCLUDES OPEN CUT CONSTRUCTION) | $27.21 | $13.45 | $40.66 | MI20260073 Heavy |
| Van Buren | LABORER: COMMON OR GENERAL | $16.87 | $5.46 | $22.33 | MI20260023 Residential |
| Van Buren | LABORER: COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - CEMENT/CONCRETE; SANDBLASTER | $27.21 | $13.45 | $40.66 | MI20260099 Building |
| Van Buren | LABORER: LANDSCAPE | $9.64 | $2.81 | $12.45 | MI20260023 Residential |
| Van Buren | LABORER: LANDSCAPE | $12.25 | $0.00 | $12.25 | MI20260073 Heavy |
| Van Buren | LABORER: LANDSCAPE & IRRIGATION | $10.38 | $0.50 | $10.88 | MI20260099 Building |
| Van Buren | LABORER: MASON TENDER - BRICK | $20.29 | $7.22 | $27.51 | MI20260099 Building |
| Van Buren | LABORER: MASON TENDER - CEMENT/CONCRETE | $27.21 | $13.45 | $40.66 | MI20260023 Residential |
| Van Buren | LABORER: PIPELAYER | $17.95 | $5.46 | $23.41 | MI20260023 Residential |
| Washtenaw | LABORER ((1) COMMON OR GENERAL) | $25.20 | $12.95 | $38.15 | MI20260074 Heavy |
| Washtenaw | LABORER ((2) MASON TENDER-CEMENT/CONCRETE) | $22.11 | $12.95 | $35.06 | MI20260074 Heavy |
| Washtenaw | LABORER ((4) GRADE CHECKER) | $25.50 | $12.95 | $38.45 | MI20260074 Heavy |
| Washtenaw | LABORER ((524.20) PIPELAYER) | $25.65 | $12.95 | $38.60 | MI20260074 Heavy |
| Washtenaw | LABORER ((7) LANDSCAPE) | $19.59 | $12.95 | $32.54 | MI20260074 Heavy |
| Washtenaw | LABORER, EXCLUDES OPEN CUT CONSTRUCTION GROUP 1 COMMON OR GENERAL; GRADE CHECKER | $38.11 | $15.45 | $53.56 | MI20260074 Heavy |
| Washtenaw | LABORER, EXCLUDES OPEN CUT CONSTRUCTION GROUP 2 MASON TENDER - CEMENT/CONCRETE | $38.33 | $15.45 | $53.78 | MI20260074 Heavy |
| Washtenaw | LABORER, EXCLUDES OPEN CUT CONSTRUCTION GROUP 3 PIPELAYER | $38.47 | $15.45 | $53.92 | MI20260074 Heavy |
| Washtenaw | LABORER: COMMON OR GENERAL | $15.58 | $5.46 | $21.04 | MI20260024 Residential |
| Washtenaw | LABORER: COMMON OR GENERAL; GRADE CHECKER; SANDBLASTER | $38.11 | $15.45 | $53.56 | MI20260100 Building |
| Washtenaw | LABORER: LANDSCAPE & IRRIGATION: GROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER, SKIDSTEER (OR EQUIVALENT) | $29.93 | $9.10 | $39.03 | MI20260100 Building |
| Washtenaw | LABORER: LANDSCAPE & IRRIGATION: GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER | $27.71 | $9.10 | $36.81 | MI20260100 Building |
| Washtenaw | LABORER: MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE | $38.33 | $15.45 | $53.78 | MI20260100 Building |
| Washtenaw | LABORER: MASON TENDER - CEMENT/CONCRETE | $38.33 | $15.45 | $53.78 | MI20260024 Residential |
| Washtenaw | LABORER: PIPELAYER | $17.99 | $5.46 | $23.45 | MI20260024 Residential |
| Washtenaw | LABORER: PIPELAYER | $38.47 | $15.45 | $53.92 | MI20260100 Building |
| Washtenaw | LANDSCAPE LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER AND SKIDSTEER (OR EQUIVALENT) | $29.93 | $9.10 | $39.03 | MI20260074 Heavy |
| Washtenaw | LANDSCAPE LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER | $27.71 | $9.10 | $36.81 | MI20260074 Heavy |
| Washtenaw | LANDSCAPE LABORER: GROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER, SKIDSTEER (OR EQUIVALENT) | $29.93 | $9.10 | $39.03 | MI20260024 Residential |
| Washtenaw | LANDSCAPE LABORER: GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER | $27.71 | $9.10 | $36.81 | MI20260024 Residential |
| Wayne | LABORER ((4) GRADE CHECKER) | $24.11 | $16.95 | $41.06 | MI20260075 Heavy |
| Wayne | LABORER ((5) PIPELAYER) | $24.17 | $16.95 | $41.12 | MI20260075 Heavy |
| Wayne | LABORER (COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - BRICK/CEMENT/CONCRETE; PIPELAYER; SANDBLASTER) | $38.00 | $18.25 | $56.25 | MI20260101 Building |
| Wayne | LABORER: ASBESTOS ABATEMENT (REMOVAL FROM FLOORS, WALLS & CEILINGS) | $39.08 | $15.92 | $55.00 | MI20260101 Building |
| Wayne | LABORER: LANDSCAPE & IRRIGATION: GROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER, SKIDSTEER (OR EQUIVALENT) | $29.93 | $9.10 | $39.03 | MI20260101 Building |
| Wayne | LABORER: LANDSCAPE & IRRIGATION: GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER | $27.71 | $9.10 | $36.81 | MI20260101 Building |
| Wayne | LABORERS: COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - CEMENT/CONCRETE; PIPELAYER (EXCLUDES OPEN CUT CONSTRUCTION) | $38.00 | $18.25 | $56.25 | MI20260075 Heavy |
| Wayne | LANDSCAPE LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER AND SKIDSTEER (OR EQUIVALENT) | $29.93 | $9.10 | $39.03 | MI20260075 Heavy |
| Wayne | LANDSCAPE LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER | $27.71 | $9.10 | $36.81 | MI20260075 Heavy |
| Wexford | LABORER (COMON OR GENERAL; MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; AND PIPELAYER) | $25.02 | $13.45 | $38.47 | MI20260154 Building |
| Wexford | LABORER: LANDSCAPE & IRRIGATION | $11.04 | $4.39 | $15.43 | MI20260154 Building |
| Wexford | LABORER: SANDBLASTER | $26.23 | $13.45 | $39.68 | MI20260154 Building |
Rates come from the current revision of each active determination; DOL revises these mid-year. Open a determination to watch it, or pin a bid date to lock the revision that legally applies. All Michigan trades.