Carpenter prevailing wages: Florida, county by county
222 current carpenter rates across 214 active Florida wage determinations. Rates differ by county and construction type; click a determination for revision history, diffs, and change alerts.
| County / area | Classification | Rate | Fringe | Total | Determination |
|---|---|---|---|---|---|
| Alachua | CARPENTER | $15.80 | $0.00 | $15.80 | FL20260103 Heavy |
| Alachua | CARPENTER, INCLUDES CABINET INSTALLATION (EXCLUDES DRYWALL HANGING) | $12.15 | $0.00 | $12.15 | FL20260052 Residential |
| Alachua | CARPENTER, INCLUDES FORM WORK | $15.08 | $0.00 | $15.08 | FL20260194 Building |
| Alachua, Gilchrist, Levy | CARPENTER | $18.98 | $0.00 | $18.98 | FL20260276 Highway |
| Baker | CARPENTER | $15.80 | $0.00 | $15.80 | FL20260104 Heavy |
| Baker | CARPENTER, EXCLUDES DRYWALL HANGING, AND FORM WORK | $14.14 | $0.00 | $14.14 | FL20260053 Residential |
| Baker | CARPENTER, INCLUDES DRYWALL HANGING, AND FORM WORK | $18.29 | $4.90 | $23.19 | FL20260195 Building |
| Baker, Nassau | CARPENTER | $19.33 | $0.00 | $19.33 | FL20260277 Highway |
| Bay | CARPENTER | $12.00 | $0.00 | $12.00 | FL20260054 Residential |
| Bay | CARPENTER | $15.36 | $0.00 | $15.36 | FL20260105 Heavy |
| Bay | CARPENTER | $19.66 | $0.00 | $19.66 | FL20260239 Highway |
| Bradford | CARPENTER | $14.98 | $0.00 | $14.98 | FL20260236 Highway |
| Bradford | CARPENTER, EXCLUDES DRYWALL HANGING | $11.90 | $0.00 | $11.90 | FL20260029 Residential |
| Bradford | CARPENTER, INCLUDES FORM WORK | $14.79 | $1.81 | $16.60 | FL20260006 Building |
| Brevard | CARPENTER | $13.56 | $1.84 | $15.40 | FL20260106 Heavy |
| Brevard | CARPENTER | $22.72 | $0.00 | $22.72 | FL20260240 Highway |
| Brevard | CARPENTER, INCLUDES FORM WORK | $13.46 | $0.54 | $14.00 | FL20260055 Residential |
| Brevard | CARPENTER, INCLUDES FORM WORK | $19.33 | $2.73 | $22.06 | FL20260196 Building |
| Broward | CARPENTER | $19.98 | $0.00 | $19.98 | FL20260241 Highway |
| Broward | CARPENTER (INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL FINISHING/TAPING, DRYWALL HANGING, FORM WORK, METAL STUD INSTALLATION) | $25.95 | $8.65 | $34.60 | FL20260197 Building |
| Broward | CARPENTER, INCLUDES CABINET INSTALLATION (EXCLUDES DRYWALL HANGING) | $21.17 | $0.86 | $22.03 | FL20260056 Residential |
| Broward | CARPENTER, INCLUDES FORM WORK | $17.00 | $2.51 | $19.51 | FL20260107 Heavy |
| Broward | CARPENTER: PILEDRIVERMAN | $25.20 | $10.36 | $35.56 | FL20260197 Building |
| Calhoun | CARPENTER | $13.63 | $1.14 | $14.77 | FL20260007 Building |
| Calhoun | CARPENTER | $11.90 | $0.00 | $11.90 | FL20260030 Residential |
| Calhoun | CARPENTER | $17.63 | $0.00 | $17.63 | FL20260237 Highway |
| Charlotte | CARPENTER | $13.66 | $2.67 | $16.33 | FL20260057 Residential |
| Charlotte | CARPENTER | $14.95 | $2.92 | $17.87 | FL20260108 Heavy |
| Charlotte | CARPENTER | $19.78 | $8.05 | $27.83 | FL20260198 Building |
| Charlotte | CARPENTER | $24.79 | $0.00 | $24.79 | FL20260242 Highway |
| Citrus | CARPENTER | $24.96 | $0.00 | $24.96 | FL20260243 Highway |
| Citrus | CARPENTER, EXCLUDES DRYWALL HANGING | $11.05 | $0.00 | $11.05 | FL20260031 Residential |
| Citrus | CARPENTER, INCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION (EXCLUDES CARPET AND VINYL FLOOR LAYING) | $16.94 | $3.16 | $20.10 | FL20260199 Building |
| Citrus | LABORER: COMMON OR GENERAL, INCLUDES CARPENTER TENDING AND CEMENT MASON TENDING | $11.77 | $1.61 | $13.38 | FL20260199 Building |
| Clay | CARPENTER | $15.80 | $0.00 | $15.80 | FL20260109 Heavy |
| Clay | CARPENTER | $19.33 | $0.00 | $19.33 | FL20260244 Highway |
| Clay | CARPENTER, EXCLUDES DRYWALL HANGING, AND FORM WORK | $14.14 | $0.00 | $14.14 | FL20260058 Residential |
| Clay | CARPENTER, INCLUDES DRYWALL HANGING, AND FORM WORK | $18.29 | $4.90 | $23.19 | FL20260200 Building |
| Collier | CARPENTER | $13.66 | $2.67 | $16.33 | FL20260059 Residential |
| Collier | CARPENTER | $14.95 | $2.92 | $17.87 | FL20260110 Heavy |
| Collier | CARPENTER | $18.00 | $0.64 | $18.64 | FL20260201 Building |
| Collier | CARPENTER | $22.38 | $0.00 | $22.38 | FL20260245 Highway |
| Columbia | CARPENTER | $14.98 | $0.00 | $14.98 | FL20260003 Highway |
| Columbia | CARPENTER, EXCLUDES DRYWALL HANGING | $11.90 | $0.00 | $11.90 | FL20260032 Residential |
| Columbia | CARPENTER, INCLUDES FORM WORK | $15.00 | $0.36 | $15.36 | FL20260008 Building |
| De Soto | CARPENTER | $15.08 | $5.07 | $20.15 | FL20260009 Building |
| De Soto | CARPENTER | $15.83 | $0.00 | $15.83 | FL20260033 Residential |
| Dixie | CARPENTER | $14.98 | $0.00 | $14.98 | FL20260279 Highway |
| Dixie | CARPENTER, EXCLUDES DRYWALL HANGING | $11.90 | $0.00 | $11.90 | FL20260034 Residential |
| Dixie | CARPENTER, INCLUDES FORM WORK | $14.79 | $1.81 | $16.60 | FL20260010 Building |
| Duval | CARPENTER | $15.92 | $0.00 | $15.92 | FL20260111 Heavy |
| Duval | CARPENTER | $19.88 | $0.00 | $19.88 | FL20260246 Highway |
| Duval | CARPENTER (INCLUDES DRYWALL HANGING AND FORM WORK) | $23.63 | $13.30 | $36.93 | FL20260202 Building |
| Duval | CARPENTER, EXCLUDES DRYWALL HANGING, AND FORM WORK | $14.63 | $0.00 | $14.63 | FL20260060 Residential |
| Escambia | CARPENTER | $15.36 | $0.00 | $15.36 | FL20260112 Heavy |
| Escambia | CARPENTER | $15.87 | $0.00 | $15.87 | FL20260203 Building |
| Escambia | CARPENTER | $19.66 | $0.00 | $19.66 | FL20260247 Highway |
| Escambia | CARPENTER, EXCLUDES DRYWALL HANGING | $12.95 | $0.00 | $12.95 | FL20260061 Residential |
| Flagler | CARPENTER | $22.58 | $0.00 | $22.58 | FL20260248 Highway |
| Flagler | CARPENTER, EXCLUDES DRYWALL HANGING | $13.93 | $0.00 | $13.93 | FL20260035 Residential |
| Flagler, Volusia | CARPENTER | $17.92 | $0.00 | $17.92 | FL20260232 Building |
| Franklin | CARPENTER | $17.38 | $0.00 | $17.38 | FL20260004 Highway |
| Franklin | CARPENTER | $12.92 | $0.00 | $12.92 | FL20260011 Building |
| Franklin | CARPENTER | $11.90 | $0.00 | $11.90 | FL20260036 Residential |
| Gadsden | CARPENTER | $13.53 | $0.00 | $13.53 | FL20260062 Residential |
| Gadsden | CARPENTER | $15.36 | $0.00 | $15.36 | FL20260113 Heavy |
| Gadsden | CARPENTER | $16.00 | $0.00 | $16.00 | FL20260204 Building |
| Gadsden | CARPENTER | $19.66 | $0.00 | $19.66 | FL20260249 Highway |
| Gilchrist | CARPENTER | $15.80 | $0.00 | $15.80 | FL20260114 Heavy |
| Gilchrist | CARPENTER, INCLUDES CABINET INSTALLATION (EXCLUDES DRYWALL HANGING) | $12.15 | $0.00 | $12.15 | FL20260063 Residential |
| Gilchrist | CARPENTER, INCLUDES FORM WORK | $15.32 | $0.00 | $15.32 | FL20260205 Building |
| Glades | CARPENTER | $15.08 | $5.07 | $20.15 | FL20260012 Building |
| Glades | CARPENTER | $15.83 | $0.00 | $15.83 | FL20260037 Residential |
| Glades + 5 more | CARPENTER | $15.61 | $0.00 | $15.61 | FL20260238 Highway |
| Gulf | CARPENTER | $11.90 | $0.00 | $11.90 | FL20260038 Residential |
| Gulf | CARPENTER | $17.63 | $0.00 | $17.63 | FL20260280 Highway |
| Gulf, Bay | CARPENTER | $16.00 | $0.00 | $16.00 | FL20260005 Building |
| Hamilton | CARPENTER, EXCLUDES DRYWALL HANGING | $11.90 | $0.00 | $11.90 | FL20260039 Residential |
| Hamilton | CARPENTER, INCLUDES FORM WORK | $14.79 | $1.81 | $16.60 | FL20260013 Building |
| Hardee | CARPENTER | $15.08 | $5.07 | $20.15 | FL20260014 Building |
| Hardee | CARPENTER | $15.83 | $0.00 | $15.83 | FL20260040 Residential |
| Hendry | CARPENTER | $15.08 | $5.07 | $20.15 | FL20260015 Building |
| Hendry | CARPENTER | $15.83 | $0.00 | $15.83 | FL20260041 Residential |
| Hernando | CARPENTER | $14.95 | $2.92 | $17.87 | FL20260115 Heavy |
| Hernando | CARPENTER | $24.96 | $0.00 | $24.96 | FL20260250 Highway |
| Hernando | CARPENTER, INCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION (EXCLUDES CARPET AND VINYL FLOOR LAYING) | $16.94 | $3.16 | $20.10 | FL20260206 Building |
| Hernando | CARPENTER, INCLUDES FORM WORK (EXCLUDES DRYWALL HANGING) | $12.97 | $1.97 | $14.94 | FL20260064 Residential |
| Hernando | LABORER: COMMON OR GENERAL, INCLUDES CARPENTER TENDING AND CEMENT MASON TENDING | $11.83 | $1.59 | $13.42 | FL20260206 Building |
| Highlands | CARPENTER | $15.83 | $0.00 | $15.83 | FL20260042 Residential |
| Highlands | CARPENTER | $16.25 | $1.36 | $17.61 | FL20260207 Building |
| Highlands | CARPENTER | $22.58 | $0.00 | $22.58 | FL20260251 Highway |
| Hillsborough | CARPENTER | $14.95 | $2.92 | $17.87 | FL20260116 Heavy |
| Hillsborough | CARPENTER | $24.96 | $0.00 | $24.96 | FL20260252 Highway |
| Hillsborough | CARPENTER, INCLUDES DRYWALL HANGING, AND FORM WORK | $15.00 | $0.00 | $15.00 | FL20260065 Residential |
| Hillsborough | CARPENTER, INCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION (EXCLUDES CARPET AND VINYL FLOOR LAYING) | $17.37 | $3.85 | $21.22 | FL20260208 Building |
| Hillsborough | LABORER: COMMON OR GENERAL, INCLUDES CARPENTER TENDING AND CEMENT MASON TENDING | $11.84 | $1.95 | $13.79 | FL20260208 Building |
| Holmes | CARPENTER | $13.63 | $1.14 | $14.77 | FL20260016 Building |
| Holmes | CARPENTER | $11.90 | $0.00 | $11.90 | FL20260043 Residential |
| Holmes, Jackson, Liberty | CARPENTER | $17.63 | $0.00 | $17.63 | FL20260283 Highway |
| Indian River | CARPENTER | $15.00 | $0.00 | $15.00 | FL20260066 Residential |
| Indian River | CARPENTER | $13.56 | $1.84 | $15.40 | FL20260117 Heavy |
| Indian River | CARPENTER | $17.49 | $3.33 | $20.82 | FL20260209 Building |
| Indian River | CARPENTER | $19.98 | $0.00 | $19.98 | FL20260253 Highway |
| Jackson | CARPENTER | $12.29 | $0.27 | $12.56 | FL20260017 Building |
| Jackson, Liberty | CARPENTER | $11.90 | $0.00 | $11.90 | FL20260048 Residential |
| Jefferson | CARPENTER | $13.53 | $0.00 | $13.53 | FL20260067 Residential |
| Jefferson | CARPENTER | $15.36 | $0.00 | $15.36 | FL20260118 Heavy |
| Jefferson, Leon | CARPENTER | $16.00 | $0.00 | $16.00 | FL20260233 Building |
| Jefferson, Wakulla | CARPENTER | $19.66 | $0.00 | $19.66 | FL20260278 Highway |
| Lafayette | CARPENTER, EXCLUDES DRYWALL HANGING | $11.90 | $0.00 | $11.90 | FL20260044 Residential |
| Lafayette | CARPENTER, INCLUDES FORM WORK | $14.79 | $1.81 | $16.60 | FL20260018 Building |
| Lake | CARPENTER | $22.72 | $0.00 | $22.72 | FL20260254 Highway |
| Lake | CARPENTER (INCLUDES FORM WORK) | $28.65 | $13.80 | $42.45 | FL20260210 Building |
| Lake | CARPENTER, EXCLUDES FORM WORK | $11.96 | $2.94 | $14.90 | FL20260068 Residential |
| Lake | CARPENTER, INCLUDES FORM WORK | $13.37 | $1.78 | $15.15 | FL20260119 Heavy |
| Lee | CARPENTER | $14.95 | $2.92 | $17.87 | FL20260120 Heavy |
| Lee | CARPENTER | $18.00 | $0.00 | $18.00 | FL20260211 Building |
| Lee | CARPENTER | $22.38 | $0.00 | $22.38 | FL20260255 Highway |
| Lee | CARPENTER, INCLUDES CABINET INSTALLATION (EXCLUDES DRYWALL HANGING) | $14.09 | $0.00 | $14.09 | FL20260069 Residential |
| Leon | CARPENTER | $13.53 | $0.00 | $13.53 | FL20260070 Residential |
| Leon | CARPENTER | $15.36 | $0.00 | $15.36 | FL20260121 Heavy |
| Leon | CARPENTER | $19.66 | $0.00 | $19.66 | FL20260256 Highway |
| Levy | CARPENTER, INCLUDES FORM WORK | $14.79 | $1.81 | $16.60 | FL20260019 Building |
| Levy, Union, Suwannee | CARPENTER, EXCLUDES DRYWALL HANGING | $11.90 | $0.00 | $11.90 | FL20260049 Residential |
| Liberty | CARPENTER, INCLUDES FORM WORK | $13.19 | $0.00 | $13.19 | FL20260020 Building |
| Madison | CARPENTER, INCLUDES FORM WORK | $14.79 | $1.81 | $16.60 | FL20260021 Building |
| Manatee | CARPENTER | $14.95 | $2.92 | $17.87 | FL20260122 Heavy |
| Manatee | CARPENTER | $19.78 | $8.05 | $27.83 | FL20260212 Building |
| Manatee | CARPENTER | $24.79 | $0.00 | $24.79 | FL20260257 Highway |
| Manatee | CARPENTER, INCLUDES CABINET INSTALLATION (EXCLUDES FORM WORK) | $15.00 | $0.00 | $15.00 | FL20260071 Residential |
| Marion | CARPENTER | $15.80 | $0.00 | $15.80 | FL20260123 Heavy |
| Marion | CARPENTER | $18.98 | $0.00 | $18.98 | FL20260258 Highway |
| Marion | CARPENTER, INCLUDES BATT INSULATION | $12.86 | $0.00 | $12.86 | FL20260072 Residential |
| Marion | CARPENTER, INCLUDES FORM WORK | $15.32 | $0.00 | $15.32 | FL20260213 Building |
| Martin | CARPENTER | $14.89 | $0.00 | $14.89 | FL20260073 Residential |
| Martin | CARPENTER | $17.49 | $3.33 | $20.82 | FL20260214 Building |
| Martin | CARPENTER | $19.98 | $0.00 | $19.98 | FL20260259 Highway |
| Martin | CARPENTER, INCLUDES FORM WORK | $15.50 | $0.00 | $15.50 | FL20260124 Heavy |
| Miami-Dade, Miami-Dade | CARPENTER | $19.98 | $0.00 | $19.98 | FL20260260 Highway |
| Miami-Dade, Miami-Dade | CARPENTER, EXCLUDES DRYWALL HANGING | $12.51 | $0.00 | $12.51 | FL20260074 Residential |
| Miami-Dade, Miami-Dade | CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL FINISHING/TAPING, DRYWALL HANGING, FORM WORK, METAL STUD INSTALLATION | $18.04 | $3.24 | $21.28 | FL20260215 Building |
| Miami-Dade, Miami-Dade | CARPENTER, INCLUDES FORM WORK | $17.00 | $2.51 | $19.51 | FL20260125 Heavy |
| Miami-Dade, Miami-Dade | CARPENTER: PILEDRIVERMAN | $25.20 | $10.36 | $35.56 | FL20260215 Building |
| Monroe | CARPENTER | $15.08 | $5.07 | $20.15 | FL20260022 Building |
| Monroe | CARPENTER | $15.83 | $0.00 | $15.83 | FL20260045 Residential |
| Nassau | CARPENTER | $15.80 | $0.00 | $15.80 | FL20260126 Heavy |
| Nassau | CARPENTER, EXCLUDES DRYWALL HANGING, AND FORM WORK | $14.14 | $0.00 | $14.14 | FL20260075 Residential |
| Nassau | CARPENTER, INCLUDES DRYWALL HANGING, AND FORM WORK | $18.29 | $4.90 | $23.19 | FL20260216 Building |
| Okaloosa | CARPENTER | $13.53 | $0.00 | $13.53 | FL20260076 Residential |
| Okaloosa | CARPENTER | $15.36 | $0.00 | $15.36 | FL20260127 Heavy |
| Okaloosa | CARPENTER | $19.66 | $0.00 | $19.66 | FL20260261 Highway |
| Okaloosa | CARPENTER, INCLUDES FORM WORK | $16.38 | $0.00 | $16.38 | FL20260217 Building |
| Okeechobee | CARPENTER | $15.08 | $5.07 | $20.15 | FL20260023 Building |
| Okeechobee | CARPENTER | $15.83 | $0.00 | $15.83 | FL20260046 Residential |
| Orange | CARPENTER | $13.56 | $1.84 | $15.40 | FL20260128 Heavy |
| Orange | CARPENTER | $22.55 | $0.00 | $22.55 | FL20260262 Highway |
| Orange | CARPENTER (INCLUDES FORM WORK) | $28.65 | $13.80 | $42.45 | FL20260218 Building |
| Orange | CARPENTER, EXCLUDES FORM WORK | $11.85 | $3.29 | $15.14 | FL20260077 Residential |
| Osceola | CARPENTER | $22.72 | $0.00 | $22.72 | FL20260263 Highway |
| Osceola | CARPENTER (INCLUDES FORM WORK) | $28.65 | $13.80 | $42.45 | FL20260219 Building |
| Osceola | CARPENTER, EXCLUDES FORM WORK | $11.96 | $2.94 | $14.90 | FL20260078 Residential |
| Osceola | CARPENTER, INCLUDES FORM WORK | $13.37 | $1.78 | $15.15 | FL20260129 Heavy |
| Palm Beach | CARPENTER | $19.98 | $0.00 | $19.98 | FL20260264 Highway |
| Palm Beach | CARPENTER, EXCLUDES DRYWALL HANGING | $14.45 | $0.00 | $14.45 | FL20260079 Residential |
| Palm Beach | CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL FINISHING/TAPING, DRYWALL HANGING, FORM WORK, METAL STUD INSTALLATION | $16.98 | $0.00 | $16.98 | FL20260220 Building |
| Palm Beach | CARPENTER, INCLUDES FORM WORK | $17.00 | $2.51 | $19.51 | FL20260130 Heavy |
| Palm Beach | CARPENTER: PILEDRIVERMAN | $25.20 | $10.36 | $35.56 | FL20260220 Building |
| Pasco | CARPENTER | $24.96 | $0.00 | $24.96 | FL20260265 Highway |
| Pasco | CARPENTER, INCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION (EXCLUDES CARPET AND VINYL FLOOR LAYING) | $14.79 | $0.70 | $15.49 | FL20260221 Building |
| Pasco | CARPENTER, INCLUDES FORM WORK (EXCLUDES DRYWALL HANGING) | $12.16 | $0.00 | $12.16 | FL20260080 Residential |
| Pasco | LABORER: COMMON OR GENERAL, INCLUDES CARPENTER TENDING AND CEMENT MASON TENDING | $11.00 | $0.70 | $11.70 | FL20260221 Building |
| Pasco, Pinellas | CARPENTER | $14.95 | $2.92 | $17.87 | FL20260139 Heavy |
| Pinellas | CARPENTER | $24.96 | $0.00 | $24.96 | FL20260266 Highway |
| Pinellas | CARPENTER, INCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION (EXCLUDES CARPET AND VINYL FLOOR LAYING) | $16.36 | $0.70 | $17.06 | FL20260222 Building |
| Pinellas | CARPENTER, INCLUDES FORM WORK | $11.67 | $2.25 | $13.92 | FL20260081 Residential |
| Pinellas | LABORER: COMMON OR GENERAL, INCLUDES CARPENTER TENDING AND CEMENT MASON TENDING | $11.31 | $0.85 | $12.16 | FL20260222 Building |
| Polk | CARPENTER | $17.10 | $1.63 | $18.73 | FL20260223 Building |
| Polk | CARPENTER | $22.58 | $0.00 | $22.58 | FL20260267 Highway |
| Polk | CARPENTER, EXCLUDES FORM WORK | $13.56 | $1.84 | $15.40 | FL20260131 Heavy |
| Polk | CARPENTER, INCLUDES CABINET INSTALLATION | $11.37 | $0.00 | $11.37 | FL20260082 Residential |
| Putnam | CARPENTER | $14.98 | $0.00 | $14.98 | FL20260234 Highway |
| Putnam | CARPENTER, EXCLUDES DRYWALL HANGING | $13.29 | $0.00 | $13.29 | FL20260047 Residential |
| Putnam | CARPENTER, INCLUDES FORM WORK | $14.46 | $3.39 | $17.85 | FL20260024 Building |
| Santa Rosa | CARPENTER | $15.36 | $0.00 | $15.36 | FL20260132 Heavy |
| Santa Rosa | CARPENTER | $16.07 | $0.00 | $16.07 | FL20260224 Building |
| Santa Rosa | CARPENTER | $19.66 | $0.00 | $19.66 | FL20260268 Highway |
| Santa Rosa | CARPENTER, EXCLUDES DRYWALL HANGING | $12.95 | $0.00 | $12.95 | FL20260083 Residential |
| Sarasota | CARPENTER | $14.95 | $2.92 | $17.87 | FL20260133 Heavy |
| Sarasota | CARPENTER | $20.30 | $0.00 | $20.30 | FL20260225 Building |
| Sarasota | CARPENTER | $24.79 | $0.00 | $24.79 | FL20260269 Highway |
| Sarasota | CARPENTER, INCLUDES CABINET INSTALLATION (EXCLUDES FORM WORK) | $16.10 | $0.00 | $16.10 | FL20260084 Residential |
| Seminole | CARPENTER | $22.72 | $0.00 | $22.72 | FL20260270 Highway |
| Seminole | CARPENTER (INCLUDES FORM WORK) | $28.65 | $13.80 | $42.45 | FL20260226 Building |
| Seminole | CARPENTER, EXCLUDES FORM WORK | $12.09 | $2.95 | $15.04 | FL20260085 Residential |
| Seminole | CARPENTER, EXCLUDES FORM WORK | $13.56 | $1.84 | $15.40 | FL20260134 Heavy |
| St Johns, St Johns | CARPENTER | $15.80 | $0.00 | $15.80 | FL20260135 Heavy |
| St Johns, St Johns | CARPENTER | $19.33 | $0.00 | $19.33 | FL20260271 Highway |
| St Johns, St Johns | CARPENTER, EXCLUDES DRYWALL HANGING, AND FORM WORK | $12.17 | $0.00 | $12.17 | FL20260086 Residential |
| St Johns, St Johns | CARPENTER, INCLUDES DRYWALL HANGING, AND FORM WORK | $18.29 | $4.90 | $23.19 | FL20260227 Building |
| St Lucie | CARPENTER | $14.89 | $0.00 | $14.89 | FL20260087 Residential |
| St Lucie | CARPENTER | $17.49 | $3.33 | $20.82 | FL20260228 Building |
| St Lucie | CARPENTER | $19.98 | $0.00 | $19.98 | FL20260272 Highway |
| St Lucie | CARPENTER, INCLUDES FORM WORK | $15.50 | $0.00 | $15.50 | FL20260136 Heavy |
| Sumter | CARPENTER | $14.97 | $0.00 | $14.97 | FL20260229 Building |
| Sumter | CARPENTER | $22.58 | $0.00 | $22.58 | FL20260273 Highway |
| Sumter, Madison, Taylor | CARPENTER, EXCLUDES DRYWALL HANGING | $11.90 | $0.00 | $11.90 | FL20260050 Residential |
| Suwannee | CARPENTER | $19.02 | $0.78 | $19.80 | FL20260281 Highway |
| Suwannee | CARPENTER, INCLUDES FORM WORK | $14.79 | $1.81 | $16.60 | FL20260025 Building |
| Taylor | CARPENTER, INCLUDES FORM WORK | $14.79 | $1.81 | $16.60 | FL20260026 Building |
| Union | CARPENTER, INCLUDES FORM WORK | $14.79 | $1.81 | $16.60 | FL20260027 Building |
| Union + 4 more | CARPENTER | $14.98 | $0.00 | $14.98 | FL20260282 Highway |
| Volusia | CARPENTER | $12.97 | $0.00 | $12.97 | FL20260088 Residential |
| Volusia | CARPENTER | $22.58 | $0.00 | $22.58 | FL20260274 Highway |
| Volusia | CARPENTER, EXCLUDES FORM WORK | $13.56 | $1.84 | $15.40 | FL20260137 Heavy |
| Wakulla | CARPENTER | $13.53 | $0.00 | $13.53 | FL20260089 Residential |
| Wakulla | CARPENTER | $15.36 | $0.00 | $15.36 | FL20260138 Heavy |
| Wakulla | CARPENTER | $16.00 | $0.00 | $16.00 | FL20260230 Building |
| Walton | CARPENTER | $19.66 | $0.00 | $19.66 | FL20260275 Highway |
| Walton | CARPENTER, INCLUDES FORM WORK | $16.38 | $0.00 | $16.38 | FL20260231 Building |
| Walton, Washington | CARPENTER | $11.90 | $0.00 | $11.90 | FL20260051 Residential |
| Washington | CARPENTER | $17.63 | $0.00 | $17.63 | FL20260235 Highway |
| Washington | CARPENTER, INCLUDES FORM WORK | $13.19 | $0.00 | $13.19 | FL20260028 Building |
Rates come from the current revision of each active determination; DOL revises these mid-year. Open a determination to watch it, or pin a bid date to lock the revision that legally applies. All Florida trades.