Residential construction wages: Hernando, Florida
Wage determination FL20260064 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/FL20260064 on · latest revision 1 · verify at sam.gov/wage-determination/FL20260064/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GROUP 3 CRANES NOT DESCRIBED ABOVE JOURNEYMAN OILER SHALL BE PAID: 90% OF GROUP 3'S RATE | $37.01 | $16.85 | $53.86 |
| POWER EQUIPMENT OPERATOR: GROUP 2 LATTICE UNDER 150 TON, 100 TON UP TO 250 TON HYDRO CRANES | $38.01 | $16.85 | $54.86 |
| POWER EQUIPMENT OPERATOR: GROUP 1 150 TON LATTICE, 250 TON HYDRO, FRICTION, TOWER AND LUFFING CRANES, 300+ FT BOOM JOURNEYMAN OILER SHALL BE PAID: 90% OF GROUP 3'S RATE | $39.01 | $16.85 | $55.86 |
| IRONWORKER, REINFORCING | $35.25 | $17.32 | $52.57 |
| TRUCK DRIVER: LOWBOY TRUCK | $12.10 | $0.00 | $12.10 |
| TRUCK DRIVER, INCLUDES DUMP TRUCK | $10.22 | $0.00 | $10.22 |
| TILE SETTER | $16.00 | $0.00 | $16.00 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION (EXCLUDES METAL ROOF INSTALLATION) | $14.82 | $0.00 | $14.82 |
| ROOFER: METAL ROOF | $16.99 | $0.00 | $16.99 |
| ROOFER, INCLUDES BUILT UP, MODIFIED BITUMEN, AND SHAKE & SHINGLE ROOFS (EXCLUDES METAL ROOFS) | $15.98 | $0.00 | $15.98 |
| PLUMBER | $12.97 | $0.00 | $12.97 |
| PLASTERER | $13.91 | $0.00 | $13.91 |
| PAINTER: INCLUDES BRUSH, ROLLER AND SPRAY (EXCLUDES DRYWALL FINISHING/TAPING) | $13.59 | $0.00 | $13.59 |
| OPERATOR: TRACTOR | $10.20 | $0.00 | $10.20 |
| OPERATOR: TRACKHOE | $14.81 | $0.00 | $14.81 |
| OPERATOR: SCREED | $10.93 | $0.00 | $10.93 |
| OPERATOR: ROLLER | $10.62 | $0.00 | $10.62 |
| OPERATOR: LOADER | $11.50 | $0.00 | $11.50 |
| OPERATOR: GRADER/BLADE | $14.00 | $0.00 | $14.00 |
| OPERATOR: FORKLIFT | $17.50 | $0.00 | $17.50 |
| OPERATOR: DISTRIBUTOR | $11.41 | $0.00 | $11.41 |
| OPERATOR: BULLDOZER | $12.67 | $0.00 | $12.67 |
| OPERATOR: BACKHOE/EXCAVATOR | $15.25 | $0.00 | $15.25 |
| OPERATOR: BACKHOE LOADER COMBO | $17.04 | $0.00 | $17.04 |
| OPERATOR: ASPHALT PAVER | $12.40 | $0.00 | $12.40 |
| LABORER: LANDSCAPE AND IRRIGATION | $10.72 | $0.00 | $10.72 |
| LABORER: ROOF TEAROFF | $9.00 | $0.00 | $9.00 |
| LABORER: PIPELAYER | $15.14 | $0.00 | $15.14 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $11.29 | $0.00 | $11.29 |
| LABORER: MASON TENDER - BRICK | $11.51 | $0.00 | $11.51 |
| LABORER: COMMON OR GENERAL | $9.25 | $0.00 | $9.25 |
| IRONWORKER, STRUCTURAL | $14.53 | $0.00 | $14.53 |
| IRONWORKER, ORNAMENTAL | $15.25 | $0.00 | $15.25 |
| INSULATOR: BATT AND BLOWN | $12.41 | $0.00 | $12.41 |
| GLAZIER | $15.88 | $0.00 | $15.88 |
| FENCE ERECTOR | $14.00 | $0.75 | $14.75 |
| ELECTRICIAN | $11.98 | $0.00 | $11.98 |
| DRYWALL HANGER | $15.00 | $0.00 | $15.00 |
| DRYWALL FINISHER/TAPER | $18.27 | $0.00 | $18.27 |
| CEMENT MASON/CONCRETE FINISHER | $15.00 | $0.00 | $15.00 |
| CARPENTER, INCLUDES FORM WORK (EXCLUDES DRYWALL HANGING) | $12.97 | $1.97 | $14.94 |
| BRICKLAYER | $20.00 | $0.00 | $20.00 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.