Building construction wages: Holmes, Florida
Wage determination FL20260016 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/FL20260016 on · latest revision 1 · verify at sam.gov/wage-determination/FL20260016/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | $33.50 | $13.85 | $47.35 |
| OPERATOR: CRANE UNDER 100 TONS CRANES WITH 350 FEET OR MORE BOOM AND/OR 400 TON CAPACITY - ADDITIONAL $1.10 PER HOUR. CRANES WITH 500 FEET BOOM AND/OR 600 TON CAPACITY - ADDITIONAL $1.45 PER HOUR | $30.25 | $14.55 | $44.80 |
| OPERATOR: CRANE 100 TONS & OVER (CONVENTIONAL & HYDRAULIC) & TOWER CRANES CRANES WITH 350 FEET OR MORE BOOM AND/OR 400 TON CAPACITY - ADDITIONAL $1.10 PER HOUR. CRANES WITH 500 FEET BOOM AND/OR 600 TON CAPACITY - ADDITIONAL $1.45 PER HOUR | $32.75 | $14.55 | $47.30 |
| IRONWORKER: STRUCTURAL AND REINFORCING | $32.00 | $18.77 | $50.77 |
| TRUCK DRIVER, INCLUDES DUMP AND 10 YARD HAUL AWAY | $8.00 | $0.15 | $8.15 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION | $11.72 | $2.19 | $13.91 |
| ROOFER: BUILT UP, COMPOSITION, HOT TAR AND SINGLE PLY | $12.00 | $0.00 | $12.00 |
| PLUMBER | $10.48 | $2.06 | $12.54 |
| PLASTERER | $15.90 | $0.00 | $15.90 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $10.10 | $0.00 | $10.10 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $9.58 | $0.00 | $9.58 |
| OPERATOR: BACKHOE/EXCAVATOR | $12.43 | $0.00 | $12.43 |
| LABORER: PIPELAYER | $11.42 | $1.95 | $13.37 |
| LABORER: COMMON OR GENERAL | $8.14 | $0.00 | $8.14 |
| CEMENT MASON/CONCRETE FINISHER | $11.50 | $0.00 | $11.50 |
| CARPENTER | $13.63 | $1.14 | $14.77 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.