Building construction wages: Sarasota, Florida
Wage determination FL20260225 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/FL20260225 on · latest revision 1 · verify at sam.gov/wage-determination/FL20260225/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $30.12 | $13.11 | $43.23 |
| ELECTRICIAN (INCLUDES LOW VOLTAGE WIRING) | $33.11 | $14.59 | $47.70 |
| ELEVATOR MECHANIC | $51.83 | $38.44 | $90.27 |
| POWER EQUIPMENT OPERATOR: GROUP 4 FORKLIFT JOURNEYMAN OILER SHALL BE PAID: 90% OF GROUP 3'S RATE | $35.01 | $16.85 | $51.86 |
| POWER EQUIPMENT OPERATOR: GROUP 3 CRANES NOT DESCRIBED ABOVE; MECHANICS JOURNEYMAN OILER SHALL BE PAID: 90% OF GROUP 3'S RATE | $37.01 | $16.85 | $53.86 |
| POWER EQUIPMENT OPERATOR: GROUP 2 LATTICE UNDER 150 TON, 100 TON UP TO 250 TON HYDRO CRANES | $38.01 | $16.85 | $54.86 |
| POWER EQUIPMENT OPERATOR: GROUP 1 150 TON LATTICE, 250 TON HYDRO, FRICTION, TOWER AND LUFFING CRANES, 300+ FT BOOM JOURNEYMAN OILER SHALL BE PAID: 90% OF GROUP 3'S RATE | $39.01 | $16.85 | $55.86 |
| IRONWORKER, STRUCTURAL | $35.25 | $17.32 | $52.57 |
| IRONWORKER: ORNAMENTAL | $28.90 | $15.66 | $44.56 |
| TRUCK DRIVER: LOWBOY TRUCK | $14.24 | $0.00 | $14.24 |
| TRUCK DRIVER: DUMP TRUCK | $13.22 | $2.12 | $15.34 |
| TILE SETTER | $18.01 | $0.00 | $18.01 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $21.86 | $7.94 | $29.80 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION | $19.05 | $4.47 | $23.52 |
| ROOFER | $19.00 | $1.17 | $20.17 |
| PLUMBER | $21.14 | $8.11 | $29.25 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION | $20.59 | $7.49 | $28.08 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $14.72 | $2.13 | $16.85 |
| OPERATOR: ROLLER | $14.43 | $4.78 | $19.21 |
| OPERATOR: LOADER | $14.00 | $1.40 | $15.40 |
| OPERATOR: GRADER/BLADE | $18.97 | $0.00 | $18.97 |
| OPERATOR: BULLDOZER | $15.40 | $1.90 | $17.30 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $22.07 | $8.80 | $30.87 |
| LABORER: PIPELAYER | $14.00 | $1.40 | $15.40 |
| LABORER: COMMON OR GENERAL, INCLUDING CEMENT MASON TENDING | $12.83 | $0.00 | $12.83 |
| IRONWORKER, REINFORCING | $26.37 | $12.65 | $39.02 |
| CEMENT MASON/CONCRETE FINISHER | $14.85 | $0.60 | $15.45 |
| CARPENTER | $20.30 | $0.00 | $20.30 |