Residential construction wages: St Lucie, Florida
Wage determination FL20260087 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/FL20260087 on · latest revision 1 · verify at sam.gov/wage-determination/FL20260087/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | $40.25 | $15.20 | $55.45 |
| OPERATOR: CRANE (CRANES 76 TON TO 129 TON) | $37.57 | $14.90 | $52.47 |
| OPERATOR: CRANE (CRANES 130-300 TON) | $39.38 | $14.90 | $54.28 |
| OPERATOR: CRANE (ALL CRANES OVER 300 TON, ELECTRIC TOWER, LUFFING BOOM CRANES) | $40.40 | $14.90 | $55.30 |
| OPERATOR: CRANE (ALL CRANES 75 TONS AND BELOW) | $37.07 | $14.90 | $51.97 |
| OPERATOR: OILER | $27.53 | $14.90 | $42.43 |
| OPERATOR: BACKHOE | $27.00 | $14.90 | $41.90 |
| IRONWORKER, ORNAMENTAL, REINFORCING AND STRUCTURAL | $28.90 | $15.66 | $44.56 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $23.84 | $14.75 | $38.59 |
| SHEET METAL WORKER, EXCLUDES METAL ROOF INSTALLATION | $29.10 | $14.68 | $43.78 |
| TRUCK DRIVER: LOWBOY TRUCK | $12.10 | $0.00 | $12.10 |
| TRUCK DRIVER, INCLUDES DUMP TRUCK | $10.22 | $0.00 | $10.22 |
| ROOFER: METAL ROOF | $16.99 | $0.00 | $16.99 |
| ROOFER, INCLUDES BUILT UP, MODIFIED BITUMEN, AND SHAKE & SHINGLE ROOFS (EXCLUDES METAL ROOFS) | $14.50 | $0.00 | $14.50 |
| PLUMBER | $25.00 | $1.17 | $26.17 |
| OPERATOR: TRACTOR | $10.20 | $0.00 | $10.20 |
| OPERATOR: TRACKHOE | $15.68 | $0.00 | $15.68 |
| OPERATOR: SCREED | $10.93 | $0.00 | $10.93 |
| OPERATOR: ROLLER | $10.58 | $0.00 | $10.58 |
| OPERATOR: LOADER | $16.48 | $0.00 | $16.48 |
| OPERATOR: GRADER/BLADE | $15.50 | $0.00 | $15.50 |
| OPERATOR: FORKLIFT | $17.50 | $0.00 | $17.50 |
| OPERATOR: EXCAVATOR | $13.50 | $0.00 | $13.50 |
| OPERATOR: DISTRIBUTOR | $11.41 | $0.00 | $11.41 |
| OPERATOR: BULLDOZER | $13.67 | $0.00 | $13.67 |
| OPERATOR: BACKHOE LOADER COMBO | $17.04 | $0.00 | $17.04 |
| OPERATOR: ASPHALT PAVER | $11.63 | $0.00 | $11.63 |
| LABORER: LANDSCAPE AND IRRIGATION | $9.15 | $0.00 | $9.15 |
| LABORER: ROOF TEAROFF | $9.00 | $0.00 | $9.00 |
| LABORER: PIPELAYER | $11.79 | $0.00 | $11.79 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $10.46 | $0.00 | $10.46 |
| LABORER: MASON TENDER - BRICK | $11.51 | $0.00 | $11.51 |
| LABORER: COMMON OR GENERAL | $9.65 | $0.00 | $9.65 |
| CEMENT MASON/CONCRETE FINISHER | $16.19 | $0.00 | $16.19 |
| CARPENTER | $14.89 | $0.00 | $14.89 |
| BRICKLAYER | $20.00 | $0.00 | $20.00 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.