Residential construction wages: Orange, Florida
Wage determination FL20260077 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/FL20260077 on · latest revision 1 · verify at sam.gov/wage-determination/FL20260077/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: OILER | $23.05 | $13.60 | $36.65 |
| POWER EQUIPMENT OPERATOR: (GANTRY CRANE, BRIDGE CRANE) | $35.41 | $13.60 | $49.01 |
| POWER EQUIPMENT OPERATOR: (CRAWLER CRANE, HYDRO CRANE, LOCOMOTIVE CRANE, TOWER CRANE, TRUCK CRANE) | $35.41 | $13.60 | $49.01 |
| IRONWORKER, STRUCTURAL | $31.50 | $16.45 | $47.95 |
| TRUCK DRIVER: LOWBOY TRUCK | $12.10 | $0.00 | $12.10 |
| TRUCK DRIVER: 4 AXLE TRUCK | $11.78 | $0.00 | $11.78 |
| TRUCK DRIVER, INCLUDES DUMP TRUCK | $10.22 | $0.00 | $10.22 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION (EXCLUDES METAL ROOF INSTALLATION) | $9.95 | $0.00 | $9.95 |
| ROOFER: METAL ROOF | $16.99 | $0.00 | $16.99 |
| ROOFER, INCLUDES BUILT UP, MODIFIED BITUMEN, AND SHAKE & SHINGLE ROOFS (EXCLUDES METAL ROOFS) | $13.33 | $0.00 | $13.33 |
| PLUMBER | $15.04 | $0.00 | $15.04 |
| PLASTERER | $13.59 | $0.00 | $13.59 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $13.61 | $0.00 | $13.61 |
| OPERATOR: TRACTOR | $10.20 | $0.00 | $10.20 |
| OPERATOR: TRACKHOE | $15.68 | $0.00 | $15.68 |
| OPERATOR: SCREED | $11.08 | $0.00 | $11.08 |
| OPERATOR: ROLLER | $11.02 | $0.00 | $11.02 |
| OPERATOR: LOADER | $11.10 | $0.00 | $11.10 |
| OPERATOR: GRADER/BLADE | $15.50 | $0.00 | $15.50 |
| OPERATOR: FORKLIFT | $17.38 | $0.00 | $17.38 |
| OPERATOR: DISTRIBUTOR | $11.57 | $0.00 | $11.57 |
| OPERATOR: BULLDOZER | $12.14 | $0.00 | $12.14 |
| OPERATOR: BACKHOE/EXCAVATOR | $12.56 | $0.00 | $12.56 |
| OPERATOR: BACKHOE LOADER COMBO | $17.04 | $0.00 | $17.04 |
| OPERATOR: ASPHALT PAVER | $12.07 | $0.00 | $12.07 |
| LABORER: LANDSCAPE AND IRRIGATION | $9.15 | $0.00 | $9.15 |
| LABORER: ROOF TEAROFF | $9.00 | $0.00 | $9.00 |
| LABORER: PIPELAYER | $11.79 | $0.00 | $11.79 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $10.46 | $0.00 | $10.46 |
| LABORER: MASON TENDER - BRICK | $11.51 | $0.00 | $11.51 |
| LABORER: COMMON OR GENERAL | $9.50 | $0.00 | $9.50 |
| IRONWORKER, REINFORCING | $16.88 | $0.00 | $16.88 |
| IRONWORKER, ORNAMENTAL | $12.60 | $0.00 | $12.60 |
| INSULATOR: BATT AND BLOWN | $12.01 | $0.00 | $12.01 |
| FORM WORKER | $14.00 | $0.54 | $14.54 |
| FENCE ERECTOR | $13.50 | $1.06 | $14.56 |
| ELECTRICIAN | $11.98 | $0.00 | $11.98 |
| CEMENT MASON/CONCRETE FINISHER | $12.19 | $0.00 | $12.19 |
| CARPENTER, EXCLUDES FORM WORK | $11.85 | $3.29 | $15.14 |
| BRICKLAYER | $20.00 | $0.00 | $20.00 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.