Building construction wages: Flagler, Volusia, Florida
Wage determination FL20260232 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/FL20260232 on · latest revision 1 · verify at sam.gov/wage-determination/FL20260232/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $30.12 | $13.11 | $43.23 |
| ELECTRICIAN | $31.02 | $14.43 | $45.45 |
| ELEVATOR MECHANIC | $53.73 | $38.44 | $92.17 |
| OPERATOR: OILER | $23.50 | $9.20 | $32.70 |
| OPERATOR: MECHANIC | $32.05 | $9.20 | $41.25 |
| OPERATOR: FORKLIFT | $23.25 | $9.20 | $32.45 |
| OPERATOR: CRANE (TOWER CRANE; CRAWLER CRANE; TRUCK CRANE; HYDRO CRANE) | $36.00 | $15.10 | $51.10 |
| OPERATOR: CRANE (GANTRY CRANE; BRIDGE CRANE) | $36.00 | $15.10 | $51.10 |
| IRONWORKER: ORNAMENTAL | $28.90 | $15.66 | $44.56 |
| PLUMBER | $41.60 | $22.68 | $64.28 |
| HVAC MECHANIC: INCLUDES PIPE AND UNIT INSTALLATION | $33.90 | $15.15 | $49.05 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $35.03 | $24.00 | $59.03 |
| SHEET METAL WORKER (INCLUDES HVAC DUCT INSTALLATION) | $25.75 | $16.92 | $42.67 |
| TRUCK DRIVER: LOWBOY TRUCK | $14.24 | $0.00 | $14.24 |
| TRUCK DRIVER: DUMP TRUCK | $12.95 | $2.28 | $15.23 |
| TILE SETTER | $17.25 | $1.74 | $18.99 |
| ROOFER | $16.59 | $0.00 | $16.59 |
| PIPEFITTER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION | $23.16 | $10.34 | $33.50 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $13.54 | $0.00 | $13.54 |
| OPERATOR: ROLLER | $14.43 | $4.78 | $19.21 |
| OPERATOR: LOADER | $16.30 | $0.00 | $16.30 |
| OPERATOR: GRADER/BLADE | $18.97 | $0.00 | $18.97 |
| OPERATOR: BULLDOZER | $15.40 | $1.90 | $17.30 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $17.80 | $2.81 | $20.61 |
| LABORER: PIPELAYER | $15.00 | $0.54 | $15.54 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $12.00 | $0.00 | $12.00 |
| LABORER: COMMON OR GENERAL | $11.61 | $0.00 | $11.61 |
| IRONWORKER, STRUCTURAL | $21.87 | $0.00 | $21.87 |
| IRONWORKER, REINFORCING | $22.81 | $11.58 | $34.39 |
| CEMENT MASON/CONCRETE FINISHER | $19.00 | $0.00 | $19.00 |
| CARPENTER | $17.92 | $0.00 | $17.92 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.