Building FL20260232 rev 1
| Classification | Rate | Fringe |
|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $30.12 | $13.11 |
| ELECTRICIAN | $31.02 | $14.43 |
| ELEVATOR MECHANIC | $53.73 | $38.44 |
| OPERATOR: OILER | $23.50 | $9.20 |
| OPERATOR: MECHANIC | $32.05 | $9.20 |
| OPERATOR: FORKLIFT | $23.25 | $9.20 |
| OPERATOR: CRANE (TOWER CRANE; CRAWLER CRANE; TRUCK CRANE; HYDRO CRANE) | $36.00 | $15.10 |
| OPERATOR: CRANE (GANTRY CRANE; BRIDGE CRANE) | $36.00 | $15.10 |
| IRONWORKER: ORNAMENTAL | $28.90 | $15.66 |
| PLUMBER | $41.60 | $22.68 |
| HVAC MECHANIC: INCLUDES PIPE AND UNIT INSTALLATION | $33.90 | $15.15 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $35.03 | $24.00 |
| SHEET METAL WORKER (INCLUDES HVAC DUCT INSTALLATION) | $25.75 | $16.92 |
| TRUCK DRIVER: LOWBOY TRUCK | $14.24 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $12.95 | $2.28 |
| TILE SETTER | $17.25 | $1.74 |
| ROOFER | $16.59 | $0.00 |
| PIPEFITTER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION | $23.16 | $10.34 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $13.54 | $0.00 |
| OPERATOR: ROLLER | $14.43 | $4.78 |
| OPERATOR: LOADER | $16.30 | $0.00 |
| OPERATOR: GRADER/BLADE | $18.97 | $0.00 |
| OPERATOR: BULLDOZER | $15.40 | $1.90 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $17.80 | $2.81 |
| LABORER: PIPELAYER | $15.00 | $0.54 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $12.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $11.61 | $0.00 |
| IRONWORKER, STRUCTURAL | $21.87 | $0.00 |
| IRONWORKER, REINFORCING | $22.81 | $11.58 |
| CEMENT MASON/CONCRETE FINISHER | $19.00 | $0.00 |
| CARPENTER | $17.92 | $0.00 |
Heavy FL20260137 rev 1
| Classification | Rate | Fringe |
|---|---|---|
| OPERATOR: OILER | $24.50 | $15.10 |
| IRONWORKER, STRUCTURAL | $31.50 | $16.45 |
| LABORER: GRADE CHECKER | $22.61 | $11.59 |
| PAINTER - BRUSH, ROLLER & SPRAY | $25.86 | $14.73 |
| TRUCK DRIVER: OFF THE ROAD TRUCK | $12.21 | $1.97 |
| TRUCK DRIVER: LOWBOY TRUCK | $11.00 | $0.00 |
| TRUCK DRIVER, INCLUDES DUMP TRUCK | $11.07 | $0.00 |
| OPERATOR: TRACTOR | $10.00 | $0.00 |
| OPERATOR: TRACKHOE | $20.92 | $5.50 |
| OPERATOR: SCRAPER | $11.00 | $1.74 |
| OPERATOR: ROLLER | $10.50 | $0.00 |
| OPERATOR: MECHANIC | $13.83 | $2.19 |
| OPERATOR: LOADER | $13.38 | $0.00 |
| OPERATOR: GRADER/BLADE | $16.00 | $2.84 |
| OPERATOR: CRANE | $14.88 | $3.17 |
| OPERATOR: BULLDOZER | $12.88 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR | $13.12 | $2.58 |
| OPERATOR: BACKHOE LOADER COMBO | $16.10 | $2.44 |
| OPERATOR: ASPHALT PAVER | $11.88 | $0.00 |
| LABORER: POWER TOOL OPERATOR (HAND HELD DRILLS/SAWS, JACKHAMMER AND POWER SAWS ONLY) | $10.63 | $2.20 |
| LABORER: PIPELAYER | $11.17 | $1.27 |
| LABORER: LANDSCAPE | $8.44 | $0.00 |
| LABORER: COMMON OR GENERAL | $9.03 | $0.81 |
| FORM WORKER | $11.36 | $0.00 |
| ELECTRICIAN | $16.71 | $3.51 |
| CEMENT MASON/CONCRETE FINISHER | $12.63 | $0.00 |
| CARPENTER, EXCLUDES FORM WORK | $13.56 | $1.84 |
Highway FL20260274 rev 1
| Classification | Rate | Fringe |
|---|---|---|
| TRUCK DRIVER: DISTRIBUTOR TRUCK | $21.50 | $0.00 |
| TRUCK DRIVER: WATER TRUCK | $18.27 | $0.00 |
| TRUCK DRIVER: OFF THE ROAD TRUCK | $16.55 | $0.00 |
| TRUCK DRIVER: LOWBOY TRUCK | $20.76 | $0.00 |
| TRUCK DRIVER: FLATBED TRUCK | $19.46 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $16.68 | $0.00 |
| TRAFFIC CONTROL PERSON | $15.92 | $0.00 |
| PAINTER | $21.02 | $0.00 |
| OPERATOR: TRACTOR | $16.00 | $0.68 |
| OPERATOR: SCREED | $18.53 | $0.00 |
| OPERATOR: SCRAPER | $15.54 | $0.00 |
| OPERATOR: ROLLER | $17.45 | $0.00 |
| OPERATOR: PILEDRIVER | $25.18 | $0.00 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $20.27 | $1.13 |
| OPERATOR: MILLING MACHINE | $20.86 | $1.95 |
| OPERATOR: MECHANIC | $29.69 | $0.00 |
| OPERATOR: LOADER | $19.05 | $1.99 |
| OPERATOR: GRADER/BLADE | $19.25 | $0.00 |
| OPERATOR: CRANE | $31.54 | $0.00 |
| OPERATOR: BULLDOZER | $21.25 | $1.57 |
| OPERATOR: BROOM/SWEEPER | $17.12 | $0.00 |
| OPERATOR: BOOM | $33.61 | $11.50 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $21.30 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $22.59 | $0.00 |
| LABORER: GRADE CHECKER | $17.21 | $0.00 |
| LABORER: PIPELAYER | $20.82 | $3.19 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $21.43 | $3.75 |
| LABORER: COMMON OR GENERAL | $15.88 | $0.85 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $16.18 | $0.00 |
| IRONWORKER | $24.16 | $0.00 |
| ELECTRICIAN | $24.08 | $3.40 |
| CEMENT MASON/CONCRETE FINISHER | $20.23 | $1.36 |
| CARPENTER | $22.58 | $0.00 |
Residential FL20260088 rev 1
| Classification | Rate | Fringe |
|---|---|---|
| POWER EQUIPMENT OPERATOR: OILER | $23.05 | $13.60 |
| POWER EQUIPMENT OPERATOR: (GANTRY CRANE, BRIDGE CRANE) | $35.41 | $13.60 |
| POWER EQUIPMENT OPERATOR: (CRAWLER CRANE, HYDRO CRANE, LOCOMOTIVE CRANE, TOWER CRANE, TRUCK CRANE) | $35.41 | $13.60 |
| IRONWORKER, STRUCTURAL | $31.50 | $16.45 |
| TRUCK DRIVER: LOWBOY TRUCK | $12.10 | $0.00 |
| TRUCK DRIVER, INCLUDES DUMP TRUCK | $10.22 | $0.00 |
| SHEET METAL WORKER, EXCLUDES METAL ROOF INSTALLATION | $9.81 | $0.00 |
| ROOFER: METAL ROOF | $16.99 | $0.00 |
| ROOFER, INCLUDES BUILT UP, MODIFIED BITUMEN, AND SHAKE & SHINGLE ROOFS (EXCLUDES METAL ROOFS) | $13.33 | $0.00 |
| PLUMBER | $11.37 | $0.00 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $13.61 | $0.00 |
| OPERATOR: TRACTOR | $10.20 | $0.00 |
| OPERATOR: TRACKHOE | $15.68 | $0.00 |
| OPERATOR: SCREED | $11.08 | $0.00 |
| OPERATOR: ROLLER | $11.02 | $0.00 |
| OPERATOR: LOADER | $11.70 | $0.00 |
| OPERATOR: GRADER/BLADE | $15.50 | $0.00 |
| OPERATOR: FORKLIFT | $17.38 | $0.00 |
| OPERATOR: DISTRIBUTOR | $11.57 | $0.00 |
| OPERATOR: BULLDOZER | $12.14 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR | $12.56 | $0.00 |
| OPERATOR: BACKHOE LOADER COMBO | $17.04 | $0.00 |
| OPERATOR: ASPHALT PAVER | $12.07 | $0.00 |
| LABORER: LANDSCAPE AND IRRIGATION | $9.15 | $0.00 |
| LABORER: ROOF TEAROFF | $9.00 | $0.00 |
| LABORER: PIPELAYER | $11.79 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $10.46 | $0.00 |
| LABORER: MASON TENDER - BRICK | $11.51 | $0.00 |
| LABORER: COMMON OR GENERAL | $10.00 | $0.19 |
| IRONWORKER, REINFORCING | $16.88 | $0.00 |
| IRONWORKER, ORNAMENTAL | $12.60 | $0.00 |
| ELECTRICIAN | $12.66 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $12.56 | $0.00 |
| CARPENTER | $12.97 | $0.00 |
| BRICKLAYER | $20.00 | $0.00 |