Building construction wages: Brevard, Florida
Wage determination FL20260196 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/FL20260196 on · latest revision 1 · verify at sam.gov/wage-determination/FL20260196/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $30.12 | $13.11 | $43.23 |
| ELEVATOR MECHANIC | $53.73 | $38.44 | $92.17 |
| OPERATOR: OILER | $23.50 | $9.20 | $32.70 |
| OPERATOR: MECHANIC | $32.05 | $9.20 | $41.25 |
| OPERATOR: FORKLIFT | $23.25 | $9.20 | $32.45 |
| OPERATOR: CRANE (TOWER CRANE; CRAWLER CRANE; TRUCK CRANE; HYDRO CRANE) | $36.00 | $15.10 | $51.10 |
| OPERATOR: CRANE (GANTRY CRANE; BRIDGE CRANE) | $36.00 | $15.10 | $51.10 |
| IRONWORKER: ORNAMENTAL | $28.90 | $15.66 | $44.56 |
| PIPEFITTER (INCLUDES HVAC PIPE AND UNIT INSTALLATION) | $41.60 | $22.68 | $64.28 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $35.03 | $24.00 | $59.03 |
| TRUCK DRIVER: LOWBOY TRUCK | $14.24 | $0.00 | $14.24 |
| TRUCK DRIVER: DUMP TRUCK | $12.95 | $2.28 | $15.23 |
| TILE SETTER | $17.25 | $1.74 | $18.99 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION | $23.50 | $0.57 | $24.07 |
| ROOFER | $17.60 | $1.39 | $18.99 |
| PLUMBER | $23.88 | $5.69 | $29.57 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $13.22 | $0.00 | $13.22 |
| OPERATOR: ROLLER | $14.43 | $4.78 | $19.21 |
| OPERATOR: LOADER | $17.83 | $0.00 | $17.83 |
| OPERATOR: GRADER/BLADE | $18.97 | $0.00 | $18.97 |
| OPERATOR: BULLDOZER | $15.40 | $1.90 | $17.30 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $19.00 | $3.43 | $22.43 |
| LABORER: PIPELAYER | $15.00 | $0.54 | $15.54 |
| LABORER: COMMON OR GENERAL, INCLUDING CEMENT MASON TENDING | $12.07 | $1.81 | $13.88 |
| IRONWORKER, STRUCTURAL | $19.80 | $0.00 | $19.80 |
| IRONWORKER, REINFORCING | $22.81 | $11.58 | $34.39 |
| ELECTRICIAN, INCLUDES LOW VOLTAGE WIRING | $17.38 | $4.46 | $21.84 |
| CEMENT MASON/CONCRETE FINISHER | $19.27 | $0.00 | $19.27 |
| CARPENTER, INCLUDES FORM WORK | $19.33 | $2.73 | $22.06 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.