Residential construction wages: Flagler, Florida
Wage determination FL20260035 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/FL20260035 on · latest revision 1 · verify at sam.gov/wage-determination/FL20260035/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| GLAZIER | $28.78 | $14.33 | $43.11 |
| TRUCK DRIVER, INCLUDES DUMP AND LOWBOY | $10.17 | $0.00 | $10.17 |
| ROOFER, INCLUDES BUILT UP, AND SHAKE & SHINGLE ROOFS | $11.64 | $0.00 | $11.64 |
| PLUMBER | $13.00 | $0.00 | $13.00 |
| PAINTER: INCLUDES BRUSH, ROLLER AND SPRAY (EXCLUDES DRYWALL FINISHING/TAPING) | $10.53 | $0.00 | $10.53 |
| OPERATOR: LOADER | $12.00 | $0.00 | $12.00 |
| OPERATOR: BACKHOE | $13.92 | $0.00 | $13.92 |
| LABORER: PIPELAYER | $9.46 | $0.00 | $9.46 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $9.00 | $0.00 | $9.00 |
| LABORER: COMMON OR GENERAL | $7.25 | $0.00 | $7.25 |
| INSULATOR: BATT AND BLOWN | $14.70 | $0.00 | $14.70 |
| HVAC MECHANIC (INSTALLATION OF HVAC DUCT) | $10.30 | $0.00 | $10.30 |
| ELECTRICIAN | $10.89 | $0.00 | $10.89 |
| DRYWALL HANGER | $12.35 | $0.00 | $12.35 |
| DRYWALL FINISHER/TAPER | $10.00 | $0.00 | $10.00 |
| CEMENT MASON/CONCRETE FINISHER | $10.25 | $0.00 | $10.25 |
| CARPENTER, EXCLUDES DRYWALL HANGING | $13.93 | $0.00 | $13.93 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.