Building construction wages: Sumter, Florida
Wage determination FL20260229 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/FL20260229 on · latest revision 1 · verify at sam.gov/wage-determination/FL20260229/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $30.12 | $13.11 | $43.23 |
| ELECTRICIAN (INCLUDES LOW VOLTAGE WIRING) | $33.11 | $14.59 | $47.70 |
| ELEVATOR MECHANIC | $51.83 | $38.44 | $90.27 |
| POWER EQUIPMENT OPERATOR: GROUP 4 FORKLIFT JOURNEYMAN OILER SHALL BE PAID: 90% OF GROUP 3'S RATE | $35.01 | $16.85 | $51.86 |
| POWER EQUIPMENT OPERATOR: GROUP 3 CRANES NOT DESCRIBED ABOVE; MECHANICS JOURNEYMAN OILER SHALL BE PAID: 90% OF GROUP 3'S RATE | $37.01 | $16.85 | $53.86 |
| POWER EQUIPMENT OPERATOR: GROUP 2 LATTICE UNDER 150 TON, 100 TON UP TO 250 TON HYDRO CRANES | $38.01 | $16.85 | $54.86 |
| POWER EQUIPMENT OPERATOR: GROUP 1 150 TON LATTICE, 250 TON HYDRO, FRICTION, TOWER AND LUFFING CRANES, 300+ FT BOOM JOURNEYMAN OILER SHALL BE PAID: 90% OF GROUP 3'S RATE | $39.01 | $16.85 | $55.86 |
| IRONWORKER: ORNAMENTAL | $28.90 | $15.66 | $44.56 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $35.03 | $24.00 | $59.03 |
| TRUCK DRIVER: LOWBOY TRUCK | $14.24 | $0.00 | $14.24 |
| TRUCK DRIVER: DUMP TRUCK | $12.95 | $2.28 | $15.23 |
| TILE SETTER | $17.25 | $1.74 | $18.99 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION | $16.50 | $3.52 | $20.02 |
| ROOFER | $16.79 | $0.00 | $16.79 |
| PLUMBER | $19.65 | $5.14 | $24.79 |
| PIPEFITTER | $22.89 | $9.93 | $32.82 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $13.54 | $0.00 | $13.54 |
| OPERATOR: ROLLER | $14.43 | $4.78 | $19.21 |
| OPERATOR: LOADER | $16.30 | $0.00 | $16.30 |
| OPERATOR: GRADER/BLADE | $18.97 | $0.00 | $18.97 |
| OPERATOR: BULLDOZER | $15.40 | $1.90 | $17.30 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $17.80 | $2.81 | $20.61 |
| LABORER: PIPELAYER | $15.00 | $0.54 | $15.54 |
| LABORER: COMMON OR GENERAL, INCLUDING CEMENT MASON TENDING | $11.80 | $1.47 | $13.27 |
| IRONWORKER, STRUCTURAL | $21.87 | $0.00 | $21.87 |
| IRONWORKER, REINFORCING | $22.81 | $11.58 | $34.39 |
| CEMENT MASON/CONCRETE FINISHER | $14.82 | $0.00 | $14.82 |
| CARPENTER | $14.97 | $0.00 | $14.97 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.