Wage determination FL20260103

Florida · Heavy · Active · Standard

Alachua

Get an email when this determination changes.
Substantive rate changes only; no spam. Bidding a specific job? Pin a project instead to lock the revision that applied on your bid date.

Revision history

RevisionPublishedCompare
rev 12026-05-18diff vs rev 0
rev 02026-05-17original

Current rates (rev 1) · download CSV

ClassificationRateFringe
ELECTRICIAN$33.50$13.85
POWER EQUIPMENT OPERATOR: GROUP 3 DRILL RIG, HORIZONTAL DIRECTIONAL DRILL OPERATOR, HORIZONTAL DIRECTION DRILL LOCATOR. JOURNEYMAN OILER SHALL BE PAID: 90% OF GROUP 3'S RATE$37.01$16.85
IRONWORKER, STRUCTURAL$29.50$12.98
LABORER: GRADE CHECKER$22.61$11.59
PAINTER: BRUSH AND SPRAY$20.21$12.38
TRUCK DRIVER: OFF THE ROAD TRUCK$12.21$1.97
TRUCK DRIVER: LOWBOY TRUCK$13.06$2.18
TRUCK DRIVER, INCLUDES DUMP TRUCK$14.63$0.00
PAINTER: ROLLER$11.94$0.00
OPERATOR: TRACTOR$10.54$0.00
OPERATOR: TRACKHOE$20.92$5.50
OPERATOR: SCRAPER$11.00$1.74
OPERATOR: ROLLER$10.03$0.00
OPERATOR: MECHANIC$14.32$0.00
OPERATOR: LOADER$11.31$2.02
OPERATOR: GRADER/BLADE$16.00$2.84
OPERATOR: CRANE$21.30$0.00
OPERATOR: BULLDOZER$13.40$1.19
OPERATOR: BACKHOE/EXCAVATOR$14.10$1.34
OPERATOR: BACKHOE LOADER COMBO$16.10$2.44
OPERATOR: ASPHALT PAVER$11.59$0.00
LABORER: POWER TOOL OPERATOR (HAND HELD DRILLS/SAWS, JACKHAMMER AND POWER SAWS ONLY)$10.63$2.20
LABORER: PIPELAYER$11.51$1.16
LABORER: LANDSCAPE$7.25$0.00
LABORER: COMMON OR GENERAL$9.85$1.53
CEMENT MASON/CONCRETE FINISHER$13.23$2.15
CARPENTER$15.80$0.00