Building construction wages: Gadsden, Florida
Wage determination FL20260204 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/FL20260204 on · latest revision 1 · verify at sam.gov/wage-determination/FL20260204/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ELEVATOR MECHANIC | $51.11 | $38.44 | $89.55 |
| OPERATOR: OILER | $23.50 | $9.20 | $32.70 |
| OPERATOR: MECHANIC | $32.05 | $9.20 | $41.25 |
| OPERATOR: FORKLIFT | $23.25 | $9.20 | $32.45 |
| OPERATOR: CRANE (ALL CRANES OVER 15 TON CAPACITY) | $32.05 | $9.20 | $41.25 |
| OPERATOR: CRANE (ALL CRANES 160 TON CAPACITY AND OVER) | $33.05 | $9.20 | $42.25 |
| IRONWORKER: ORNAMENTAL | $28.90 | $15.66 | $44.56 |
| PIPEFITTER (INCLUDES HVAC UNIT INSTALLATION) | $37.50 | $17.59 | $55.09 |
| TRUCK DRIVER: LOWBOY TRUCK | $14.24 | $0.00 | $14.24 |
| TRUCK DRIVER: DUMP TRUCK | $13.22 | $2.12 | $15.34 |
| TILE SETTER | $18.01 | $0.00 | $18.01 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION | $20.05 | $0.00 | $20.05 |
| ROOFER | $16.99 | $0.00 | $16.99 |
| PLUMBER | $19.40 | $0.36 | $19.76 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $14.54 | $2.01 | $16.55 |
| OPERATOR: ROLLER | $14.43 | $4.78 | $19.21 |
| OPERATOR: LOADER | $14.83 | $1.84 | $16.67 |
| OPERATOR: GRADER/BLADE | $18.97 | $0.00 | $18.97 |
| OPERATOR: BULLDOZER | $15.40 | $1.90 | $17.30 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $22.07 | $8.80 | $30.87 |
| LABORER: COMMON OR GENERAL, INCLUDING CEMENT MASON TENDING AND PIPELAYING | $13.64 | $0.00 | $13.64 |
| IRONWORKER, STRUCTURAL | $23.79 | $8.74 | $32.53 |
| IRONWORKER, REINFORCING | $22.81 | $11.58 | $34.39 |
| INSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $20.78 | $10.89 | $31.67 |
| ELECTRICIAN | $17.00 | $0.00 | $17.00 |
| CEMENT MASON/CONCRETE FINISHER | $14.61 | $0.00 | $14.61 |
| CARPENTER | $16.00 | $0.00 | $16.00 |