Clay County, Florida: Davis-Bacon prevailing wages
Rates from the current active wage determination for each construction type. Click through for revision history and change diffs.
Bidding a job in Clay County? Pin your bid date to lock the revision that legally applies under the FAR ten-day rule, and get an email if anything moves before or after opening.
Building FL20260200 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $28.00 | $12.30 | $40.30 |
| ELEVATOR MECHANIC | $51.11 | $38.44 | $89.55 |
| IRONWORKER: ORNAMENTAL | $28.90 | $15.66 | $44.56 |
| PLUMBER | $37.50 | $17.59 | $55.09 |
| PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION) | $37.50 | $17.59 | $55.09 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $35.03 | $24.00 | $59.03 |
| SHEET METAL WORKER: INCLUDES HVAC DUCT AND UNIT INSTALLATION A: HOLIDAY PAY: NEW YEAR'S DAY, MEMORIAL DAY, JULY FOURTH, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING AND CHRISTMAS DAY | $31.64 | $15.98 | $47.62 |
| TRUCK DRIVER: LOWBOY TRUCK | $14.24 | $0.00 | $14.24 |
| TRUCK DRIVER: DUMP TRUCK | $13.22 | $2.12 | $15.34 |
| TILE SETTER | $18.01 | $0.00 | $18.01 |
| ROOFER | $16.99 | $0.00 | $16.99 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $15.62 | $2.05 | $17.67 |
| LABORER: PIPELAYER | $13.73 | $1.07 | $14.80 |
| LABORER: COMMON OR GENERAL, INCLUDING CEMENT MASON TENDING | $13.51 | $0.00 | $13.51 |
| IRONWORKER, STRUCTURAL | $17.66 | $4.49 | $22.15 |
| IRONWORKER, REINFORCING | $22.81 | $11.58 | $34.39 |
| ELECTRICIAN, INCLUDES LOW VOLTAGE WIRING | $21.81 | $7.79 | $29.60 |
| CEMENT MASON/CONCRETE FINISHER | $17.38 | $0.00 | $17.38 |
| CARPENTER, INCLUDES DRYWALL HANGING, AND FORM WORK | $18.29 | $4.90 | $23.19 |
OPERATOR 10 classifications · $15.84 to $42.25 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: OILER | $23.50 | $9.20 | $32.70 |
| OPERATOR: MECHANIC | $32.05 | $9.20 | $41.25 |
| OPERATOR: FORKLIFT | $23.25 | $9.20 | $32.45 |
| OPERATOR: CRANE (ALL CRANES OVER 15 TON CAPACITY) | $32.05 | $9.20 | $41.25 |
| OPERATOR: CRANE (ALL CRANES 160 TON CAPACITY AND OVER) | $33.05 | $9.20 | $42.25 |
| OPERATOR: ROLLER | $14.43 | $4.78 | $19.21 |
| OPERATOR: LOADER | $14.83 | $1.84 | $16.67 |
| OPERATOR: GRADER/BLADE | $18.97 | $0.00 | $18.97 |
| OPERATOR: BULLDOZER | $15.40 | $1.90 | $17.30 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $14.44 | $1.40 | $15.84 |
Heavy FL20260109 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | $33.50 | $13.85 | $47.35 |
| IRONWORKER, STRUCTURAL | $29.50 | $12.98 | $42.48 |
| LABORER: GRADE CHECKER | $22.61 | $11.59 | $34.20 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $20.21 | $12.38 | $32.59 |
| TRUCK DRIVER: OFF THE ROAD TRUCK | $12.21 | $1.97 | $14.18 |
| TRUCK DRIVER: LOWBOY TRUCK | $13.06 | $2.18 | $15.24 |
| TRUCK DRIVER, INCLUDES DUMP TRUCK | $14.63 | $0.00 | $14.63 |
| LABORER: POWER TOOL OPERATOR (HAND TOOLS, DRILLS, GRINDERS AND SKID STEER) | $10.63 | $2.20 | $12.83 |
| LABORER: PIPELAYER | $12.85 | $1.21 | $14.06 |
| LABORER: LANDSCAPE | $7.25 | $0.00 | $7.25 |
| LABORER: COMMON OR GENERAL | $9.89 | $1.58 | $11.47 |
| CEMENT MASON/CONCRETE FINISHER | $13.23 | $2.15 | $15.38 |
| CARPENTER | $15.80 | $0.00 | $15.80 |
OPERATOR 12 classifications · $10.03 to $26.42 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: TRACTOR | $10.54 | $0.00 | $10.54 |
| OPERATOR: TRACKHOE | $20.92 | $5.50 | $26.42 |
| OPERATOR: SCRAPER | $11.00 | $1.74 | $12.74 |
| OPERATOR: ROLLER | $10.03 | $0.00 | $10.03 |
| OPERATOR: MECHANIC | $14.32 | $0.00 | $14.32 |
| OPERATOR: LOADER | $11.31 | $2.02 | $13.33 |
| OPERATOR: GRADER/BLADE | $16.00 | $2.84 | $18.84 |
| OPERATOR: CRANE | $22.38 | $0.00 | $22.38 |
| OPERATOR: BULLDOZER | $13.40 | $1.19 | $14.59 |
| OPERATOR: BACKHOE/EXCAVATOR | $13.91 | $1.39 | $15.30 |
| OPERATOR: BACKHOE LOADER COMBO | $16.10 | $2.44 | $18.54 |
| OPERATOR: ASPHALT PAVER | $11.59 | $0.00 | $11.59 |
Highway FL20260244 rev 2
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER | $19.33 | $0.00 | $19.33 |
| CEMENT MASON/CONCRETE FINISHER | $20.00 | $0.82 | $20.82 |
| ELECTRICIAN | $33.05 | $10.79 | $43.84 |
| IRONWORKER | $24.16 | $0.00 | $24.16 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $16.33 | $0.00 | $16.33 |
| LABORER: COMMON OR GENERAL | $15.39 | $0.00 | $15.39 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $20.24 | $2.01 | $22.25 |
| LABORER: PIPELAYER | $17.00 | $0.70 | $17.70 |
| LABORER: GRADE CHECKER | $17.21 | $0.00 | $17.21 |
| PAINTER | $21.02 | $0.00 | $21.02 |
| TRAFFIC CONTROL: FLAGGER | $14.82 | $0.00 | $14.82 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $15.03 | $0.00 | $15.03 |
| TRAFFIC SIGNAL INSTALLATION/HIGHWAY LIGHTING | $26.50 | $0.00 | $26.50 |
OPERATOR 16 classifications · $15.13 to $45.11 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $19.16 | $0.00 | $19.16 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $15.85 | $0.00 | $15.85 |
| OPERATOR: BOOM | $33.61 | $11.50 | $45.11 |
| OPERATOR: BROOM/SWEEPER | $15.13 | $0.00 | $15.13 |
| OPERATOR: BULLDOZER | $19.03 | $0.00 | $19.03 |
| OPERATOR: CRANE | $29.95 | $0.00 | $29.95 |
| OPERATOR: GRADER/BLADE | $19.34 | $0.00 | $19.34 |
| OPERATOR: LOADER | $16.87 | $0.00 | $16.87 |
| OPERATOR: MECHANIC | $31.30 | $0.00 | $31.30 |
| OPERATOR: MILLING MACHINE | $19.68 | $0.00 | $19.68 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $17.77 | $0.00 | $17.77 |
| OPERATOR: PILEDRIVER | $22.98 | $0.00 | $22.98 |
| OPERATOR: ROLLER | $15.21 | $0.00 | $15.21 |
| OPERATOR: SCRAPER | $15.54 | $0.00 | $15.54 |
| OPERATOR: SCREED | $18.35 | $0.00 | $18.35 |
| OPERATOR: TRACTOR | $16.91 | $0.66 | $17.57 |
TRUCK DRIVER 6 classifications · $16.91 to $22.16 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: DUMP TRUCK | $18.00 | $0.74 | $18.74 |
| TRUCK DRIVER: FLATBED TRUCK | $19.46 | $0.00 | $19.46 |
| TRUCK DRIVER: LOWBOY TRUCK | $22.16 | $0.00 | $22.16 |
| TRUCK DRIVER: OFF THE ROAD TRUCK | $16.91 | $0.00 | $16.91 |
| TRUCK DRIVER: WATER TRUCK | $18.27 | $0.00 | $18.27 |
| TRUCK DRIVER: DISTRIBUTOR TRUCK | $19.18 | $0.00 | $19.18 |
Residential FL20260058 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: OILER | $23.05 | $13.60 | $36.65 |
| POWER EQUIPMENT OPERATOR: (GANTRY CRANE, BRIDGE CRANE) | $35.41 | $13.60 | $49.01 |
| POWER EQUIPMENT OPERATOR: (CRAWLER CRANE, HYDRO CRANE, LOCOMOTIVE CRANE, TOWER CRANE, TRUCK CRANE) | $35.41 | $13.60 | $49.01 |
| PLUMBER, INCLUDING HVAC PIPE INSTALLATION | $37.50 | $17.59 | $55.09 |
| SHEET METAL WORKER (EXCLUDES HVAC DUCT AND METAL ROOF INSTALLATION) | $31.64 | $15.98 | $47.62 |
| TRUCK DRIVER: LOWBOY TRUCK | $12.14 | $0.00 | $12.14 |
| TRUCK DRIVER, INCLUDES DUMP TRUCK | $10.62 | $0.00 | $10.62 |
| TILE SETTER | $12.46 | $0.00 | $12.46 |
| ROOFER: METAL ROOF | $16.99 | $0.00 | $16.99 |
| ROOFER, INCLUDES BUILT UP, MODIFIED BITUMEN, AND SHAKE & SHINGLE ROOFS (EXCLUDES METAL ROOFS) | $9.68 | $0.00 | $9.68 |
| PLASTERER | $15.10 | $0.00 | $15.10 |
| PAINTER: INCLUDES BRUSH, ROLLER AND SPRAY (EXCLUDES DRYWALL FINISHING/TAPING) | $10.68 | $0.00 | $10.68 |
| LATHER | $14.20 | $0.00 | $14.20 |
| IRONWORKER, ORNAMENTAL, REINFORCING AND STRUCTURAL | $9.00 | $0.00 | $9.00 |
| HVAC MECHANIC (INSTALLATION OF HVAC DUCT) | $13.99 | $0.00 | $13.99 |
| FORM WORKER | $12.00 | $0.46 | $12.46 |
| FLOOR LAYER: CARPET | $10.00 | $0.00 | $10.00 |
| ELECTRICIAN | $11.79 | $0.00 | $11.79 |
| DRYWALL HANGER | $12.35 | $0.00 | $12.35 |
| DRYWALL FINISHER/TAPER | $16.13 | $0.00 | $16.13 |
| CEMENT MASON/CONCRETE FINISHER | $12.97 | $0.00 | $12.97 |
| CARPENTER, EXCLUDES DRYWALL HANGING, AND FORM WORK | $14.14 | $0.00 | $14.14 |
| BRICKLAYER | $20.00 | $0.00 | $20.00 |
OPERATOR 12 classifications · $10.20 to $17.50 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: TRACTOR | $10.20 | $0.00 | $10.20 |
| OPERATOR: TRACKHOE | $15.68 | $0.00 | $15.68 |
| OPERATOR: SCREED | $10.93 | $0.00 | $10.93 |
| OPERATOR: ROLLER | $10.59 | $0.00 | $10.59 |
| OPERATOR: LOADER | $12.75 | $0.00 | $12.75 |
| OPERATOR: GRADER/BLADE | $15.50 | $0.00 | $15.50 |
| OPERATOR: FORKLIFT | $17.50 | $0.00 | $17.50 |
| OPERATOR: DISTRIBUTOR | $11.41 | $0.00 | $11.41 |
| OPERATOR: BULLDOZER | $12.40 | $0.00 | $12.40 |
| OPERATOR: BACKHOE/EXCAVATOR | $12.72 | $0.00 | $12.72 |
| OPERATOR: BACKHOE LOADER COMBO | $17.04 | $0.00 | $17.04 |
| OPERATOR: ASPHALT PAVER | $11.63 | $0.00 | $11.63 |
LABORER 7 classifications · $8.05 to $11.93 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: LANDSCAPE AND IRRIGATION | $8.05 | $0.00 | $8.05 |
| LABORER: ROOF TEAROFF | $9.00 | $0.00 | $9.00 |
| LABORER: PIPELAYER | $11.93 | $0.00 | $11.93 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $10.46 | $0.00 | $10.46 |
| LABORER: MASON TENDER - BRICK | $11.51 | $0.00 | $11.51 |
| LABORER: COMMON OR GENERAL | $9.00 | $0.00 | $9.00 |
| LABORER: ASPHALT RAKER | $10.12 | $0.00 | $10.12 |
Get an email when rates change here
One watch per determination above; every email includes a stop link. Bidding a specific job? Pin it to your bid date instead.