Residential construction wages: Holmes, Florida
Wage determination FL20260043 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/FL20260043 on · latest revision 1 · verify at sam.gov/wage-determination/FL20260043/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER, INCLUDES DUMP AND LOWBOY | $11.40 | $0.00 | $11.40 |
| ROOFER, INCLUDES BUILT UP, AND SHAKE & SHINGLE ROOFS | $11.64 | $0.00 | $11.64 |
| PLUMBER | $13.00 | $0.00 | $13.00 |
| OPERATOR: LOADER | $12.00 | $0.00 | $12.00 |
| OPERATOR: BACKHOE | $13.92 | $0.00 | $13.92 |
| LABORER: PIPELAYER | $9.46 | $0.00 | $9.46 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $9.00 | $0.00 | $9.00 |
| LABORER: COMMON OR GENERAL | $9.00 | $0.00 | $9.00 |
| ELECTRICIAN | $10.89 | $0.00 | $10.89 |
| CEMENT MASON/CONCRETE FINISHER | $10.09 | $0.00 | $10.09 |
| CARPENTER | $11.90 | $0.00 | $11.90 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.