Wage determination FL20260212

Florida · Building · Active · Standard

Manatee

Get an email when this determination changes.
Substantive rate changes only; no spam. Bidding a specific job? Pin a project instead to lock the revision that applied on your bid date.

Revision history

RevisionPublishedCompare
rev 12026-05-18diff vs rev 0
rev 02026-05-17original

Current rates (rev 1) · download CSV

ClassificationRateFringe
ASBESTOS WORKER/HEAT & FROST INSULATOR$30.12$13.11
ELECTRICIAN (INCLUDES LOW VOLTAGE WIRING)$33.11$14.59
ELEVATOR MECHANIC$51.83$38.44
POWER EQUIPMENT OPERATOR: GROUP 4 FORKLIFT JOURNEYMAN OILER SHALL BE PAID: 90% OF GROUP 3'S RATE$35.01$16.85
POWER EQUIPMENT OPERATOR: GROUP 3 CRANES NOT DESCRIBED ABOVE; MECHANICS JOURNEYMAN OILER SHALL BE PAID: 90% OF GROUP 3'S RATE$37.01$16.85
POWER EQUIPMENT OPERATOR: GROUP 2 LATTICE UNDER 150 TON, 100 TON UP TO 250 TON HYDRO CRANES$38.01$16.85
POWER EQUIPMENT OPERATOR: GROUP 1 150 TON LATTICE, 250 TON HYDRO, FRICTION, TOWER AND LUFFING CRANES, 300+ FT BOOM JOURNEYMAN OILER SHALL BE PAID: 90% OF GROUP 3'S RATE$39.01$16.85
IRONWORKER, STRUCTURAL$35.25$17.32
IRONWORKER: ORNAMENTAL$28.90$15.66
SPRINKLER FITTER (FIRE SPRINKLERS)$35.03$24.00
TRUCK DRIVER: LOWBOY TRUCK$14.24$0.00
TRUCK DRIVER: DUMP TRUCK$13.22$2.12
TILE SETTER$18.01$0.00
SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION$18.82$6.78
ROOFER$19.00$1.17
PLUMBER$21.14$8.11
PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION$21.93$7.96
PAINTER: BRUSH, ROLLER AND SPRAY$14.72$2.13
OPERATOR: ROLLER$14.43$4.78
OPERATOR: LOADER$14.00$1.40
OPERATOR: GRADER/BLADE$18.97$0.00
OPERATOR: BULLDOZER$15.40$1.90
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$22.07$8.80
LABORER: PIPELAYER$14.00$1.40
LABORER: COMMON OR GENERAL, INCLUDING CEMENT MASON TENDING$13.11$0.60
IRONWORKER, REINFORCING$26.37$12.65
CEMENT MASON/CONCRETE FINISHER$14.85$0.60
CARPENTER$19.78$8.05