Building construction wages: Suwannee, Florida
Wage determination FL20260025 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/FL20260025 on · latest revision 1 · verify at sam.gov/wage-determination/FL20260025/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | $33.50 | $13.85 | $47.35 |
| OPERATOR: CRANE (TOWER CRANE; LOCOMOTIVE CRANE; CRAWLER CRANE; TRUCK CRANE; & HYDRO CRANE) | $35.41 | $13.60 | $49.01 |
| OPERATOR: CRANE (GANTRY CRANE & BRIDGE CRANE) | $35.41 | $13.60 | $49.01 |
| IRONWORKER: STRUCTURAL AND REINFORCING | $29.50 | $12.98 | $42.48 |
| SHEET METAL WORKER: INCLUDES HVAC DUCT INSTALLATION JULY FOURTH, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING AND CHRISTMAS DAY | $31.64 | $15.98 | $47.62 |
| TRUCK DRIVER, INCLUDES DUMP AND 10 YARD HAUL AWAY | $8.00 | $0.15 | $8.15 |
| ROOFER: BUILT UP, COMPOSITION, HOT TAR AND SINGLE PLY | $12.00 | $0.00 | $12.00 |
| PLUMBER | $12.27 | $3.33 | $15.60 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $10.10 | $0.00 | $10.10 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $9.58 | $0.00 | $9.58 |
| OPERATOR: BACKHOE/EXCAVATOR | $13.19 | $0.00 | $13.19 |
| LABORER: PIPELAYER | $11.42 | $1.95 | $13.37 |
| LABORER: COMMON OR GENERAL | $9.95 | $0.00 | $9.95 |
| CEMENT MASON/CONCRETE FINISHER | $16.79 | $0.00 | $16.79 |
| CARPENTER, INCLUDES FORM WORK | $14.79 | $1.81 | $16.60 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.