Residential construction wages: Duval, Florida
Wage determination FL20260060 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/FL20260060 on · latest revision 1 · verify at sam.gov/wage-determination/FL20260060/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: OILER | $23.05 | $13.60 | $36.65 |
| POWER EQUIPMENT OPERATOR: (GANTRY CRANE, BRIDGE CRANE) | $35.41 | $13.60 | $49.01 |
| POWER EQUIPMENT OPERATOR: (CRAWLER CRANE, HYDRO CRANE, LOCOMOTIVE CRANE, TOWER CRANE, TRUCK CRANE) | $35.41 | $13.60 | $49.01 |
| PLUMBER, INCLUDING HVAC PIPE INSTALLATION | $37.50 | $17.59 | $55.09 |
| SHEET METAL WORKER (EXCLUDES HVAC DUCT AND METAL ROOF INSTALLATION) | $31.64 | $15.98 | $47.62 |
| TRUCK DRIVER: LOWBOY TRUCK | $12.12 | $0.00 | $12.12 |
| TRUCK DRIVER, INCLUDES DUMP TRUCK | $10.62 | $0.00 | $10.62 |
| TILE SETTER | $10.00 | $0.00 | $10.00 |
| ROOFER: METAL ROOF | $16.99 | $0.00 | $16.99 |
| ROOFER, INCLUDES BUILT UP, MODIFIED BITUMEN, AND SHAKE & SHINGLE ROOFS (EXCLUDES METAL ROOFS) | $9.00 | $0.00 | $9.00 |
| PLASTERER | $15.10 | $0.00 | $15.10 |
| PAINTER: INCLUDES BRUSH, ROLLER AND SPRAY (EXCLUDES DRYWALL FINISHING/TAPING) | $10.68 | $0.00 | $10.68 |
| OPERATOR: TRACTOR | $10.20 | $0.00 | $10.20 |
| OPERATOR: TRACKHOE | $15.68 | $0.00 | $15.68 |
| OPERATOR: SCREED | $10.93 | $0.00 | $10.93 |
| OPERATOR: ROLLER | $10.54 | $0.00 | $10.54 |
| OPERATOR: LOADER | $12.94 | $0.00 | $12.94 |
| OPERATOR: GRADER/BLADE | $15.50 | $0.00 | $15.50 |
| OPERATOR: FORKLIFT | $17.50 | $0.00 | $17.50 |
| OPERATOR: DISTRIBUTOR | $11.41 | $0.00 | $11.41 |
| OPERATOR: BULLDOZER | $12.40 | $0.00 | $12.40 |
| OPERATOR: BACKHOE/EXCAVATOR | $12.72 | $0.00 | $12.72 |
| OPERATOR: BACKHOE LOADER COMBO | $17.04 | $0.00 | $17.04 |
| OPERATOR: ASPHALT PAVER | $11.63 | $0.00 | $11.63 |
| LATHER | $14.20 | $0.00 | $14.20 |
| LABORER: LANDSCAPE AND IRRIGATION | $7.95 | $0.00 | $7.95 |
| LABORER: ROOF TEAROFF | $9.00 | $0.00 | $9.00 |
| LABORER: PIPELAYER | $11.93 | $0.00 | $11.93 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $10.46 | $0.00 | $10.46 |
| LABORER: MASON TENDER - BRICK | $11.51 | $0.00 | $11.51 |
| LABORER: COMMON OR GENERAL | $9.00 | $0.00 | $9.00 |
| LABORER: ASPHALT RAKER | $10.06 | $0.00 | $10.06 |
| IRONWORKER: STRUCTURAL, REINFORCING AND ORNAMENTAL | $9.00 | $0.00 | $9.00 |
| HVAC MECHANIC (INSTALLATION OF HVAC DUCT) | $13.78 | $0.00 | $13.78 |
| FORM WORKER | $12.00 | $0.46 | $12.46 |
| FLOOR LAYER: CARPET | $10.00 | $0.00 | $10.00 |
| ELECTRICIAN | $12.49 | $0.00 | $12.49 |
| DRYWALL HANGER | $13.15 | $0.00 | $13.15 |
| DRYWALL FINISHER/TAPER | $16.13 | $0.00 | $16.13 |
| CEMENT MASON/CONCRETE FINISHER | $12.30 | $0.00 | $12.30 |
| CARPENTER, EXCLUDES DRYWALL HANGING, AND FORM WORK | $14.63 | $0.00 | $14.63 |
| BRICKLAYER | $20.00 | $0.00 | $20.00 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.